522: 533:(KMT)-led government proposed that a referendum should be issued, which would allow the people of the country to decide the fate of the plant. The proposed referendum was sponsored by 32 KMT lawmakers led by Lee Ching-hua and asked "Do you agree that the construction of the Fourth Nuclear Power Plant should be halted and that it not become operational?" Referendums must have good voter turnout (greater than 50% of registered voters must participate in the referendum vote), and a majority of participating voters must vote yes in order for the referendum to become binding, meaning that poor voter turnout would ensure referendum defeat (and in the case of the Lee referendum, continued construction). The opposition DPP claimed that getting better than 50% voter turnout in a non-Presidential election year was too difficult, and barricaded the legislative chamber to prevent a vote to place the Lee referendum on the national ballot. This led to 51: 605: 630:
construction, underwent several revisions until its final submission in January 2015; the AEC approved Taipower's final plan in February, and it will take effect in July 2015 and run through 2017. Of the 126 systems which passed safety testing, 80 will remain in operation, 14 require periodic testing to ensure they can support their safety functions and 32 will be kept in low-humidity storage. It was estimated the cost of maintaining the mothballed reactor is 1.3 billion NT Dollars per year. With the formal entry into mothball status on July 1, Unit 1 is required to resubmit the application for initial fuel loading.
740: 480: 568:, initially as a local referendum and then a national one in July 2014, once sufficient signatures had been gathered. The language of the Kao referendum was formulated to require positive action: "Do you agree to allow Taiwan Power Co to insert fuel rods into the Fourth Nuclear Power Plant in New Taipei City for a test run" so poor voter turnout would result in referendum defeat, and thus create binding opposition to starting the plant. 754: 768: 369:. The preceding four reactors in Japan were completed in four to five years. However, Taipower did not award the contract to a single architect/engineering firm; instead, they split the procurement among multiple vendors, complicating project management and increasing costs. In 2000, the project was canceled due to political opposition when it was approximately 10–30% complete but restarted in February 2001. 577:
purpose of a new referendum was to have the people decide the plant's fate while weighing the consequences of not bringing a major power source on-line. Electricity prices are estimated to rise by 14–40%, and electricity rationing could be imposed as early as 2021. Completely cancelling the plant would force Taipower to book the construction budget as a total loss and force it into insolvency.
518:. By obtaining the signatures of a certain percentage of registered voters, or by legislative action, a referendum may be referred to the national ballot for voter action. However, due to the politically sensitive nature of the Fourth Nuclear Plant issue, legislatively-referred and voter-referred referendums had failed to enter the national ballot. 498:(AEC) criticized Taipower's management of the project. Taipower was fined by the AEC twice, in 2008 and 2011, for completing design changes without first obtaining approval from the plant's designer, General Electric. Taipower later stated the changes were executed to stay on schedule, and approval was later obtained from GE for 97% of the changes. 594:
despite the referendum gathering more than 120,000 signatures. Undaunted, supporters of the Kao referendum vowed in October 2014 to initiate another referendum. That same month, Unit 1 completed the required safety tests before the start of operations. 126 systems were tested including cooling, shutdown, containment, control and power generation.
713:
Some custom made power plants have lower reliability in the first few years of operation. Some parts may prove unsuitable and need replacement or modifications may be necessary. ABWR uses standardized parts to avoid this, but the 3rd and 4th units displayed low reliability (45% - 70%). It is believed
585:
cited the prior 2000 precedent when construction was interrupted by executive order which was later ruled unconstitutional as the reason why he rejected the proposed special legislation. The Executive Yuan stated the plant could start operations if the referendum on halting construction was not held,
576:
In April 2014, the government decided to halt construction. The first reactor was sealed after the completion of safety checks, and construction of the second reactor was halted. A final decision on whether to proceed with construction would be subject to another referendum. The ruling KMT stated the
653:
plans to shut down all nuclear plants in Taiwan by 2025. The removal of the fuel rods may mean that the plant's construction will never be restarted. Taipower stated it would take at least six years to start commercial operations at Unit 1 due to fuel removal, obsolescence of components in the ABWR
433:
to supply the turbines and the generators, and other contractors for the rest, making the project difficult to manage. Construction has been delayed by legal, regulatory and political obstacles. The delays in schedule also have increased the cost of the project, due to the inflation of the costs of
428:
The application to start construction was submitted on October 16, 1997, and after the license was granted on March 17, 1999, construction of the plant began in 1999 and was expected to be completed in 2004. The preceding four ABWR units in Japan were completed in four to five years each. Taipower,
701:
A Generation III nuclear reactor has a 72-hour capability of passive cooling to prevent damage to its core should the plant face a total blackout after an emergency shut down. If core overheating and meltdown became unavoidable, these reactors have core catchers that will trap the molten fuel and
372:
A national referendum was proposed in 2014 to decide if construction of the plant should continue, but the referendum was rejected from the ballot for contradictory and confusing language. Taipower submitted a plan to mothball Unit 1, which was by then complete, and freeze construction of Unit 2,
593:
The proposed Kao referendum was rejected by the Executive Yuan Referendum Review Committee in August 2014, citing the language as confusing and contradictory, since the reason given for the referendum is in opposition to nuclear power, while the referendum itself asks to start a nuclear reactor,
556:
in May 2013, ruling the issue was of national importance, and could not be decided by local referendum. She launched another local referendum in June 2013 in opposition to the KMT-authored Lee referendum. Meanwhile, Lu filed suit in 2014 in the Taipei High Administrative Court over the Executive
629:
In September 2014 Taiwan Power Co. submitted its plan to the Atomic Energy Council (AEC) to mothball Unit 1 and halt construction on Unit 2 of the No. 4 nuclear power plant for three years, beginning in 2015. The plan, written in accordance with the April 2014 government directive to halt
501:
The temporary cancellation by the Government and other project management difficulties caused significant delays, pushing the price tag of the plant to more than US$ 7.5 billion by 2009. As of 2014, the total price tag was close to US$ 10 billion, or NT$ 300 billion.
702:
stop the nuclear reaction (although Lungmen, as other ABWR does not have a core catcher but rely on passive cooling of the corium). Finally, a tight containment ensures that no evacuation zone is required around a Generation III nuclear power plant.
537:
when KMT legislators attempted to break through the barricade, and the Lee referendum was not voted on. In the following legislative session, protesters called on the government to withdraw the Lee referendum, and it was subsequently withdrawn.
612:
Past polls in Taiwan have showed more support for nuclear power among educated than uneducated people. The China Times poll taken in 2000 showed 60% support among those with higher degrees, and only 40% among those with only primary education.
580:
Meanwhile, also in April 2014, the opposition DPP planned to introduce special legislation to bypass the provisions of the Referendum Act, allowing a simple majority vote (with no threshold of participation) to decide the plant's fate. Premier
476:, prompting further protests. Each reactor vessel delivery was greeted with activist protests and construction delays resulted in the vessels being stored longer than expected, with Unit 1's reactor vessel not installed until 2005. 491:(S&W), but Taipower canceled its contract with S&W in 2007, leading to protracted litigation from 2007 to 2011. In 2010, aboriginal artifacts were found at the construction site, prompting calls to halt construction again. 457:(DPP) legislators in March 2000 on an anti-nuclear platform which included stopping plant construction. DPP legislators called for a halt to the project in April 2000, which led to the suspension of construction in October 2000 by 621:
The Ministry of Economic Affairs proposed in August 2014 that further construction be halted for three years until a national referendum could be held; Taipower estimated the three-year cost of sealing Unit 1 as less than
544:
used the local referendum process to debate the plant's fate as early as 2012. Her petition for a local referendum gathered 50,000 signatures by March 2013, but the proposed referendum was rejected by the Executive Yuan
464:
when it was approximately 10–30% complete, only to restart the following year. Contractors were idled for 111 days (from 27 October 2000 to 14 February 2001), which caused a 576-day delay towards commercial operation.
373:
starting in 2015. In 2018, Taipower started removing unused fuel from Unit 1 and returned the fuel to the United States. In December 2021, the proposal to continue construction of Unit 2 was narrowly rejected in a
521: 3127: 590:
went on a hunger strike for two weeks to oppose continued construction, reflecting a popular poll, which favored lowering the threshold of participation and opposed continued construction.
3122: 551: 546: 446:
in 1999 prompted three legislators to inspect construction progress; they cited rusty rebar and potential seawater seepage into the plant's foundation as potential issues.
557:
Yuan's rejection of the earlier referendum. The court's decision is expected in August 2014. Taipower applied for the initial fuel loading of Unit 1 on December 31, 2013.
2526:
Liu, Tai-Yi; Chen, Po-Han; Chou, Nelson N.S.; Hsieh, Ting-Ya (July 2020). "Technical and non-technical challenges for the Lungmen nuclear power plant project in Taiwan".
956: 3017: 912:
The Lungmen project is supported by the GE Team, including: Black & Veatch, Hitachi, Shimizu, Toshiba, and other US, Taiwan, China and international participants.
2719: 409:
The Fourth Nuclear Power Plant was first proposed in 1978, and Taipower selected the ABWR in 1996 after a competitive bidding process. The reactor is designed by
2854: 1350: 472:
in 2003 to accommodate delivery of heavy components, such as the reactor vessel. The wharf was beset with construction delays and may have contributed to local
2776: 2731: 2606: 2934: 2844: 2839: 2745: 2653: 2611: 2352: 87: 3056: 3000: 2924: 2771: 2738: 3011: 2766: 2752: 2724: 2759: 2576: 3132: 1924: 50: 265: 3117: 1716: 601:
said, "Passing the rigorous review illustrates the high standards of care invested in the design and construction of the facility."
2714: 2709: 2308: 2290: 661:
of the re-construction of the plant was rejected, further ensuring that the construction would not be restarted in near future.
2366:
Shih, Chunkuan; Wang, Jong-Rong; Huang, Wen-Shu; Chen, Shao-Wen; Wang, Ting-Yi; Yu, Tzu-Yao; Chiu, Hsien-Lang (February 2019).
715: 2268: 2177: 1178: 1049: 705:
The ABWR was designed to a 0.3G earthquake acceleration standard with the Lungmen units seismic hardening increased to 0.4G.
595: 401:
to finish construction of a nuclear power plant after decades of no construction activity on a legacy construction project.
2569: 1014: 511: 390: 1611: 812: 669:
Lungmen Nuclear Power Plant consists of two identical ABWR units, each with a rated thermal power of 3,926 MW (1.340
2326: 634: 515: 447: 534: 429:
however, did not award the contract to a single architect/engineer, but hired General Electric to build the reactors,
2309:"Taipower allegedly starts shipping nuclear fuel rods back to U.S. | Society | FocusTaiwan Mobile - CNA English News" 1354: 2585: 2291:"Taipower readies 2nd batch of nuclear fuel rods for U.S. return | Society | FocusTaiwan Mobile - CNA English News" 788: 458: 604: 393:), it is unlikely that construction will ever restart even though it is technologically feasible in principle and 2968: 2562: 315: 289: 2368:
The Ultimate Response Guideline Simulation and Study for Lungmen (ABWR) Nuclear Power Plant Using RELAP5/SNAP
714:
this experience provided knowledge that will give better results in future units. The first two units built,
398: 931: 2899: 2676: 2435: 2409: 793: 650: 454: 2670: 719: 430: 2392: 2142: 2091: 2010: 1984: 1955: 1899: 1847: 1821: 1795: 1769: 1743: 1690: 1638: 1586: 1534: 1482: 1430: 1377: 1325: 1299: 1273: 1247: 1221: 1195: 982: 842: 2243: 2117: 2065: 2039: 1664: 1560: 1508: 1456: 1144: 1118: 1092: 1066: 561: 394: 2193: 1932: 1410:(Technical report). Atomic Energy Council, Department of Nuclear Regulation. May 19, 2012. p. 27 773: 723: 658: 374: 2373:(Report). U.S. Nuclear Regulatory Commission / National Tsing Hua University / Taiwan Power Company 988:. Lungmen Units 1&2 Preliminary Safety Analysis Report (Report). Taipei: Atomic Energy Council 783: 362: 17: 2461: 3081: 2995: 2807: 2802: 2797: 495: 382: 137: 2487: 3097: 2792: 2642: 2627: 355: 183: 169: 1402: 8: 3071: 3061: 2885: 2812: 2647: 2365: 418: 339: 3076: 3050: 2952: 2870: 2849: 2632: 2543: 2220: 488: 244: 2525: 2312: 2294: 3022: 3005: 2928: 2880: 2875: 2637: 2547: 2173: 1174: 1045: 623: 461: 162: 75: 65: 2520: 1873: 870: 674: 3066: 2554: 2535: 410: 386: 216: 2539: 2367: 896: 649:. Taipower is required to remove all fuel rods from the plant by 2020. The ruling 598: 473: 343: 425:, and other American, Taiwanese, and other Chinese and international companies. 450: 443: 2393:"Preliminary Safety Analysis Report, Assessment of Severe Accident Mitigation" 2172:(Energy, Climate and the Environment Series ed.). Palgrave. p. 183. 1173:(Energy, Climate and the Environment Series ed.). Palgrave. p. 180. 1044:(Energy, Climate and the Environment Series ed.). Palgrave. p. 182. 479: 3111: 759: 745: 587: 582: 565: 102: 89: 677:, and water is circulated using ten reactor internal pumps at a rate of 52.2 122: 378: 932:
The Republic of China national report for the Convention on Nuclear Safety
1900:"NUCLEAR POWER DEBATE: Proposal for referendum on fuel rods gets support" 1717:"Ex-Vice President Annette Lu delivers referendum petition in New Taipei" 902:. Status report 97 - Advanced Boiling Water Reactor (ABWR) (Report). IAEA 541: 530: 366: 274: 1871: 351: 250: 2515: 753: 422: 414: 2521:
Power Technology - Lungmen (Dragon Gate) Nuclear Project, Taiwan
1985:"NUCLEAR POWER DEBATE: Scrapping plant would ruin Taipower: Duh" 645:
In 2018, Taipower started shipping unused fuel rods back to the
529:
Because of the controversy over the plant, in February 2013 the
2221:"Taiwan ready to defer construction of new nuclear power plant" 323: 297: 2092:"NUCLEAR POWER DEBATE: Majority wants no plebiscite threshold" 1874:"Referendum on fourth nuclear plant passes initial threshold" 586:
assuming safety tests were passed first. Former DPP chairman
469: 3128:
Nuclear power stations using advanced boiling water reactors
1925:"Taiwan to halt construction of fourth nuclear power plant" 1662: 608:
Lungmen plant, as seen from the coast along Gongliao (2015)
525:
Demonstrations were held to halt construction in March 2013
347: 206: 2353:"Taiwan 2021 Referendum: an instigation for power crisis?" 1587:"Nuclear Power Debate: Academics slam referendum question" 1353:. World Nuclear Association. February 2013. Archived from 2170:
Nuclear Energy Development in Asia Problems and Prospects
1872:
Tang, Pei-chun; Su, Justine; Wu, Lilian (July 15, 2014).
1171:
Nuclear Energy Development in Asia Problems and Prospects
1042:
Nuclear Energy Development in Asia Problems and Prospects
937:(Report). Taiwan Atomic Energy Commission. September 2016 1796:"Annette Lu files injunction over rejected nuclear poll" 571: 3123:
Nuclear power stations with reactors under construction
646: 2244:"AEC approves plan to shutter fourth nuclear facility" 2063: 2115: 1326:"Aboriginal artifacts found at site of nuclear plant" 3096:※Note:The power plants without"*", were operated by 2584: 1848:"Anti-nuclear-group plans rock fest signature drive" 1663:
Shih, Hsiu-chuan; Wang, Chris (September 11, 2013).
1196:"Taipower wants to import a nuclear reactor in June" 735: 718:
6 & 7 fared much better than the following two,
1639:"Activists want no referendum and no nuclear plant" 1457:"Ma and Su discuss nuclear plant, remain far apart" 27:
Nuclear power plant in Gungliao, New Taipei, Taiwan
2194:"MOEA unveils three-year nuclear power plant plan" 1822:"Annette Lu vows pursuit of anti-plant referendum" 1404:Overview of Recent Regulatory Activities in Taiwan 361:It was intended to be the first of these advanced 1770:"Lu launches new petition for nuclear referendum" 1744:"Annette Lu moots another nuclear referendum bid" 1145:"Activists applaud killing of nuclear plant plan" 673:10 BTU/h); the core is composed of 872 GE14 3109: 1917: 1558: 1506: 840: 1454: 1297: 871:"Lungmen (Dragon Gate) Nuclear Project, Taiwan" 560:A competing referendum was launched in 2012 by 2011:"DPP plans new law to resolve nuclear dispute" 1323: 1009: 1007: 1005: 1003: 983:"1.4 Identification of Agents and Contractors" 2570: 2528:Journal of the Chinese Institute of Engineers 2033: 2031: 1978: 1976: 1953: 1584: 2269:"GE seeks arbitration over Lungmen payments" 2261: 2218: 1767: 1271: 1245: 1219: 1193: 1142: 1116: 1090: 1064: 926: 924: 922: 920: 2116:Loa, Iok-sin; Lin, Sean (August 23, 2014). 2109: 2089: 2037: 2008: 1982: 1897: 1891: 1845: 1819: 1793: 1741: 1688: 1665:"KMT's Lee withdraws nuclear poll proposal" 1636: 1532: 1480: 1428: 1375: 1000: 805: 505: 483:Construction of Lungmen Nuclear Power Plant 333: 3042: 2988: 2577: 2563: 2028: 1973: 836: 834: 2327:"Taipower rules out operation of Lungmen" 2241: 1956:"Nuclear plant 'must be seen in context'" 1714: 917: 1691:"Lu launches bid for nuclear referendum" 1561:"KMT unveils text of nuclear referendum" 1222:"Government considers redesigning wharf" 1136: 1015:"Lungmen 1 passes pre-operational tests" 897:"12.3 Entities involved (Taiwan, China)" 865: 863: 603: 520: 478: 2118:"Committee rejects referendum proposal" 2064:Wang, Chris; Lee, I-chia (1 May 2014). 1535:"Nuclear referendum question protested" 1067:"Activists ask for delay of nuke plant" 841:Lassen, Jonathan (September 10, 2000). 831: 616: 487:Design of the plant was carried out by 437: 266:Related media on Commons 14: 3133:Buildings and structures in New Taipei 3110: 2271:. World Nuclear News. 14 December 2015 1612:"Taiwanese Nuclear Vote Turns Violent" 1509:"Nuclear referendum receives go-ahead" 1507:Shih, Hsiu-chuan (February 26, 2013). 1378:"Taipower fined by AEC NT$ 15 million" 1343: 1084: 813:"Commissioning approaches for Lungmen" 693:10 lb/h) of steam at full power. 2558: 2066:"Lin ends anti-nuclear hunger strike" 860: 572:Unit 1 completion and 2014 referendum 1483:"Groups call for nuclear referendum" 637:proceedings over withheld payments. 391:2024 Taiwanese presidential election 338:'Nuke 4'), is an unfinished 2040:"Jiang rejects DPP nuclear statute" 1431:"Taipower mulling filing an appeal" 640: 24: 1637:Lee, I-chia (September 18, 2013). 1559:Shih, Hsiu-chuan (March 8, 2013). 1455:Shih Hsiu-chuan (April 26, 2014). 1300:"Taipower must pay US$ 29m: court" 1298:Tang, Chia-ling (March 10, 2011). 635:International Court of Arbitration 516:Fukushima Daiichi nuclear disaster 510:Environmental groups called for a 25: 3144: 2509: 2331:Nuclear Engineering International 2219:Ko, Shu-ling (15 December 2014). 1324:Huang, Shelley (April 28, 2010). 1274:"Old reactor unit sparks concern" 1248:"Activists protest Japan reactor" 1143:Chiu, Yu-tzu (October 28, 2000). 1065:Chiu, Yu-tzu (October 29, 1999). 3118:Nuclear power stations in Taiwan 2586:List of power stations in Taiwan 1954:Hsiao, Alison (April 23, 2014). 1794:Wang, Chris (January 23, 2014). 1429:Lee, I-chia (January 21, 2014). 1376:Lee, I-chia (November 8, 2011). 789:List of power stations in Taiwan 766: 752: 738: 198:Nuclear power station 49: 2480: 2454: 2428: 2402: 2385: 2359: 2345: 2319: 2301: 2283: 2235: 2212: 2186: 2167: 2161: 2143:"Groups plan second referendum" 2135: 2083: 2057: 2002: 1947: 1931:. 28 April 2014. Archived from 1865: 1839: 1813: 1787: 1761: 1735: 1708: 1682: 1656: 1630: 1604: 1585:Shan, Shelley (March 9, 2013). 1578: 1552: 1526: 1500: 1474: 1448: 1422: 1395: 1369: 1317: 1291: 1272:Chiu, Yu-tzu (March 16, 2005). 1265: 1239: 1213: 1187: 1168: 1162: 1110: 1093:"Construction delays condemned" 1058: 1039: 685:10 lb/h), generating 7.637 1898:Lee, I-chia (April 30, 2014). 1533:Lee, I-chia (April 20, 2013). 1481:Chang, Rich (April 12, 2011). 1117:Chiu, Yu-tzu (April 9, 2000). 1033: 975: 949: 889: 708: 328: 319: 302: 293: 39: 13: 1: 2540:10.1080/02533839.2020.1777203 2436:"Kashiwazaki Kariwa-7, Japan" 2410:"Kashiwazaki Kariwa-6, Japan" 2242:Lin, Sean (4 February 2015). 2090:Wang, Chris (30 April 2014). 2038:Wang, Chris (22 April 2014). 2009:Wang, Chris (17 April 2014). 1983:Lee, I-chia (29 April 2014). 1846:Lee, I-chia (July 10, 2012). 1820:Wang, Chris (July 16, 2014). 1768:Mo, Yan-chih (June 7, 2013). 1689:Wang, Chris (July 18, 2012). 1246:Chiu, Yu-tzu (July 7, 2004). 1220:Chiu, Yu-tzu (July 3, 2003). 1194:Chiu, Yu-tzu (May 10, 2003). 799: 633:In September 2015 GE started 514:in April 2011, following the 453:was elected along with other 346:, Taiwan. It consists of two 1742:Wang, Chris (May 26, 2013). 1715:Li, Lauly (March 12, 2013). 1091:Chiu, Yu-tzu (May 8, 2001). 794:Electricity sector in Taiwan 651:Democratic Progressive Party 596:Minister of Economic Affairs 455:Democratic Progressive Party 389:by 2025 (one year after the 236:Units under const. 7: 1119:"Nuclear plant in question" 729: 654:NSSS, and startup testing. 547:Referendum Review Committee 431:Mitsubishi Heavy Industries 286:Lungmen Nuclear Power Plant 36:Lungmen Nuclear Power Plant 10: 3149: 562:National Taiwan University 404: 303:Lóngmén Hénéng Fādiànchǎng 3094: 3035: 2981: 2961: 2945: 2917: 2910: 2894: 2863: 2832: 2825: 2785: 2702: 2695: 2663: 2620: 2599: 2592: 2492:World Nuclear Association 2466:World Nuclear Association 2440:World Nuclear Association 2414:World Nuclear Association 1878:Focus Taiwan News Channel 1351:"Nuclear Power In Taiwan" 961:World Nuclear Association 774:Nuclear technology portal 696: 664: 385:and wishes to complete a 271: 261: 256: 243: 231: 227: 222: 212: 202: 197: 189: 179: 155: 136: 128: 118: 81: 71: 61: 57: 48: 32: 506:2012 referendum attempts 2149:. CNA. October 17, 2014 784:Nuclear power in Taiwan 468:Taipower constructed a 363:Generation III reactors 245:Nameplate capacity 129:Construction began 657:In December 2021, the 609: 526: 484: 413:, but is supported by 314:Nuclear Power Plant ( 156:Construction cost 148:N/A (Unit 2) 145:N/A (Unit 1) 103:25.03861°N 121.92417°E 3036:Kinmen and Lienchiang 607: 524: 496:Atomic Energy Council 482: 383:opposes nuclear power 306:), formerly known as 223:Power generation 213:Reactor supplier 3098:Taiwan Power Company 617:Three-year deferment 438:Initial cancellation 356:Taiwan Power Company 354:net. It is owned by 310:and commonly as the 138:Commission date 1935:on January 12, 2016 957:"Lungmen-2, Taiwan" 689:10 kg/h (1.684 512:national referendum 494:In 2011 the Taiwan 489:Stone & Webster 419:Shimizu Corporation 350:each of 1,300  340:nuclear power plant 257:External links 108:25.03861; 121.92417 99: /  2516:Taiwan AEC website 2462:"Hamaoka-5, Japan" 1616:World Nuclear News 1357:on 28 January 2016 1019:World Nuclear News 819:. January 10, 2014 817:World Nuclear News 716:Kashiwazaki Kariwa 681:10 kg/h (1.15 610: 527: 485: 381:of the ruling DPP 3105: 3104: 3090: 3089: 3031: 3030: 2977: 2976: 2931: 2929:Bihai Power Plant 2906: 2905: 2821: 2820: 2763: 2755: 2748: 2741: 2734: 2727: 2691: 2690: 2333:. 6 February 2019 2179:978-0-230-22150-5 1180:978-0-230-22150-5 1051:978-0-230-22150-5 462:Chang Chun-hsiung 336: 282: 281: 203:Reactor type 76:Gongliao District 16:(Redirected from 3140: 3040: 3039: 2986: 2985: 2927: 2915: 2914: 2830: 2829: 2758: 2751: 2744: 2737: 2730: 2722: 2700: 2699: 2597: 2596: 2579: 2572: 2565: 2556: 2555: 2551: 2504: 2503: 2501: 2499: 2488:"Shika-2, Japan" 2484: 2478: 2477: 2475: 2473: 2458: 2452: 2451: 2449: 2447: 2432: 2426: 2425: 2423: 2421: 2406: 2400: 2399: 2397: 2389: 2383: 2382: 2380: 2378: 2372: 2363: 2357: 2356: 2349: 2343: 2342: 2340: 2338: 2323: 2317: 2316: 2311:. Archived from 2305: 2299: 2298: 2293:. Archived from 2287: 2281: 2280: 2278: 2276: 2265: 2259: 2258: 2256: 2254: 2239: 2233: 2232: 2230: 2228: 2216: 2210: 2209: 2207: 2205: 2190: 2184: 2183: 2165: 2159: 2158: 2156: 2154: 2139: 2133: 2132: 2130: 2128: 2113: 2107: 2106: 2104: 2102: 2087: 2081: 2080: 2078: 2076: 2061: 2055: 2054: 2052: 2050: 2035: 2026: 2025: 2023: 2021: 2006: 2000: 1999: 1997: 1995: 1980: 1971: 1970: 1968: 1966: 1951: 1945: 1944: 1942: 1940: 1921: 1915: 1914: 1912: 1910: 1895: 1889: 1888: 1886: 1884: 1869: 1863: 1862: 1860: 1858: 1843: 1837: 1836: 1834: 1832: 1817: 1811: 1810: 1808: 1806: 1791: 1785: 1784: 1782: 1780: 1765: 1759: 1758: 1756: 1754: 1739: 1733: 1732: 1730: 1728: 1712: 1706: 1705: 1703: 1701: 1686: 1680: 1679: 1677: 1675: 1660: 1654: 1653: 1651: 1649: 1634: 1628: 1627: 1625: 1623: 1618:. August 2, 2013 1608: 1602: 1601: 1599: 1597: 1582: 1576: 1575: 1573: 1571: 1556: 1550: 1549: 1547: 1545: 1530: 1524: 1523: 1521: 1519: 1504: 1498: 1497: 1495: 1493: 1478: 1472: 1471: 1469: 1467: 1452: 1446: 1445: 1443: 1441: 1426: 1420: 1419: 1417: 1415: 1409: 1399: 1393: 1392: 1390: 1388: 1373: 1367: 1366: 1364: 1362: 1347: 1341: 1340: 1338: 1336: 1321: 1315: 1314: 1312: 1310: 1295: 1289: 1288: 1286: 1284: 1269: 1263: 1262: 1260: 1258: 1243: 1237: 1236: 1234: 1232: 1217: 1211: 1210: 1208: 1206: 1191: 1185: 1184: 1166: 1160: 1159: 1157: 1155: 1140: 1134: 1133: 1131: 1129: 1114: 1108: 1107: 1105: 1103: 1088: 1082: 1081: 1079: 1077: 1062: 1056: 1055: 1037: 1031: 1030: 1028: 1026: 1021:. August 1, 2014 1011: 998: 997: 995: 993: 987: 979: 973: 972: 970: 968: 953: 947: 946: 944: 942: 936: 928: 915: 914: 909: 907: 901: 893: 887: 886: 884: 882: 875:Power Technology 867: 858: 857: 855: 853: 838: 829: 828: 826: 824: 809: 776: 771: 770: 769: 762: 757: 756: 748: 743: 742: 741: 692: 688: 684: 680: 672: 641:Continued freeze 626:2 billion. 555: 411:General Electric 387:nuclear phaseout 337: 334: 330: 321: 304: 295: 275:edit on Wikidata 217:General Electric 114: 113: 111: 110: 109: 104: 100: 97: 96: 95: 92: 53: 41: 30: 29: 21: 3148: 3147: 3143: 3142: 3141: 3139: 3138: 3137: 3108: 3107: 3106: 3101: 3086: 3027: 2982:Outlying Island 2973: 2957: 2941: 2902: 2890: 2859: 2826:Southern Taiwan 2817: 2781: 2687: 2659: 2616: 2593:Northern Taiwan 2588: 2583: 2512: 2507: 2497: 2495: 2486: 2485: 2481: 2471: 2469: 2460: 2459: 2455: 2445: 2443: 2434: 2433: 2429: 2419: 2417: 2408: 2407: 2403: 2395: 2391: 2390: 2386: 2376: 2374: 2370: 2364: 2360: 2351: 2350: 2346: 2336: 2334: 2325: 2324: 2320: 2307: 2306: 2302: 2289: 2288: 2284: 2274: 2272: 2267: 2266: 2262: 2252: 2250: 2240: 2236: 2226: 2224: 2217: 2213: 2203: 2201: 2200:. 1 August 2014 2192: 2191: 2187: 2180: 2166: 2162: 2152: 2150: 2141: 2140: 2136: 2126: 2124: 2114: 2110: 2100: 2098: 2088: 2084: 2074: 2072: 2062: 2058: 2048: 2046: 2036: 2029: 2019: 2017: 2007: 2003: 1993: 1991: 1981: 1974: 1964: 1962: 1952: 1948: 1938: 1936: 1923: 1922: 1918: 1908: 1906: 1896: 1892: 1882: 1880: 1870: 1866: 1856: 1854: 1844: 1840: 1830: 1828: 1818: 1814: 1804: 1802: 1792: 1788: 1778: 1776: 1766: 1762: 1752: 1750: 1740: 1736: 1726: 1724: 1713: 1709: 1699: 1697: 1687: 1683: 1673: 1671: 1661: 1657: 1647: 1645: 1635: 1631: 1621: 1619: 1610: 1609: 1605: 1595: 1593: 1583: 1579: 1569: 1567: 1557: 1553: 1543: 1541: 1531: 1527: 1517: 1515: 1505: 1501: 1491: 1489: 1479: 1475: 1465: 1463: 1453: 1449: 1439: 1437: 1427: 1423: 1413: 1411: 1407: 1401: 1400: 1396: 1386: 1384: 1374: 1370: 1360: 1358: 1349: 1348: 1344: 1334: 1332: 1322: 1318: 1308: 1306: 1296: 1292: 1282: 1280: 1270: 1266: 1256: 1254: 1244: 1240: 1230: 1228: 1218: 1214: 1204: 1202: 1192: 1188: 1181: 1167: 1163: 1153: 1151: 1141: 1137: 1127: 1125: 1115: 1111: 1101: 1099: 1089: 1085: 1075: 1073: 1063: 1059: 1052: 1038: 1034: 1024: 1022: 1013: 1012: 1001: 991: 989: 985: 981: 980: 976: 966: 964: 955: 954: 950: 940: 938: 934: 930: 929: 918: 905: 903: 899: 895: 894: 890: 880: 878: 869: 868: 861: 851: 849: 839: 832: 822: 820: 811: 810: 806: 802: 780: 779: 772: 767: 765: 758: 751: 744: 739: 737: 732: 711: 699: 690: 686: 682: 678: 675:fuel assemblies 670: 667: 643: 619: 599:Chang Chia-juch 574: 549: 508: 440: 434:raw materials. 407: 344:New Taipei City 278: 175: 151: 107: 105: 101: 98: 93: 90: 88: 86: 85: 44: 28: 23: 22: 15: 12: 11: 5: 3146: 3136: 3135: 3130: 3125: 3120: 3103: 3102: 3095: 3092: 3091: 3088: 3087: 3085: 3084: 3079: 3074: 3069: 3064: 3059: 3054: 3046: 3044: 3037: 3033: 3032: 3029: 3028: 3026: 3025: 3020: 3015: 3008: 3003: 2998: 2992: 2990: 2983: 2979: 2978: 2975: 2974: 2972: 2971: 2965: 2963: 2959: 2958: 2956: 2955: 2949: 2947: 2943: 2942: 2940: 2939: 2937: 2932: 2921: 2919: 2912: 2911:Eastern Taiwan 2908: 2907: 2904: 2903: 2898: 2896: 2892: 2891: 2889: 2888: 2883: 2878: 2873: 2867: 2865: 2861: 2860: 2858: 2857: 2852: 2847: 2842: 2836: 2834: 2827: 2823: 2822: 2819: 2818: 2816: 2815: 2810: 2805: 2800: 2795: 2789: 2787: 2783: 2782: 2780: 2779: 2774: 2769: 2764: 2756: 2749: 2742: 2735: 2728: 2717: 2712: 2706: 2704: 2697: 2696:Central Taiwan 2693: 2692: 2689: 2688: 2686: 2685: 2679: 2674: 2667: 2665: 2661: 2660: 2658: 2657: 2650: 2645: 2640: 2635: 2630: 2624: 2622: 2618: 2617: 2615: 2614: 2609: 2603: 2601: 2594: 2590: 2589: 2582: 2581: 2574: 2567: 2559: 2553: 2552: 2534:(7): 666–680. 2523: 2518: 2511: 2510:External links 2508: 2506: 2505: 2479: 2453: 2427: 2401: 2384: 2358: 2344: 2318: 2315:on 2018-10-17. 2300: 2297:on 2018-10-18. 2282: 2260: 2234: 2211: 2185: 2178: 2160: 2134: 2108: 2082: 2056: 2027: 2001: 1972: 1946: 1916: 1890: 1864: 1838: 1812: 1786: 1760: 1734: 1721:The China Post 1707: 1681: 1655: 1629: 1603: 1577: 1551: 1525: 1499: 1473: 1447: 1421: 1394: 1368: 1342: 1316: 1290: 1264: 1238: 1212: 1186: 1179: 1161: 1135: 1109: 1083: 1057: 1050: 1032: 999: 974: 948: 916: 888: 859: 830: 803: 801: 798: 797: 796: 791: 786: 778: 777: 763: 749: 734: 733: 731: 728: 710: 707: 698: 695: 666: 663: 642: 639: 618: 615: 573: 570: 507: 504: 451:Chen Shui-bian 444:921 earthquake 439: 436: 406: 403: 280: 279: 272: 269: 268: 263: 259: 258: 254: 253: 247: 241: 240: 237: 233: 232: 229: 228: 225: 224: 220: 219: 214: 210: 209: 204: 200: 199: 195: 194: 191: 187: 186: 181: 177: 176: 174: 173: 166: 159: 157: 153: 152: 150: 149: 146: 142: 140: 134: 133: 130: 126: 125: 120: 116: 115: 83: 79: 78: 73: 69: 68: 63: 59: 58: 55: 54: 46: 45: 43: 42: 37: 33: 26: 9: 6: 4: 3: 2: 3145: 3134: 3131: 3129: 3126: 3124: 3121: 3119: 3116: 3115: 3113: 3099: 3093: 3083: 3080: 3078: 3075: 3073: 3070: 3068: 3065: 3063: 3060: 3058: 3055: 3053: 3052: 3048: 3047: 3045: 3041: 3038: 3034: 3024: 3021: 3019: 3016: 3014: 3013: 3009: 3007: 3004: 3002: 2999: 2997: 2994: 2993: 2991: 2987: 2984: 2980: 2970: 2967: 2966: 2964: 2960: 2954: 2951: 2950: 2948: 2944: 2938: 2936: 2933: 2930: 2926: 2923: 2922: 2920: 2916: 2913: 2909: 2901: 2897: 2893: 2887: 2884: 2882: 2879: 2877: 2874: 2872: 2869: 2868: 2866: 2862: 2856: 2853: 2851: 2848: 2846: 2843: 2841: 2838: 2837: 2835: 2831: 2828: 2824: 2814: 2811: 2809: 2806: 2804: 2801: 2799: 2796: 2794: 2791: 2790: 2788: 2784: 2778: 2775: 2773: 2770: 2768: 2765: 2761: 2757: 2754: 2750: 2747: 2743: 2740: 2736: 2733: 2729: 2726: 2721: 2718: 2716: 2713: 2711: 2708: 2707: 2705: 2701: 2698: 2694: 2683: 2680: 2678: 2675: 2672: 2669: 2668: 2666: 2662: 2656: 2655: 2651: 2649: 2646: 2644: 2641: 2639: 2636: 2634: 2631: 2629: 2626: 2625: 2623: 2619: 2613: 2610: 2608: 2605: 2604: 2602: 2598: 2595: 2591: 2587: 2580: 2575: 2573: 2568: 2566: 2561: 2560: 2557: 2549: 2545: 2541: 2537: 2533: 2529: 2524: 2522: 2519: 2517: 2514: 2513: 2493: 2489: 2483: 2467: 2463: 2457: 2441: 2437: 2431: 2415: 2411: 2405: 2394: 2388: 2369: 2362: 2354: 2348: 2332: 2328: 2322: 2314: 2310: 2304: 2296: 2292: 2286: 2270: 2264: 2249: 2245: 2238: 2222: 2215: 2199: 2195: 2189: 2181: 2175: 2171: 2164: 2148: 2144: 2138: 2123: 2119: 2112: 2097: 2093: 2086: 2071: 2067: 2060: 2045: 2041: 2034: 2032: 2016: 2012: 2005: 1990: 1986: 1979: 1977: 1961: 1957: 1950: 1934: 1930: 1926: 1920: 1905: 1901: 1894: 1879: 1875: 1868: 1853: 1849: 1842: 1827: 1823: 1816: 1801: 1797: 1790: 1775: 1771: 1764: 1749: 1745: 1738: 1722: 1718: 1711: 1696: 1692: 1685: 1670: 1666: 1659: 1644: 1640: 1633: 1617: 1613: 1607: 1592: 1588: 1581: 1566: 1562: 1555: 1540: 1536: 1529: 1514: 1510: 1503: 1488: 1484: 1477: 1462: 1458: 1451: 1436: 1432: 1425: 1406: 1405: 1398: 1383: 1379: 1372: 1356: 1352: 1346: 1331: 1327: 1320: 1305: 1301: 1294: 1279: 1275: 1268: 1253: 1249: 1242: 1227: 1223: 1216: 1201: 1197: 1190: 1182: 1176: 1172: 1165: 1150: 1146: 1139: 1124: 1120: 1113: 1098: 1094: 1087: 1072: 1068: 1061: 1053: 1047: 1043: 1036: 1020: 1016: 1010: 1008: 1006: 1004: 984: 978: 962: 958: 952: 933: 927: 925: 923: 921: 913: 898: 892: 876: 872: 866: 864: 848: 844: 837: 835: 818: 814: 808: 804: 795: 792: 790: 787: 785: 782: 781: 775: 764: 761: 760:Energy portal 755: 750: 747: 746:Taiwan portal 736: 727: 725: 721: 717: 706: 703: 694: 676: 662: 660: 655: 652: 648: 638: 636: 631: 627: 625: 614: 606: 602: 600: 597: 591: 589: 588:Lin Yi-hsiung 584: 583:Jiang Yi-huah 578: 569: 567: 566:Kao Cheng-yan 563: 558: 553: 548: 543: 539: 536: 532: 523: 519: 517: 513: 503: 499: 497: 492: 490: 481: 477: 475: 474:beach erosion 471: 466: 463: 460: 456: 452: 449: 445: 435: 432: 426: 424: 420: 416: 412: 402: 400: 396: 392: 388: 384: 380: 377:. Given that 376: 370: 368: 367:outside Japan 364: 359: 357: 353: 349: 345: 341: 331: 325: 317: 313: 309: 305: 299: 291: 287: 276: 270: 267: 264: 260: 255: 252: 248: 246: 242: 238: 235: 234: 230: 226: 221: 218: 215: 211: 208: 205: 201: 196: 192: 188: 185: 182: 178: 171: 167: 164: 161: 160: 158: 154: 147: 144: 143: 141: 139: 135: 131: 127: 124: 121: 117: 112: 84: 80: 77: 74: 70: 67: 64: 60: 56: 52: 47: 38: 35: 34: 31: 19: 3049: 3018:Green Island 3010: 2715:Minhu Pumped 2684:(unfinished) 2681: 2652: 2531: 2527: 2496:. Retrieved 2491: 2482: 2470:. Retrieved 2465: 2456: 2444:. Retrieved 2439: 2430: 2418:. Retrieved 2413: 2404: 2387: 2375:. Retrieved 2361: 2347: 2335:. Retrieved 2330: 2321: 2313:the original 2303: 2295:the original 2285: 2273:. Retrieved 2263: 2251:. Retrieved 2248:Taipei Times 2247: 2237: 2225:. Retrieved 2223:. Kyodo News 2214: 2202:. Retrieved 2198:Taipei Times 2197: 2188: 2169: 2163: 2153:November 24, 2151:. Retrieved 2147:Taipei Times 2146: 2137: 2127:November 24, 2125:. Retrieved 2122:Taipei Times 2121: 2111: 2099:. Retrieved 2096:Taipei Times 2095: 2085: 2073:. Retrieved 2070:Taipei Times 2069: 2059: 2047:. Retrieved 2044:Taipei Times 2043: 2018:. Retrieved 2015:Taipei Times 2014: 2004: 1992:. Retrieved 1989:Taipei Times 1988: 1965:November 25, 1963:. Retrieved 1960:Taipei Times 1959: 1949: 1937:. Retrieved 1933:the original 1928: 1919: 1909:November 24, 1907:. Retrieved 1904:Taipei Times 1903: 1893: 1883:November 26, 1881:. Retrieved 1877: 1867: 1857:November 26, 1855:. Retrieved 1852:Taipei Times 1851: 1841: 1831:November 26, 1829:. Retrieved 1826:Taipei Times 1825: 1815: 1805:November 26, 1803:. Retrieved 1800:Taipei Times 1799: 1789: 1779:November 25, 1777:. Retrieved 1774:Taipei Times 1773: 1763: 1753:November 26, 1751:. Retrieved 1748:Taipei Times 1747: 1737: 1727:November 26, 1725:. Retrieved 1720: 1710: 1700:November 26, 1698:. Retrieved 1695:Taipei Times 1694: 1684: 1674:November 25, 1672:. Retrieved 1669:Taipei Times 1668: 1658: 1648:November 25, 1646:. Retrieved 1643:Taipei Times 1642: 1632: 1620:. Retrieved 1615: 1606: 1596:November 25, 1594:. Retrieved 1591:Taipei Times 1590: 1580: 1570:November 25, 1568:. Retrieved 1565:Taipei Times 1564: 1554: 1544:November 25, 1542:. Retrieved 1539:Taipei Times 1538: 1528: 1518:November 25, 1516:. Retrieved 1513:Taipei Times 1512: 1502: 1492:November 25, 1490:. Retrieved 1487:Taipei Times 1486: 1476: 1466:November 25, 1464:. Retrieved 1461:Taipei Times 1460: 1450: 1440:November 25, 1438:. Retrieved 1435:Taipei Times 1434: 1424: 1412:. Retrieved 1403: 1397: 1387:November 25, 1385:. Retrieved 1382:Taipei Times 1381: 1371: 1359:. Retrieved 1355:the original 1345: 1335:November 25, 1333:. Retrieved 1330:Taipei Times 1329: 1319: 1309:November 25, 1307:. Retrieved 1304:Taipei Times 1303: 1293: 1283:November 25, 1281:. Retrieved 1278:Taipei Times 1277: 1267: 1257:November 25, 1255:. Retrieved 1252:Taipei Times 1251: 1241: 1231:November 25, 1229:. Retrieved 1226:Taipei Times 1225: 1215: 1205:November 25, 1203:. Retrieved 1200:Taipei Times 1199: 1189: 1170: 1164: 1154:November 25, 1152:. Retrieved 1149:Taipei Times 1148: 1138: 1128:November 25, 1126:. Retrieved 1123:Taipei Times 1122: 1112: 1102:November 25, 1100:. Retrieved 1097:Taipei Times 1096: 1086: 1076:November 25, 1074:. Retrieved 1071:Taipei Times 1070: 1060: 1041: 1035: 1025:November 24, 1023:. Retrieved 1018: 992:November 25, 990:. Retrieved 977: 965:. Retrieved 960: 951: 939:. Retrieved 911: 904:. Retrieved 891: 881:November 25, 879:. Retrieved 874: 852:November 25, 850:. Retrieved 847:Taipei Times 846: 843:"Power play" 823:November 24, 821:. Retrieved 816: 807: 712: 704: 700: 668: 656: 644: 632: 628: 620: 611: 592: 579: 575: 559: 540: 528: 509: 500: 493: 486: 467: 441: 427: 408: 379:Tsai Ing Wen 371: 360: 358:(Taipower). 327: 311: 307: 301: 285: 283: 239:2 x 1,350 MW 172:9.4 billion) 3043:Fossil fuel 2989:Fossil fuel 2946:Fossil fuel 2864:Fossil fuel 2786:Fossil fuel 2720:Dajia River 2621:Fossil fuel 2498:19 February 2472:19 February 2446:19 February 2420:19 February 1622:October 29, 1414:December 4, 709:Reliability 550: [ 190:Operator(s) 165:280 billion 106: / 94:121°55′27″E 82:Coordinates 3112:Categories 2962:Geothermal 2377:28 January 2337:28 January 2275:1 November 2168:Lee, Min. 1361:28 October 1169:Lee, Min. 1040:Lee, Min. 967:29 October 941:28 January 800:References 564:professor 542:Annette Lu 531:Kuomintang 375:referendum 123:Mothballed 91:25°02′19″N 3082:Hsiahsing 2996:Chienshan 2855:Wushantou 2808:Hsingneng 2803:Hsingyuan 2798:Tunghsiao 2673:(defunct) 2548:221521250 535:a scuffle 448:President 399:precedent 2969:Qingshui 2900:Maanshan 2793:Taichung 2777:Mingjian 2732:Qingshan 2677:Kuosheng 2643:Kuokuang 2628:Hsieh-ho 2607:Gueishan 1939:28 April 1723:. Taipei 730:See also 659:proposal 397:without 308:Gongliao 193:Taipower 184:Taipower 180:Owner(s) 72:Location 3072:Dongyin 3062:Zhushan 2935:Lanyang 2895:Nuclear 2886:Chiahui 2845:Kaoping 2840:Zengwen 2813:Mailiao 2746:Tienlun 2710:Mingtan 2682:Lungmen 2671:Jinshan 2664:Nuclear 2654:Shen-Ao 2648:Hsintao 2612:Shihmen 2253:5 March 2227:5 March 2204:5 March 2101:5 March 2075:5 March 2049:5 March 2020:5 March 1994:5 March 1929:Reuters 906:15 July 720:Hamaoka 459:Premier 423:Toshiba 415:Hitachi 405:History 316:Chinese 294:龍門核能發電廠 290:Chinese 262:Commons 62:Country 40:龍門核能發電廠 18:Lungmen 3077:Tashan 3057:Nangan 3051:Beigan 3001:Wangan 2953:Hoping 2925:Tungpu 2871:Hsinta 2850:Sun Ba 2772:Cholan 2739:Kukuan 2633:Linkou 2546:  2494:. 2017 2468:. 2017 2442:. 2017 2416:. 2017 2176:  1177:  1048:  963:. 2013 877:. 2012 722:5 and 697:Safety 665:Design 365:built 326:: 324:pinyin 318:: 312:Fourth 300:: 298:pinyin 292:: 249:2,700 119:Status 66:Taiwan 3023:Lanyu 3012:Jibei 3006:Qimei 2918:Hydro 2881:Nanpu 2876:Talin 2833:Hydro 2767:Wanta 2753:Houli 2725:Techi 2703:Hydro 2638:Tatan 2600:Hydro 2544:S2CID 2396:(PDF) 2371:(PDF) 1408:(PDF) 986:(PDF) 935:(PDF) 900:(PDF) 724:Shika 554:] 470:wharf 348:ABWRs 273:[ 3067:Xiju 2760:Maan 2500:2017 2474:2017 2448:2017 2422:2017 2379:2022 2339:2022 2277:2016 2255:2015 2229:2015 2206:2015 2174:ISBN 2155:2014 2129:2014 2103:2015 2077:2015 2051:2015 2022:2015 1996:2015 1967:2014 1941:2014 1911:2014 1885:2014 1859:2014 1833:2014 1807:2014 1781:2014 1755:2014 1729:2014 1702:2014 1676:2014 1650:2014 1624:2013 1598:2014 1572:2014 1546:2014 1520:2014 1494:2014 1468:2014 1442:2014 1416:2014 1389:2014 1363:2013 1337:2014 1311:2014 1285:2014 1259:2014 1233:2014 1207:2014 1175:ISBN 1156:2014 1130:2014 1104:2014 1078:2014 1046:ISBN 1027:2014 994:2014 969:2013 943:2022 908:2014 883:2014 854:2014 825:2014 624:NT$ 442:The 335:lit. 329:Hésì 284:The 207:ABWR 170:US$ 163:NT$ 132:1999 2536:doi 726:2. 395:not 352:MWe 342:in 3114:: 2542:. 2532:43 2530:. 2490:. 2464:. 2438:. 2412:. 2329:. 2246:. 2196:. 2145:. 2120:. 2094:. 2068:. 2042:. 2030:^ 2013:. 1987:. 1975:^ 1958:. 1927:. 1902:. 1876:. 1850:. 1824:. 1798:. 1772:. 1746:. 1719:. 1693:. 1667:. 1641:. 1614:. 1589:. 1563:. 1537:. 1511:. 1485:. 1459:. 1433:. 1380:. 1328:. 1302:. 1276:. 1250:. 1224:. 1198:. 1147:. 1121:. 1095:. 1069:. 1017:. 1002:^ 959:. 919:^ 910:. 873:. 862:^ 845:. 833:^ 815:. 647:US 552:zh 421:, 417:, 332:; 322:; 320:核四 296:; 251:MW 3100:. 2762:) 2723:( 2578:e 2571:t 2564:v 2550:. 2538:: 2502:. 2476:. 2450:. 2424:. 2398:. 2381:. 2355:. 2341:. 2279:. 2257:. 2231:. 2208:. 2182:. 2157:. 2131:. 2105:. 2079:. 2053:. 2024:. 1998:. 1969:. 1943:. 1913:. 1887:. 1861:. 1835:. 1809:. 1783:. 1757:. 1731:. 1704:. 1678:. 1652:. 1626:. 1600:. 1574:. 1548:. 1522:. 1496:. 1470:. 1444:. 1418:. 1391:. 1365:. 1339:. 1313:. 1287:. 1261:. 1235:. 1209:. 1183:. 1158:. 1132:. 1106:. 1080:. 1054:. 1029:. 996:. 971:. 945:. 885:. 856:. 827:. 691:× 687:× 683:× 679:× 671:× 288:( 277:] 168:( 20:)

Index

Lungmen

Taiwan
Gongliao District
25°02′19″N 121°55′27″E / 25.03861°N 121.92417°E / 25.03861; 121.92417
Mothballed
Commission date
NT$
US$
Taipower
ABWR
General Electric
Nameplate capacity
MW
Related media on Commons
edit on Wikidata
Chinese
pinyin
Chinese
pinyin
nuclear power plant
New Taipei City
ABWRs
MWe
Taiwan Power Company
Generation III reactors
outside Japan
referendum
Tsai Ing Wen
opposes nuclear power

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.