pumping the sand from the updrift (west) section of the coast to the downdrift (east) section of the coast. Sand is captured in a sand trap and the sand is pumped via pipelines to a discharge point on the opposite end of the port. Both capturing and discharge occurs in the wave zones. The system serves to prevent accretion and erosion on the western and eastern sides respectively.
351:, incorporating into its design rainwater harvesting, solar panels and light motion sensors in certain areas. The building’s large window areas allow it to take advantage of the port’s panoramic views and natural lighting flowing into the building, thereby reducing the need for electrical lighting. It represents an investment of R255 million into the economy of the 366:, dating back some 65 years is located outside the port side of the atrium and was declared a heritage site and protected against damage during construction. The building has a capacity for 205 staff, and is divided into east and west wings, separated by an atrium which extends the full height of the building and is serviced by two circular scenic lifts. A 243:
The Port of Ngqura is South Africa's newest port and the deepest container port in the country. It has an entrance channel -18 m Port Chart Datum in depth, a turning basin of 600 m in diameter and also at -18 m Port Chart Datum, 1 general cargo berth at -18 m Port Chart Datum, and
321:
One of the coastal processes considered relevant during the design of the port was sediment transport. Littoral transport is maintained by a fixed embedded jet pump sand bypass that was a world-first. It mimics the natural long shore drift of sand along the coast of South Africa. This is achieved by
410:
The construction of the eastern breakwater water was a 24-hour operation with rock being tipped at a peak-time rate of a 40-ton truckload every three minutes. 800 ton crawler cranes mounted on portal crawlers were used to place the dolosse on the rubble mound breakwaters. The portal crawlers were
370:
at the entrance welcomes both staff and visitors. In addition to offices, other facilities include a gymnasium, canteen, boardrooms, training rooms, a Port Operations Centre and staff rest areas. The building includes a basement comprising parking bays as well as storage and plant rooms. There is
346:
a hundred years before in 1917, carrying over 800 servicemen, the majority of whom were black South Africans. The name was unveiled by TNPA Chief Executive Richard Vallihu, Chief Operating Officer Phyllis Difeto and Ngqura Port Manager Tandi Lebakeng at an event attended by port employees. The
312:
that is situated 1 km off-shore. The paleo channel provided an opportunity to establish a deepwater port without the need to dredge large quantities of consolidated material. This dramatically reduced capital costs associated with dredging. The bay's birdlife, which includes a significant
395:
The crest of the breakwaters at the Port of Ngqura has been formed by 26,500 30-ton dolosse. The dolosse used at the Port of Ngqura weighed 30 tonnes each and they were the largest in the world at their time of construction. They were designed and developed in-house by Transnet National Ports
279:
The main intended function of the Port of Ngqura is to service the industrial bulk commodity requirements of the regional and national hinterland. The port was also planned to serve as a container terminal that would relieve congestion in other ports and to serve as a transhipment hub serving
403:
The dolosse protect the breakwaters by dissipating rather than blocking the energy of incoming waves. Most of the wave action energy is deflected to the side by their angular design. Over time the structures settle and lock into place as the waves subtly shift them. Together, they form an
31: 379:
New technological advancements in port construction were made during the building of the quays (built in the dry), the building of the breakwaters, the use of 30 ton dolosse, and the implementation of the sand bypass system (one of only 3 in the world and unique in itself).
313:
African penguin population was deemed to be environmentally sensitive, so construction was forbidden within 500 m of the island. The main breakwater was designed and constructed to meet the requirements of the Jahleel Island exclusion zone.
399:
A crane driver using a global positioning system (GPS) fitted to the end of his crane ensured that each of the two-storey tall structures was precisely placed to meet to the calculated coordinates of the model studies.
272:
The first phase construction of the Port of Ngqura Greenfields project commenced in September 2002. The MSC Catania, was the first commercial vessel to berth at the port. It off-loaded 275 containers on 4 October 2009.
388:
The port is protected by two breakwaters. The western breakwater is 1.3 km in length and the eastern breakwater is 2.7 km in length. The breakwaters are rubble mound constructions with
392:
serving as armour protection. The main (eastern) breakwater is the longest in South Africa. The breakwaters and dolosse were constructed and placed from September 2002 to February 2006.
434:. The corridor would be 1,003 km long, and would mostly involve upgrades of existing rail lines; capacity is expected to increase from 5·5 million tonnes / year to 16 mpta. 396:
Authority. Approximately 26,500 units were placed- each one 13 m in volume. These structures combined used approximately 344,500 m of concrete (or 826,800 tons).
407:
A double layer of 30 ton dolosse units was placed along the exposed side of the breakwaters and a single layer was placed along the leeward side of the main breakwater.
411:
constructed high enough to allow the haul trucks access to the construction face where back tipping and skip placement of rock was carried out on a 24-hour cycle.
231:. It was authorised by an act of parliament in 2002, construction started in September 2002 and the port became operational in October 2009 when the MSC  308:
Two of the physical characteristics that had the most significant influence on the lay-out of the port, were the paleo-channel that runs through the site and
799: 297:
The Port of Ngqura is the only port in South Africa that has an environmental authorization (Record of Decision or RoD) for its construction and operation.
617: 521: 499: 547: 276:
The Port of Ngqura forms part of the Coega Industrial Development Zone, but falls under the jurisdiction of the Transnet National Ports Authority.
784: 287:
The port would attract new transhipment volumes under the container hub principle as well as handle an increasing number of Gauteng containers.
176:
4 container berths at -16m Port Chart Datum, 2 general cargo berths at -16m Port Chart Datum and 1 general cargo berth at -18m Port Chart Datum
751: 63: 789: 648: 578: 293:
Coega Industrial Development Zone generated cargoes be handled through the port (none of these potential cargoes have been finalized).
592: 663: 794: 726: 77: 331: 149: 137: 290:
The port will serve as a bulk port to handle commodities such as manganese, chemicals, oil and refined hydrocarbons.
624: 525: 756: 309: 70: 280:
primarily the African East and West coast traffic and also inter-line traffic from South America to Asia.
554: 453: 443: 257:
The Port of Ngqura complements the existing ports of South Africa (mainly the twin sister port,
300:
In the 2023 World Bank Container Port Performance Index, the port was ranked 404th out of 405.
266: 258: 691: 254:
The biggest container vessels to have been handled at the port are MSC's 12,500 TEU vessels.
262: 187: 283:
The Port of Ngqura is a deepwater port and the medium to long term expectations are that:
8: 642: 572: 132: 247:
The Port Chart Datum at the Port of Ngqura is 1.026 m below the South African
171: 367: 343: 334:(TNPA) at the port on 23 June 2017. The five-storey, 10 000 m building was named 730: 473: 712: 348: 248: 220: 778: 431: 92: 79: 244:
4 container berth and 2 general cargo berth at -16 m Port Chart Datum.
356: 352: 224: 423: 363: 144: 127:
2009 (commercially) 2012 (officially, by former President Jacob Zuma)
109: 30: 419: 339: 228: 593:"Dead last among 405 ports – SA flies the CPPI rogues flag again" 427: 50: 157: 448: 389: 422:
is upgrading a rail corridor which will connect Ngqura with
404:
interlocking yet porous wall that grows stronger with time.
330:
A new port administration building was launched by the
727:"Cambridge University Press Africa Educator's Blog" 685: 683: 776: 206:2023 World Bank Container Port Performance Index 689: 303: 680: 524:. SouthAfrica.info. 2009-10-13. Archived from 514: 491: 664:"TNPA unveils R255m admin building at Ngqura" 661: 800:Nelson Mandela Bay Metropolitan Municipality 64:Nelson Mandela Bay Metropolitan Municipality 227:) of South Africa, 20 km northeast of 193:2.0 million TEU per annum (design capacity) 752:"Transnet to expand heavy haul operations" 201:1.026m below South African Mean Sea Level 325: 466: 785:Ports and harbours of the Indian Ocean 777: 647:: CS1 maint: archived copy as title ( 577:: CS1 maint: archived copy as title ( 39:Click on the map for a fullscreen view 316: 522:"First ships dock at Port of Ngqura" 500:"Deep-water port of Ngqura launched" 497: 662:van Wyngaardt, Megan (2017-06-27). 371:also an open parking area outside. 13: 790:Ports and harbours of South Africa 502:. Engineering News (Creamer Media) 14: 811: 332:Transnet National Ports Authority 150:Transnet National Ports Authority 138:Transnet National Ports Authority 668:Creamer Media's Engineering News 29: 744: 719: 713:"Massive concrete dolosse used" 374: 705: 690:myportelizabeth (2017-06-27). 655: 610: 585: 540: 474:"UNLOCODE (ZA) - SOUTH AFRICA" 383: 167: 1: 795:Transport in the Eastern Cape 757:Railway Gazette International 498:Smit, Petronel (2009-12-11). 459: 414: 261:) and the deepwater ports in 729:. 2011-08-07. Archived from 342:troop ship that sank in the 304:Environmental considerations 7: 437: 238: 10: 816: 692:"eMendi Welcomed to Nqura" 454:2021 Transnet Cyberattack 444:Transport in South Africa 205: 197: 185: 180: 166: 155: 143: 131: 123: 118: 108: 69: 59: 49: 44: 37: 28: 23: 259:Port of Port Elizabeth 347:building is a 4-star 326:eMendi Admin Building 93:33.80083°S 25.68389°E 349:green rated building 338:in reference to the 235:docked at the port. 18:Port in South Africa 694:. My Port Elizabeth 223:on the east coast ( 98:-33.80083; 25.68389 89: /  317:Sand bypass system 209:404th (out of 405) 478:service.unece.org 213: 212: 807: 769: 768: 766: 764: 748: 742: 741: 739: 738: 723: 717: 716: 709: 703: 702: 700: 699: 687: 678: 677: 675: 674: 659: 653: 652: 646: 638: 636: 635: 629: 623:. Archived from 622: 614: 608: 607: 605: 604: 589: 583: 582: 576: 568: 566: 565: 559: 553:. Archived from 552: 544: 538: 537: 535: 533: 518: 512: 511: 509: 507: 495: 489: 488: 486: 484: 470: 198:Port Chart Datum 169: 104: 103: 101: 100: 99: 94: 90: 87: 86: 85: 82: 33: 21: 20: 815: 814: 810: 809: 808: 806: 805: 804: 775: 774: 773: 772: 762: 760: 750: 749: 745: 736: 734: 725: 724: 720: 711: 710: 706: 697: 695: 688: 681: 672: 670: 660: 656: 640: 639: 633: 631: 627: 620: 618:"Archived copy" 616: 615: 611: 602: 600: 591: 590: 586: 570: 569: 563: 561: 557: 550: 548:"Archived copy" 546: 545: 541: 531: 529: 520: 519: 515: 505: 503: 496: 492: 482: 480: 472: 471: 467: 462: 440: 417: 386: 377: 344:English Channel 328: 319: 306: 241: 97: 95: 91: 88: 83: 80: 78: 76: 75: 40: 19: 12: 11: 5: 813: 803: 802: 797: 792: 787: 771: 770: 743: 718: 704: 679: 654: 609: 584: 539: 513: 490: 464: 463: 461: 458: 457: 456: 451: 446: 439: 436: 416: 413: 385: 382: 376: 373: 327: 324: 318: 315: 310:Jahleel Island 305: 302: 295: 294: 291: 288: 249:Mean Sea Level 240: 237: 221:deepwater port 217:Port of Ngqura 211: 210: 207: 203: 202: 199: 195: 194: 191: 183: 182: 178: 177: 174: 164: 163: 160: 153: 152: 147: 141: 140: 135: 129: 128: 125: 121: 120: 116: 115: 112: 106: 105: 73: 67: 66: 61: 57: 56: 53: 47: 46: 42: 41: 38: 35: 34: 26: 25: 24:Port of Ngqura 17: 9: 6: 4: 3: 2: 812: 801: 798: 796: 793: 791: 788: 786: 783: 782: 780: 759: 758: 753: 747: 733:on 2011-08-07 732: 728: 722: 714: 708: 693: 686: 684: 669: 665: 658: 650: 644: 630:on 2006-09-25 626: 619: 613: 598: 594: 588: 580: 574: 560:on 2006-09-24 556: 549: 543: 528:on 2009-10-16 527: 523: 517: 501: 494: 479: 475: 469: 465: 455: 452: 450: 447: 445: 442: 441: 435: 433: 432:Northern Cape 429: 426:mines around 425: 421: 412: 408: 405: 401: 397: 393: 391: 381: 372: 369: 368:porte-cochère 365: 360: 358: 354: 350: 345: 341: 337: 333: 323: 314: 311: 301: 298: 292: 289: 286: 285: 284: 281: 277: 274: 270: 268: 264: 260: 255: 252: 250: 245: 236: 234: 230: 226: 222: 218: 208: 204: 200: 196: 192: 189: 184: 179: 175: 173: 165: 161: 159: 154: 151: 148: 146: 142: 139: 136: 134: 130: 126: 122: 117: 113: 111: 107: 102: 74: 72: 68: 65: 62: 58: 54: 52: 48: 43: 36: 32: 27: 22: 16: 761:. Retrieved 755: 746: 735:. Retrieved 731:the original 721: 707: 696:. Retrieved 671:. Retrieved 667: 657: 632:. Retrieved 625:the original 612: 601:. Retrieved 599:. 2024-06-05 597:Freight News 596: 587: 562:. Retrieved 555:the original 542: 530:. Retrieved 526:the original 516: 504:. Retrieved 493: 481:. Retrieved 477: 468: 418: 409: 406: 402: 398: 394: 387: 378: 375:Construction 361: 357:South Africa 353:Eastern Cape 335: 329: 320: 307: 299: 296: 282: 278: 275: 271: 263:Richards Bay 256: 253: 246: 242: 232: 225:Indian Ocean 216: 214: 55:South Africa 15: 384:Breakwaters 133:Operated by 96: / 71:Coordinates 779:Categories 737:2020-04-23 698:2017-07-22 673:2017-07-22 634:2007-11-03 603:2024-06-07 564:2007-11-03 460:References 415:Rail links 355:Province, 181:Statistics 162:Artificial 84:25°41′02″E 81:33°48′03″S 424:manganese 364:lime kiln 188:container 110:UN/LOCODE 643:cite web 573:cite web 483:28 April 438:See also 420:Transnet 340:SS Mendi 267:Saldanha 239:Overview 229:Gqeberha 156:Type of 145:Owned by 60:Location 45:Location 763:10 June 532:9 March 506:9 March 430:in the 428:Hotazel 390:dolosse 233:Catania 186:Annual 158:harbour 119:Details 51:Country 336:eMendi 190:volume 172:berths 124:Opened 114:ZACNGQ 628:(PDF) 621:(PDF) 558:(PDF) 551:(PDF) 449:Coega 219:is a 765:2013 649:link 579:link 534:2010 508:2010 485:2020 265:and 215:The 170:of 168:No. 781:: 754:. 682:^ 666:. 645:}} 641:{{ 595:. 575:}} 571:{{ 476:. 362:A 359:. 269:. 251:. 767:. 740:. 715:. 701:. 676:. 651:) 637:. 606:. 581:) 567:. 536:. 510:. 487:.

Index


Country
Nelson Mandela Bay Metropolitan Municipality
Coordinates
33°48′03″S 25°41′02″E / 33.80083°S 25.68389°E / -33.80083; 25.68389
UN/LOCODE
Operated by
Transnet National Ports Authority
Owned by
Transnet National Ports Authority
harbour
berths
container
deepwater port
Indian Ocean
Gqeberha
Mean Sea Level
Port of Port Elizabeth
Richards Bay
Saldanha
Jahleel Island
Transnet National Ports Authority
SS Mendi
English Channel
green rated building
Eastern Cape
South Africa
lime kiln
porte-cochère
dolosse

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.