Summit Tunnel

Source šŸ“

263: 396: 325: 36: 773: 300:
on several railway schemes. Between spring 1835 and 1844, Gooch was the engineer for the Manchester and Leeds Railway on behalf of George Stephenson, who was working on other projects. In September 1837, during Gooch's tenure, work commenced boring the tunnel. Gooch was assisted by Barnard Dickinson.
429:
when it struck ice that had fallen onto the tracks from one of the ventilation shafts. The ice had built up during exceptionally cold weather and fell into the tunnel when it started to thaw. The train was the first to use the tunnel in three days as a result of a temporary break in services around
383:
1840; but the opening was delayed after the discovery of a defective invert, 0.5 miles (0.8 km) from one end which had displaced the central track drain. After repairs, the tunnel was officially opened by Sir John Frederick Sigismund Smith, the government inspector of railways on 1 March 1841.
417:
sections of its outer brickwork. The build up of heat in the surrounding ground led to a 'false spring'; many plants produced flowers and buds as the warm soil triggered new growth. Damage to the tunnel lining was minimal which was attributed to heated gases from the fire escaping through the
247:, assisted by Barnard Dickinson. Progress on its construction was slower than anticipated, largely because excavation was more difficult than anticipated. On 1 March 1841, Summit Tunnel was opened by Sir John Frederick Sigismund Smith; it had cost of Ā£251,000 and 41 workers had died. 340:, which were used to remove material from the shafts. The bedrock was hewn using physical strength and hand tools, illuminated only by candlelight. At an early stage of track laying, the rails were laid directly onto excavated rock, but conventional wooden 304:
The tunnel is 1 mile 1,125 yards (2.638 km) long and 22 feet (6.6 m) tall; the horseshoe-shaped bore is 26 feet (7.9 m) wide and accommodates a pair of tracks. The tunnel falls on a gradient of 1-in-330 southwards (towards
367:
through which it was bored proved to be harder to excavate than anticipated. In March 1839, because of slow progress, the original contractors were dismissed and George Stephenson took over, after which the pace of work increased until a
309:). It was driven by hand through shale, coal and sandstone, after which the walls were lined with six courses of brick, using more than 23 million bricks. The bricks were handmade locally and up to 60,000 were laid in a single day. 351:
Alignment of the tunnel was achieved by drilling 14 vertical shafts to provide survey points. When the tunnel was complete, two shafts were sealed and the remaining 12 were retained as ventilation. The
1077: 336:
The original contractors were Evans, Stewart and Copeland. At the peak of construction, a workforce of between 800 and 1,250 men and boys was active, aided by about 100 horses and 13 stationary
254:
occurred. There were no deaths and five months later, the tunnel reopened after repairs. The tunnel has remained in continuous use with little interruption since it opened.
112: 1082: 74: 804: 731:
Edmondson, Vikki; Sherratt, Fred; Roff, Richard; Levett, Andy (May 2018). "Advancing tunnelling: the Victorian engineering management legacy".
243:
tracks in a single horseshoe-shaped tube, approximately 24 feet (7.2 m) wide and 22 feet (6.6 m) high. Summit Tunnel was designed by
1057: 1052: 665: 777: 639: 422:. Restoration involved replacing 550 yards (500 m) of track and sleepers before it re-opened to traffic on 19 August 1985. 1072: 1067: 532: 507: 301:
When speaking about the tunnel, Dickinson exclaimed: "This tunnel will defy the rage of tempest, fire, war or wasting age".
680: 692: 321:. During August 1838, James Wood, the chairman of the Manchester and Leeds Railway, laid the first brick in a ceremony. 1062: 797: 644: 239:, a natural obstruction to most forms of traffic. The tunnel is just over 1.6 miles (2.6 km) long and carries two 356:
were up to 92 to 308 feet (28 to 94 m) deep. During the tunnel's service life, No.6 was sealed after rock falls.
721: 224: 384:
Summit Tunnel cost Ā£251,000 and the loss of 41 lives. The cost was far greater than the railway company expected.
317:
to water. It has been estimated that about 8,100 tonnes (dry weight) of cement was transported to the tunnel from
282:. When built, it was the world's longest railway tunnel and a critical element of the first trans-Pennine line. 569: 790: 314: 306: 262: 106: 485: 275: 274:
Summit Tunnel, between Littleborough and Todmorden is the highest section of the 51-mile (82 km) long
209: 67: 208:
in England is one of the world's oldest railway tunnels. It was constructed between 1838 and 1841 by the
395: 324: 399:
Public walkthrough of the Summit Tunnel days prior to its reopening to rail traffic, 17 August 1985
508:"The Summit tunnel 175 years on: The miracle of engineering which survived a devastating fire." 289: 244: 184: 165: 43: 977: 597: 329: 19:
This article is about the Summit Tunnel in England. For the Summit Tunnel in California, see
858: 8: 434:. It collided with the tunnel wall, but remained upright and no injuries were reported. 344:
were also used. The spoil was used for other purposes, including in the construction of
410: 404: 318: 251: 60: 994: 971: 960: 934: 929: 919: 863: 740: 717: 565: 528: 419: 380: 369: 353: 297: 293: 267: 914: 909: 828: 635: 35: 999: 944: 924: 899: 873: 848: 843: 693:"Derailment in Summit tunnel, near Todmorden, West Yorkshire, 28 December 2010." 965: 939: 904: 894: 838: 833: 425:
On 28 December 2010, a passenger train travelling from Manchester to Leeds was
286: 279: 240: 1046: 878: 853: 744: 345: 194: 89: 76: 40: 20: 762:(1975, Random House); a novel set during the building of the Summit Tunnel. 341: 337: 310: 220:. When built, Summit Tunnel was the longest railway tunnel in the world. 640:"Southern Entrance to Summit (Railway Tunnel) (Grade II) (1162164)" 616: 541: 782: 426: 373: 217: 1029:
5: Former railway tunnel opened up for pedestrian/cycle/horse traffic
814: 431: 232: 683:ā€˜ā€™Rail Accident Investigation Boardā€™ā€™, 2012. Retrieved 12 June 2018. 376:
occurred in March 1840. The last brick was laid on 9 December 1840.
236: 332:
locomotive hauling a freight train through the tunnel, 8 June 1983
414: 409:
The tunnel closed for the first eight months of 1985 following a
360: 228: 1078:
Buildings and structures in the Metropolitan Borough of Rochdale
714:
The Manchester & Leeds Railway : the Calder Valley line
772: 387:
The southern portal of the tunnel was grade II listed in 1986.
681:ā€œDerailment in Summit tunnel, near Todmorden, West Yorkshire.ā€ 364: 213: 46:
emerges from Summit Tunnel southern portal near Littleborough
730: 622: 547: 1026:
4: Straddles the border between Yorkshire and Lincolnshire
601:, vol. 3, p. 20. Edinburgh: A. Fullarton & Co., 1851. 1032:
6: Former railway tunnel now carrying electricity cables
1020:
2: Straddles the border between Yorkshire and Lancashire
1017:
1: Straddles the border between Yorkshire and Derbyshire
488:ā€˜ā€™engineering-timelines.comā€™ā€™, Retrieved: 12 June 2018. 359:
Progress on construction was slower than expected; the
16:
Railway tunnel near Todmorden, West Yorkshire, England
1023:
3: Straddles the border between Yorkshire and Cumbria
604: 578: 666:"Summit Tunnel blaze was a threat to towns' future." 634: 527:(4 ed.). Beckington, Frome: Trackmaps. 45A. 523:Kelman, Leanne (2018). Brailsford, Martyn (ed.). 1044: 598:The Parliamentary Gazetteer of England and Wales 798: 739:(2). London: Institution of Civil Engineers. 564:(2 ed.). London: Telford. p. 195. 562:Civil engineering heritage. Northern England 175:1 mile 1,125 yards (2.638 km) 671:, 19 December 2009. Retrieved 12 June 2018. 513:, 28 February 2018. Retrieved 12 June 2018. 481: 479: 477: 475: 473: 471: 469: 467: 805: 791: 698:, 13 October 2014. Retrieved 12 June 2018. 465: 463: 461: 459: 457: 455: 453: 451: 449: 447: 34: 502: 500: 498: 496: 494: 212:Company to provide a direct line between 812: 711: 610: 584: 559: 394: 323: 261: 444: 1083:Buildings and structures in Calderdale 1045: 522: 491: 786: 1058:Rail transport in Greater Manchester 379:Summit Tunnel should have opened on 13: 752: 645:National Heritage List for England 413:that generated sufficient heat to 278:, which was built parallel to the 14: 1094: 766: 560:Rennison, Robert William (1996). 1053:Rail transport in West Yorkshire 771: 705: 686: 674: 659: 628: 285:The tunnel was designed by the 590: 553: 516: 257: 180: 1: 1073:Trans-Pennine Railway tunnels 1068:Tunnels in Greater Manchester 390: 276:Manchester and Leeds Railway 210:Manchester and Leeds Railway 7: 760:The World From Rough Stones 10: 1099: 716:. Leeds: Martin Bairstow. 437: 402: 18: 1063:Tunnels in West Yorkshire 1009: 987: 953: 887: 821: 712:Bairstow, Martin (2001). 696:Office of Rail Regulation 525:Midlands & North West 250:On 20 December 1984, the 193: 179: 171: 161: 156: 148: 140: 132: 127: 119: 105: 66: 56: 51: 33: 235:, was bored beneath the 511:Manchester Evening News 888:Railway tunnels closed 778:Summit Tunnel, England 400: 333: 290:Thomas Longridge Gooch 271: 245:Thomas Longridge Gooch 166:Thomas Longridge Gooch 978:Woodsmith Mine Tunnel 780:at Wikimedia Commons 623:Edmondson et al. 2018 548:Edmondson et al. 2018 403:Further information: 398: 330:British Rail Class 40 327: 265: 199:1-in-330 (southwards) 822:Railway tunnels open 733:Forensic Engineering 292:, a collaborator of 266:One of the tunnel's 223:The tunnel, between 90:53.68389Ā°N 2.09194Ā°W 346:Blackpool Promenade 86: /  30: 420:ventilation shafts 405:Summit Tunnel fire 401: 354:ventilation shafts 334: 272: 268:ventilation shafts 252:Summit Tunnel fire 95:53.68389; -2.09194 61:Calder Valley line 28: 1040: 1039: 1035: 1000:Woodhead 3 Tunnel 988:Re-opened tunnels 961:Humber Gas Tunnel 776:Media related to 534:978-1-9996271-1-9 313:was used for its 298:Robert Stephenson 294:George Stephenson 203: 202: 107:OS grid reference 1090: 1014: 945:Woodhead tunnels 807: 800: 793: 784: 783: 775: 748: 727: 699: 690: 684: 678: 672: 663: 657: 656: 654: 652: 636:Historic England 632: 626: 620: 614: 608: 602: 594: 588: 582: 576: 575: 557: 551: 545: 539: 538: 520: 514: 506:Thacker, Simon. 504: 489: 486:ā€œSummit Tunnel.ā€ 483: 182: 144:20 December 1984 115: 101: 100: 98: 97: 96: 91: 87: 84: 83: 82: 79: 38: 31: 27: 1098: 1097: 1093: 1092: 1091: 1089: 1088: 1087: 1043: 1042: 1041: 1036: 1005: 983: 949: 883: 817: 811: 769: 755: 753:Further reading 724: 708: 703: 702: 691: 687: 679: 675: 664: 660: 650: 648: 633: 629: 621: 617: 609: 605: 595: 591: 583: 579: 572: 558: 554: 546: 542: 535: 521: 517: 505: 492: 484: 445: 440: 407: 393: 260: 162:Design engineer 111: 94: 92: 88: 85: 80: 77: 75: 73: 72: 47: 24: 17: 12: 11: 5: 1096: 1086: 1085: 1080: 1075: 1070: 1065: 1060: 1055: 1038: 1037: 1034: 1033: 1030: 1027: 1024: 1021: 1018: 1013: 1011: 1007: 1006: 1004: 1003: 997: 991: 989: 985: 984: 982: 981: 975: 969: 963: 957: 955: 951: 950: 948: 947: 942: 937: 932: 927: 922: 917: 912: 907: 902: 897: 891: 889: 885: 884: 882: 881: 876: 871: 866: 861: 856: 851: 846: 841: 836: 831: 825: 823: 819: 818: 810: 809: 802: 795: 787: 768: 767:External links 765: 764: 763: 758:MacDonald, M. 754: 751: 750: 749: 728: 722: 707: 704: 701: 700: 685: 673: 669:Todmorden News 658: 627: 615: 603: 589: 577: 570: 552: 540: 533: 515: 490: 442: 441: 439: 436: 392: 389: 381:New Year's Eve 315:impermeability 287:civil engineer 280:Rochdale Canal 259: 256: 241:standard-gauge 201: 200: 197: 191: 190: 187: 177: 176: 173: 169: 168: 163: 159: 158: 154: 153: 152:19 August 1985 150: 146: 145: 142: 138: 137: 134: 130: 129: 125: 124: 121: 117: 116: 109: 103: 102: 70: 64: 63: 58: 54: 53: 49: 48: 39: 15: 9: 6: 4: 3: 2: 1095: 1084: 1081: 1079: 1076: 1074: 1071: 1069: 1066: 1064: 1061: 1059: 1056: 1054: 1051: 1050: 1048: 1031: 1028: 1025: 1022: 1019: 1016: 1015: 1012: 1008: 1001: 998: 996: 993: 992: 990: 986: 979: 976: 973: 970: 967: 964: 962: 959: 958: 956: 954:Other tunnels 952: 946: 943: 941: 938: 936: 933: 931: 928: 926: 923: 921: 918: 916: 913: 911: 908: 906: 903: 901: 898: 896: 893: 892: 890: 886: 880: 877: 875: 872: 870: 867: 865: 862: 860: 859:Richmond Hill 857: 855: 852: 850: 847: 845: 842: 840: 837: 835: 832: 830: 827: 826: 824: 820: 816: 808: 803: 801: 796: 794: 789: 788: 785: 781: 779: 774: 761: 757: 756: 746: 742: 738: 734: 729: 725: 723:1-871944-22-8 719: 715: 710: 709: 697: 694: 689: 682: 677: 670: 667: 662: 647: 646: 641: 637: 631: 625:, p. 50. 624: 619: 613:, p. 26. 612: 611:Bairstow 2001 607: 600: 599: 593: 587:, p. 54. 586: 585:Bairstow 2001 581: 573: 567: 563: 556: 550:, p. 51. 549: 544: 536: 530: 526: 519: 512: 509: 503: 501: 499: 497: 495: 487: 482: 480: 478: 476: 474: 472: 470: 468: 466: 464: 462: 460: 458: 456: 454: 452: 450: 448: 443: 435: 433: 428: 423: 421: 416: 412: 406: 397: 388: 385: 382: 377: 375: 371: 366: 362: 357: 355: 349: 347: 343: 339: 338:steam engines 331: 326: 322: 320: 316: 312: 308: 307:Littleborough 302: 299: 295: 291: 288: 283: 281: 277: 269: 264: 255: 253: 248: 246: 242: 238: 234: 230: 226: 225:Littleborough 221: 219: 215: 211: 207: 206:Summit Tunnel 198: 196: 192: 188: 186: 178: 174: 170: 167: 164: 160: 155: 151: 147: 143: 139: 135: 131: 126: 122: 118: 114: 110: 108: 104: 99: 71: 69: 65: 62: 59: 55: 50: 45: 42: 41:Northern Rail 37: 32: 29:Summit Tunnel 26: 22: 21:Tunnel No. 41 868: 770: 759: 736: 732: 713: 706:Bibliography 695: 688: 676: 668: 661: 649:. Retrieved 643: 630: 618: 606: 596: 592: 580: 561: 555: 543: 524: 518: 510: 424: 408: 386: 378: 358: 350: 335: 311:Roman cement 303: 296:and his son 284: 273: 249: 222: 205: 204: 136:1 March 1841 25: 813:Tunnels in 374:bricklayers 258:Development 93: / 68:Coordinates 1047:Categories 995:Thurgoland 980:(minerals) 935:Thurgoland 930:Sugar Loaf 920:Queensbury 651:13 January 571:0727725181 365:blue shale 218:Manchester 78:53Ā°41ā€²02ā€³N 972:Standedge 915:Lees Moor 910:Greenside 864:Standedge 829:Blea Moor 815:Yorkshire 745:2043-9903 432:Christmas 391:Incidents 233:Todmorden 157:Technical 128:Operation 81:2Ā°05ā€²31ā€³W 44:Class 158 925:Sandsend 900:Cat Hill 874:Thackley 849:Grosmont 844:Bramhope 427:derailed 342:sleepers 237:Pennines 149:Reopened 113:SD940208 52:Overview 974:(canal) 968:(canal) 966:Norwood 940:Weedley 905:Drewton 895:Burdale 839:Bradway 834:Bowling 438:Sources 415:vitrify 372:of the 361:bedrock 229:Walsden 1002:  879:Totley 869:Summit 854:Morley 743:  720:  568:  531:  370:strike 270:, 2008 185:tracks 172:Length 141:Closed 133:Opened 120:Status 1010:Notes 231:near 214:Leeds 195:Grade 741:ISSN 718:ISBN 653:2022 566:ISBN 529:ISBN 411:fire 363:and 319:Hull 227:and 216:and 123:Open 57:Line 737:171 183:of 181:No. 1049:: 735:. 642:. 638:. 493:^ 446:^ 348:. 328:A 806:e 799:t 792:v 747:. 726:. 655:. 574:. 537:. 189:2 23:.

Index

Tunnel No. 41
A train emerging from a tunnel portal
Northern Rail
Class 158
Calder Valley line
Coordinates
53Ā°41ā€²02ā€³N 2Ā°05ā€²31ā€³W / 53.68389Ā°N 2.09194Ā°W / 53.68389; -2.09194
OS grid reference
SD940208
Thomas Longridge Gooch
tracks
Grade
Manchester and Leeds Railway
Leeds
Manchester
Littleborough
Walsden
Todmorden
Pennines
standard-gauge
Thomas Longridge Gooch
Summit Tunnel fire

ventilation shafts
Manchester and Leeds Railway
Rochdale Canal
civil engineer
Thomas Longridge Gooch
George Stephenson
Robert Stephenson