Singapore Branch Joint Venture at a sum of S$ 356 million (US$ 261 million). Construction works for the 3.2-kilometre (2.0 mi) tunnel is expected to start in the second quarter of 2021 and is targeted to be completed by 2030 when CRL1 commences passenger service. For the first time, the LTA will
411:
Subsequently, the contract for the station's construction and tunnelling works was awarded to Woh Hup Pte. Ltd. – Dongah Geological Engineering Co. JV on 13 September 2021. The S$ 748 million contract (US$ 548.3 million) includes constructing a section of a vehicular viaduct above the station. Due
423:
The construction will involve multiple traffic diversions to relocate the utilities underneath the road. From the first quarter of 2023, the segment of Loyang Avenue between Pasir Ris Drive 3 and Loyang Way will be closed, with a new bus-only road for affected bus services plying the road.
568: 480: 560: 698: 820: 634: 759: 472: 511: 789: 538: 665: 690: 450: 728: 838: 812: 626: 601: 420:
soil), specially-designed machinery will be used for excavation works. The new vehicular viaduct above the station is expected to improve traffic along Loyang Avenue.
751: 561:"Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line" 1191: 503: 99: 1186: 860: 781: 534: 1181: 473:"LTA | News Room | News Releases | Joint News Release by the Land Transport Authority (LTA) & SLA – Cross Island Line 1: New Links by 2029" 399:
On 8 March 2021, Contract CR105 for the design and construction of bored tunnels between the Aviation Park and Loyang stations was awarded to
657: 868: 442: 720: 504:"First phase of Cross Island MRT line finalised; will have 12 stations, Transport News & Top Stories – The Straits Times" 590: 853: 404: 388:(CRL). The station will be constructed as part of Phase 1 (CRL1), consisting of 12 stations between Aviation Park and 691:"LTA Awards Civil Contract for Design and Construction of Loyang Station and Tunnels under Cross Island Line Phase 1" 1039: 846: 876: 393: 350: 237: 69: 1011: 392:, and was expected to be completed in 2029. However, restrictions imposed on construction works due to the 958: 937: 923: 267: 909: 312: 247: 1127: 381: 134: 813:"Parts of Loyang Avenue, Pasir Ris Drive 1 to close for works on CRL MRT stations and new viaduct" 1078: 1071: 986: 389: 272: 408:
use a large-diameter tunnel boring machine to construct a single tunnel with two tracks in it.
1032: 972: 1101: 1057: 1004: 979: 965: 930: 893: 385: 354: 257: 149: 1025: 368:
The station is in the vicinity of Loyang Industrial Estate, Loyang Valley Condominium, and
8: 951: 752:"Multiple traffic diversions needed from end-2021 for construction of Loyang MRT station" 627:"News Room – News Releases – LTA Awards Civil Contract for the Cross Island Line Phase 1" 400: 161: 1109: 1064: 1156: 1018: 944: 369: 365:. It will be located underneath Loyang Avenue, at the junction with Loyang Lane. 78: 1175: 1142: 114: 101: 535:"First phase of Cross Island Line to open by 2029 with 12 stations – CNA" 721:"Construction of Loyang MRT station on Cross Island Line to start in Q4" 658:"LTA awards $ 356 million contract for Cross Island Line tunnel works" 871: 362: 358: 417: 384:(LTA) announced that Loyang station would be part of the proposed 413: 412:
to the weak ground condition at the site (a combination of hard
782:"Road Closures and Bus Route Changes in Pasir Ris and Changi" 443:"Loyang Valley condo up for collective sale at $ 980 million" 804: 434: 1137: 405:
China State Construction Engineering Corporation Limited
886:
Italicised locations are currently not in operation
685: 683: 1173: 743: 877:Mass Rapid Transit (MRT) stations in Singapore 680: 18:Future Mass Rapid Transit station in Singapore 854: 396:pushed the completion date for CRL1 to 2030. 45: 53: 1192:Railway stations scheduled to open in 2030 861: 847: 77: 774: 713: 649: 583: 1187:Mass Rapid Transit (Singapore) stations 619: 1182:Proposed railway stations in Singapore 1174: 762:from the original on 13 September 2021 731:from the original on 13 September 2021 701:from the original on 13 September 2021 842: 532: 440: 236: 823:from the original on 4 February 2023 810: 792:from the original on 4 February 2023 655: 502:Tan, Christopher (25 January 2019). 453:from the original on 4 February 2023 750:Wei, Toh Ting (13 September 2021). 749: 501: 13: 14: 1203: 811:Yong, Clement (25 October 2022). 668:from the original on 8 March 2021 637:from the original on 8 March 2021 607:from the original on 8 March 2021 541:from the original on 5 March 2020 514:from the original on 5 March 2020 495: 483:from the original on 5 March 2020 1150: 1136: 870: 571:from the original on 17 May 2021 441:Leong, Grace (18 October 2022). 318: 311: 533:Yusof, Amir (25 January 2019). 656:Yong, Clement (8 March 2021). 553: 526: 465: 319: 46: 1: 427: 208:; 6 years' time 7: 10: 1208: 375: 1119: 1092: 1049: 996: 901: 892: 883: 306: 299: 295: 291: 287: 283: 241: 233: 229: 224: 220: 202: 197: 189: 181: 176: 168: 156: 140: 130: 93: 88: 76: 67: 54: 23: 1128:Land Transport Authority 1050:Punggol Extension (2032) 382:Land Transport Authority 380:On 25 January 2019, the 349:is a future underground 135:Land Transport Authority 83:Loyang MRT station site 727:. 13 September 2021. 697:. 13 September 2021. 1157:Singapore portal 1040:Jurong Lake District 788:. 25 October 2022. 479:. 25 January 2019. 111: /  89:General information 401:Taisei Corporation 351:Mass Rapid Transit 347:Loyang MRT station 242:Following station 238:Mass Rapid Transit 234:Preceding station 162:2 island platforms 70:Mass Rapid Transit 1169: 1168: 1143:Trains portal 1088: 1087: 894:Cross Island Line 817:The Straits Times 756:The Straits Times 662:The Straits Times 508:The Straits Times 447:The Straits Times 394:COVID-19 pandemic 386:Cross Island line 357:(CRL) located in 355:Cross Island line 344: 343: 340: 339: 279: 278: 258:Cross Island Line 150:Cross Island Line 115:1.372°N 103.972°E 1199: 1155: 1154: 1153: 1141: 1140: 1107: 1104: 1012:King Albert Park 899: 898: 875: 874: 863: 856: 849: 840: 839: 833: 832: 830: 828: 808: 802: 801: 799: 797: 778: 772: 771: 769: 767: 747: 741: 740: 738: 736: 717: 711: 710: 708: 706: 687: 678: 677: 675: 673: 653: 647: 646: 644: 642: 633:. 8 March 2021. 623: 617: 616: 614: 612: 606: 595: 591:"Contract CR105" 587: 581: 580: 578: 576: 557: 551: 550: 548: 546: 530: 524: 523: 521: 519: 499: 493: 492: 490: 488: 469: 463: 462: 460: 458: 438: 370:Loyang Bus Depot 322: 321: 315: 297: 296: 231: 230: 216: 214: 209: 147: 126: 125: 123: 122: 121: 116: 112: 109: 108: 107: 104: 81: 58: 57: 56: 50: 49: 48: 40: 39: 38: 32: 21: 20: 1207: 1206: 1202: 1201: 1200: 1198: 1197: 1196: 1172: 1171: 1170: 1165: 1164: 1151: 1149: 1135: 1115: 1102: 1099: 1084: 1045: 992: 959:Serangoon North 888: 879: 869: 867: 837: 836: 826: 824: 809: 805: 795: 793: 780: 779: 775: 765: 763: 748: 744: 734: 732: 719: 718: 714: 704: 702: 689: 688: 681: 671: 669: 654: 650: 640: 638: 625: 624: 620: 610: 608: 604: 593: 589: 588: 584: 574: 572: 567:. 11 May 2021. 559: 558: 554: 544: 542: 531: 527: 517: 515: 500: 496: 486: 484: 471: 470: 466: 456: 454: 439: 435: 430: 378: 353:station on the 336: 335: 334: 333: 330: 329: 328: 327: 323: 302: 275: 262: 252: 212: 210: 207: 152: 145: 119: 117: 113: 110: 105: 102: 100: 98: 97: 84: 63: 62: 61: 60: 59: 52: 51: 44: 43: 41: 36: 30: 29: 28: 19: 12: 11: 5: 1205: 1195: 1194: 1189: 1184: 1167: 1166: 1163: 1162: 1161: 1160: 1146: 1130: 1121: 1120: 1117: 1116: 1114: 1113: 1096: 1094: 1090: 1089: 1086: 1085: 1083: 1082: 1075: 1068: 1061: 1053: 1051: 1047: 1046: 1044: 1043: 1036: 1029: 1022: 1015: 1008: 1000: 998: 997:Phase 2 (2032) 994: 993: 991: 990: 983: 976: 969: 962: 955: 948: 941: 938:Tampines North 934: 927: 924:Pasir Ris East 920: 913: 905: 903: 902:Phase 1 (2030) 896: 890: 889: 884: 881: 880: 866: 865: 858: 851: 843: 835: 834: 803: 773: 742: 712: 679: 648: 618: 582: 552: 525: 494: 464: 432: 431: 429: 426: 377: 374: 342: 341: 338: 337: 332:Loyang station 331: 325: 324: 317: 316: 310: 309: 308: 307: 304: 303: 300: 293: 292: 289: 288: 285: 284: 281: 280: 277: 276: 270: 268:Pasir Ris East 265: 263: 261:Future service 260: 255: 253: 250: 244: 243: 240: 235: 227: 226: 222: 221: 218: 217: 204: 200: 199: 195: 194: 191: 187: 186: 183: 182:Structure type 179: 178: 174: 173: 170: 166: 165: 158: 154: 153: 144: 142: 138: 137: 132: 128: 127: 120:1.372; 103.972 95: 91: 90: 86: 85: 82: 74: 73: 65: 64: 27: 26: 25: 24: 17: 9: 6: 4: 3: 2: 1204: 1193: 1190: 1188: 1185: 1183: 1180: 1179: 1177: 1159: 1158: 1147: 1145: 1144: 1139: 1133: 1132: 1131: 1129: 1126: 1123: 1122: 1118: 1112: 1111: 1105: 1098: 1097: 1095: 1091: 1081: 1080: 1076: 1074: 1073: 1069: 1067: 1066: 1062: 1060: 1059: 1055: 1054: 1052: 1048: 1042: 1041: 1037: 1035: 1034: 1030: 1028: 1027: 1023: 1021: 1020: 1016: 1014: 1013: 1009: 1007: 1006: 1002: 1001: 999: 995: 989: 988: 984: 982: 981: 977: 975: 974: 970: 968: 967: 963: 961: 960: 956: 954: 953: 949: 947: 946: 942: 940: 939: 935: 933: 932: 928: 926: 925: 921: 919: 918: 914: 912: 911: 910:Aviation Park 907: 906: 904: 900: 897: 895: 891: 887: 882: 878: 873: 864: 859: 857: 852: 850: 845: 844: 841: 822: 818: 814: 807: 791: 787: 783: 777: 761: 757: 753: 746: 730: 726: 722: 716: 700: 696: 692: 686: 684: 667: 663: 659: 652: 636: 632: 628: 622: 603: 599: 592: 586: 570: 566: 562: 556: 540: 536: 529: 513: 509: 505: 498: 482: 478: 474: 468: 452: 448: 444: 437: 433: 425: 421: 419: 415: 409: 406: 402: 397: 395: 391: 387: 383: 373: 371: 366: 364: 360: 356: 352: 348: 314: 305: 298: 294: 290: 286: 282: 274: 269: 266: 264: 259: 256: 254: 249: 248:Aviation Park 246: 245: 239: 232: 228: 223: 219: 205: 201: 196: 192: 188: 184: 180: 175: 171: 167: 163: 159: 155: 151: 143: 139: 136: 133: 129: 124: 96: 92: 87: 80: 75: 72:(MRT) station 71: 66: 35: 22: 16: 1148: 1134: 1124: 1108: 1077: 1070: 1063: 1056: 1038: 1031: 1024: 1017: 1010: 1003: 985: 978: 971: 964: 957: 950: 943: 936: 929: 922: 916: 915: 908: 885: 825:. Retrieved 816: 806: 794:. Retrieved 785: 776: 766:13 September 764:. Retrieved 755: 745: 735:13 September 733:. Retrieved 724: 715: 705:13 September 703:. Retrieved 694: 670:. Retrieved 661: 651: 639:. Retrieved 630: 621: 609:. Retrieved 597: 585: 573:. Retrieved 564: 555: 543:. Retrieved 528: 516:. Retrieved 507: 497: 485:. Retrieved 476: 467: 455:. Retrieved 446: 436: 422: 410: 398: 379: 367: 346: 345: 177:Construction 33: 15: 1110:Changi East 987:Bright Hill 390:Bright Hill 273:Bright Hill 185:Underground 118: / 106:103°58′19″E 94:Coordinates 1176:Categories 1033:West Coast 973:Ang Mo Kio 827:27 October 796:27 October 457:27 October 428:References 190:Accessible 1125:See also: 1058:Pasir Ris 1005:Turf City 980:Teck Ghee 966:Tavistock 931:Pasir Ris 363:Singapore 359:Pasir Ris 157:Platforms 103:1°22′19″N 1093:Depot(s) 1026:Clementi 821:Archived 790:Archived 760:Archived 729:Archived 699:Archived 666:Archived 635:Archived 602:Archived 569:Archived 539:Archived 512:Archived 481:Archived 451:Archived 418:alluvium 301:Location 271:towards 251:Terminus 225:Services 131:Owned by 1079:Punggol 1072:Riviera 952:Hougang 672:8 March 641:8 March 611:8 March 545:5 March 518:5 March 487:5 March 414:granite 376:History 211: ( 203:Opening 198:History 141:Line(s) 68:Future 1106:  1100:  917:Loyang 575:17 May 326:Loyang 169:Tracks 148:  146:  55:லோயாங் 42:Loyang 37:  31:  1065:Elias 605:(PDF) 594:(PDF) 1019:Maju 945:Defu 829:2022 798:2022 768:2021 737:2021 707:2021 674:2021 643:2021 613:2021 577:2021 547:2020 520:2020 489:2020 459:2022 416:and 213:2030 206:2030 1103:CRL 786:LTA 725:CNA 695:LTA 631:LTA 598:LTA 565:MOT 477:LTA 193:Yes 160:4 ( 34:CR3 1178:: 819:. 815:. 784:. 758:. 754:. 723:. 693:. 682:^ 664:. 660:. 629:. 600:. 596:. 563:. 537:. 510:. 506:. 475:. 449:. 445:. 403:– 372:. 361:, 47:罗央 862:e 855:t 848:v 831:. 800:. 770:. 739:. 709:. 676:. 645:. 615:. 579:. 549:. 522:. 491:. 461:. 215:) 172:3 164:)

Index

Mass Rapid Transit

1°22′19″N 103°58′19″E / 1.372°N 103.972°E / 1.372; 103.972
Land Transport Authority
Cross Island Line
2 island platforms
Mass Rapid Transit
Aviation Park
Cross Island Line
Pasir Ris East
Bright Hill
Singapore MRT/LRT system map
Mass Rapid Transit
Cross Island line
Pasir Ris
Singapore
Loyang Bus Depot
Land Transport Authority
Cross Island line
Bright Hill
COVID-19 pandemic
Taisei Corporation
China State Construction Engineering Corporation Limited
granite
alluvium
"Loyang Valley condo up for collective sale at $ 980 million"
Archived
"LTA | News Room | News Releases | Joint News Release by the Land Transport Authority (LTA) & SLA – Cross Island Line 1: New Links by 2029"
Archived
"First phase of Cross Island MRT line finalised; will have 12 stations, Transport News & Top Stories – The Straits Times"

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.