Muskrat Falls Generating Station

Source đź“ť

47: 355:. On December 17, 2012, the provincial government announced project sanction. Emera received approval to proceed with the Maritime Link from the Nova Scotia Utility and Review Board in 2013. Financial close for the loan guarantee occurred in late 2013. On September 23, 2020, the first unit at Muskrat Falls was synced to the electricity grid in Labrador. Power from the remaining three units was originally expected to come online in the fall of 2021. However, there were delays in construction, including on the corresponding Labrador–Island Link which will transmit generated power to a converter outside 1720: 1748: 1734: 54: 548:
that the business case, which assumed the Muskrat Falls project was the lowest-cost power option, was “questionable.” LeBlanc said that the project’s economics were not sufficiently tested and that Nalcor failed to consider all potentially viable power options. LeBlanc said that Nalcor concealed information that could have undermined the business case for the project from the public and government.
547:
Dwight Ball called a public inquiry into the project, which took place between 2018 and 2020. In the inquiry report, Commissioner Richard LeBlanc concluded the government failed its duty to residents by predetermining that the megaproject would proceed no matter what. In his report, LeBlanc concluded
535:
The project is more than $ 6 billion over budget, and five years late as of 2022. Projected cost overruns exceeding 70% from $ 7.4 billion to $ 12.7 billion due to poor planning, lack of engineering experience, and related assumptions that were invalid, misleading or later turned out to be incorrect
522:
accepting. Nalcor had applied for a permit in July 2018 to carry out the approximately 13 hectares of wetland capping – essentially pouring sand and stone over a small area of wetland near the reservoir – but the permit was never approved by the Department of Municipal
475:
and the provincial government began in 2006, resulting in the New Dawn (Tshash Petapen) Agreement, finalized in 2011. This agreement included an Impacts and Benefits Agreement (IBA), a Redress Agreement related to damage caused by the Churchill Falls development, and an agreement in principle about
373:
In April 2023, Jennifer Williams, CEO of Newfoundland and Labrador Hydro, announced the completion of the final successful test of the 1100 km transmission link to Newfoundland. Commissioning by the federal government will be announced following the completion of paperwork. Originally approved
499:
Community Council) and the Government of Newfoundland and Labrador outlining the establishment of an independent committee to make recommendations on mitigating potential impacts of methylmercury on human health from the Lower Churchill Project at Muskrat Falls, Labrador. In 2018, the committee
470:
with the provincial and federal governments. The provincial and federal government agreed to a combined review process that would fulfill the requirements of both levels of government, resulting in the formation of a Joint Review Panel. In 2010, the focus shifted to Muskrat Falls only. The
562:
would provide the project with $ 5.2 billion of financial support to compensate for its large cost overrun (from $ 6.2 billion to over $ 13 billion) and to enable the province to maintain the price of power at a competitive rate (14.7 cents per kilowatt-hour). The
471:
environmental assessment for the transmission lines was done separately and was conducted in 2013. Many Indigenous peoples had serious concerns about how the land and wildlife would be changed by the development. Negotiations between the
387:
Reservoir impoundment was completed in 2019 with the flooding of 41 km of land to create the 101 km reservoir. Containment is by a two-part concrete dam totalling 757 metres long. This will power an 834 MW generating station.
1506: 487:
levels in fish would rise as a result of the project. After protests led by Indigenous groups in Central Labrador in 2016, an agreement was reached by Labrador’s three Indigenous groups (
1062: 46: 1769: 1300: 1323: 514:
at the Muskrat Falls reservoir as previously planned. The $ 30 million designated for the capping was split up and offered to all three Indigenous governments, with the
1551: 1794: 1254: 742: 1618: 783: 1412: 334:
to develop the project was announced in November 2010. On November 30, 2012, a federal loan guarantee deal for financing of the project was signed by
97: 1277: 1185: 622: 1596: 893: 805: 476:
the Innu Nation’s land claim. Upon the ratification of the New Dawn Agreement, the Innu Nation indicated that the project was acceptable to them.
761: 1159: 1111: 1001: 827: 442:, power is distributed via the existing grid. Emera hopes to sell surplus power via a proposed 563 km underwater transmission line from 1031: 1231: 937: 1680: 585:
protested the decision stating they had not been consulted. The Innu Nation also raised concerns about the compensation claimed by the
1390: 1700: 715: 656: 1345: 1774: 1784: 981: 416: 17: 1434: 871: 687: 374:
in 2012 with an anticipated price tag of around $ 7.4 billion, the costs of the project increased to more than $ 13 billion.
1528: 1368: 544: 342: 511: 1638: 1457: 598: 316: 589:
and how cost overruns may reduce the amount of Innu royalties received under the 2011 impact and benefits agreement.
1779: 367: 156: 582: 507:
During the Muskrat Falls inquiry in 2019, it was revealed the provincial government wouldn’t be completing
1659:"Trudeau offers $ 5.2 billion bailout for Newfoundland and Labrador's beleaguered Muskrat Falls hydro dam" 1063:"Transmission link between Labrador and Newfoundland energized as Muskrat Falls project nears completion" 401: 356: 500:
recommended – among other things – wetland capping to stem the release of
312: 183: 1301:"Newfoundland and Labrador government 'unintentionally' missed Muskrat Falls wetland capping deadline" 304: 173: 84: 66: 552: 467: 424: 335: 431:
with a capacity of 500 MW. Construction was a 1.2 billion dollar joint venture between Nalcor and
1753: 1658: 1573: 1391:"Government skipped methylmercury deadline then offered 'hush money,' says Nunatsiavut president" 1039: 1324:"No time left for reservoir work prior to flooding, deputy minister tells Muskrat Falls Inquiry" 1136: 1084: 915: 849: 688:
Report on Two Generation Expansion Alternatives for the Island Interconnected Electrical System
349: 1413:"Liberal minister dismisses call for investigation into Muskrat Falls wetland capping failure" 1789: 850:"Government of Newfoundland and Labrador Announces Sanction of the Muskrat Falls Development" 603: 571: 463: 405: 397: 574:
protested against this subsidy, which they claimed provided unfair competition to their own
564: 559: 527:
later said wetland capping would have only decreased methylmercury levels by two per cent.
409: 404:
line with a capacity of 900 MW. The total length is 1,100 km, of which 30 km are
719: 8: 1619:"$ 5.2B deal reached between feds, N.L. government to stave off skyrocketing power bills" 568: 1232:"Nunatsiavut president pleads with premier to pump the brakes on Muskrat Falls flooding" 1480: 480: 428: 258: 956: 1458:"Too late to mitigate: Inquiry hears how wetland capping no longer a Muskrat option" 462:
registered the generation components of the Lower Churchill Project, including both
1507:"'Project was not the right choice': Muskrat Falls estimate surpasses $ 11-billion" 345: 271: 1681:"Innu Nation repeatedly blindsided by Muskrat Falls announcements, letters show" 743:"Churchill hydro deal signals era of Atlantic co-operation – The Globe and Mail" 575: 1529:"Muskrat Falls: A story of unchecked oilmen and their boondoggle hydro project" 694: 555: 352: 338: 281: 251: 1255:"Advisory committee recommendations about Muskrat Falls deserve action: chair" 1763: 1725: 982:"Nalcor Energy to be no more: Crown corporation being folded into N.L. Hydro" 629: 578: 501: 484: 447: 443: 327: 320: 245: 112: 99: 62: 762:"Harper signs loan guarantee deal for Muskrat Falls despite Quebec's outcry" 323:
has a capacity of over 824 MW and provides 4.5 TWh of electricity per year.
1739: 1085:"New power transmission towers connect Muskrat Falls, mainland Nova Scotia" 363: 212: 1002:"Muskrat Falls hydroelectric project in N.L. considered commissioned: CEO" 916:"Speaking notes delivered December 10 by the Honourable Kathy Dunderdale" 524: 519: 496: 492: 488: 472: 420: 1369:"Nalcor's $ 10M deal with NunatuKavut hammered out in a page and a half" 1639:"Ottawa to give N.L. billions of dollars to offset Muskrat Falls costs" 1186:"Methylmercury levels downstream from Muskrat Falls concern researcher" 537: 1278:"United Nations calls for methyl mercury mitigation at Muskrat Falls" 439: 1747: 1705: 1685: 1643: 1623: 1552:"Newfoundland Premier announces inquiry into Muskrat Falls project" 1207: 986: 300: 264: 198: 80: 1346:"Methylmercury deal struck with 2 of 3 Labrador Indigenous groups" 1733: 1701:"Muskrat Falls deal 'betrayed the Innu people,' says Innu Nation" 508: 1597:"Final report from Muskrat Falls inquiry released to the public" 957:"Hydro Announces Completion of Muskrat Falls Generating Station" 459: 308: 168: 894:"Maritime Link energy project approved by Nova Scotia's UARB" 432: 331: 1576:. Government of Newfoundland and Labrador. November 20, 2017 1139:. Government of Newfoundland and Labrador. November 18, 2011 918:. Government of Newfoundland and Labrador. December 17, 2012 852:. Government of Newfoundland and Labrador. December 17, 2012 366:
announced Nalcor Energy would be dismantled and folded into
586: 536:
led Nalcor CEO Stan Marshall to say that the project was a
515: 1026: 1024: 1022: 1770:
Hydroelectric power stations in Newfoundland and Labrador
326:
A $ 6.2 billion deal between Newfoundland and Labrador's
287: 1435:""Last supper" held tonight by Muskrat Falls protestors" 1112:"Halifax-based Emera makes plans for $ 2B Atlantic Link" 784:"Terms of Muskrat Falls federal loan guarantee released" 311:. It comprises part of the remaining 35 per cent of the 53: 1032:"Muskrat Falls Development Generation and Transmission" 1019: 1160:"Inadequate consultation on the Muskrat Falls project" 708: 1574:"Premier Ball Announces Muskrat Falls Public Inquiry" 1715: 27:
Hydroelectric generation station in Labrador, Canada
806:"Harper to announce Muskrat Falls deal in Labrador" 657:"Nalcor's submission to the Board of Commissioners" 530: 1208:"Timeline - Independent Expert Advisory Committee" 211:1 overflow spillway and 1 spillway with submerged 1761: 412:. Construction began in 2014 and ended in 2018. 1594: 1060: 828:"Harper 'reiterates support' for Muskrat Falls" 438:Once on Newfoundland and the mainland of the 299:is a hydroelectric generating station in the 1795:Newfoundland and Labrador political scandals 872:"$ 1.5B Maritime Link approved by Emera Inc" 1661:. The Narwhal (Victoria, BC). July 29, 2021 1321: 1252: 1504: 1498: 1595:McKenzie-Sutter, Holly (March 10, 2020). 435:. The link came online in December 2017. 423:via a 200 kV 180 km sub-sea line to 1061:McKenzie-Sutter, Holly (June 27, 2018). 954: 740: 30:Dam in Newfoundland and Labrador, Canada 1549: 1526: 1455: 1157: 1109: 1036:Government of Newfoundland and Labrador 615: 453: 14: 1762: 1550:Vaughan, Andrew (September 29, 2017). 1183: 759: 681: 679: 677: 623:"Construction schedule to first power" 1366: 1322:Fitzpatrick, Ashley (June 20, 2019). 1298: 1275: 1253:Fitzpatrick, Ashley (April 8, 2019). 1212:Independent Expert Advisory Committee 1054: 955:Callahan, Brian (November 29, 2021). 651: 649: 647: 645: 741:McCarthy, Shawn (18 November 2010). 1478: 1472: 1158:Flowers, Bill (December 13, 2016). 685: 674: 24: 1184:Careen, Evan (November 20, 2016). 1137:"A New Dawn for the Labrador Innu" 938:"Muskrat Falls Generating Project" 693:(Report). Vol. II. Winnipeg: 662:. Nalcor Energy. November 10, 2011 642: 599:Churchill Falls Generating Station 317:Churchill Falls Generating Station 25: 1806: 760:Bailey, Sue (November 30, 2012). 523:Affairs and Environment. Premier 377: 343:Newfoundland and Labrador Premier 1746: 1732: 1718: 531:Cost overruns and public inquiry 297:Muskrat Falls Generating Station 52: 45: 36:Muskrat Falls Generation Station 1775:Newfoundland and Labrador Hydro 1693: 1673: 1651: 1631: 1611: 1588: 1566: 1543: 1527:Roberts, Terry (Apr 19, 2019). 1520: 1481:"A reckoning for Muskrat Falls" 1456:Roberts, Terry (Jun 27, 2019). 1449: 1427: 1405: 1383: 1367:White, Bailery (Jul 24, 2019). 1360: 1338: 1315: 1292: 1269: 1246: 1224: 1200: 1177: 1151: 1129: 1103: 1077: 994: 974: 948: 930: 908: 886: 864: 842: 718:. Nalcor Energy. Archived from 391: 368:Newfoundland and Labrador Hydro 330:and Halifax, Nova Scotia-based 157:Newfoundland and Labrador Hydro 1785:Roller-compacted concrete dams 1110:Withers, Paul (Jan 12, 2017). 820: 798: 776: 753: 734: 315:that was not developed by the 13: 1: 1299:Maher, David (July 4, 2019). 1276:Maher, David (June 7, 2019). 686:Rae, P. (January 2012). "5". 609: 382: 1505:Sue Bailey (June 24, 2016). 190:Elevation at crest 7: 1479:Cox, Sarah (May 16, 2019). 1437:. The Telegram. Aug 6, 2019 592: 402:high-voltage direct current 10: 1811: 479:In 2016, researchers from 415:Power is transmitted from 362:On June 23, 2021, Premier 716:"Lower Churchill Project" 305:Newfoundland and Labrador 280: 270: 257: 244: 239: 231: 226: 218: 207: 197: 189: 179: 174:Roller compacted concrete 167: 162: 152: 144: 136: 128: 91: 85:Newfoundland and Labrador 76: 67:Newfoundland and Labrador 40: 35: 1415:. CBC News. Aug 23, 2019 1393:. CBC News. Aug 11, 2019 1348:. CBC News. Jul 23, 2019 1234:. CBC News. Jul 22, 2019 896:. CBC News. Nov 29, 2013 874:. CBC News. Dec 18, 2012 830:. CBC News. Sep 24, 2012 808:. CBC News. Nov 29, 2012 468:environmental assessment 396:Power is transmitted to 1780:HVDC transmission lines 1754:Renewable energy portal 786:. CBC News. Dec 4, 2012 466:and Muskrat Falls, for 259:Installed capacity 129:Construction began 18:Lower Churchill Project 406:submarine power cables 282:Annual generation 219:Spillway capacity 145:Construction cost 604:List of HVDC projects 572:Members of Parliament 232:Normal elevation 169:Type of dam 113:53.24556°N 60.77278°W 1599:. The Globe and Mail 1554:. The Globe and Mail 1509:. The Globe and Mail 1065:. The Globe and Mail 722:on November 29, 2016 565:government of Quebec 560:Government of Canada 454:Environmental impact 410:Strait of Belle Isle 272:Capacity factor 1042:on 26 December 2018 558:announced that the 419:on Newfoundland to 350:Nova Scotia Premier 118:53.24556; -60.77278 109: /  1188:. Saltwire Network 747:The Globe and Mail 481:Harvard University 429:Cape Breton Island 208:Spillway type 140:September 23, 2020 319:. The station at 293: 292: 163:Dam and spillways 137:Opening date 16:(Redirected from 1802: 1756: 1751: 1750: 1742: 1737: 1736: 1728: 1723: 1722: 1721: 1711: 1710: 1697: 1691: 1690: 1677: 1671: 1670: 1668: 1666: 1655: 1649: 1648: 1647:. July 27, 2021. 1635: 1629: 1628: 1627:. July 28, 2021. 1615: 1609: 1608: 1606: 1604: 1592: 1586: 1585: 1583: 1581: 1570: 1564: 1563: 1561: 1559: 1547: 1541: 1540: 1538: 1536: 1524: 1518: 1517: 1515: 1514: 1502: 1496: 1495: 1493: 1491: 1476: 1470: 1469: 1467: 1465: 1453: 1447: 1446: 1444: 1442: 1431: 1425: 1424: 1422: 1420: 1409: 1403: 1402: 1400: 1398: 1387: 1381: 1380: 1378: 1376: 1364: 1358: 1357: 1355: 1353: 1342: 1336: 1335: 1333: 1331: 1319: 1313: 1312: 1310: 1308: 1296: 1290: 1289: 1287: 1285: 1273: 1267: 1266: 1264: 1262: 1250: 1244: 1243: 1241: 1239: 1228: 1222: 1221: 1219: 1218: 1204: 1198: 1197: 1195: 1193: 1181: 1175: 1174: 1172: 1170: 1155: 1149: 1148: 1146: 1144: 1133: 1127: 1126: 1124: 1122: 1107: 1101: 1100: 1098: 1096: 1091:. August 2, 2018 1081: 1075: 1074: 1072: 1070: 1058: 1052: 1051: 1049: 1047: 1038:. Archived from 1028: 1017: 1016: 1014: 1013: 1008:. April 12, 2023 998: 992: 991: 990:. June 23, 2021. 978: 972: 971: 969: 967: 952: 946: 945: 934: 928: 927: 925: 923: 912: 906: 905: 903: 901: 890: 884: 883: 881: 879: 868: 862: 861: 859: 857: 846: 840: 839: 837: 835: 824: 818: 817: 815: 813: 802: 796: 795: 793: 791: 780: 774: 773: 771: 769: 757: 751: 750: 738: 732: 731: 729: 727: 712: 706: 705: 703: 702: 692: 683: 672: 671: 669: 667: 661: 653: 640: 639: 637: 636: 627: 619: 346:Kathy Dunderdale 124: 123: 121: 120: 119: 114: 110: 107: 106: 105: 102: 56: 55: 49: 33: 32: 21: 1810: 1809: 1805: 1804: 1803: 1801: 1800: 1799: 1760: 1759: 1752: 1745: 1738: 1731: 1724: 1719: 1717: 1714: 1699: 1698: 1694: 1689:. Oct 14, 2021. 1679: 1678: 1674: 1664: 1662: 1657: 1656: 1652: 1637: 1636: 1632: 1617: 1616: 1612: 1602: 1600: 1593: 1589: 1579: 1577: 1572: 1571: 1567: 1557: 1555: 1548: 1544: 1534: 1532: 1525: 1521: 1512: 1510: 1503: 1499: 1489: 1487: 1477: 1473: 1463: 1461: 1454: 1450: 1440: 1438: 1433: 1432: 1428: 1418: 1416: 1411: 1410: 1406: 1396: 1394: 1389: 1388: 1384: 1374: 1372: 1365: 1361: 1351: 1349: 1344: 1343: 1339: 1329: 1327: 1320: 1316: 1306: 1304: 1297: 1293: 1283: 1281: 1274: 1270: 1260: 1258: 1251: 1247: 1237: 1235: 1230: 1229: 1225: 1216: 1214: 1206: 1205: 1201: 1191: 1189: 1182: 1178: 1168: 1166: 1156: 1152: 1142: 1140: 1135: 1134: 1130: 1120: 1118: 1108: 1104: 1094: 1092: 1083: 1082: 1078: 1068: 1066: 1059: 1055: 1045: 1043: 1030: 1029: 1020: 1011: 1009: 1000: 999: 995: 980: 979: 975: 965: 963: 953: 949: 936: 935: 931: 921: 919: 914: 913: 909: 899: 897: 892: 891: 887: 877: 875: 870: 869: 865: 855: 853: 848: 847: 843: 833: 831: 826: 825: 821: 811: 809: 804: 803: 799: 789: 787: 782: 781: 777: 767: 765: 758: 754: 739: 735: 725: 723: 714: 713: 709: 700: 698: 690: 684: 675: 665: 663: 659: 655: 654: 643: 634: 632: 625: 621: 620: 616: 612: 595: 533: 483:suggested that 456: 394: 385: 380: 313:Churchill River 252:Kaplan turbines 184:Churchill River 117: 115: 111: 108: 103: 100: 98: 96: 95: 72: 71: 70: 69: 59: 58: 57: 31: 28: 23: 22: 15: 12: 11: 5: 1808: 1798: 1797: 1792: 1787: 1782: 1777: 1772: 1758: 1757: 1743: 1729: 1713: 1712: 1709:. Aug 3, 2021. 1692: 1672: 1650: 1630: 1610: 1587: 1565: 1542: 1519: 1497: 1471: 1448: 1426: 1404: 1382: 1359: 1337: 1326:. The Telegram 1314: 1303:. The Telegram 1291: 1280:. The Telegram 1268: 1257:. The Telegram 1245: 1223: 1199: 1176: 1164:Policy Options 1150: 1128: 1102: 1076: 1053: 1018: 993: 973: 947: 929: 907: 885: 863: 841: 819: 797: 775: 752: 733: 707: 695:Manitoba Hydro 673: 641: 613: 611: 608: 607: 606: 601: 594: 591: 569:Bloc QuĂ©bĂ©cois 556:Justin Trudeau 553:Prime Minister 551:In July 2021, 532: 529: 458:In late 2006, 455: 452: 393: 390: 384: 381: 379: 378:Technical plan 376: 353:Darrell Dexter 339:Stephen Harper 336:Prime Minister 291: 290: 284: 278: 277: 274: 268: 267: 261: 255: 254: 248: 242: 241: 237: 236: 233: 229: 228: 224: 223: 220: 216: 215: 209: 205: 204: 201: 195: 194: 191: 187: 186: 181: 177: 176: 171: 165: 164: 160: 159: 154: 150: 149: 148:$ 12.7 billion 146: 142: 141: 138: 134: 133: 130: 126: 125: 93: 89: 88: 78: 74: 73: 60: 51: 50: 44: 43: 42: 41: 38: 37: 29: 26: 9: 6: 4: 3: 2: 1807: 1796: 1793: 1791: 1788: 1786: 1783: 1781: 1778: 1776: 1773: 1771: 1768: 1767: 1765: 1755: 1749: 1744: 1741: 1735: 1730: 1727: 1726:Canada portal 1716: 1708: 1707: 1702: 1696: 1688: 1687: 1682: 1676: 1660: 1654: 1646: 1645: 1640: 1634: 1626: 1625: 1620: 1614: 1598: 1591: 1575: 1569: 1553: 1546: 1530: 1523: 1508: 1501: 1486: 1482: 1475: 1459: 1452: 1436: 1430: 1414: 1408: 1392: 1386: 1370: 1363: 1347: 1341: 1325: 1318: 1302: 1295: 1279: 1272: 1256: 1249: 1233: 1227: 1213: 1209: 1203: 1187: 1180: 1165: 1161: 1154: 1138: 1132: 1117: 1113: 1106: 1090: 1086: 1080: 1064: 1057: 1041: 1037: 1033: 1027: 1025: 1023: 1007: 1006:Globalnews.ca 1003: 997: 989: 988: 983: 977: 962: 958: 951: 943: 942:Nalcor Energy 939: 933: 917: 911: 895: 889: 873: 867: 851: 845: 829: 823: 807: 801: 785: 779: 764:. Global News 763: 756: 748: 744: 737: 721: 717: 711: 697:International 696: 689: 682: 680: 678: 658: 652: 650: 648: 646: 631: 630:Nalcor Energy 624: 618: 614: 605: 602: 600: 597: 596: 590: 588: 584: 580: 579:power company 577: 573: 570: 566: 561: 557: 554: 549: 546: 541: 539: 528: 526: 521: 517: 513: 510: 505: 503: 502:methylmercury 498: 494: 490: 486: 485:methylmercury 482: 477: 474: 469: 465: 461: 451: 449: 448:Massachusetts 445: 444:New Brunswick 441: 436: 434: 430: 426: 422: 418: 413: 411: 407: 403: 400:via a 350 kV 399: 389: 375: 371: 369: 365: 360: 358: 354: 351: 347: 344: 340: 337: 333: 329: 328:Nalcor Energy 324: 322: 321:Muskrat Falls 318: 314: 310: 306: 302: 298: 289: 285: 283: 279: 275: 273: 269: 266: 262: 260: 256: 253: 249: 247: 243: 240:Power Station 238: 234: 230: 225: 221: 217: 214: 210: 206: 202: 200: 196: 192: 188: 185: 182: 178: 175: 172: 170: 166: 161: 158: 155: 151: 147: 143: 139: 135: 131: 127: 122: 94: 90: 86: 82: 79: 75: 68: 64: 63:Muskrat Falls 48: 39: 34: 19: 1790:Megaprojects 1740:Water portal 1704: 1695: 1684: 1675: 1663:. Retrieved 1653: 1642: 1633: 1622: 1613: 1601:. Retrieved 1590: 1578:. Retrieved 1568: 1556:. Retrieved 1545: 1533:. Retrieved 1522: 1511:. Retrieved 1500: 1488:. Retrieved 1484: 1474: 1462:. Retrieved 1451: 1439:. Retrieved 1429: 1417:. Retrieved 1407: 1395:. Retrieved 1385: 1373:. Retrieved 1362: 1350:. Retrieved 1340: 1328:. Retrieved 1317: 1305:. Retrieved 1294: 1282:. Retrieved 1271: 1259:. Retrieved 1248: 1236:. Retrieved 1226: 1215:. Retrieved 1211: 1202: 1190:. Retrieved 1179: 1167:. Retrieved 1163: 1153: 1141:. Retrieved 1131: 1119:. Retrieved 1115: 1105: 1093:. Retrieved 1088: 1079: 1067:. Retrieved 1056: 1044:. Retrieved 1040:the original 1035: 1010:. Retrieved 1005: 996: 985: 976: 964:. Retrieved 960: 950: 941: 932: 922:December 10, 920:. Retrieved 910: 898:. Retrieved 888: 876:. Retrieved 866: 854:. Retrieved 844: 832:. Retrieved 822: 810:. Retrieved 800: 788:. Retrieved 778: 766:. Retrieved 755: 746: 736: 724:. Retrieved 720:the original 710: 699:. Retrieved 666:December 27, 664:. Retrieved 633:. Retrieved 617: 576:Hydro QuĂ©bec 550: 542: 534: 506: 491:Government, 478: 457: 437: 417:Stephenville 414: 398:Newfoundland 395: 392:Transmission 386: 372: 364:Andrew Furey 361: 325: 296: 294: 213:radial gates 61:Location of 1485:The Narwhal 1089:Global News 583:Innu Nation 525:Dwight Ball 520:NunatuKavut 516:Innu Nation 497:NunatuKavut 493:Innu Nation 489:Nunatsiavut 473:Innu Nation 464:Gull Island 425:Point Aconi 421:Nova Scotia 250:4 x 206 MW 116: / 92:Coordinates 1764:Categories 1531:. CBC News 1513:2016-06-24 1460:. CBC News 1371:. CBC News 1217:2018-10-30 1012:2023-04-16 966:24 January 749:. Toronto. 701:2014-07-26 635:2014-07-26 610:References 538:boondoggle 408:under the 383:Generation 357:St. John's 303:region of 104:60°46′22″W 101:53°14′44″N 543:In 2017, 440:Maritimes 227:Reservoir 222:5930 m/s 199:Spillways 1706:CBC News 1686:CBC News 1644:CBC News 1624:CBC News 987:CBC News 593:See also 495:and the 301:Labrador 246:Turbines 180:Impounds 153:Owner(s) 87:, Canada 81:Labrador 77:Location 1665:Oct 16, 1603:Nov 29, 1580:Nov 29, 1558:Nov 29, 1535:Nov 29, 1490:21 July 1464:Nov 29, 1441:Nov 29, 1419:Nov 29, 1397:Nov 29, 1375:Nov 29, 1352:Nov 29, 1330:Nov 29, 1307:Nov 29, 1284:Nov 29, 1261:Nov 29, 1238:Nov 29, 1192:Nov 29, 1169:Nov 29, 1143:Nov 29, 1121:21 July 1095:Nov 29, 1069:Nov 29, 1046:21 July 900:Nov 29, 878:Nov 29, 856:Nov 29, 834:Nov 29, 812:Nov 29, 790:Nov 29, 768:Nov 29, 726:June 8, 545:Premier 512:capping 509:wetland 581:. The 460:Nalcor 309:Canada 193:39.5 m 691:(PDF) 660:(PDF) 626:(JPG) 433:Emera 332:Emera 276:62.3% 235:39 m 132:2013 1667:2022 1605:2020 1582:2020 1560:2020 1537:2020 1492:2019 1466:2020 1443:2020 1421:2020 1399:2020 1377:2020 1354:2020 1332:2020 1309:2020 1286:2020 1263:2020 1240:2020 1194:2020 1171:2020 1145:2020 1123:2019 1097:2020 1071:2020 1048:2019 968:2022 961:VOCM 924:2013 902:2020 880:2020 858:2020 836:2020 814:2020 792:2020 770:2020 728:2013 668:2011 587:Innu 567:and 518:and 348:and 295:The 286:4.5 263:824 1116:CBC 446:to 427:on 288:TWh 65:in 1766:: 1703:. 1683:. 1641:. 1621:. 1483:. 1210:. 1162:. 1114:. 1087:. 1034:. 1021:^ 1004:. 984:. 959:. 940:. 745:. 676:^ 644:^ 628:. 540:. 504:. 450:. 370:. 359:. 341:, 307:, 265:MW 83:, 1669:. 1607:. 1584:. 1562:. 1539:. 1516:. 1494:. 1468:. 1445:. 1423:. 1401:. 1379:. 1356:. 1334:. 1311:. 1288:. 1265:. 1242:. 1220:. 1196:. 1173:. 1147:. 1125:. 1099:. 1073:. 1050:. 1015:. 970:. 944:. 926:. 904:. 882:. 860:. 838:. 816:. 794:. 772:. 730:. 704:. 670:. 638:. 203:2 20:)

Index

Lower Churchill Project
Muskrat Falls Generating Station is located in Newfoundland and Labrador
Muskrat Falls
Newfoundland and Labrador
Labrador
Newfoundland and Labrador
53°14′44″N 60°46′22″W / 53.24556°N 60.77278°W / 53.24556; -60.77278
Newfoundland and Labrador Hydro
Type of dam
Roller compacted concrete
Churchill River
Spillways
radial gates
Turbines
Kaplan turbines
Installed capacity
MW
Capacity factor
Annual generation
TWh
Labrador
Newfoundland and Labrador
Canada
Churchill River
Churchill Falls Generating Station
Muskrat Falls
Nalcor Energy
Emera
Prime Minister
Stephen Harper