Moss Landing Power Plant

Source 📝

497:(CPUC). This would be the largest lithium-ion battery energy storage system in the world. The project began construction in December 2019, and Phase 1 began operating at the end of 2020. It is made of LG JH4 cells in TR1300 racks in two storeys in the old turbine hall. Phase 2 adding a further 100 MW / 400 MWh was completed in August 2021, bringing total capacity to 400 MW / 1,600 MWh. In September 2021, Phase 1 was shut down after a high temperature event caused by a leak in a liquid cooling hose, while Phase 2 kept operating. In February 2022, Phase 1 remained offline while Phase 2 also went offline after a sprinkler event. Most of the facility was back in operation as of July 2022. In 2023, construction of Phase 3 with another 350 MW / 1,400 MWh was underway to bring total capacity to 750 MW / 3,000 MWh, and commissioned in August 2023. 257: 31: 265: 388:
capacity, but a similar amount (mostly ocean cooled) would be retired by 2021. The glut in electricity capacity is partially a result of policies which guarantee utilities like PG&E (a regulated monopoly) a return on investment for building new power plants, even when they are not needed. Independent power producers like Dynegy, on the other hand, do not have a guaranteed return on their investment. Power production has dropped considerably, reducing taxes paid to
536:
actions were taken. Specifically, it was found that mitigating actions were required to minimize the environmental impact of the project on "biological resources" such as wildlife habitat, and on "cultural resources", especially culturally-significant archaeological sites at the proposed location of the Megapack deployment.
667: 606: 535:
Resource Management Agency published a Mitigated Negative Declaration, detailing actions that must be taken to mitigate potential environmental impacts of the project. The report concluded that the project would have a "Less than Significant Impact" on the environment, assuming the correct mitigating
967:
California has a big — and growing — glut of power, an investigation by the Los Angeles Times has found. The state's power plants are on track to be able to produce at least 21% more electricity than it needs by 2020, based on official estimates. And that doesn't even count the soaring production of
973:
Utilities are typically guaranteed a rate of return of about 10.5% for the cost of each new plant regardless of need. This creates a major incentive to keep construction going: Utilities can make more money building new plants than by buying and reselling readily available electricity from existing
440:
The generation process for units 6 and 7 starts with natural gas injected at one end of the boiler to be burned. Primary water is injected at the other end of the boiler to receive the heat produced. The gas simply comes from a natural gas pipeline, and combustion products go up the stack and into
387:
In February 2017, independent power producer Dynegy, Inc. announced that it may close the gas plant, due to market conditions resulting from a glut of wholesale electricity capacity in California making it difficult to operate profitably. By 2018, California had 7,000 MW of surplus generating
1574:
The BESS project will have the capacity to dispatch up to 730 megawatt hours (MWh) of energy to the electrical grid at a maximum rate of 182.5 MW for up to 4 hours during periods of high demand. The purpose of the Elkhorn Battery Energy Storage System (BESS) Project (project) is to enable
1478:
transform the voltage between the 34.5 kV power conversion systems and the 500 kV transmission systems. The substations would contain the 500 kV transformer control house and associated breakers, switches, and miscellaneous equipment necessary to tap into existing 500 kV
370:
units, 50% more efficient than the other units, because they use two turbines: first, a pair of 170 MW gas turbines, then a 190 MW steam turbine, for a total of 530 MW each. When completed in 2002, the plant was the largest power plant in California by capacity, at 2560 MW.
1741:
Pacific Gas and Electric Co.'s 182.5-MW Tesla Moss Landing Battery Energy Storage Project (Elkhorn), for instance, a marquee project planned near the shores of California's Monterey Bay, was on track to start construction in late March. That will not happen now as Pacific Gas and Electric, or
327:
of 750 MWh MW / 3,000 MWh of power, potentially the world's largest when completed. A fire occurred on site in 2022 during construction, and PG&E and Tesla took corrective actions. The project still moved forward and Phase III was completed and went into operation in June 2023.
457:
Combustion products drive the gas turbines directly. First, air is drawn from the air intake to the compressor (driven by the turbine axle), then it is burned with natural gas in the combustion chamber. The hot combustion gasses then go through the actual turbine (driving the axle). From a
445:. Then it is purified, used to cool down the water coming from the turbines, and discharged into the ocean. Steam for the turbines is created from the primary water flow, which is preheated before entering the boiler. From the boiler, the superheated steam is directed into a first 663: 598: 343:
In 1964, the construction of two additional units began (6 and 7), with two new 500-foot (150 m) stacks. These two units had a capacity of 750 MW each for a total of 1500 MW, with 180 feet (55 m) tall boilers. They employed a newer technology using
519:
The project is designed to improve energy reliability and to allow for more renewable energy sources to be used at the Moss Landing site by increasing electricity storage available in California. The project also aims to save costs by reducing PG&E's reliance on
424:
Both the supercritical units and the combined cycle units use once-through cooling. The supercritical units have a cooling requirement of 600,000 US gallons (2,300 m) per minute, and the combined cycle units a requirement of 250,000 US gallons (950 m).
1690: 1030:"It's huge for the area and as you know the power plant has been gradually shutting down and they producing about one-tenth of the power they used to produce in the past and that hurts us from a tax standpoint," said Monterey County Supervisor John Phillips. 1703:
The same union group, represented by the same law firm, offered a similar critique a few years ago when the county was considering California Flats solar project in South County. The threat of a lawsuit allowed organized labor to get concessions from the
437:. These units were retired at the end of 2016. At the end of their life, units 6 and 7 were typically operated as peaking units when demand for electricity was highest. In 2016, the last year of operation, they only operated approximately 3% of the time. 1143: 493:, using the existing turbine building and existing interconnection from units 6 and 7, connecting to the 500 kV grid. Vistra Energy expected the energy storage system to begin commercial operation by the end of 2020, pending receipt of approval from 1728: 547:
when performing its environmental assessment. This same union group, with the same legal representation, used similar arguments against the California Flats solar project in order for organized labor to get concessions from the developer.
1174: 916: 1575:
PG&E to provide reliable and flexible power to the electrical system at and around PG&E's Moss Landing Substation, which serves the South Bay-Moss Landing local sub-area, spanning Silicon Valley to the central coast.
1682: 1443: 1861: 1758: 1531: 1045: 512:(PG&E) asked the CPUC to approve four energy storage projects located at Moss Landing including another large lithium-ion battery storage system of 182.5 MW / 730 MWh ("Elkhorn") to be provided by 365:
Starting in 2000, the eight 225-foot (69 m) stacks and 19 fuel oil storage tanks were removed, and two new units were built on the former site. The new units 1 and 2 were brought online in 2002. They are
1135: 441:
the atmosphere. Water has a much more complicated path, and consists of two distinct systems: coolant water and primary (steam-generating) water. Cooling water is pumped out of the Monterey Bay or the nearby
465:
At the output of the gas turbines, some of the remaining energy (heat) in the exhaust gas is recovered through a heat exchanger and transferred to water that feeds a steam turbine, similar to units 6 and 7.
340:(PG&E) began construction on the Moss Landing Power Plant. Five natural gas and oil powered steam units were built during the 1950s. Commercial generation started in 1950 with a capacity of 613 MW. 1004:
The California ISO has about 7,000 megawatts of surplus capacity . .. about 7,000 megawatts of older plants are already set to retire by 2021 due to a regulation on plants that use ocean water for cooling.
1321: 1299: 1720: 999: 551:
In February 2020, the Monterey County Planning Commission unanimously approved the project, which was initially scheduled to start construction in late March and be complete by 2021. However, the
316:
generation units. It was once the largest power plant in the state of California, with a generation capacity of 2560 MW, before its two large supercritical steam units were retired in 2016.
1166: 1351: 1228: 1205: 462:. Because the gas turbine does not transfer energy from the combustion process to the turbine via steam, it avoids the cost, energy loss and environmental impact of the primary water cycle. 1836: 908: 1561: 1382: 1113: 693: 384:
On December 31, 2016, Dynegy retired supercritical steam units 6 and 7 as they were no longer economically competitive. However, Dynegy continues to maintain the permit on these units.
1791: 1259: 1413: 2465: 883: 1629: 642: 1435: 1868: 1754: 739: 1813: 1523: 1053: 1025: 374:
In 2006, having invested over half a billion dollars in upgraded capacity, efficiency and emission control, Duke Energy sold the plant to LS Power Equity Partners.
2460: 1313: 469:
On a smaller scale than the supercritical units, units 1 and 2 are also more flexible, with a start-up time of only an hour, against 24 hours for units 6 and 7.
1291: 989: 850: 68: 1343: 2475: 1220: 1197: 489:, which merged with Dynegy on April 9, 2018, announced that it will develop a 300 MW / 1,200 MWh energy storage system to be located at 1828: 1742:
PG&E, has postponed groundbreaking "until after the stay-at-home order is lifted," according to Paul Doherty, a spokesperson for the utility.
1498: 1553: 1374: 1105: 764: 782: 689: 1783: 1771:
Construction for the project is anticipated to begin in late 2019 and early 2020, with closing-out activities continuing through summer 2021.
1251: 1405: 952: 2480: 1854: 1664: 820: 500:
An expansion to 1,500 MW / 6,000 MWh (also connecting to the 500 kV grid) was approved in August 2020, but not decided.
873: 1598: 237: 1621: 632: 1083: 715: 2116: 2101: 494: 1805: 732: 647:
four projects, totaling 567.5 megawatts/2,270 megawatt-hours … includes … 182.5-megawatt/730-megawatt-hour Tesla system that
540: 2211: 2121: 2030: 1877: 1017: 573: 544: 528: 1956: 2333: 1982: 2338: 1465: 2096: 648: 509: 358:(DENA) in 1998. To comply with more restrictive pollution regulations, units 6 and 7 were upgraded in 1998 with a 2399: 2249: 2239: 2106: 2025: 2010: 1930: 578: 552: 2318: 2298: 381:
In 2015, a transmission tower collapsed at the power plant, causing a major Monterey County area power outage.
2040: 2303: 359: 320: 842: 2389: 2384: 2206: 2141: 2131: 2111: 351:
In 1995, the original five units were retired, and in 1997 PG&E let the permits lapse for these units.
1436:"Vistra approved to build a grid battery bigger than all utility-scale battery storage in the US combined" 2429: 2283: 532: 389: 2343: 2328: 2293: 2275: 2234: 2050: 2015: 1987: 1278: 1491: 2353: 2308: 2071: 2055: 555:
and subsequent stay-at-home order forced the project to be delayed. Construction began in July 2020,
337: 768: 2439: 1940: 790: 508:
Utilities in California are required by a 2013 law to provide significant battery storage by 2024.
490: 477:
Utilities in California are required by a 2013 law to provide significant battery storage by 2024.
285: 56: 2434: 2424: 2419: 412:
that allow power to flow to far-away regions. The plant is also connected to local loads and the
1314:"World's biggest lithium battery storage facility now completely offline after weekend incident" 216: 2313: 2005: 449:
working at high pressure, then into a low pressure turbine. The turbines drive the generators.
942: 2470: 2035: 1935: 556: 108: 1656: 1292:"Investigation begins into overheating incident at world's biggest battery storage facility" 812: 2485: 2394: 2363: 2288: 2191: 2156: 1903: 568: 413: 324: 1590: 1221:"Manufacturer reveals involvement in world's biggest battery energy storage system so far" 1198:"At 300MW / 1,200MWh, the world's largest battery storage system so far is up and running" 8: 2229: 2020: 1972: 521: 434: 345: 2348: 539:
The project was subsequently opened to public submissions on its environmental impact.
187: 256: 2166: 2161: 1075: 947: 297: 30: 2368: 2146: 1344:"World's biggest battery storage system comes back online after months of shutdown" 354:
As part of the Deregulation of Utilities in California, PG&E sold the plant to
1683:"Moss Landing mega battery project faces environmental challenge from union group" 2323: 2171: 1829:"PG&E ushers in landmark Tesla battery energy storage system at Moss Landing" 994: 878: 637: 990:"PG&E Must Solicit Energy Storage and DERs to Replace 3 Existing Gas Plants" 264: 2244: 1846: 1375:"Vistra's 350MW Moss Landing expansion coming online this summer in California" 442: 378:
then purchased the plant in April 2007 along with other assets of LS partners.
367: 313: 200: 147: 1554:"Monterey County - File #: PC 20-013, PLN180371. Exhibit B - Discussion draft" 1272: 1106:"Monterey County - File #: PC 19-019, PLN180394. Exhibit B - Discussion draft" 2454: 2186: 1136:"Vistra Energy to Develop 300-Megawatt Battery Storage Project in California" 486: 459: 206: 83: 70: 1784:"PG&E, Tesla begin construction on one of the world's largest batteries" 1406:"Moss Landing: World's biggest battery storage project is now 3GWh capacity" 1252:"Expansion complete at world's biggest battery storage system in California" 516:
and owned and operated by PG&E, connecting to the regional 115 kV grid.
2254: 2176: 2151: 690:"PG&E Shares Findings of September 2022 Moss Landing Megapack Incident" 633:"PG&E's Record-Breaking Battery Proposal Wins Approval From Regulators" 289: 1457: 246: 2201: 2136: 1977: 1721:"US battery storage boom hits COVID-19 roadblock as project delays mount" 909:"Moss Landing power plant's tall twin towers are off, but permits remain" 513: 355: 281: 277: 140: 125: 1046:"PG&E, Tesla Break Ground on Landmark Battery Energy Storage System" 2358: 2196: 2181: 2126: 1881: 1167:"Despite COVID-19, 300-MW Calif. battery array expected online in 2020" 783:"Duke Energy Completes Sale of Wholesale Generation Assets to LS Power" 543:
argued that the County of Monterey failed to meet the standards of the
1622:"In Boost for Renewables, Grid-Scale Battery Storage Is on the Rise" 1921: 1894: 1755:"Elkhorn Battery Storage Facility - Mitigated Negative Declaration" 309: 193: 1274:
Vistra provides first look at Moss Landing energy storage facility
968:
electricity by rooftop solar panels that has added to the surplus.
1524:"Tesla strikes another mammoth energy storage deal in California" 765:"Duke Energy Breaks Ground on Moss Landing Modernization Project" 446: 409: 405: 401: 301: 293: 1806:"PG&E commissions 182.5MW/730MWh Tesla BESS at Moss Landing" 375: 305: 121: 1591:"Tesla's Megapack is a battery built for the electrical grid" 943:"Californians are paying billions for power they don't need" 599:"Electricity Data Browser - Dynegy Moss Landing Power Plant" 874:"Update: Power trickling back on across Monterey Peninsula" 16:
Natural gas-fired power station in Moss Landing, California
733:"Final Staff Assessment- Moss Landing Power Plant Project" 1458:"Dynegy Moss Landing LLC (Vistra Energy) / IS_PLN190253" 35:
Moss Landing Power Plant, with its highly visible stacks
2466:
Buildings and structures in Monterey County, California
936: 934: 843:"Dynegy Announces Completion of LS Power Transaction" 524:
that come online during periods of increased demand.
308:
and currently has a generation capacity of 1020 
1018:"Tesla battery power plant approved in Moss Landing" 428: 1651: 1649: 1647: 931: 903: 901: 716:"Vistra Moss Landing Phase III expansion complete" 626: 624: 2452: 1876: 1644: 1585: 1583: 1040: 1038: 767:. Duke Energy. November 16, 2000. Archived from 898: 621: 458:thermodynamic standpoint, this is the standard 452: 2461:Natural gas-fired power stations in California 1676: 1674: 1112:. Monterey County. March 20, 2019. p. 5. 1052:(Press release). July 29, 2020. Archived from 941:Penn, Ivan; Menezes, Ryan (February 5, 2017). 1862: 1580: 1035: 727: 725: 559:in April 2022, and inaugurated in June 2022. 400:The plant has power lines that connect it to 1757:. Monterey County. July 2, 2019. p. 7. 1492:"Advice Letter 5322-E from PG&E to CPUC" 1464:. Monterey County. May 15, 2020. p. 9. 1671: 940: 738:. California Energy Commission. June 2000. 1869: 1855: 722: 1714: 1712: 1546: 1450: 1403: 1372: 1289: 1249: 1243: 1218: 1195: 1098: 1794:from the original on September 28, 2020. 1076:"Vistra / Dynegy Merger - Vistra Energy" 1002:from the original on September 2, 2020. 871: 527:On July 3, 2019, in accordance with the 263: 255: 2476:Energy infrastructure completed in 1949 1468:from the original on September 18, 2020 1446:from the original on September 4, 2020. 1302:from the original on September 9, 2021. 987: 630: 260:Aerial view of Moss Landing Power Plant 238:Related media on Commons 2453: 1718: 1709: 1680: 1324:from the original on February 16, 2022 1208:from the original on January 28, 2021. 1164: 1015: 955:from the original on February 22, 2017 872:Melendez, Claudia (October 18, 2015). 813:"LS Power Closes Deal for Duke Assets" 745:from the original on February 16, 2017 645:from the original on August 10, 2020. 495:California Public Utilities Commission 296:are landmarks, visible throughout the 1850: 1826: 1761:from the original on October 21, 2020 1693:from the original on October 19, 2021 1632:from the original on February 6, 2021 1601:from the original on October 10, 2021 1564:from the original on October 21, 2020 1290:Colthorpe, Andy (September 8, 2021). 1262:from the original on August 21, 2021. 1116:from the original on October 21, 2020 696:from the original on January 25, 2024 670:from the original on January 17, 2023 609:from the original on January 17, 2023 541:California Unions for Reliable Energy 300:. The plant is owned and operated by 1908: 1798: 1619: 1385:from the original on August 31, 2024 1028:from the original on July 25, 2020. 1009: 988:Spector, Julian (January 15, 2018). 823:from the original on August 31, 2024 631:Spector, Julian (November 8, 2018). 574:List of power stations in California 545:California Environmental Quality Act 529:California Environmental Quality Act 288:, United States, at the midpoint of 1681:Shalev, Asaf (September 12, 2019). 1667:from the original on July 18, 2022. 1560:. February 14, 2020. pp. 2–4. 1416:from the original on August 2, 2023 1250:Colthorpe, Andy (August 20, 2021). 1196:Colthorpe, Andy (January 7, 2021). 1016:Cortez, Felix (February 27, 2020). 886:from the original on August 8, 2022 268:One of the stacks for units 6 and 7 13: 2334:Imperial Solar Energy Center South 2107:Big Creek No. 1, 2, 2A, 3, 4 and 8 2031:Los Esteros Critical Energy Center 1839:from the original on June 7, 2022. 1816:from the original on May 24, 2022. 1731:from the original on July 25, 2020 1719:Hering, Garrett (March 26, 2020). 1620:Katz, Cheryl (December 15, 2020). 1404:Colthorpe, Andy (August 2, 2023). 1354:from the original on July 14, 2022 1231:from the original on June 19, 2021 1177:from the original on July 25, 2020 1165:Hering, Garrett (April 17, 2020). 919:from the original on July 10, 2018 472: 395: 362:unit and digital control systems. 14: 2497: 2481:1949 establishments in California 2339:Imperial Solar Energy Center West 1534:from the original on July 3, 2018 1504:from the original on July 3, 2018 1219:Colthorpe, Andy (June 17, 2021). 1146:from the original on July 3, 2018 1086:from the original on July 3, 2018 853:from the original on May 29, 2018 651:would own at a substation nearby. 503: 429:Supercritical Steam Units 6 and 7 348:at 3,600 psi (25 MPa). 1657:"MITIGATED NEGATIVE DECLARATION" 1373:Colthorpe, Andy (May 10, 2023). 480: 132:Thermal power station 29: 2400:Solar Energy Generating Systems 2324:Desert Stateline Solar Facility 2026:Huntington Beach Energy Project 2011:Donald Von Raesfeld Power Plant 1820: 1776: 1747: 1613: 1516: 1484: 1428: 1397: 1366: 1336: 1306: 1283: 1266: 1212: 1189: 1158: 1128: 1068: 981: 865: 835: 579:List of energy storage projects 553:COVID-19 pandemic in California 2319:Centinela Solar Energy Project 2299:California Flats Solar Project 805: 775: 757: 708: 682: 656: 591: 416:region by transmission lines. 1: 2304:California Valley Solar Ranch 789:. May 4, 2006. Archived from 584: 360:selective catalytic reduction 321:battery storage power station 2390:Ivanpah Solar Power Facility 2385:Genesis Solar Energy Project 1936:Puente Hills Energy Recovery 1827:Kenny, Tess (June 7, 2022). 453:Combined Cycle Units 1 and 2 419: 404:, and interconnections like 284:generation plant located in 7: 2430:San Gorgonio Pass Wind Farm 2284:Antelope Valley Solar Ranch 664:"Dynergy Generating Assets" 562: 201:Annual net output 10: 2502: 2344:McCoy Solar Energy Project 2329:Desert Sunlight Solar Farm 2294:Blythe Solar Power Project 2051:Russell City Energy Center 2016:Gateway Generating Station 974:plants run by competitors. 510:Pacific Gas & Electric 338:Pacific Gas & Electric 331: 84:36.8048722°N 121.7819972°W 2412: 2377: 2354:Panoche Valley Solar Farm 2309:Campo Verde Solar Project 2274: 2267: 2220: 2089: 2080: 2064: 1996: 1965: 1949: 1917: 1888: 1140:investor.vistraenergy.com 243: 233: 228: 215: 199: 186: 179:Units decommissioned 166: 162: 157: 146: 136: 131: 117: 107: 99: 62: 52: 44: 40: 28: 23: 2440:Tehachapi Pass Wind Farm 2046:Moss Landing Power Plant 1957:Argus Cogeneration Plant 319:It is the site of a new 286:Moss Landing, California 274:Moss Landing Power Plant 89:36.8048722; -121.7819972 57:Moss Landing, California 24:Moss Landing Power Plant 2435:Shiloh Wind Power Plant 2425:Altamont Pass Wind Farm 2420:Alta Wind Energy Center 2147:Mammoth Pool Powerhouse 188:Nameplate capacity 2314:Catalina Solar Project 2192:San Francisquito No. 1 2006:Alamitos Energy Center 1941:Sunshine Gas Producers 1687:Monterey County Weekly 976: 970: 913:Monterey County Weekly 269: 261: 171:Units operational 2207:White Rock Powerhouse 2036:Metcalf Energy Center 1558:monterey.legistar.com 1320:. February 16, 2022. 1110:monterey.legistar.com 971: 965: 915:. February 23, 2017. 793:on September 27, 2011 267: 259: 217:Storage capacity 158:Power generation 2395:Mojave Solar Project 2364:Springbok Solar Farm 2289:Beacon Solar Project 2157:New Bullards Bar Dam 2142:Loon Lake Powerhouse 718:. September 3, 2023. 569:Energy in California 325:grid battery storage 223:(starting late 2020) 109:Commission date 2255:William R. Gianelli 2152:Moccasin Powerhouse 2117:Caribou No. 1 and 2 2021:Glenarm Power Plant 1810:Energy Storage News 1442:. August 13, 2020. 1410:Energy-Storage.News 1379:Energy Storage News 1348:Energy Storage News 1318:Energy Storage News 1296:Energy Storage News 1256:Energy Storage News 1225:Energy Storage News 1202:Energy Storage News 522:peaker power plants 435:supercritical steam 433:Units 6 and 7 used 346:supercritical steam 312:(net) from its two 229:External links 148:Combined cycle 80: /  2349:Mount Signal Solar 2132:Jaybird Powerhouse 1812:. April 19, 2022. 1661:County of Monterey 1462:ceqanet.opr.ca.gov 533:County of Monterey 485:On June 29, 2018, 270: 262: 124:, a subsidiary of 2448: 2447: 2408: 2407: 2263: 2262: 2167:New Exchequer Dam 2162:New Don Pedro Dam 2112:Camino Powerhouse 2102:Belden Powerhouse 1790:. July 29, 2020. 1597:. July 29, 2019. 1350:. July 18, 2022. 1056:on March 15, 2023 948:Los Angeles Times 849:. April 2, 2007. 298:Monterey Bay Area 254: 253: 224: 211: 137:Primary fuel 2493: 2369:Topaz Solar Farm 2272: 2271: 2212:William E. Warne 2097:Balch Powerhouse 2087: 2086: 1871: 1864: 1857: 1848: 1847: 1841: 1840: 1824: 1818: 1817: 1802: 1796: 1795: 1780: 1774: 1773: 1768: 1766: 1751: 1745: 1744: 1738: 1736: 1725:www.spglobal.com 1716: 1707: 1706: 1700: 1698: 1678: 1669: 1668: 1653: 1642: 1641: 1639: 1637: 1617: 1611: 1610: 1608: 1606: 1587: 1578: 1577: 1571: 1569: 1550: 1544: 1543: 1541: 1539: 1520: 1514: 1513: 1511: 1509: 1503: 1496: 1488: 1482: 1481: 1475: 1473: 1454: 1448: 1447: 1432: 1426: 1425: 1423: 1421: 1401: 1395: 1394: 1392: 1390: 1370: 1364: 1363: 1361: 1359: 1340: 1334: 1333: 1331: 1329: 1310: 1304: 1303: 1287: 1281: 1275: 1270: 1264: 1263: 1247: 1241: 1240: 1238: 1236: 1216: 1210: 1209: 1193: 1187: 1186: 1184: 1182: 1171:www.spglobal.com 1162: 1156: 1155: 1153: 1151: 1132: 1126: 1125: 1123: 1121: 1102: 1096: 1095: 1093: 1091: 1072: 1066: 1065: 1063: 1061: 1042: 1033: 1032: 1013: 1007: 1006: 985: 979: 978: 962: 960: 938: 929: 928: 926: 924: 905: 896: 895: 893: 891: 869: 863: 862: 860: 858: 839: 833: 832: 830: 828: 809: 803: 802: 800: 798: 779: 773: 772: 771:on July 2, 2004. 761: 755: 754: 752: 750: 744: 737: 729: 720: 719: 712: 706: 705: 703: 701: 686: 680: 679: 677: 675: 660: 654: 653: 628: 619: 618: 616: 614: 595: 247:edit on Wikidata 222: 209: 95: 94: 92: 91: 90: 85: 81: 78: 77: 76: 73: 33: 21: 20: 2501: 2500: 2496: 2495: 2494: 2492: 2491: 2490: 2451: 2450: 2449: 2444: 2404: 2373: 2259: 2222: 2216: 2172:New Melones Dam 2082: 2076: 2060: 1998: 1992: 1983:Imperial Valley 1961: 1945: 1919: 1913: 1909:Elkhorn Battery 1892: 1890: 1884: 1875: 1845: 1844: 1825: 1821: 1804: 1803: 1799: 1788:pv magazine USA 1782: 1781: 1777: 1764: 1762: 1753: 1752: 1748: 1734: 1732: 1717: 1710: 1696: 1694: 1679: 1672: 1655: 1654: 1645: 1635: 1633: 1618: 1614: 1604: 1602: 1589: 1588: 1581: 1567: 1565: 1552: 1551: 1547: 1537: 1535: 1522: 1521: 1517: 1507: 1505: 1501: 1494: 1490: 1489: 1485: 1471: 1469: 1456: 1455: 1451: 1440:pv magazine USA 1434: 1433: 1429: 1419: 1417: 1402: 1398: 1388: 1386: 1371: 1367: 1357: 1355: 1342: 1341: 1337: 1327: 1325: 1312: 1311: 1307: 1288: 1284: 1273: 1271: 1267: 1248: 1244: 1234: 1232: 1217: 1213: 1194: 1190: 1180: 1178: 1163: 1159: 1149: 1147: 1134: 1133: 1129: 1119: 1117: 1104: 1103: 1099: 1089: 1087: 1074: 1073: 1069: 1059: 1057: 1044: 1043: 1036: 1014: 1010: 995:Greentech Media 986: 982: 958: 956: 939: 932: 922: 920: 907: 906: 899: 889: 887: 879:Monterey Herald 870: 866: 856: 854: 841: 840: 836: 826: 824: 819:. May 4, 2006. 811: 810: 806: 796: 794: 781: 780: 776: 763: 762: 758: 748: 746: 742: 735: 731: 730: 723: 714: 713: 709: 699: 697: 688: 687: 683: 673: 671: 662: 661: 657: 638:Greentech Media 629: 622: 612: 610: 597: 596: 592: 587: 565: 506: 483: 475: 473:Battery storage 455: 431: 422: 398: 396:Grid connection 390:Monterey County 334: 250: 88: 86: 82: 79: 74: 71: 69: 67: 66: 36: 17: 12: 11: 5: 2499: 2489: 2488: 2483: 2478: 2473: 2468: 2463: 2446: 2445: 2443: 2442: 2437: 2432: 2427: 2422: 2416: 2414: 2410: 2409: 2406: 2405: 2403: 2402: 2397: 2392: 2387: 2381: 2379: 2375: 2374: 2372: 2371: 2366: 2361: 2356: 2351: 2346: 2341: 2336: 2331: 2326: 2321: 2316: 2311: 2306: 2301: 2296: 2291: 2286: 2280: 2278: 2269: 2265: 2264: 2261: 2260: 2258: 2257: 2252: 2247: 2242: 2237: 2232: 2226: 2224: 2218: 2217: 2215: 2214: 2209: 2204: 2199: 2194: 2189: 2184: 2179: 2174: 2169: 2164: 2159: 2154: 2149: 2144: 2139: 2134: 2129: 2124: 2119: 2114: 2109: 2104: 2099: 2093: 2091: 2084: 2078: 2077: 2075: 2074: 2068: 2066: 2062: 2061: 2059: 2058: 2053: 2048: 2043: 2038: 2033: 2028: 2023: 2018: 2013: 2008: 2002: 2000: 1994: 1993: 1991: 1990: 1985: 1980: 1975: 1969: 1967: 1963: 1962: 1960: 1959: 1953: 1951: 1947: 1946: 1944: 1943: 1938: 1933: 1927: 1925: 1915: 1914: 1912: 1911: 1906: 1900: 1898: 1886: 1885: 1878:Power stations 1874: 1873: 1866: 1859: 1851: 1843: 1842: 1833:Silicon Valley 1819: 1797: 1775: 1746: 1708: 1670: 1643: 1612: 1579: 1545: 1515: 1483: 1449: 1427: 1396: 1365: 1335: 1305: 1282: 1265: 1242: 1211: 1188: 1157: 1127: 1097: 1067: 1034: 1008: 980: 930: 897: 864: 834: 804: 774: 756: 721: 707: 681: 655: 620: 589: 588: 586: 583: 582: 581: 576: 571: 564: 561: 505: 504:Elkhorn 115 kV 502: 482: 479: 474: 471: 454: 451: 443:Elkhorn Slough 430: 427: 421: 418: 397: 394: 368:combined cycle 333: 330: 314:combined cycle 252: 251: 244: 241: 240: 235: 231: 230: 226: 225: 219: 213: 212: 203: 197: 196: 190: 184: 183: 180: 176: 175: 172: 168: 167: 164: 163: 160: 159: 155: 154: 151: 144: 143: 138: 134: 133: 129: 128: 119: 115: 114: 111: 105: 104: 101: 97: 96: 75:121°46′55.19″W 64: 60: 59: 54: 50: 49: 46: 42: 41: 38: 37: 34: 26: 25: 15: 9: 6: 4: 3: 2: 2498: 2487: 2484: 2482: 2479: 2477: 2474: 2472: 2469: 2467: 2464: 2462: 2459: 2458: 2456: 2441: 2438: 2436: 2433: 2431: 2428: 2426: 2423: 2421: 2418: 2417: 2415: 2411: 2401: 2398: 2396: 2393: 2391: 2388: 2386: 2383: 2382: 2380: 2376: 2370: 2367: 2365: 2362: 2360: 2357: 2355: 2352: 2350: 2347: 2345: 2342: 2340: 2337: 2335: 2332: 2330: 2327: 2325: 2322: 2320: 2317: 2315: 2312: 2310: 2307: 2305: 2302: 2300: 2297: 2295: 2292: 2290: 2287: 2285: 2282: 2281: 2279: 2277: 2273: 2270: 2266: 2256: 2253: 2251: 2248: 2246: 2243: 2241: 2240:J.S. Eastwood 2238: 2236: 2233: 2231: 2228: 2227: 2225: 2219: 2213: 2210: 2208: 2205: 2203: 2200: 2198: 2195: 2193: 2190: 2188: 2187:Pine Flat Dam 2185: 2183: 2180: 2178: 2175: 2173: 2170: 2168: 2165: 2163: 2160: 2158: 2155: 2153: 2150: 2148: 2145: 2143: 2140: 2138: 2135: 2133: 2130: 2128: 2125: 2123: 2120: 2118: 2115: 2113: 2110: 2108: 2105: 2103: 2100: 2098: 2095: 2094: 2092: 2088: 2085: 2079: 2073: 2072:Diablo Canyon 2070: 2069: 2067: 2063: 2057: 2054: 2052: 2049: 2047: 2044: 2042: 2041:Midway Sunset 2039: 2037: 2034: 2032: 2029: 2027: 2024: 2022: 2019: 2017: 2014: 2012: 2009: 2007: 2004: 2003: 2001: 1995: 1989: 1986: 1984: 1981: 1979: 1976: 1974: 1971: 1970: 1968: 1964: 1958: 1955: 1954: 1952: 1948: 1942: 1939: 1937: 1934: 1932: 1931:Hyperion DGUP 1929: 1928: 1926: 1923: 1916: 1910: 1907: 1905: 1904:Beacon BESS 1 1902: 1901: 1899: 1896: 1887: 1883: 1879: 1872: 1867: 1865: 1860: 1858: 1853: 1852: 1849: 1838: 1834: 1830: 1823: 1815: 1811: 1807: 1801: 1793: 1789: 1785: 1779: 1772: 1760: 1756: 1750: 1743: 1730: 1726: 1722: 1715: 1713: 1705: 1692: 1688: 1684: 1677: 1675: 1666: 1662: 1658: 1652: 1650: 1648: 1631: 1627: 1623: 1616: 1600: 1596: 1592: 1586: 1584: 1576: 1563: 1559: 1555: 1549: 1533: 1529: 1525: 1519: 1500: 1493: 1487: 1480: 1467: 1463: 1459: 1453: 1445: 1441: 1437: 1431: 1415: 1411: 1407: 1400: 1384: 1380: 1376: 1369: 1353: 1349: 1345: 1339: 1323: 1319: 1315: 1309: 1301: 1297: 1293: 1286: 1280: 1276: 1269: 1261: 1257: 1253: 1246: 1230: 1226: 1222: 1215: 1207: 1203: 1199: 1192: 1176: 1172: 1168: 1161: 1145: 1141: 1137: 1131: 1115: 1111: 1107: 1101: 1085: 1081: 1080:Vistra Energy 1077: 1071: 1055: 1051: 1047: 1041: 1039: 1031: 1027: 1023: 1019: 1012: 1005: 1001: 997: 996: 991: 984: 977: 975: 969: 954: 950: 949: 944: 937: 935: 918: 914: 910: 904: 902: 885: 881: 880: 875: 868: 852: 848: 847:press release 844: 838: 822: 818: 817:press release 814: 808: 792: 788: 787:press release 784: 778: 770: 766: 760: 741: 734: 728: 726: 717: 711: 695: 691: 685: 669: 665: 659: 652: 650: 644: 640: 639: 634: 627: 625: 608: 604: 600: 594: 590: 580: 577: 575: 572: 570: 567: 566: 560: 558: 554: 549: 546: 542: 537: 534: 530: 525: 523: 517: 515: 511: 501: 498: 496: 492: 488: 487:Vistra Energy 481:Vistra 500 kV 478: 470: 467: 463: 461: 460:Brayton cycle 450: 448: 444: 438: 436: 426: 417: 415: 411: 407: 403: 393: 391: 385: 382: 379: 377: 372: 369: 363: 361: 357: 352: 349: 347: 341: 339: 329: 326: 322: 317: 315: 311: 307: 303: 299: 295: 291: 287: 283: 279: 275: 266: 258: 248: 242: 239: 236: 232: 227: 220: 218: 214: 208: 204: 202: 198: 195: 191: 189: 185: 181: 178: 177: 173: 170: 169: 165: 161: 156: 152: 149: 145: 142: 139: 135: 130: 127: 123: 120: 116: 112: 110: 106: 102: 98: 93: 72:36°48′17.54″N 65: 61: 58: 55: 51: 48:United States 47: 43: 39: 32: 27: 22: 19: 2471:Monterey Bay 2177:Oroville Dam 2122:Devil Canyon 2090:Conventional 2045: 1832: 1822: 1809: 1800: 1787: 1778: 1770: 1763:. Retrieved 1749: 1740: 1733:. Retrieved 1724: 1702: 1695:. Retrieved 1686: 1660: 1634:. Retrieved 1625: 1615: 1603:. Retrieved 1594: 1573: 1566:. Retrieved 1557: 1548: 1536:. Retrieved 1528:Ars Technica 1527: 1518: 1506:. Retrieved 1486: 1477: 1470:. Retrieved 1461: 1452: 1439: 1430: 1418:. Retrieved 1409: 1399: 1387:. Retrieved 1378: 1368: 1356:. Retrieved 1347: 1338: 1328:February 16, 1326:. Retrieved 1317: 1308: 1295: 1285: 1268: 1255: 1245: 1233:. Retrieved 1224: 1214: 1201: 1191: 1179:. Retrieved 1170: 1160: 1148:. Retrieved 1139: 1130: 1118:. Retrieved 1109: 1100: 1088:. Retrieved 1079: 1070: 1058:. Retrieved 1054:the original 1049: 1029: 1021: 1011: 1003: 993: 983: 972: 966: 964: 959:December 30, 957:. Retrieved 946: 921:. Retrieved 912: 888:. Retrieved 877: 867: 855:. Retrieved 846: 837: 825:. Retrieved 816: 807: 797:February 16, 795:. Retrieved 791:the original 786: 777: 769:the original 759: 747:. Retrieved 710: 698:. Retrieved 684: 672:. Retrieved 658: 646: 636: 613:February 16, 611:. Retrieved 602: 593: 557:commissioned 550: 538: 526: 518: 507: 499: 491:Moss Landing 484: 476: 468: 464: 456: 439: 432: 423: 399: 386: 383: 380: 373: 364: 353: 350: 342: 335: 318: 292:. Its large 290:Monterey Bay 273: 271: 18: 2486:Vistra Corp 2202:Trinity Dam 2137:Keswick Dam 1978:The Geysers 1765:October 20, 1636:February 6, 1568:October 20, 1472:October 20, 1120:October 20, 1060:February 6, 890:February 6, 700:January 25, 603:www.eia.gov 356:Duke Energy 282:electricity 278:natural gas 141:Natural gas 126:Vistra Corp 103:Operational 87: / 63:Coordinates 2455:Categories 2359:Solar Star 2250:Thermalito 2197:Shasta Dam 2182:Parker Dam 2127:Folsom Dam 1966:Geothermal 1882:California 1704:developer. 674:August 31, 585:References 174:2 x 530 MW 1626:Yale E360 1605:April 15, 1420:August 2, 420:Gas units 336:In 1949, 221:567.5 MW 2221:Pumped- 2083:electric 1997:Natural 1918:Biomass 1891:storage 1889:Battery 1837:Archived 1814:Archived 1792:Archived 1759:Archived 1735:July 24, 1729:Archived 1697:April 5, 1691:Archived 1665:Archived 1630:Archived 1599:Archived 1595:Engadget 1562:Archived 1532:Archived 1499:Archived 1466:Archived 1444:Archived 1414:Archived 1383:Archived 1358:July 18, 1352:Archived 1322:Archived 1300:Archived 1260:Archived 1235:June 18, 1229:Archived 1206:Archived 1181:July 24, 1175:Archived 1144:Archived 1114:Archived 1084:Archived 1050:PG&E 1026:Archived 1000:Archived 953:Archived 917:Archived 884:Archived 851:Archived 821:Archived 740:Archived 694:Archived 668:Archived 649:PG&E 643:Archived 607:Archived 563:See also 414:San Jose 280:powered 118:Owner(s) 53:Location 2378:Thermal 2245:O'Neill 2230:Castaic 2223:storage 2081:Hydro- 2065:Nuclear 1988:Mammoth 1538:July 3, 1508:July 3, 1389:May 10, 1279:YouTube 1150:July 3, 1090:July 3, 923:May 28, 857:May 28, 827:May 28, 749:May 28, 447:turbine 410:Path 66 406:Path 26 402:Path 15 332:History 304:-based 302:Houston 234:Commons 45:Country 2056:Valley 531:, the 376:Dynegy 306:Dynegy 294:stacks 210:(2022) 205:5,336 192:1,060 122:Dynegy 100:Status 2268:Solar 2235:Helms 1502:(PDF) 1495:(PDF) 1479:line. 743:(PDF) 736:(PDF) 514:Tesla 276:is a 245:[ 2413:Wind 1973:Coso 1950:Coal 1920:(≥10 1893:(≥10 1767:2020 1737:2020 1699:2020 1638:2021 1607:2020 1570:2020 1540:2018 1510:2018 1474:2020 1422:2023 1391:2023 1360:2022 1330:2022 1237:2021 1183:2020 1152:2018 1122:2020 1092:2018 1062:2021 1022:KSBW 961:2017 925:2018 892:2021 859:2018 829:2018 799:2011 751:2018 702:2024 676:2024 615:2023 408:and 323:for 272:The 113:1950 1999:gas 1880:in 1277:on 207:GWh 153:Yes 2457:: 2276:PV 1922:MW 1895:MW 1835:. 1831:. 1808:. 1786:. 1769:. 1739:. 1727:. 1723:. 1711:^ 1701:. 1689:. 1685:. 1673:^ 1663:. 1659:. 1646:^ 1628:. 1624:. 1593:. 1582:^ 1572:. 1556:. 1530:. 1526:. 1497:. 1476:. 1460:. 1438:. 1412:. 1408:. 1381:. 1377:. 1346:. 1316:. 1298:. 1294:. 1258:. 1254:. 1227:. 1223:. 1204:. 1200:. 1173:. 1169:. 1142:. 1138:. 1108:. 1082:. 1078:. 1048:. 1037:^ 1024:. 1020:. 998:. 992:. 963:. 951:. 945:. 933:^ 911:. 900:^ 882:. 876:. 845:. 815:. 785:. 724:^ 692:. 666:. 641:. 635:. 623:^ 605:. 601:. 392:. 310:MW 194:MW 1924:) 1897:) 1870:e 1863:t 1856:v 1640:. 1609:. 1542:. 1512:. 1424:. 1393:. 1362:. 1332:. 1239:. 1185:. 1154:. 1124:. 1094:. 1064:. 927:. 894:. 861:. 831:. 801:. 753:. 704:. 678:. 617:. 249:] 182:7 150:?

Index


Moss Landing, California
36°48′17.54″N 121°46′55.19″W / 36.8048722°N 121.7819972°W / 36.8048722; -121.7819972
Commission date
Dynegy
Vistra Corp
Natural gas
Combined cycle
Nameplate capacity
MW
Annual net output
GWh
Storage capacity
Related media on Commons
edit on Wikidata


natural gas
electricity
Moss Landing, California
Monterey Bay
stacks
Monterey Bay Area
Houston
Dynegy
MW
combined cycle
battery storage power station
grid battery storage
Pacific Gas & Electric