261:. There are three new additions to the site. The Logistics Warehouse (5016 sqm / 54000 sqft) contains a large reception space, offices, and storage. The Support and Maintenance Facility (4800 sqm / 51670 sqft) houses equipment, offices, and flexible open spaces. The Science Collaboration Centre (8198 sqm / 88240 sqft) has studios, laboratories, and administrative spaces.
353:
The
Logistics Warehouse is the new public face to the campus. It finished construction in September 2020 at $ 30.6 million dollars. This is a two storey building that houses spaces for reception and information, offices, and storage. The front half of the building is the public space, with storage in
357:
The
Support and Maintenance Facility is also a two storey building. This is their manufacturing and servicing depot. This facility was completed in March 2021 at $ 32.8 million dollars. The interior of the warehouse has entirely exposed services and structure. The facade on this building is mostly
361:
The
Science Collaboration Centre is a six storey, multi-use building that will act as the heart of the campus. Its projected completion date is Spring 2023 with a budget of $ 62 million dollars. The building will feature three open plan studios, offices, laboratories, and data storage. The facade
423:"Chalking out the future: Building on seven decades of science at Chalk River, Canadian Nuclear Laboratories is undertaking a massive revitalisation of the research campus, capabilities and programmes, as Mark Lesinski explains"
392:
312:
in 1952, but today the site remains operated through contractors such as CNL. This is referred to as GoCo management, government owned and contractor operated. The research led to the development of the
268:
and research institute. Their ageing facilities required an overhaul to continue innovation. The campus contains over 300 buildings across a 3700 hectare plot of land along the
393:"Innovation Hub: Canadian Nuclear Laboratories (CNL) Site Entrance Building, Support and Maintenance Facility, and Science Collaboration Centre, Chalk River, Ontario"
542:
422:
552:
537:
354:
the back half. The front facade design is mostly transparent using glazing with wood slatting in front of the curtain walls.
547:
305:
467:
74:
345:. The investment plan required the decommissioning of 120 aged facilities and designing new centres.
506:
Huffman, Allison (1 July 2019). Canadian
Nuclear Laboratories: An Asset Management Journey - 19438.
443:
309:
285:
362:
design is mostly glass which will reveal the active spaces inside as well as the wood structure.
231:
Projected energy use 130.4 kWh/sqm/yr (without data centre), 373.8k Wh/sqm/yr (with data centre)
491:
Moore, M. A (2019). "Modern
Integrated Decommissioning at Chalk River Laboratories - 19401".
342:
8:
289:
293:
265:
511:
326:
341:. In 2016 a $ 1.2 billion dollar investment plan over ten years was released by the
338:
531:
334:
314:
337:
to leave behind coal fired power plants and fully rely on nuclear power and
75:
https://www.cnl.ca/about-cnl/revitalization-of-the-chalk-river-laboratories/
269:
254:
515:
322:
273:
318:
330:
258:
358:
solid, with thin glazing that frames the surrounding forest.
301:
297:
292:
and advanced nuclear research facility. CNL began developing
251:
Canadian
Nuclear Laboratories (CNL) research facilities
468:"Revitalizing the Chalk River Laboratories campus"
16:Research facility in Chalk River, Ontario, Canada
529:
508:Office of Scientific and Technical Information
257:, Canada, approximately 180km north-west of
543:Buildings and structures in Renfrew County
420:
505:
530:
390:
306:Atomic energy of Canada Limited (AECL)
490:
444:"CNL Chalk River Laboratories | HDR"
438:
436:
416:
414:
412:
410:
386:
384:
382:
380:
378:
376:
374:
321:production, storage and handling of
175:Project energy use 143.3 kWh/sqm/yr
119:Projected energy use 101 kWh/sqm/yr
22:CNL Revitalized Research Facilities
13:
14:
564:
484:
433:
407:
391:Leland, Dadson (1 October 2021).
371:
333:became the first jurisdiction in
317:. Other research included fuels,
421:Lesinski, Mark (December 2017).
310:Chalk River Nuclear Laboratories
141:Support and Maintenance Facility
553:Wooden buildings and structures
329:treatment for cancer. In 2014,
327:alpha therapies medical isotope
304:. The government owned company
499:
460:
1:
538:Research institutes in Canada
472:Canadian Nuclear Laboratories
365:
51:Canadian Nuclear Laboratories
197:Science Collaboration Centre
7:
43:Chalk River, Ontario Canada
10:
569:
279:
348:
240:
235:
227:
222:
214:
206:
201:
196:
184:
179:
171:
166:
158:
150:
145:
140:
128:
123:
115:
110:
102:
94:
89:
84:
73:
68:
60:
55:
47:
39:
31:
26:
21:
548:Sustainable architecture
286:Chalk River Laboratories
56:Design and construction
218:Estimated $ 62 million
427:Gale Academic OneFile
244:8918 sqm / 88240 sqft
210:Estimated spring 2023
188:4800 sqm / 51670 sqft
132:5016 sqm / 54000 sqft
343:Government of Canada
325:, and more recently
255:Chalk River, Ontario
290:nuclear power plant
276:was the architect.
202:General information
146:General information
90:General information
85:Logistics Warehouse
27:General information
397:Canadian Architect
339:renewable energies
294:nuclear technology
284:Historically, the
266:nuclear technology
495:– via OMNI.
248:
247:
236:Technical details
192:
191:
180:Technical details
136:
135:
124:Technical details
80:
79:
560:
520:
519:
503:
497:
496:
488:
482:
481:
479:
478:
464:
458:
457:
455:
454:
440:
431:
430:
418:
405:
404:
388:
194:
193:
138:
137:
82:
81:
19:
18:
568:
567:
563:
562:
561:
559:
558:
557:
528:
527:
525:
523:
504:
500:
489:
485:
476:
474:
466:
465:
461:
452:
450:
442:
441:
434:
419:
408:
389:
372:
368:
351:
282:
253:are located in
17:
12:
11:
5:
566:
556:
555:
550:
545:
540:
522:
521:
498:
483:
459:
448:www.hdrinc.com
432:
406:
369:
367:
364:
350:
347:
281:
278:
272:. Design firm
246:
245:
242:
238:
237:
233:
232:
229:
225:
224:
220:
219:
216:
212:
211:
208:
204:
203:
199:
198:
190:
189:
186:
182:
181:
177:
176:
173:
169:
168:
164:
163:
162:$ 32.8 million
160:
156:
155:
152:
148:
147:
143:
142:
134:
133:
130:
126:
125:
121:
120:
117:
113:
112:
108:
107:
106:$ 30.6 million
104:
100:
99:
98:September 2020
96:
92:
91:
87:
86:
78:
77:
71:
70:
66:
65:
62:
58:
57:
53:
52:
49:
45:
44:
41:
37:
36:
35:286 Plant Road
33:
29:
28:
24:
23:
15:
9:
6:
4:
3:
2:
565:
554:
551:
549:
546:
544:
541:
539:
536:
535:
533:
526:
517:
513:
509:
502:
494:
487:
473:
469:
463:
449:
445:
439:
437:
428:
424:
417:
415:
413:
411:
402:
398:
394:
387:
385:
383:
381:
379:
377:
375:
370:
363:
359:
355:
346:
344:
340:
336:
335:North America
332:
328:
324:
320:
316:
315:CANDU reactor
311:
307:
303:
299:
295:
291:
287:
277:
275:
271:
267:
262:
260:
256:
252:
243:
239:
234:
230:
228:Architectural
226:
221:
217:
213:
209:
205:
200:
195:
187:
183:
178:
174:
172:Architectural
170:
165:
161:
157:
153:
149:
144:
139:
131:
127:
122:
118:
116:Architectural
114:
109:
105:
101:
97:
93:
88:
83:
76:
72:
67:
63:
59:
54:
50:
46:
42:
38:
34:
30:
25:
20:
524:
507:
501:
492:
486:
475:. Retrieved
471:
462:
451:. Retrieved
447:
426:
400:
396:
360:
356:
352:
296:in the late
283:
270:Ottawa River
263:
250:
249:
61:Architect(s)
40:Town or city
493:WM Symposia
403:(7): 26–27.
532:Categories
510:(Report).
477:2022-02-13
453:2022-02-13
366:References
308:took over
300:and early
241:Floor area
185:Floor area
154:March 2021
129:Floor area
323:radiation
264:CNL is a
207:Completed
151:Completed
95:Completed
516:23005335
319:hydrogen
331:Ontario
280:History
69:Website
32:Address
514:
349:Design
302:1950's
298:1940's
288:was a
259:Ottawa
223:Height
167:Height
111:Height
48:Client
429:: 30.
512:OSTI
215:Cost
159:Cost
103:Cost
274:HDR
64:HDR
534::
470:.
446:.
435:^
425:.
409:^
401:66
399:.
395:.
373:^
518:.
480:.
456:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.