31: 986: 972: 893:
of the pipeline only accounts for 1.8% of the estimate, with 87.22% of estimated emissions coming from eventual product use of the oil and not from the pipeline itself. The estimated total over the 25 year period exceeds France’s national emissions in 2020 at 277 million tonnes, and is slightly less than Australia's at 392 million tonnes. It carries significant global impacts by contributing to global warming.
482:, the Chairman/CEO of TotalEnergies and Chen Zhuoubiao, President of CNOOC Uganda along with Ugandan and Tanzanian technocrats, lawyers and government ministers, to sign a number of agreements, allowing to begin construction. Construction was slated to begin in July 2021, with first oil anticipated in 2025. 927:
The #StopEACOP campaign is a global campaign against the construction of the pipeline. Campaigners argue that, as the world's longest heated oil pipeline which will run through many populated areas, it will contribute to poor social outcomes for those displaced. They also mention the significant risk
907:
As of July 2023, it is projected that the project will displace 100,000 people in Uganda and Tanzania and put key wildlife habitat and coastal waters at risk. As of 2020, civil society organizations have petitioned funding agencies not to support the project, citing potential social and environmental
410:
on its own, thereby abandoning the Uganda–Kenya Crude Oil Pipeline. As of August 2017, the pipeline was planned to have a capacity of 216,000 barrels of crude oil per day. to be 24 inches (61 cm) in diameter, and Uganda was to pay Tanzania US$ 12.20 for every barrel flowing through the pipeline.
892:
According to a report by the Climate Accountability Institute, EACOP is expected to emit 379 million tonnes of CO2 during 25 years of operation, during peak crude oil flow, in years three through six, the attributed emissions total 34.8 million tonnes per year. However the construction and operation
497:
In August 2017, the plan was to raise 70 percent of $ 3.5b financing capital needed from international lenders and 30 percent through Total, the Anglo-Irish Tullow and China National Offshore Oil Corporation (Cnooc), the Tanzania Petroleum Development Corporation and Uganda National Oil Company; the
449:
In September 2020, TotalEnergies and the government of Uganda signed a Host Government Agreement about Total's rights and obligations with respect to the development, construction, and operation of EACOP, at State House Entebbe with an expected final investment decision by the end of 2020. Two days
520:
In April 2020, Tullow Oil Plc sold its "entire interests in Uganda's Lake Albert development project, including the East African Crude Oil Pipeline", to TotalEnergies for US$ 575 million with all tax liabilities. That ownership changed in April 2021, at the signing of the definitive investment
959:
In October 2023, the Guardian reported about 4 dozen students attempting to deliver a petition to parliament who were beaten and 4 of them arrested. In spite of all these reports TotalEnergies has stated it is "unaware of any allegations by human rights and environmental defenders of threats or
442:
newspaper reported that Total E&P was prepared to spend US$ 4 billion (UGX:13 trillion) to fund EACOP construction. In July 2016, following meetings between delegations led by the oil ministers of Tanzania and Uganda, held in Hoima, it was announced that construction of the 1,443 kilometres
928:
to nature and biodiversity, as the pipeline runs through large areas of savannah, zones of high biodiversity value, mangroves, coastal waters, and protected areas, before arriving at the coast where an oil spill could be dire. Spills are deemed more likely given the route through areas with
466:
In October 2020, TotalEnergies and the Government of Tanzania signed a Host Government Agreement to govern the dealings between them regarding the EACOP, as 70 percent will pass through Tanzanian territory. Laying of the pipeline was anticipated to begin during the first quarter of 2021.
422:
into Ugandan law which governs the country's participation in the then estimated US$ 3.5 billion construction, operations and maintenance. Uganda's contribution was estimated at US$ 293 million, of which US$ 130 million had been paid in advance. A similar law had been passed by the
258:(UNOC) at 15 percent, Tanzania at 15 per cent and CNOOC at 5 percent. The price of the project has increased to US$ 5 billion. Financing as of January 2024 remained uncertain, as 24 banks have distanced themselves from the project with only two banks namely 871:
As of 2013, the country had planned to build a refinery in the Western Region to meet local and regional demand, and to export the rest via pipeline to the Indian Ocean coast. The US$ 2.5 billion project was to be developed under a
435:
As of March 2016, construction was planned to start in August 2016 and expected to last three years at a cost of US$ 4 billion, providing approximately 15,000 construction jobs and 1,000 to 2,000 permanent jobs. In March 2016, the
462:
to jointly construct the 1,445 kilometres (898 mi) East Africa Crude Oil Pipeline, at an estimated cost of US$ 3.5 billion. Work was scheduled to start by the end of 2020. Construction was expected to last about 36 months.
1378: 1565: 273:
Once completed, the pipeline would be the longest electrically heated crude oil pipeline in the world. Because of the large scale displacement of communities and wildlife, the threat to water resources, and contribution to
1714: 2701: 832:
reported that the first 100 kilometres (62 mi) of pipe was ready for shipment from the factory in China to Tanzania. At that time construction was expected to start in Q1 2024 and conclude in Q4 2025.
948:
Critics of the project in Uganda have been met with intimidation, shutdown of their organization (Africa Institute for Energy Governance) and arrests as early as October 2021. In September 2022, the
920:, the pipeline will disproportionately and negatively impact women including loss of income because of displacement, loss of land, loss of power in the household if men earn cash wages, increase in 1167: 391:. In 2015, concerns regarding security and cost, however, motivated parallel negotiations with Tanzania regarding a shorter and safer route to Port of Tanga, with the support of TotalEnergies. 2613: 337:
In 2006, the Kingfisher oil field was discovered on the eastern bank of Lake Albert, the border between Uganda and the Democratic Republic of the Congo, spread over 344 square km in the
1388: 1575: 2939: 1959: 876:, with 50 percent of the project owned by a private developer and 10 percent owned by Jk Minerals Africa of South Africa, the remaining 40 percent to be distributed among the 402:
routes through Kenya. The presidents of Kenya and Rwanda were present, along with representatives from Ethiopia, South Sudan, and Tanzania. At the same conference, President
517:
In March 2019, Uganda's National Oil Company took 15 percent shares in EACOP, Tanzania 5 per cent, Tullow shares 10 per cent, Chinese CNOOC 35 percent and Total 35 percent.
1724: 3067: 1838: 2445: 952:
had passed a resolution condemning the EACOP project, calling for "the end of the extractive activities in protected and sensitive ecosystems, including the shores of
3287: 1656: 2711: 2169: 2871: 1866: 394:
In April 2016, at the 13th Northern Corridor Heads of State Summit in Kampala, Uganda officially chose the Tanzania route for its crude oil, in preference to the
1685: 1004: 724:, the president of CNOOC Uganda Limited, Chen Zhuobiao; Ugandan cabinet ministers, oil technocrats from Uganda and Tanzania and other invited guests gathered at 904:
basin, where 400 kilometres of the pipeline will be laid. Once built, EACOP will cause irreversible damage to biodiversity, natural habitats and water sources.
2788: 1074: 219:), is a 1,443 km crude oil pipeline in planning since 2013, with a foundation stone nominally under construction since 2017, and is intended to transport 67: 1598: 3040: 2105: 2311: 1899: 1627: 3336: 3165: 1320: 2367: 2073: 2015: 1747: 1203: 841:
In August 2022, Ugandan online media reported that licensing, registration and shareholding paperwork had been submitted, received and approved by the
2472: 1177: 3341: 3331: 3016:"JOINT MOTION FOR A RESOLUTION on violations of human rights in Uganda and Tanzania linked to investments in fossil fuels projects - RC-B9-0409/2022" 2285: 2044: 2990: 2137: 857:
about violating "the guidelines governing the actions of multinational corporations with regard to respect for human rights and the environment".
1346: 3286:
Akoli Atine, Joy; Ayebare, Clare; Bogrand, Andrew; Brodeur, Caroline; Mbenna, Devota; Sellwood, Scott A.; Twesigye, Bashir (10 September 2020).
1986: 814:. Construction was expected to begin in the first half of 2023 at an estimated cost of between US$ 3–4 billion with first oil expected in 2025. 728:
in Kampala, to witness the signing of the final investment decision by TotalEnergies and CNOOC. Other related parties to the EACOP included the
1258: 3356: 2499: 1009: 1138: 849:(ICOGU) to insure the EACOP. In February 2023, Ugandan, Tanzanian and an US organisation filed a complaint against the US insurance broker 2819: 1038: 376:
As of 2015, Uganda proven oil resources (oil in place) exceeded 6.5 billion barrels, of which about 2.2 billion barrels were recoverable.
3361: 2844: 2770: 2395: 1518: 737: 634: 282:
have been protesting its construction and finance. Peaceful activism and protests in Uganda have been met with repression and arrests.
2557: 2418: 3093: 2639: 825:
of France being a sub-contractor, responsible for transport, storage, handling and construction management of construction hardware.
799: 485:
In August 2021, the project cost had risen to US$ 5 billion, of which $ 2 billion were to be raised by the owners of the pipeline as
3237:"Cut-off and forgotten?: Livelihood disruption, social impacts and food insecurity arising from the East African Crude Oil Pipeline" 842: 364:
and to drill roughly 400 wells at 31 locations. Buried pipelines would deliver the raw material to an oil treatment plant built in
2257: 1291: 761: 580: 342: 251: 3366: 3195: 2744: 787:
announced that after their own internal assessment, they had decided to fund the pipeline. A formal announcement is awaited.
1776: 756:, joining 24 banks who have distanced themselves from the project. As of June 2023, only two banks namely the South African 1014: 811: 1470: 764:, were financial advisors to the project. In August 2023, it was reported that US$ 3 billion in loans were expected from 503: 380: 1928: 936:
and also to the fact that the pipeline will add another major source of oil to global markets and thereby contribute to
3346: 3216: 2528: 2732: 2586: 3351: 607: 909: 765: 749: 1437: 446:
As of August 2017, the construction budget for the 1,445 kilometres (898 mi) pipeline was US$ 3.5 billion.
932:. Critics of the project point to the negative hydrological impact on the surface and groundwater resources of 873: 2796: 2201: 1410: 1550: 999: 733: 499: 361: 1463: 937: 275: 60: 776:, while the pipeline shareholders would provide about US$ 2 billion. In January 2024 it was reported that 729: 357: 263: 255: 1492: 1232: 3288:"Empty Promises Down the Line? A Human Rights Impact Assessment of the East African Crude Oil Pipeline" 3015: 884:
In April 2016, Tanzania agreed to buy 8 percent of the shares in the refinery for US$ 150.4 million.
2533: 1107: 956:". Afterwards, 9 Ugandan students who demonstrated in support of this EU resolution were arrested. 913: 829: 769: 407: 290:
As of March 2016, the East African Crude Oil Pipeline (EACOP) was to start in Buseruka sub-county,
3154: 795:
In 2017, Museveni laid the foundation stone, and the press reported that construction had begun.
2872:"GENDER ANALYSIS OF EAST AFRICA CRUDE OIL PIPELINE, Environmental and Social Impact Assessment" 2706: 2020: 1050: 511: 498:
final investment decision was expected at the end of 2017. Uganda and Tanzania were advised by
424: 299: 3158: 2230: 3248: 3094:"'Very disturbing': crackdown on oil pipeline protests in Uganda concerns UN rights expert" 953: 415: 295: 3184:"East Africa: DR Congo Shows Interest As Uganda-Tanga Port Oil Pipeline Preps in Top Gear" 2940:"With a New Pipeline in East Africa, an Oil Company Flouts France's Leadership on Climate" 8: 2473:"Standard Bank Commits $ 5 Billion to Controversial Uganda-Tanzania Oil Pipeline Project" 2312:"Standard Chartered refuses financing for controversial $ 5 billion Ugandan oil pipeline" 1810: 1527: 1523: 949: 866: 784: 455: 443:(897 mi) pipeline would begin in January 2017, and completion was planned for 2020. 3252: 721: 479: 356:
has been planning to operate the Tilenga project (56.6%), in partnership with CNOOC and
3303: 3274: 1963: 1719: 753: 3307: 3278: 3266: 3101: 1544: 486: 3135: 2074:"Cost of Hoima-Tanga pipeline hits $ 5b as risk averse banks walk away from project" 30: 3295: 3256: 3068:"Environment activists demand release of nine students remanded over EACOP protest" 2396:"Eacop partners race against time to close $ 3bn financing deal with China lenders" 1871: 929: 803: 3183: 2668: 1805: 1102: 2733:
https://climateaccountability.org/wp-content/uploads/2022/10/EACOP-PR-27Oct22.pdf
2206: 2142: 2078: 1991: 1904: 1843: 1781: 1752: 1603: 1570: 1208: 1143: 897: 850: 507: 475: 459: 451: 365: 135: 3261: 3236: 3136:"Design of EACOP integrates adequate environmental protection, safety measures" 403: 348:
The Tilenga oil fields are located Northeast of the Kingfisher oilfield in the
338: 307: 303: 291: 279: 2614:"Uganda's EACOP pipeline: Insurer Marsh targeted by complaint filed with OECD" 3325: 3270: 3105: 2677: 2504: 2372: 2174: 2110: 2049: 1814: 1806:"East Africa: Construction of Uganda - Tanga Port Oil Pipeline Starts August" 1661: 1632: 1383: 1351: 1263: 1172: 1111: 1043: 991: 977: 901: 818: 757: 717: 553: 438: 353: 331: 315: 259: 243: 228: 158: 82: 69: 2337: 510:
was advising TotalEnergies on legal matters, while CNOOC was advised by the
1960:"Uganda, Total reach agreement bringing crude pipeline construction closer" 1748:"Museveni's visit to Dar rescues oil pipeline deal, sets project timelines" 1690: 933: 773: 471: 3041:"European parliament adopts a resolution condemning Total's EACOP project" 3092:
Lakhani, Nina; reporter, Nina Lakhani climate justice (19 October 2023).
2446:"Standard Bank To Finance Controversial $ 5 Billion African Oil Pipeline" 1496: 1236: 877: 821:
reported that construction would start in the first quarter of 2024 with
489:
and the remaining $ 3 billion were to be borrowed from external sources.
334:, for export a distance of approximately 1,410 kilometres (880 mi). 327: 802:(EPC) contract was awarded to a joint venture comprising the Australian 3299: 2964: 2888: 2673: 2644: 2562: 2262: 1933: 943: 822: 1566:"Regional power play in tussle over new route of Uganda oil pipeline" 1519:"Uganda, Kenya Agree to Construct Crude export Pipeline to Port Lamu" 341:
basin in western Uganda. The Kingfisher project will be developed by
319: 220: 2789:"Economic lifeline or climate peril? East African pipeline heats up" 2016:"Tanzania, Total sign agreement for East African Crude Oil Pipeline" 1464:"Oil in Uganda: Hard bargaining and complex politics in East Africa" 2845:"SA's Standard Bank Group Faces Protest Over Pipeline Funding Plan" 2286:"Sumitomo Mitsui Rules Out Funding $ 5 Billion Uganda Oil Pipeline" 921: 777: 267: 232: 53: 3166:"Pipeline dreams: Inside the Uganda - Tanzania oil pipeline talks" 2771:"How will East African Crude Oil Pipeline affect the environment?" 1411:"Kingfisher Oil Field Development, Lake Albert Rift Basin, Uganda" 1292:"A Major Oil Pipeline Project Strikes Deep at the Heart of Africa" 1103:"Uganda: Museveni, Magufuli Lay Foundation Stone for Oil Pipeline" 254:(CNOOC). In 2021, EACOP was owned by TotalEnergies at 65 percent, 3217:"Will the East African Crude Oil Pipeline (EACOP) ever be built?" 2913: 1875: 1715:"As Uganda chooses Tanzania pipeline route, Kenya to go it alone" 985: 395: 349: 323: 3285: 1204:"Magufuli, Museveni lay foundation stone for crude oil pipeline" 360:(UNOC) by developing six fields, one of which is located inside 1839:"Building of Hoima-Tanzania oil pipeline will start in January" 725: 716:
In February 2022, Museveni and the Vice President of Tanzania
311: 224: 124: 114: 49: 2669:"East Africa: EAC States to Invest 40 Percent in Oil Refinery" 2170:"Total To Acquire Tullow Interests In Uganda At $ 575 Million" 2045:"New Dawn As Govt, Oil Firms Seal Deal To Kick Off Production" 2419:"Standard Bank Chief Touts East Africa Pipeline At US summit" 1231:
Elias Biryabarema, and Fumbuka Ng'wanakilala (2 March 2016).
917: 384: 238:
Uganda wants to develop its oilfields under the two projects
110: 2258:"As it happened: Final investment decision on oil announced" 1867:"Tanzania aims to complete oil pipeline from Uganda in 2020" 1379:"Total readies UShs13 trillion for oil pipeline development" 2991:"Environment watchdogs condemn arrest of Ugandan activists" 2640:"Uganda's Oil Refinery – An Opportunity for transformation" 1657:"Transporting oil to Tanzania to cost Shs40,000 per barrel" 854: 399: 388: 2202:"EACOP's Financing Blues As Lenders Desert $ 3.5B Project" 1531:. New York City. Archived from the original on 6 July 2013 1493:"Uganda agrees to plan for oil pipeline to new Kenya port" 525:
East African Crude Oil Pipeline Stock Ownership over time
2702:"TZ to spend Sh300bn on buying stake in Uganda refinery" 2368:"Oil pipeline construction set to start early next year" 2106:"Uganda, TZ target 'flexible' European pipeline funding" 1987:"Magufuli, Museveni sign deal on $ 3.5bn crude pipeline" 2965:"FOR NATURE - Stop the East African Crude Oil Pipeline" 2555: 2529:"EACOP crude oil pipelines ready, on the way to Uganda" 2338:"Who's Banking on the East African Crude Oil Pipeline?" 1686:"Kenya will build own pipeline, Uhuru tells EAC summit" 420:
East African Crude Oil Pipeline Special Provisions Bill
2889:"FOR PEOPLE. Stop the East African Crude Oil Pipeline" 2745:"The east African crude oil pipeline: future ecocide?" 1100: 1075:"Total Expects First Oil From Ugandan Project in 2025" 1039:"Uganda's first oil production now set for early 2025" 306:
in a general south-easterly direction to pass through
3129: 1321:"AfDB says no plans to fund Uganda-Tanzania pipeline" 1168:"Getting crude oil pipeline off ground is great leap" 780:
would only announce its final decision by June 2024.
2500:"Oil pipeline firm applies for construction license" 2228: 1984: 1564:
Allan Olingo, and James Anyanzwa (17 October 2015).
967: 2443: 1897: 944:
Repression against critics and protesters in Uganda
908:harm that the pipeline will cause. According to an 1259:"A big Ugandan oil project is progressing at last" 887: 3181: 1230: 1197: 1195: 760:, through its subsidiary Stanbic Uganda, and the 470:In April 2021, presidents Museveni of Uganda and 3323: 2611: 2587:"East African oil pipeline finally gets insured" 1774: 314:in Tanzania, loop around the southern shores of 3091: 2699: 2584: 2526: 2497: 2199: 2135: 2071: 2042: 2013: 1929:"Uganda, Total sign key oil pipeline agreement" 1836: 1599:"Oil firms prefer Tanga pipeline route to Lamu" 1376: 1201: 1136: 1072: 1005:Kenya–Uganda–Rwanda Petroleum Products Pipeline 752:said it was not financing the pipeline, as was 720:, the Executive Chairman/CEO of TotalEnergies, 3065: 2869: 2416: 1900:"Tanzania ready to take up pipeline contracts" 1192: 3234: 3214: 2558:"EAACOP Construction Work Underway In Uganda" 2231:"Oil & Gas: The Long Awaited FID Is Here" 2167: 1628:"Uganda chooses Tanga route for oil pipeline" 1256: 1036: 3235:Ogwang, Tom; Vanclay, Frank (1 April 2021). 2556:Ambrose Niwagaba Katoto (13 November 2023). 2470: 2365: 2255: 1563: 379:In 2013, Uganda had agreed to build a joint 227:'s Tilenga and Kingfisher oil fields to the 1490: 1435: 847:Insurance Consortium for Oil and Gas Uganda 3337:Proposed energy infrastructure in Tanzania 1985:Agence France-Presse (14 September 2020). 1926: 738:Tanzania Petroleum Development Corporation 635:Tanzania Petroleum Development Corporation 29: 3260: 2195: 2193: 2138:"Uganda oil pipeline to wait for a while" 1768: 1438:"Tilenga and EACOP: acting transparently" 1318: 1165: 1139:"Uganda seeks more land for oil pipeline" 1010:Hoima–Kampala Petroleum Products Pipeline 800:engineering, procurement and construction 3342:Proposed energy infrastructure in Uganda 3332:Proposed energy infrastructure in Africa 2937: 2229:Muhamadi Byemboijana (1 February 2022). 2163: 2161: 2131: 2129: 1954: 1952: 1803: 1745: 1372: 1370: 1132: 1130: 1101:The Independent Uganda (6 August 2017). 843:Insurance Regulatory Authority of Uganda 3196:"Uganda, Tanzania discuss oil pipeline" 2768: 2605: 2578: 2361: 2359: 2036: 1596: 762:Industrial and Commercial Bank of China 581:China National Offshore Oil Corporation 343:China National Offshore Oil Corporation 252:China National Offshore Oil Corporation 16:Pipeline from Uganda to Tanzanian coast 3324: 2863: 2666: 2520: 2464: 2190: 2103: 2099: 2097: 1712: 1654: 1625: 1516: 1344: 1289: 278:, global environmental groups and the 35:Map of East African Crude Oil Pipeline 2817: 2667:Kasita, Ibrahim (19 September 2013). 2549: 2491: 2410: 2249: 2222: 2158: 2126: 2065: 1949: 1898:Christopher Kidanka (6 August 2017). 1777:"Ugandan Parliament Passes EACOP Law" 1775:Johnathan Kamoga (10 December 2021). 1597:Abdalah, Halima (13 September 2015). 1461: 1429: 1367: 1347:"Oil pipeline: Which way for Uganda?" 1338: 1314: 1312: 1127: 900:and degradation, particularly to the 836: 430: 406:announced that Kenya would build the 3357:Petroleum infrastructure in Tanzania 3241:Energy Research & Social Science 3182:Lydia Shekighenda (25 August 2016). 2938:McKibben, Bill (20 September 2020). 2769:Mugonza, Andrew (10 November 2021). 2637: 2612:Laurence Caramel (8 February 2023). 2444:Adekunle Agbetiloye (13 June 2024). 2437: 2356: 1713:Ligami, Christabel (16 April 2016). 1683: 1285: 1283: 1281: 1233:"Uganda, Tanzania plan oil pipeline" 1137:Halima Abdallah (5 September 2017). 1096: 1094: 1092: 1032: 1030: 1015:Tanzania-Uganda Natural Gas Pipeline 812:China Petroleum Pipeline Engineering 368:, to separate and treat the fluids. 3188:Tanzania Daily News (Dar es Salaam) 2988: 2811: 2527:The Independent (1 November 2023). 2104:Musisi, Frederic (16 August 2017). 2094: 2014:Zephania Ubwani (27 October 2020). 2007: 1655:Musisi, Frederick (26 April 2016). 1491:Biryabarema, Elias (25 June 2013). 1471:Oxford Institute for Energy Studies 1224: 504:Sumitomo Mitsui Banking Corporation 458:of Tanzania signed an agreement in 450:later in September 2020, President 13: 3362:Petroleum infrastructure in Uganda 3215:Gerard Kreeft (17 November 2022). 2795:. 7 September 2022. Archived from 2585:Kenneth Kazibwe (19 August 2022). 2072:Julius Barigaba (21 August 2021). 1626:Musisi, Frederic (23 April 2016). 1403: 1309: 924:as well as more unpaid care work. 213:Uganda–Tanzania Crude Oil Pipeline 14: 3378: 3123: 3066:Juliet Kigongo (8 October 2022). 2700:Ludger Kasumuni (30 April 2016). 2136:Halima Abdallah (14 March 2019). 2043:Frederic Musisi (11 April 2021). 1746:Barigaba, Julius (6 March 2017). 1517:Bariyo, Nicholas (25 June 2013). 1387:. Kampala, Uganda. Archived from 1377:Frederic Musisi (16 March 2016). 1345:Musisi, Frederic (7 March 2016). 1278: 1257:The Economist (5 February 2022). 1202:The EastAfrican (5 August 2017). 1089: 1077:. Annecy, France: Market Screener 1073:Nicholas Bariyo (12 April 2021). 1027: 896:The pipeline poses high risks of 506:. The London-based firm law firm 2256:Joseph Kizza (1 February 2022). 1927:New Vision (11 September 2020). 1804:Mwakyusa, Alvar (8 March 2016). 1319:Karashani, Bob (11 April 2020). 984: 970: 608:Uganda National Pipeline Company 502:, while Total SA was advised by 3155:East African Crude Oil Pipeline 3085: 3059: 3033: 3008: 2982: 2957: 2931: 2906: 2881: 2837: 2781: 2762: 2737: 2726: 2710:. Dar Es Salaam. Archived from 2693: 2660: 2638:Ouga, Samuel (14 August 2013). 2631: 2498:Frederic Musisi (4 July 2022). 2417:Julian Pecquet (18 July 2023). 2388: 2366:Paul Murungi (30 August 2023). 2330: 2304: 2278: 2168:Daily Monitor (23 April 2020). 1978: 1920: 1891: 1859: 1837:Francis Mugerwa (8 July 2016). 1830: 1797: 1739: 1706: 1677: 1648: 1619: 1590: 1557: 1510: 1484: 1455: 1037:Daily Monitor (12 April 2021). 910:Environmental Impact Assessment 888:Social and environmental impact 860: 790: 750:Sumitomo Mitsui Financial Group 381:Uganda–Kenya Crude Oil Pipeline 270:still advising on the project. 205:East African Crude Oil Pipeline 24:East African Crude Oil Pipeline 2870:Christina Hill (August 2019). 2200:Julius Barigaba (3 May 2021). 1250: 1159: 1066: 1042:(The Citizen Tanzania Quoting 1: 2818:Horne, Felix (10 July 2023). 2471:Grace Ashiru (14 June 2024). 1020: 1000:Petroleum Authority of Uganda 734:Petroleum Authority of Uganda 500:Standard Bank of South Africa 362:Murchison Falls National Park 358:Uganda's National Oil Company 256:Uganda's National Oil Company 1966:. Reuters. 12 September 2020 1462:Patey, Luke (October 2015). 1290:Pearce, Fred (21 May 2020). 938:anthropogenic climate change 492: 302:. It would travel along the 276:anthropogenic climate change 7: 1166:Editorial (9 August 2017). 963: 766:Export–Import Bank of China 736:, TotalEnergies Uganda and 730:Uganda National Oil Company 371: 285: 181:897 mi (1,444 km) 10: 3383: 3262:10.1016/j.erss.2021.101970 2749:Stop Ecocide International 916:from 2019 commissioned by 874:public-private partnership 864: 743: 3367:Tanzania–Uganda relations 3347:Oil pipelines in Tanzania 1723:. Nairobi. Archived from 1574:. Nairobi. Archived from 1549:: CS1 maint: unfit URL ( 1176:. Kampala. Archived from 262:, through its subsidiary 193: 185: 177: 172: 164: 154: 146: 141: 131: 120: 106: 98: 59: 45: 40: 28: 23: 2534:The Independent (Uganda) 2479:. Pretoria, South Africa 1879:. Reuters. 3 August 2016 1108:The Independent (Uganda) 914:social impact assessment 770:Islamic Development Bank 454:of Uganda and President 408:Kenya Crude Oil Pipeline 197:24 in (610 mm) 3352:Oil pipelines in Uganda 2989:AFP (24 October 2021). 2820:""Our Trust is Broken"" 2450:Business Insider Africa 882:(subscription required) 189:216,000 barrels per day 3020:www.europarl.europa.eu 2707:The Citizen (Tanzania) 2021:The Citizen (Tanzania) 1684:PSCU (23 April 2016). 1051:The Citizen (Tanzania) 830:The Independent Uganda 808:Worley Parsons Limited 512:Imperial Bank of China 425:Parliament of Tanzania 414:In December 2021, the 3159:Global Energy Monitor 3045:www.amisdelaterre.org 542:Ownership in 2021 (%) 539:Ownership in 2020 (%) 536:Ownership in 2019 (%) 352:and Nwoya districts. 235:on the Indian Ocean. 211:), also known as the 173:Technical information 3178:As of 18 March 2019. 1436:TotalEnergies (nd). 898:freshwater pollution 296:Lake Albert (Africa) 83:1.26500°S 31.67583°E 3253:2021ERSS...7401970O 3047:. 15 September 2022 2799:on 7 September 2022 1811:Tanzania Daily News 1578:on 8 September 2017 1528:Dow Jones Newswires 1524:Wall Street Journal 1180:on 28 November 2018 950:European Parliament 867:Uganda Oil Refinery 817:In August 2023 the 785:Standard Bank Group 526: 474:of Tanzania met in 456:John Pombe Magufuli 330:peninsula near the 318:, continue through 264:Stanbic Bank Uganda 142:General information 79: /  3300:10.21201/2020.6423 2824:Human Rights Watch 2423:The African Report 1964:The Economic Times 1391:on 7 November 2018 837:Pipeline insurance 828:In November 2023, 798:In July 2022, the 783:In June 2024, the 754:Standard Chartered 524: 431:Cost and timetable 427:, in August 2021. 416:Ugandan parliament 298:basin in Uganda's 150:Crude oil pipeline 88:-1.26500; 31.67583 3202:. 17 January 2021 3168:. 1 February 2021 2775:wearerestless.org 2593:. Kampala, Uganda 2566:. Kampala, Uganda 2537:. Kampala, Uganda 2508:. Kampala, Uganda 2398:. 15 January 2024 2376:. Kampala, Uganda 2266:. Kampala, Uganda 2237:. Kampala, Uganda 1442:TotalEnergies.com 1415:ns energybusiness 823:Bollore Logistics 714: 713: 487:equity investment 201: 200: 186:Maximum discharge 102:West to Southeast 99:General direction 3374: 3318: 3316: 3314: 3282: 3264: 3231: 3229: 3227: 3211: 3209: 3207: 3191: 3177: 3175: 3173: 3151: 3149: 3147: 3130:Official Website 3117: 3116: 3114: 3112: 3089: 3083: 3082: 3080: 3078: 3063: 3057: 3056: 3054: 3052: 3037: 3031: 3030: 3028: 3026: 3012: 3006: 3005: 3003: 3001: 2986: 2980: 2979: 2977: 2975: 2961: 2955: 2954: 2952: 2950: 2935: 2929: 2928: 2926: 2924: 2910: 2904: 2903: 2901: 2899: 2885: 2879: 2878: 2876: 2867: 2861: 2860: 2858: 2856: 2841: 2835: 2834: 2832: 2830: 2815: 2809: 2808: 2806: 2804: 2785: 2779: 2778: 2766: 2760: 2759: 2757: 2755: 2741: 2735: 2730: 2724: 2723: 2721: 2719: 2697: 2691: 2690: 2688: 2686: 2664: 2658: 2657: 2655: 2653: 2635: 2629: 2628: 2626: 2624: 2609: 2603: 2602: 2600: 2598: 2591:Nile Post Uganda 2582: 2576: 2575: 2573: 2571: 2553: 2547: 2546: 2544: 2542: 2524: 2518: 2517: 2515: 2513: 2495: 2489: 2488: 2486: 2484: 2468: 2462: 2461: 2459: 2457: 2452:. Lagos, Nigeria 2441: 2435: 2434: 2432: 2430: 2414: 2408: 2407: 2405: 2403: 2392: 2386: 2385: 2383: 2381: 2363: 2354: 2353: 2351: 2349: 2334: 2328: 2327: 2325: 2323: 2308: 2302: 2301: 2299: 2297: 2282: 2276: 2275: 2273: 2271: 2253: 2247: 2246: 2244: 2242: 2226: 2220: 2219: 2217: 2215: 2197: 2188: 2187: 2185: 2183: 2165: 2156: 2155: 2153: 2151: 2133: 2124: 2123: 2121: 2119: 2101: 2092: 2091: 2089: 2087: 2082:. Nairobi, Kenya 2069: 2063: 2062: 2060: 2058: 2040: 2034: 2033: 2031: 2029: 2011: 2005: 2004: 2002: 2000: 1982: 1976: 1975: 1973: 1971: 1956: 1947: 1946: 1944: 1942: 1924: 1918: 1917: 1915: 1913: 1895: 1889: 1888: 1886: 1884: 1872:The East African 1863: 1857: 1856: 1854: 1852: 1847:. Nairobi, Kenya 1834: 1828: 1827: 1825: 1823: 1801: 1795: 1794: 1792: 1790: 1785:. Nairobi, Kenya 1772: 1766: 1765: 1763: 1761: 1743: 1737: 1736: 1734: 1732: 1727:on 17 April 2016 1710: 1704: 1703: 1701: 1699: 1681: 1675: 1674: 1672: 1670: 1652: 1646: 1645: 1643: 1641: 1623: 1617: 1616: 1614: 1612: 1594: 1588: 1587: 1585: 1583: 1561: 1555: 1554: 1548: 1540: 1538: 1536: 1514: 1508: 1507: 1505: 1503: 1488: 1482: 1481: 1479: 1477: 1468: 1459: 1453: 1452: 1450: 1448: 1433: 1427: 1426: 1424: 1422: 1407: 1401: 1400: 1398: 1396: 1374: 1365: 1364: 1362: 1360: 1342: 1336: 1335: 1333: 1331: 1325:The East African 1316: 1307: 1306: 1304: 1302: 1287: 1276: 1275: 1273: 1271: 1254: 1248: 1247: 1245: 1243: 1228: 1222: 1221: 1219: 1217: 1212:. Nairobi, Kenya 1199: 1190: 1189: 1187: 1185: 1163: 1157: 1156: 1154: 1152: 1134: 1125: 1124: 1122: 1120: 1098: 1087: 1086: 1084: 1082: 1070: 1064: 1063: 1061: 1059: 1047: 1034: 994: 989: 988: 980: 975: 974: 973: 930:seismic activity 883: 722:Patrick PouyannĂ© 527: 523: 480:Patrick PouyannĂ© 326:, to end on the 94: 93: 91: 90: 89: 84: 80: 77: 76: 75: 72: 33: 21: 20: 3382: 3381: 3377: 3376: 3375: 3373: 3372: 3371: 3322: 3321: 3312: 3310: 3225: 3223: 3205: 3203: 3194: 3171: 3169: 3164: 3145: 3143: 3134: 3126: 3121: 3120: 3110: 3108: 3090: 3086: 3076: 3074: 3064: 3060: 3050: 3048: 3039: 3038: 3034: 3024: 3022: 3014: 3013: 3009: 2999: 2997: 2987: 2983: 2973: 2971: 2963: 2962: 2958: 2948: 2946: 2936: 2932: 2922: 2920: 2912: 2911: 2907: 2897: 2895: 2887: 2886: 2882: 2874: 2868: 2864: 2854: 2852: 2843: 2842: 2838: 2828: 2826: 2816: 2812: 2802: 2800: 2787: 2786: 2782: 2767: 2763: 2753: 2751: 2743: 2742: 2738: 2731: 2727: 2717: 2715: 2714:on 24 June 2016 2698: 2694: 2684: 2682: 2665: 2661: 2651: 2649: 2636: 2632: 2622: 2620: 2610: 2606: 2596: 2594: 2583: 2579: 2569: 2567: 2554: 2550: 2540: 2538: 2525: 2521: 2511: 2509: 2496: 2492: 2482: 2480: 2469: 2465: 2455: 2453: 2442: 2438: 2428: 2426: 2425:. Paris, France 2415: 2411: 2401: 2399: 2394: 2393: 2389: 2379: 2377: 2364: 2357: 2347: 2345: 2336: 2335: 2331: 2321: 2319: 2310: 2309: 2305: 2295: 2293: 2284: 2283: 2279: 2269: 2267: 2254: 2250: 2240: 2238: 2227: 2223: 2213: 2211: 2207:The EastAfrican 2198: 2191: 2181: 2179: 2166: 2159: 2149: 2147: 2143:The EastAfrican 2134: 2127: 2117: 2115: 2102: 2095: 2085: 2083: 2079:The EastAfrican 2070: 2066: 2056: 2054: 2041: 2037: 2027: 2025: 2024:. Dar es Salaam 2012: 2008: 1998: 1996: 1992:The EastAfrican 1983: 1979: 1969: 1967: 1958: 1957: 1950: 1940: 1938: 1925: 1921: 1911: 1909: 1905:The EastAfrican 1896: 1892: 1882: 1880: 1865: 1864: 1860: 1850: 1848: 1844:The EastAfrican 1835: 1831: 1821: 1819: 1818:. Dar es Salaam 1802: 1798: 1788: 1786: 1782:The EastAfrican 1773: 1769: 1759: 1757: 1753:The EastAfrican 1744: 1740: 1730: 1728: 1711: 1707: 1697: 1695: 1682: 1678: 1668: 1666: 1653: 1649: 1639: 1637: 1624: 1620: 1610: 1608: 1604:The EastAfrican 1595: 1591: 1581: 1579: 1571:The EastAfrican 1562: 1558: 1542: 1541: 1534: 1532: 1515: 1511: 1501: 1499: 1489: 1485: 1475: 1473: 1466: 1460: 1456: 1446: 1444: 1434: 1430: 1420: 1418: 1409: 1408: 1404: 1394: 1392: 1375: 1368: 1358: 1356: 1343: 1339: 1329: 1327: 1317: 1310: 1300: 1298: 1288: 1279: 1269: 1267: 1255: 1251: 1241: 1239: 1229: 1225: 1215: 1213: 1209:The EastAfrican 1200: 1193: 1183: 1181: 1164: 1160: 1150: 1148: 1144:The EastAfrican 1135: 1128: 1118: 1116: 1099: 1090: 1080: 1078: 1071: 1067: 1057: 1055: 1054:. Dar es Salaam 1041: 1035: 1028: 1023: 990: 983: 976: 971: 969: 966: 946: 890: 881: 869: 863: 839: 793: 746: 708: 701: 694: 676: 671: 666: 651: 646: 641: 624: 619: 614: 597: 592: 587: 570: 565: 560: 508:Clifford Chance 495: 476:Entebbe, Uganda 460:Chato, Tanzania 452:Yoweri Museveni 433: 374: 288: 168:2025 (Expected) 136:Tanga, Tanzania 87: 85: 81: 78: 73: 70: 68: 66: 65: 36: 17: 12: 11: 5: 3380: 3370: 3369: 3364: 3359: 3354: 3349: 3344: 3339: 3334: 3320: 3319: 3283: 3232: 3212: 3192: 3179: 3162: 3152: 3142:. 15 July 2022 3132: 3125: 3124:External links 3122: 3119: 3118: 3084: 3058: 3032: 3007: 2981: 2956: 2944:The New Yorker 2930: 2905: 2880: 2862: 2851:. 24 June 2020 2836: 2810: 2780: 2761: 2736: 2725: 2692: 2659: 2630: 2604: 2577: 2548: 2519: 2490: 2477:Tech In Africa 2463: 2436: 2409: 2387: 2355: 2344:. 12 June 2023 2329: 2303: 2277: 2248: 2221: 2189: 2157: 2125: 2093: 2064: 2035: 2006: 1977: 1948: 1919: 1890: 1858: 1829: 1796: 1767: 1738: 1720:African Review 1705: 1676: 1647: 1618: 1589: 1556: 1509: 1483: 1454: 1428: 1402: 1366: 1337: 1308: 1277: 1249: 1223: 1191: 1158: 1126: 1088: 1065: 1025: 1024: 1022: 1019: 1018: 1017: 1012: 1007: 1002: 996: 995: 981: 965: 962: 960:retaliation". 945: 942: 889: 886: 865:Main article: 862: 859: 838: 835: 804:Worley Limited 792: 789: 745: 742: 712: 711: 709: 704: 702: 697: 695: 690: 688: 683: 680: 679: 677: 674: 672: 669: 667: 664: 662: 661:Tullow Oil Plc 659: 655: 654: 652: 649: 647: 644: 642: 639: 637: 632: 628: 627: 625: 622: 620: 617: 615: 612: 610: 605: 601: 600: 598: 595: 593: 590: 588: 585: 583: 578: 574: 573: 571: 568: 566: 563: 561: 558: 556: 551: 547: 546: 543: 540: 537: 534: 531: 494: 491: 432: 429: 404:Uhuru Kenyatta 373: 370: 339:Albertine Rift 308:Rakai District 304:Albertine Rift 300:Western Region 292:Hoima District 287: 284: 280:European Union 242:, operated by 199: 198: 195: 191: 190: 187: 183: 182: 179: 175: 174: 170: 169: 166: 162: 161: 156: 152: 151: 148: 144: 143: 139: 138: 133: 129: 128: 122: 121:Passes through 118: 117: 108: 104: 103: 100: 96: 95: 63: 57: 56: 47: 43: 42: 38: 37: 34: 26: 25: 15: 9: 6: 4: 3: 2: 3379: 3368: 3365: 3363: 3360: 3358: 3355: 3353: 3350: 3348: 3345: 3343: 3340: 3338: 3335: 3333: 3330: 3329: 3327: 3309: 3305: 3301: 3297: 3293: 3289: 3284: 3280: 3276: 3272: 3268: 3263: 3258: 3254: 3250: 3246: 3242: 3238: 3233: 3222: 3218: 3213: 3201: 3197: 3193: 3189: 3185: 3180: 3167: 3163: 3160: 3156: 3153: 3141: 3137: 3133: 3131: 3128: 3127: 3107: 3103: 3099: 3095: 3088: 3073: 3069: 3062: 3046: 3042: 3036: 3021: 3017: 3011: 2996: 2992: 2985: 2970: 2966: 2960: 2945: 2941: 2934: 2919: 2915: 2909: 2894: 2890: 2884: 2873: 2866: 2850: 2846: 2840: 2825: 2821: 2814: 2798: 2794: 2790: 2784: 2776: 2772: 2765: 2750: 2746: 2740: 2734: 2729: 2713: 2709: 2708: 2703: 2696: 2680: 2679: 2678:AllAfrica.com 2675: 2670: 2663: 2647: 2646: 2641: 2634: 2619: 2615: 2608: 2592: 2588: 2581: 2565: 2564: 2559: 2552: 2536: 2535: 2530: 2523: 2507: 2506: 2505:Daily Monitor 2501: 2494: 2478: 2474: 2467: 2451: 2447: 2440: 2424: 2420: 2413: 2397: 2391: 2375: 2374: 2373:Daily Monitor 2369: 2362: 2360: 2343: 2339: 2333: 2317: 2313: 2307: 2292:. 16 May 2023 2291: 2290:Bloomberg.com 2287: 2281: 2265: 2264: 2259: 2252: 2236: 2232: 2225: 2209: 2208: 2203: 2196: 2194: 2177: 2176: 2175:Daily Monitor 2171: 2164: 2162: 2145: 2144: 2139: 2132: 2130: 2113: 2112: 2111:Daily Monitor 2107: 2100: 2098: 2081: 2080: 2075: 2068: 2052: 2051: 2050:Daily Monitor 2046: 2039: 2023: 2022: 2017: 2010: 1994: 1993: 1988: 1981: 1965: 1961: 1955: 1953: 1936: 1935: 1930: 1923: 1907: 1906: 1901: 1894: 1878: 1877: 1873: 1868: 1862: 1846: 1845: 1840: 1833: 1817: 1816: 1815:AllAfrica.com 1812: 1807: 1800: 1784: 1783: 1778: 1771: 1755: 1754: 1749: 1742: 1726: 1722: 1721: 1716: 1709: 1693: 1692: 1687: 1680: 1664: 1663: 1662:Daily Monitor 1658: 1651: 1635: 1634: 1633:Daily Monitor 1629: 1622: 1606: 1605: 1600: 1593: 1577: 1573: 1572: 1567: 1560: 1552: 1546: 1530: 1529: 1525: 1520: 1513: 1498: 1494: 1487: 1472: 1465: 1458: 1443: 1439: 1432: 1416: 1412: 1406: 1390: 1386: 1385: 1384:Daily Monitor 1380: 1373: 1371: 1354: 1353: 1352:Daily Monitor 1348: 1341: 1326: 1322: 1315: 1313: 1297: 1293: 1286: 1284: 1282: 1266: 1265: 1264:The Economist 1260: 1253: 1238: 1234: 1227: 1211: 1210: 1205: 1198: 1196: 1179: 1175: 1174: 1173:Daily Monitor 1169: 1162: 1146: 1145: 1140: 1133: 1131: 1114: 1113: 1112:AllAfrica.com 1109: 1104: 1097: 1095: 1093: 1076: 1069: 1053: 1052: 1045: 1044:Daily Monitor 1040: 1033: 1031: 1026: 1016: 1013: 1011: 1008: 1006: 1003: 1001: 998: 997: 993: 992:Energy portal 987: 982: 979: 978:Uganda portal 968: 961: 957: 955: 951: 941: 939: 935: 931: 925: 923: 919: 915: 911: 905: 903: 902:Lake Victoria 899: 894: 885: 879: 875: 868: 858: 856: 852: 848: 844: 834: 831: 826: 824: 820: 819:Daily Monitor 815: 813: 809: 805: 801: 796: 788: 786: 781: 779: 775: 771: 767: 763: 759: 758:Standard Bank 755: 751: 748:In May 2023, 741: 739: 735: 731: 727: 723: 719: 718:Philip Mpango 710: 707: 703: 700: 696: 693: 689: 687: 684: 682: 681: 678: 673: 668: 663: 660: 657: 656: 653: 648: 643: 638: 636: 633: 630: 629: 626: 621: 616: 611: 609: 606: 603: 602: 599: 594: 589: 584: 582: 579: 576: 575: 572: 567: 562: 557: 555: 554:TotalEnergies 552: 549: 548: 544: 541: 538: 535: 533:Name of Owner 532: 529: 528: 522: 518: 515: 513: 509: 505: 501: 490: 488: 483: 481: 477: 473: 468: 464: 461: 457: 453: 447: 444: 441: 440: 439:Daily Monitor 428: 426: 421: 417: 412: 409: 405: 401: 397: 392: 390: 386: 382: 377: 369: 367: 363: 359: 355: 354:TotalEnergies 351: 346: 344: 340: 335: 333: 332:Port of Tanga 329: 325: 321: 317: 316:Lake Victoria 313: 309: 305: 301: 297: 293: 283: 281: 277: 271: 269: 265: 261: 260:Standard Bank 257: 253: 249: 245: 244:TotalEnergies 241: 236: 234: 230: 229:Port of Tanga 226: 222: 218: 214: 210: 206: 196: 192: 188: 184: 180: 176: 171: 167: 163: 160: 159:TotalEnergies 157: 153: 149: 145: 140: 137: 134: 130: 126: 123: 119: 116: 112: 109: 105: 101: 97: 92: 64: 62: 58: 55: 51: 48: 44: 39: 32: 27: 22: 19: 3311:. Retrieved 3291: 3244: 3240: 3224:. Retrieved 3220: 3204:. Retrieved 3199: 3187: 3170:. Retrieved 3144:. Retrieved 3139: 3109:. Retrieved 3098:The Guardian 3097: 3087: 3075:. Retrieved 3071: 3061: 3049:. Retrieved 3044: 3035: 3023:. Retrieved 3019: 3010: 2998:. Retrieved 2994: 2984: 2972:. Retrieved 2968: 2959: 2947:. Retrieved 2943: 2933: 2921:. Retrieved 2917: 2908: 2896:. Retrieved 2892: 2883: 2865: 2853:. Retrieved 2849:Naija247news 2848: 2839: 2827:. Retrieved 2823: 2813: 2801:. Retrieved 2797:the original 2792: 2783: 2774: 2764: 2752:. Retrieved 2748: 2739: 2728: 2716:. Retrieved 2712:the original 2705: 2695: 2683:. Retrieved 2672: 2662: 2650:. Retrieved 2643: 2633: 2621:. Retrieved 2617: 2607: 2595:. Retrieved 2590: 2580: 2568:. Retrieved 2561: 2551: 2539:. Retrieved 2532: 2522: 2510:. Retrieved 2503: 2493: 2481:. Retrieved 2476: 2466: 2454:. Retrieved 2449: 2439: 2427:. Retrieved 2422: 2412: 2400:. Retrieved 2390: 2378:. Retrieved 2371: 2346:. Retrieved 2341: 2332: 2320:. Retrieved 2318:. 2 May 2023 2315: 2306: 2294:. Retrieved 2289: 2280: 2268:. Retrieved 2261: 2251: 2239:. Retrieved 2234: 2224: 2212:. Retrieved 2205: 2180:. Retrieved 2173: 2148:. Retrieved 2141: 2116:. Retrieved 2109: 2084:. Retrieved 2077: 2067: 2055:. Retrieved 2048: 2038: 2026:. Retrieved 2019: 2009: 1997:. Retrieved 1990: 1980: 1968:. Retrieved 1941:13 September 1939:. Retrieved 1932: 1922: 1910:. Retrieved 1903: 1893: 1881:. Retrieved 1870: 1861: 1849:. Retrieved 1842: 1832: 1820:. Retrieved 1809: 1799: 1787:. Retrieved 1780: 1770: 1758:. Retrieved 1751: 1741: 1729:. Retrieved 1725:the original 1718: 1708: 1696:. Retrieved 1691:Daily Nation 1689: 1679: 1667:. Retrieved 1660: 1650: 1638:. Retrieved 1631: 1621: 1609:. Retrieved 1602: 1592: 1580:. Retrieved 1576:the original 1569: 1559: 1533:. Retrieved 1522: 1512: 1500:. Retrieved 1486: 1474:. Retrieved 1457: 1445:. Retrieved 1441: 1431: 1419:. Retrieved 1414: 1405: 1393:. Retrieved 1389:the original 1382: 1357:. Retrieved 1350: 1340: 1328:. Retrieved 1324: 1299:. Retrieved 1295: 1268:. Retrieved 1262: 1252: 1240:. Retrieved 1226: 1214:. Retrieved 1207: 1182:. Retrieved 1178:the original 1171: 1161: 1149:. Retrieved 1142: 1117:. Retrieved 1106: 1079:. Retrieved 1068: 1056:. Retrieved 1049: 958: 947: 934:Lake Turkana 926: 906: 895: 891: 878:East African 870: 861:Oil refinery 846: 840: 827: 816: 807: 797: 794: 791:Construction 782: 774:Afrexim Bank 747: 715: 705: 698: 691: 685: 521:agreements. 519: 516: 496: 484: 472:Samia Suluhu 469: 465: 448: 445: 437: 434: 419: 413: 393: 378: 375: 347: 336: 289: 272: 247: 239: 237: 216: 212: 208: 204: 202: 165:Commissioned 18: 3072:The Monitor 3051:25 November 2995:The Monitor 2793:Environment 2618:Le Monde.fr 2570:13 November 1789:10 December 1497:Reuters.com 1237:Reuters.com 1151:5 September 954:Lake Albert 418:passed the 328:Chongoleani 310:in Uganda, 86: / 61:Coordinates 3326:Categories 3247:: 101970. 3140:New Vision 3111:9 December 3077:9 December 3000:9 December 2969:#StopEACOP 2918:#StopEACOP 2893:#StopEACOP 2829:9 December 2674:New Vision 2645:New Vision 2563:New Vision 2541:1 November 2342:#StopEACOP 2270:1 February 2263:New Vision 2241:1 February 2028:31 October 1999:30 October 1970:11 October 1962:. Mumbai: 1934:New Vision 1469:. Oxford: 1270:3 February 1021:References 880:countries. 806:(formerly 248:Kingfisher 127:, Tanzania 74:31°40′33″E 71:01°15′54″S 3308:235082166 3279:233587520 3271:2214-6296 3221:ieefa.org 3106:0261-3077 2681:. Kampala 2648:. Kampala 2380:31 August 2316:Banktrack 2235:SoftPower 2210:. Nairobi 2178:. Kampala 2146:. Nairobi 2118:16 August 2114:. Kampala 2086:22 August 2053:. Kampala 1995:. Nairobi 1937:. Kampala 1908:. Nairobi 1756:. Nairobi 1694:. Nairobi 1665:. Kampala 1636:. Kampala 1607:. Nairobi 1355:. Kampala 1296:Yale E360 1147:. Nairobi 1115:. Kampala 853:with the 493:Ownership 345:(CNOOC). 320:Shinyanga 294:, at the 221:crude oil 2718:3 August 2685:3 August 2597:2 August 2182:24 April 2150:18 March 2057:12 April 1912:6 August 1883:3 August 1874:Quoting 1760:6 August 1731:26 April 1698:26 April 1669:26 April 1640:23 April 1545:cite web 1535:28 April 1526:Quoting 1502:28 April 1476:28 April 1395:16 March 1216:5 August 1184:9 August 1119:8 August 1081:12 April 1058:12 April 964:See also 922:sex work 845:for the 778:Sinosure 387:port of 372:Overview 286:Location 268:Sinosure 233:Tanzania 194:Diameter 155:Partners 54:Tanzania 41:Location 3313:1 March 3249:Bibcode 3226:1 March 3206:1 March 3200:Monitor 3172:1 March 3157:at the 3146:1 March 3025:2 March 2803:2 March 2754:2 March 2652:3 March 2623:1 March 2483:23 June 2456:15 June 2429:15 June 2402:2 March 2348:12 June 2322:12 June 1876:Reuters 1851:12 July 1822:8 March 1611:3 March 1582:3 March 1421:8 March 1359:7 March 1242:3 March 744:Funding 396:Mombasa 383:to the 366:Kasenyi 350:Buliisa 324:Singida 240:Tilenga 46:Country 3306:  3277:  3269:  3104:  2974:31 May 2949:31 May 2923:31 May 2914:"HOME" 2898:31 May 2855:5 July 2512:4 July 2296:24 May 1447:24 May 1417:. 2020 1330:5 July 1301:5 July 810:) and 726:Kololo 545:Notes 385:Kenyan 312:Bukoba 266:, and 246:, and 225:Uganda 178:Length 125:Bukoba 115:Uganda 50:Uganda 3304:S2CID 3292:Oxfam 3275:S2CID 2875:(PDF) 2214:3 May 1467:(PDF) 918:Oxfam 851:Marsh 686:Total 478:with 223:from 217:UTCOP 209:EACOP 111:Hoima 3315:2023 3267:ISSN 3228:2023 3208:2023 3174:2023 3148:2023 3113:2023 3102:ISSN 3079:2023 3053:2023 3027:2023 3002:2023 2976:2022 2951:2022 2925:2022 2900:2022 2857:2020 2831:2023 2805:2023 2756:2023 2720:2016 2687:2016 2676:via 2654:2016 2625:2023 2599:2022 2572:2023 2543:2023 2514:2022 2485:2023 2458:2024 2431:2024 2404:2024 2382:2023 2350:2023 2324:2023 2298:2023 2272:2022 2243:2022 2216:2021 2184:2020 2152:2019 2120:2017 2088:2021 2059:2021 2030:2020 2001:2020 1972:2020 1943:2020 1914:2017 1885:2016 1853:2016 1824:2016 1813:via 1791:2021 1762:2017 1733:2016 1700:2016 1671:2016 1642:2016 1613:2016 1584:2016 1551:link 1537:2016 1504:2016 1478:2016 1449:2023 1423:2023 1397:2016 1361:2016 1332:2020 1303:2020 1272:2022 1244:2016 1218:2017 1186:2017 1153:2017 1121:2017 1110:via 1083:2021 1060:2021 912:and 855:OECD 772:and 530:Rank 400:Lamu 389:Lamu 322:and 203:The 147:Type 107:From 52:and 3296:doi 3257:doi 706:100 699:100 692:100 398:or 250:by 3328:: 3302:. 3294:. 3290:. 3273:. 3265:. 3255:. 3245:74 3243:. 3239:. 3219:. 3198:. 3186:. 3138:. 3100:. 3096:. 3070:. 3043:. 3018:. 2993:. 2967:. 2942:. 2916:. 2891:. 2847:. 2822:. 2791:. 2773:. 2747:. 2704:. 2671:. 2642:. 2616:. 2589:. 2560:. 2531:. 2502:. 2475:. 2448:. 2421:. 2370:. 2358:^ 2340:. 2314:. 2288:. 2260:. 2233:. 2204:. 2192:^ 2172:. 2160:^ 2140:. 2128:^ 2108:. 2096:^ 2076:. 2047:. 2018:. 1989:. 1951:^ 1931:. 1902:. 1869:. 1841:. 1808:. 1779:. 1750:. 1717:. 1688:. 1659:. 1630:. 1601:. 1568:. 1547:}} 1543:{{ 1521:. 1495:. 1440:. 1413:. 1381:. 1369:^ 1349:. 1323:. 1311:^ 1294:. 1280:^ 1261:. 1235:. 1206:. 1194:^ 1170:. 1141:. 1129:^ 1105:. 1091:^ 1048:. 1029:^ 940:. 768:, 740:. 732:, 665:10 650:15 623:15 618:15 613:15 591:35 586:35 569:62 564:45 559:35 514:. 231:, 132:To 113:, 3317:. 3298:: 3281:. 3259:: 3251:: 3230:. 3210:. 3190:. 3176:. 3161:. 3150:. 3115:. 3081:. 3055:. 3029:. 3004:. 2978:. 2953:. 2927:. 2902:. 2877:. 2859:. 2833:. 2807:. 2777:. 2758:. 2722:. 2689:. 2656:. 2627:. 2601:. 2574:. 2545:. 2516:. 2487:. 2460:. 2433:. 2406:. 2384:. 2352:. 2326:. 2300:. 2274:. 2245:. 2218:. 2186:. 2154:. 2122:. 2090:. 2061:. 2032:. 2003:. 1974:. 1945:. 1916:. 1887:. 1855:. 1826:. 1793:. 1764:. 1735:. 1702:. 1673:. 1644:. 1615:. 1586:. 1553:) 1539:. 1506:. 1480:. 1451:. 1425:. 1399:. 1363:. 1334:. 1305:. 1274:. 1246:. 1220:. 1188:. 1155:. 1123:. 1085:. 1062:. 1046:) 675:0 670:0 658:5 645:5 640:5 631:4 604:3 596:8 577:2 550:1 215:( 207:(

Index


Uganda
Tanzania
Coordinates
01°15′54″S 31°40′33″E / 1.26500°S 31.67583°E / -1.26500; 31.67583
Hoima
Uganda
Bukoba
Tanga, Tanzania
TotalEnergies
crude oil
Uganda
Port of Tanga
Tanzania
TotalEnergies
China National Offshore Oil Corporation
Uganda's National Oil Company
Standard Bank
Stanbic Bank Uganda
Sinosure
anthropogenic climate change
European Union
Hoima District
Lake Albert (Africa)
Western Region
Albertine Rift
Rakai District
Bukoba
Lake Victoria
Shinyanga

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑