367:
Transmission Utility & Licensee only up to 24 September 2008. In exercise of the powers conferred under sub-sections (1), (2), (5), (6) and (7) of section 131 and section 133 of the Electricity Act 2003 (Central Act 36 of 2003) the Government of Kerala had issued notification vide G.O. (MS) No.37/2008/PD, Dated, Thiruvananthapuram, 25 September 2008 for the purpose of vesting of functions, properties, interests, rights, obligations and liabilities of the Kerala State Electricity Board in the State Government on such terms as agreed to by the Kerala State Electricity Board and the State Government and revesting thereof by the State Government in a Corporate entity and also for the transfer of Personnel of the Board to the Corporate entity and for determining the terms and conditions on which such transfers and vesting shall be made. Accordingly, with effect from 25 September 2008, all the functions, properties and all interests, rights in properties, all rights, and liabilities of the Board are vested in the State Government. The Kerala State Electricity Board Limited has been incorporated under the
332:
Pallivasal Hydroelectric Project, the construction of which was started in 1933. The first stage of the project was commissioned in 1940. Its capacity was 13.5 MW. By that time, a comparable electric transmission network had also been completed with 66 kV substations at Alappuzha, Mavelikkara, Kothamangalam, Kundara, Kalamasserry, Viyyur, Aluva, and Thiruvananthapuram, which were also commissioned in 1940 during April and May. With the commissioning of Pallivasal project in 1940, the Kannan Devan Hills Produce Company closed down its plant. Supply from the Pallivasal hydro-electric project in Travancore began in 1942, and by 1945-46, the entire requirements of Ernakulam and Mattanchery were met from this source.
317:
such efforts. In 1927, a Thermal Power Station was established under government ownership at Thiruvananthapuram for the production of electrical energy on commercial lines. Three oil engine generators, of a capacity of 65 kW each, were installed and commercial production started in 1929. This station was located at Thampanoor at Thiruvananthapuram. An Electrical Wing under the State Public Works Department was entrusted with the administration of the scheme.
354:
classes of consumers in the state of Kerala. Kerala State Electricity Board commenced functioning on 31 March 1957 afternoon as per order no. EL1-6475/56/PW dated 7 March 1957 of the Kerala State Government. It had 5 members with K. P. Sreedharan Nair as chairman. All the staff belonging to the erstwhile Electricity Department was transferred to the Board. The 'Board' consisting of the chairman and the Members is the Supreme Governing Body.
38: 142: 381: 151: 324:. The formation of the Electricity Department paved the way for notable developments in the field. Thermal generating stations were set up at Kollam, Kottayam and Nagercoil (now in Tamil Nadu) in 1934. By that time, the possibilities of hydroelectric generation attracted the attention of the technologists and authorities. 316:
Attempts at power generation for meeting local needs through thermal plants were making progress in several parts of the state between 1929 and 1941. The Trivandrum Electric Supply which supplied power for street and domestic lighting and for lights and fans in government offices was the earliest of
343:
At the time of its inception, in 1958, the KSEB had an installed capacity of 109.5 MW, with a total annual internal generation of 441.35 MU. Over the years, as demand increased, the board has imported power from neighbouring states and private entities. As per the Central Electricity Act 2003, KSEB
312:
The history of electricity in the state is around one century old. The first effort in this direction was a private endeavour. Electricity was first brought to the state by a British company โ€“ the Kannan Devan Hill Produce Company, Munnar. The first generating station of the state was set up on the
1545:
KSEB follows a slab system in which a consumer using up to 250 units per month will have a telescopic tariff. This means that the first 50 units will be charged at a lower rate, with the rates increasing progressively for subsequent 50 units. After 250 units, the billing will be "non-telescopic",
391:
KSEB Ltd has 31 hydro-electric projects, 7 solar projects, 2 diesel power plants and 1 wind farm. Power generation is also undertaken by Captive Mode Projects, Independent Power Mode Projects & Co-generation mode projects other than KSEBL. About 25% of the energy requirement is being met from
357:
The State Government by their notification EL3-9345 dated 21 February 1958 constituted the State Electricity Consultative Council under section 16 of the Electricity Supply Act. The Council functions as a consultative body and the Board is required to place before the council the annual financial
353:
The Kerala State Electricity Board, constituted by the Government of Kerala, by order dated 7 March 1957, under the Electricity (Supply) Act, 1948 is in the business of Generation, Transmission and Distribution of electricity and strives to provide quality electricity at an affordable cost to all
1386:
A 2000 MW HVDC Station has commissioned by Power Grid Corporation of India Ltd. at Madakkathara as part of Raigarh-Pugalur-Thrissur HVDC Project. This is the first HVDC Project in Kerala and the fourth project in South India after Kolar, Vizag and Pugalur. The project was inaugurated by Prime
331:
Kerala being a land of mountains and rivers presented a fertile field for hydroelectric generation. The vast potential for hydroelectric generation in the state prompted the state authorities to take steps to establish stations for hydroelectric generation. The first of these ventures was the
366:
Since the enactment of the Electricity Act, 2003, KSEB has been functioning as the State Transmission Utility (STU) and a distribution licensee w.e.f 10 December 2004 under section 172(a) of the Electricity Act, 2003. The Central Government had approved the continuation of KSEB as a State
335:
The Kerala state Electricity board started functioning under the direction of a newly formed Kerala government on 31 March 1957. The first governing body consisted of 5 members, and was headed by chairman K P Sreedhara Kaymal. The staff of the erstwhile Department of Electricity of the
1532:
KSEB Ltd distributes electricity in the State of Kerala except in the administrative region of Thrissur Municipal Corporation and Munnar (Kannan Devan Hills). For operational conveniences the distribution wing is divided into four zones: South, Central, North and North Malabar.
1428:
The major substations include five 400 kV substations, and 17 220 kV substations. The main grid comprises the 220 kV systems. The transmission sector of KSEB comprises two zones namely North and South. The State Load Dispatch Centre (SLDC) located at Kalamassery.
371:
on 14 January 2011 and started operations as an independent company with effect from 1 November 2013. The original KSEB was dissolved and its assets and liabilities were transferred from government to the newly formed company KSEB Limited.
327:
The first attempt at generation on a commercial scale was made in 1935-36 when the Government of Cochin issued a licence to the Cochin State Power and Light Corporation for electrification of the towns of Ernakulam and Thrissur and the
344:
was converted to Kerala State Electricity Board Limited in 2014. The original KSEB was dissolved and its assets and liabilities transferred to the government initially and then transferred to the newly formed company KSEB Limited.
1717:
For three-phase customers the fixed charges are set as Rs 110 for consumers having a monthly consumption up to 350 units, Rs 120 for up to 400 units, Rs 130 for up to 400 units and Rs 150 for consumption above 500 units.
1541:
Kerala State Electricity Board tariff consists of different components. The charges levied on consumers include fixed charges, meter rent, energy charges, fuel surcharges, electricity duty and applicable local taxes.
362:
and KSE Board issued orders for the restructuring of KSE Board into profit centers in April 2002. Members head the profit centers. There is a Corporate Office to coordinate and control the activities of the Board.
313:
right bank of a tributary of River Periyar in 1906. It was a hydroelectric project and the tributary called Mudirappuzha continues to be the site for large numbers of hydroelectric projects in the state.
358:
statement and supplementary statements, if any, before submitting such statements to the State Government. The 'Board' consisting of the chairman and seven members is the Supreme Governing Body. The
299:
that generates, transmits and distributes electricity in the state. Established in 1957, the agency comes under the authority of the Department of Power. It has been registered under Indian
1871: 320:
The next significant development was the formation of a separate department for electricity in 1932 by His Highness Sri Chithirathirunal Maharaja and his Diwan
2023: 1546:
which means the slab rate will be applicable for the entire electricity consumed. The following table shows the electricity tariff for domestic consumers
1935: 2064: 1839: 1524:, while 400 kV substation at Madakkathara, Thrissur, is owned by KSEB. 400 kV substation, Madakkathara is the first 400 kV substation in Kerala. 55: 2044: 102: 2054: 74: 1903: 2018: 1814: 1727: 81: 1981: 1357:
The Kerala power system grid is connected to the Southern Region Transmission system through 400 kV double circuit lines. They are
1908: 1021: 88: 2059: 1928: 1639:
customers having a monthly consumption up to 100 units, the fixed charges are set as Rs 90 and Rs 100 for up to 250 units.
1277: 292: 70: 1921: 121: 1737: 1521: 1857: 1520:
400 kV substations at Pallipuram โ€“ Thiruvananthapuram, Pallikkara โ€“ Kochi, Palakkad, and Kozhikode are owned by
1802: 977: 59: 242: 392:
hydel plants owned and operated by KSEBL. As of December 2019, the total installed capacity was 2823.01 MW.
95: 2013: 1732: 179: 1636: 399:
owned by KSEB, Captive Mode Projects, Independent Power Mode Projects and co-generation mode projects.
2049: 1308: 183: 1948: 48: 1876: 175: 1913: 479: 359: 321: 296: 17: 8: 451: 368: 300: 211: 156: 1785: 509: 494: 1777: 1390:
There are 6 major inter-state transmission lines at 220 kV level and 110 kV level.
1976: 1944: 663: 560: 446: 2038: 1789: 1966: 1282: 542: 464: 1410: 337: 1971: 1765: 1365: 1026: 524: 428: 385: 1148: 1781: 37: 1642: 1549: 1372: 1189: 1094: 1067: 966: 417: 1858:"KSEB hikes power tariff for domestic consumers by 11.4 per cent" 141: 1872:"KSEB gives shock treatment to domestic users, but ignores dues" 1952: 1406: 529: 433: 396: 228: 215: 1943: 1379: 982: 380: 150: 1904:
ORUMA: the result of KSEBโ€™s concerted efforts: 'The Hindu'
1815:"Kerala State Electricity Board Limited โ€“ KSEBL Overview" 275: 2024:
Indian states ranking by households having electricity
395:
The below list contains power generation projects in
62:. Unsourced material may be challenged and removed. 1896: 2036: 1643:Tariff for monthly consumption (above 250 units) 1550:Tariff for monthly consumption (up to 250 units) 1909:Electricity Industry in Public Sector in India 1840:"PM inaugurates Pugalur-Thrissur HVDC project" 1803:History of Electricity in Kerala, Dr. D. Shina 1338:Renewable Power Corporation of Kerala Limited 1929: 1860:. 8 July 2019 – via Malayala Manorama. 2019:States of India by installed power capacity 348: 1936: 1922: 1728:List of electricity organisations in India 149: 1982:Rajiv Gandhi Combined Cycle Power Project 1387:Minister Narendra Modi in February 2021. 402: 122:Learn how and when to remove this message 1397:Kaniyampetta โ€“ Kadakola (single circuit) 379: 2065:Government agencies established in 1957 1022:Rajiv Gandhi Combined Cycle Power Plant 951: 14: 2037: 1763: 135:Kerala State Electricity Board Limited 1917: 1536: 2045:Government-owned companies of Kerala 1759: 1757: 1755: 1753: 1278:Cochin International Airport Limited 60:adding citations to reliable sources 31: 2055:State electricity agencies of India 1403:Sabarigiri โ€“ Theni (single circuit) 1400:Idukki โ€“ Udumalpet (single circuit) 340:state were transferred to the KSEB. 24: 25: 2076: 1888: 1750: 1174: 510:Peringalkuthu Left Bank Extension 140: 71:"Kerala State Electricity Board" 36: 1738:List of power stations in India 1527: 1352: 995:Kozhikode Diesel Power Project 47:needs additional citations for 1998:Kerala State Electricity Board 1864: 1850: 1832: 1807: 1796: 978:Brahmapuram Diesel Power Plant 285:Kerala State Electricity Board 27:Electricity Supplier Of Kerala 13: 1: 2060:1957 establishments in Kerala 1766:"Power Development in Kerala" 1743: 1656:Electricity tariff (Rs/unit) 1563:Electricity tariff (Rs/unit) 1361:Udumalpet โ€“ Madakkathara line 1052: 1039:MPS Steel Castings Pvt. Ltd. 1009:Philips Carbon Black Limited 375: 7: 2014:Electricity sector in India 1733:Electricity sector in India 1721: 10: 2081: 1441:Line length in circuit km 1421:Parassala โ€“ Kuzhithura and 306: 2006: 1990: 1959: 293:public sector undertaking 270: 260: 252: 235: 222: 207: 189: 171: 163: 148: 139: 1309:Kochi Metro Rail Limited 349:Organizational structure 1877:The New Indian Express 1764:Mathew, E. T. (1977). 1417:The 110 kV lines are: 1393:The 220 kV lines are: 403:Hydroelectric projects 388: 322:Sir C P Ramaswami Iyer 195:; 67 years ago 176:Electricity generation 1424:Manjeswaram โ€“ Konake. 383: 167:Public Sector Company 155:KSEB Headquarters in 1371:Mysore โ€“ Kozhikode ( 1078:Kanjikode Wind Farm 952:Fossil fuel projects 360:Government of Kerala 297:Government of Kerala 56:improve this article 1846:. 19 February 2021. 1653:Fixed charges (Rs) 1560:Fixed charges (Rs) 730:Kuttiady tail race 262:Number of employees 247:(Chairman & MD) 136: 1537:Electricity tariff 1444:Reliability index 1091:Malayala Manorama 452:Ernakulam district 389: 369:Companies Act 1956 301:Companies Act 1956 212:Thiruvananthapuram 157:Thiruvananthapuram 134: 2032: 2031: 1715: 1714: 1650:Consumption slab 1633: 1632: 1557:Consumption slab 1518: 1517: 1350: 1349: 1172: 1171: 1050: 1049: 949: 948: 495:Peringalkuthu Dam 303:in January 2011. 282: 281: 193:7 March 1957 132: 131: 124: 106: 16:(Redirected from 2072: 2050:Energy in Kerala 1938: 1931: 1924: 1915: 1914: 1900: 1899: 1897:Official website 1882: 1881: 1868: 1862: 1861: 1854: 1848: 1847: 1836: 1830: 1829: 1827: 1825: 1811: 1805: 1800: 1794: 1793: 1770:Social Scientist 1761: 1647: 1646: 1554: 1553: 1438:No. substations 1432: 1431: 1413:(double circuit) 1179: 1178: 1057: 1056: 956: 955: 717:Lower Meenmutty 407: 406: 278: 248: 241:Biju Prabhakar, 203: 201: 196: 153: 144: 137: 133: 127: 120: 116: 113: 107: 105: 64: 40: 32: 21: 2080: 2079: 2075: 2074: 2073: 2071: 2070: 2069: 2035: 2034: 2033: 2028: 2002: 1986: 1955: 1942: 1895: 1894: 1891: 1886: 1885: 1870: 1869: 1865: 1856: 1855: 1851: 1838: 1837: 1833: 1823: 1821: 1813: 1812: 1808: 1801: 1797: 1782:10.2307/3516684 1762: 1751: 1746: 1724: 1645: 1552: 1539: 1530: 1355: 1177: 1055: 954: 756:Ranni-Perunadu 405: 378: 351: 309: 291:) is an Indian 274: 263: 246: 245: 238: 225: 199: 197: 194: 159: 128: 117: 111: 108: 65: 63: 53: 41: 28: 23: 22: 15: 12: 11: 5: 2078: 2068: 2067: 2062: 2057: 2052: 2047: 2030: 2029: 2027: 2026: 2021: 2016: 2010: 2008: 2007:Related topics 2004: 2003: 2001: 2000: 1994: 1992: 1988: 1987: 1985: 1984: 1979: 1977:Idamalayar Dam 1974: 1969: 1963: 1961: 1960:Power stations 1957: 1956: 1945:Power stations 1941: 1940: 1933: 1926: 1918: 1912: 1911: 1906: 1901: 1890: 1889:External links 1887: 1884: 1883: 1880:. 9 July 2019. 1863: 1849: 1831: 1806: 1795: 1748: 1747: 1745: 1742: 1741: 1740: 1735: 1730: 1723: 1720: 1713: 1712: 1709: 1706: 1702: 1701: 1698: 1695: 1691: 1690: 1687: 1684: 1680: 1679: 1676: 1673: 1669: 1668: 1665: 1662: 1658: 1657: 1654: 1651: 1644: 1641: 1631: 1630: 1627: 1624: 1620: 1619: 1616: 1613: 1609: 1608: 1605: 1602: 1598: 1597: 1594: 1591: 1587: 1586: 1583: 1580: 1576: 1575: 1572: 1569: 1565: 1564: 1561: 1558: 1551: 1548: 1538: 1535: 1529: 1526: 1516: 1515: 1512: 1509: 1506: 1502: 1501: 1498: 1495: 1492: 1488: 1487: 1484: 1481: 1478: 1474: 1473: 1470: 1467: 1464: 1460: 1459: 1456: 1453: 1450: 1446: 1445: 1442: 1439: 1436: 1426: 1425: 1422: 1415: 1414: 1404: 1401: 1398: 1384: 1383: 1378:Tirunelveli - 1376: 1369: 1364:Tirunelveli โ€“ 1362: 1354: 1351: 1348: 1347: 1345: 1342: 1339: 1335: 1334: 1331: 1328: 1325: 1321: 1320: 1317: 1314: 1311: 1305: 1304: 1301: 1298: 1296: 1292: 1291: 1288: 1285: 1280: 1274: 1273: 1270: 1267: 1265: 1261: 1260: 1257: 1254: 1252: 1248: 1247: 1244: 1241: 1239: 1235: 1234: 1232: 1229: 1227: 1223: 1222: 1219: 1216: 1214: 1210: 1209: 1206: 1203: 1201: 1197: 1196: 1193: 1186: 1183: 1176: 1175:Solar projects 1173: 1170: 1169: 1167: 1164: 1162: 1158: 1157: 1154: 1151: 1146: 1142: 1141: 1138: 1135: 1133: 1129: 1128: 1126: 1123: 1121: 1117: 1116: 1113: 1110: 1108: 1104: 1103: 1100: 1097: 1092: 1088: 1087: 1084: 1081: 1079: 1075: 1074: 1071: 1064: 1061: 1054: 1051: 1048: 1047: 1045: 1042: 1040: 1036: 1035: 1032: 1029: 1024: 1018: 1017: 1015: 1012: 1010: 1006: 1005: 1002: 999: 996: 992: 991: 988: 985: 980: 974: 973: 970: 963: 960: 953: 950: 947: 946: 943: 940: 938: 934: 933: 930: 927: 925: 921: 920: 917: 914: 912: 908: 907: 904: 901: 899: 895: 894: 891: 888: 886: 882: 881: 878: 875: 873: 869: 868: 866: 863: 861: 857: 856: 853: 850: 848: 847:Peruthenaruvi 844: 843: 840: 837: 835: 831: 830: 827: 824: 822: 818: 817: 814: 811: 809: 805: 804: 801: 798: 796: 792: 791: 788: 785: 783: 779: 778: 775: 772: 770: 766: 765: 762: 759: 757: 753: 752: 749: 746: 744: 740: 739: 736: 733: 731: 727: 726: 723: 720: 718: 714: 713: 710: 707: 705: 701: 700: 697: 694: 692: 688: 687: 684: 681: 679: 675: 674: 671: 668: 666: 664:Malampuzha Dam 660: 659: 657: 654: 652: 648: 647: 644: 641: 639: 635: 634: 631: 628: 626: 622: 621: 618: 615: 613: 609: 608: 605: 602: 600: 599:Lower Periyar 596: 595: 592: 589: 587: 586:Neriamangalam 583: 582: 579: 576: 574: 570: 569: 566: 563: 561:Pathanamthitta 558: 554: 553: 550: 547: 545: 539: 538: 535: 532: 527: 521: 520: 517: 514: 512: 506: 505: 502: 499: 497: 491: 490: 487: 484: 482: 476: 475: 472: 469: 467: 461: 460: 457: 454: 449: 447:Idamalayar Dam 443: 442: 439: 436: 431: 425: 424: 421: 414: 411: 404: 401: 377: 374: 350: 347: 346: 345: 341: 333: 329: 325: 318: 314: 308: 305: 280: 279: 272: 268: 267: 264: 261: 258: 257: 254: 250: 249: 239: 236: 233: 232: 226: 223: 220: 219: 209: 205: 204: 191: 187: 186: 173: 169: 168: 165: 161: 160: 154: 146: 145: 130: 129: 44: 42: 35: 26: 9: 6: 4: 3: 2: 2077: 2066: 2063: 2061: 2058: 2056: 2053: 2051: 2048: 2046: 2043: 2042: 2040: 2025: 2022: 2020: 2017: 2015: 2012: 2011: 2009: 2005: 1999: 1996: 1995: 1993: 1991:Organisations 1989: 1983: 1980: 1978: 1975: 1973: 1970: 1968: 1965: 1964: 1962: 1958: 1954: 1950: 1949:organisations 1946: 1939: 1934: 1932: 1927: 1925: 1920: 1919: 1916: 1910: 1907: 1905: 1902: 1898: 1893: 1892: 1879: 1878: 1873: 1867: 1859: 1853: 1845: 1841: 1835: 1820: 1816: 1810: 1804: 1799: 1791: 1787: 1783: 1779: 1775: 1771: 1767: 1760: 1758: 1756: 1754: 1749: 1739: 1736: 1734: 1731: 1729: 1726: 1725: 1719: 1710: 1707: 1704: 1703: 1699: 1696: 1693: 1692: 1688: 1685: 1682: 1681: 1677: 1674: 1671: 1670: 1666: 1663: 1660: 1659: 1655: 1652: 1649: 1648: 1640: 1638: 1628: 1625: 1622: 1621: 1617: 1614: 1611: 1610: 1606: 1603: 1600: 1599: 1595: 1592: 1589: 1588: 1584: 1581: 1578: 1577: 1573: 1570: 1567: 1566: 1562: 1559: 1556: 1555: 1547: 1543: 1534: 1525: 1523: 1513: 1510: 1507: 1504: 1503: 1499: 1496: 1493: 1490: 1489: 1485: 1482: 1479: 1476: 1475: 1471: 1468: 1465: 1462: 1461: 1457: 1454: 1451: 1448: 1447: 1443: 1440: 1437: 1434: 1433: 1430: 1423: 1420: 1419: 1418: 1412: 1408: 1405: 1402: 1399: 1396: 1395: 1394: 1391: 1388: 1381: 1377: 1374: 1370: 1367: 1363: 1360: 1359: 1358: 1346: 1343: 1340: 1337: 1336: 1332: 1329: 1327:Kuzhalmandam 1326: 1323: 1322: 1318: 1315: 1312: 1310: 1307: 1306: 1302: 1299: 1297: 1294: 1293: 1289: 1286: 1284: 1281: 1279: 1276: 1275: 1271: 1268: 1266: 1263: 1262: 1258: 1255: 1253: 1251:Muvattupuzha 1250: 1249: 1245: 1242: 1240: 1237: 1236: 1233: 1230: 1228: 1225: 1224: 1220: 1217: 1215: 1212: 1211: 1207: 1204: 1202: 1199: 1198: 1194: 1191: 1187: 1184: 1181: 1180: 1168: 1165: 1163: 1160: 1159: 1155: 1152: 1150: 1147: 1144: 1143: 1139: 1136: 1134: 1131: 1130: 1127: 1124: 1122: 1119: 1118: 1114: 1111: 1109: 1107:Ramakkelmedu 1106: 1105: 1101: 1098: 1096: 1093: 1090: 1089: 1085: 1082: 1080: 1077: 1076: 1072: 1069: 1065: 1062: 1059: 1058: 1046: 1043: 1041: 1038: 1037: 1033: 1030: 1028: 1025: 1023: 1020: 1019: 1016: 1013: 1011: 1008: 1007: 1003: 1000: 997: 994: 993: 989: 986: 984: 981: 979: 976: 975: 971: 968: 964: 961: 958: 957: 944: 941: 939: 936: 935: 931: 928: 926: 923: 922: 918: 915: 913: 910: 909: 905: 902: 900: 897: 896: 892: 889: 887: 884: 883: 879: 876: 874: 871: 870: 867: 864: 862: 859: 858: 854: 851: 849: 846: 845: 841: 838: 836: 833: 832: 828: 825: 823: 820: 819: 815: 812: 810: 807: 806: 802: 799: 797: 794: 793: 789: 786: 784: 781: 780: 776: 773: 771: 768: 767: 763: 760: 758: 755: 754: 750: 747: 745: 742: 741: 737: 734: 732: 729: 728: 724: 721: 719: 716: 715: 711: 708: 706: 703: 702: 698: 695: 693: 690: 689: 685: 682: 680: 678:Chembukadavu 677: 676: 672: 669: 667: 665: 662: 661: 658: 655: 653: 650: 649: 645: 642: 640: 637: 636: 632: 629: 627: 624: 623: 619: 616: 614: 611: 610: 606: 603: 601: 598: 597: 593: 590: 588: 585: 584: 580: 577: 575: 572: 571: 567: 564: 562: 559: 556: 555: 551: 548: 546: 544: 541: 540: 536: 533: 531: 528: 526: 523: 522: 518: 515: 513: 511: 508: 507: 503: 500: 498: 496: 493: 492: 488: 485: 483: 481: 478: 477: 473: 470: 468: 466: 463: 462: 458: 455: 453: 450: 448: 445: 444: 440: 437: 435: 432: 430: 427: 426: 422: 419: 415: 412: 409: 408: 400: 398: 393: 387: 382: 373: 370: 364: 361: 355: 342: 339: 334: 330: 326: 323: 319: 315: 311: 310: 304: 302: 298: 294: 290: 286: 277: 273: 269: 265: 259: 255: 251: 244: 240: 234: 230: 227: 221: 217: 213: 210: 206: 192: 188: 185: 181: 177: 174: 170: 166: 162: 158: 152: 147: 143: 138: 126: 123: 115: 104: 101: 97: 94: 90: 87: 83: 80: 76: 73: โ€“  72: 68: 67:Find sources: 61: 57: 51: 50: 45:This article 43: 39: 34: 33: 30: 19: 1997: 1967:Chembukadavu 1875: 1866: 1852: 1843: 1834: 1822:. Retrieved 1818: 1809: 1798: 1776:(2): 52โ€“63. 1773: 1769: 1716: 1634: 1544: 1540: 1531: 1528:Distribution 1519: 1427: 1416: 1392: 1389: 1385: 1356: 1353:Transmission 1341:Ambalathara 1283:Nedumbassery 1195:Year opened 1073:Year opened 972:Year opened 937:Pathankayam 898:Iruttukanam 834:Vellathuval 743:Poozhithode 423:Year opened 394: 390: 365: 356: 352: 288: 284: 283: 208:Headquarters 184:distribution 180:transmission 164:Company type 118: 109: 99: 92: 85: 78: 66: 54:Please help 49:verification 46: 29: 1819:www.kseb.in 1637:three-phase 1411:Tirunelveli 1264:Pothencode 1226:Kollengode 1161:Kosamattom 924:Meenvallom 911:Karikkayam 557:Sabarigiri 338:Thiru-Kochi 256:Electricity 224:Area served 112:August 2014 2039:Categories 1972:Idukki Dam 1744:References 1366:Trivandrum 1200:Kanjikode 1188:Capacity ( 1066:Capacity ( 1053:Wind farms 1027:Kayamkulam 965:Capacity ( 872:Kuthungal 808:Adyanpara 704:Malankara 651:Madupetty 525:Pallivasal 429:Idukki Dam 416:Capacity ( 386:Idukki Dam 376:Generation 295:under the 237:Key people 200:1957-03-07 82:newspapers 1844:The Hindu 1790:0970-0293 1435:Capacity 1295:Hindalco 1238:Barapole 1185:Location 1149:Kanjikode 1063:Location 998:Nallalam 962:Location 885:Ullunkal 821:Barapole 782:Vilangad 413:Location 1722:See also 1623:201-250 1612:151-200 1601:101-150 1469:2701.38 1373:Areekode 1095:Palakkad 860:Maniyar 795:Chimini 638:Peppara 625:Kallada 573:Panniar 543:Sengulam 480:Kuttiadi 465:Sholayar 328:suburbs. 253:Products 172:Industry 1590:51-100 1477:110 kV 1463:220 kV 1449:400 kV 1313:Muttom 1213:Edayar 1132:Ahalia 1031:359.58 769:Peechi 612:Kakkad 307:History 276:kseb.in 271:Website 231:, India 218:, India 198: ( 190:Founded 96:scholar 1953:Kerala 1824:5 June 1788:  1694:0-500 1683:0-400 1672:0-350 1661:0-300 1514:92.99 1505:33 kV 1500:97.86 1491:66 kV 1486:98.25 1472:97.75 1458:99.96 1407:Edamon 1375:) line 1344:50.00 1324:ANERT 1287:29.03 1125:18.60 1120:Agali 1112:14.25 1083:2.025 1044:10.00 987:106.6 691:Urumi 530:Idukki 434:Idukki 397:Kerala 266:35,000 229:Kerala 216:Kerala 98:  91:  84:  77:  69:  1711:7.90 1705:500- 1700:7.10 1689:6.90 1678:6.60 1667:5.80 1629:7.60 1618:6.40 1607:4.80 1596:3.70 1585:3.15 1579:0-50 1568:0-40 1522:PGCIL 1511:1430 1497:2387 1483:4004 1380:Kochi 1333:2017 1330:2.00 1319:2017 1316:2.67 1303:2016 1300:1.00 1290:2015 1272:2016 1269:2.00 1259:2016 1256:1.25 1246:2016 1243:4.00 1231:1.00 1221:2016 1218:1.25 1208:2015 1205:1.00 1182:Name 1156:2017 1145:Inox 1140:2016 1137:8.40 1115:2008 1102:2019 1086:1995 1060:Name 1034:1998 1004:2000 990:1997 983:Kochi 959:Name 945:2017 932:2014 919:2009 916:10.5 906:2010 893:2018 880:2000 855:2017 842:2016 829:2016 816:2015 803:2015 790:2014 777:2013 774:1.25 764:2012 751:2011 738:2008 735:3.75 725:2006 712:1994 709:10.5 699:2004 696:6.15 686:2003 683:6.45 673:2011 646:2015 633:1994 620:1999 607:1997 594:1961 591:77.5 581:1963 568:1966 552:1954 537:1940 534:37.5 519:1999 504:1957 489:1972 474:1966 459:1985 441:1976 410:Name 103:JSTOR 89:books 1947:and 1826:2019 1786:ISSN 1708:150 1697:130 1686:120 1675:110 1664:100 1635:For 1574:1.5 1508:114 1480:129 1455:378 1382:line 1368:line 1001:128 903:4.5 839:3.6 813:3.5 800:2.5 787:7.5 748:4.8 722:3.5 670:2.5 604:180 565:340 486:225 438:780 384:The 289:KSEB 75:news 18:KSEB 1951:of 1778:doi 1626:80 1615:70 1604:55 1593:45 1582:35 1494:83 1466:17 1153:16 1099:10 1014:10 877:21 865:12 826:15 630:15 617:50 578:32 549:48 516:16 501:36 471:54 456:75 243:IAS 58:by 2041:: 1874:. 1842:. 1817:. 1784:. 1772:. 1768:. 1752:^ 1571:0 1452:5 1409:โ€“ 1192:) 1190:MW 1166:1 1070:) 1068:MW 969:) 967:MW 942:8 929:3 890:7 852:6 761:4 656:2 643:3 420:) 418:MW 214:, 182:, 178:, 1937:e 1930:t 1923:v 1828:. 1792:. 1780:: 1774:6 287:( 202:) 125:) 119:( 114:) 110:( 100:ยท 93:ยท 86:ยท 79:ยท 52:. 20:)

Index

KSEB

verification
improve this article
adding citations to reliable sources
"Kerala State Electricity Board"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message


Thiruvananthapuram
Electricity generation
transmission
distribution
Thiruvananthapuram
Kerala
Kerala
IAS
kseb.in
public sector undertaking
Government of Kerala
Companies Act 1956
Sir C P Ramaswami Iyer
Thiru-Kochi
Government of Kerala
Companies Act 1956

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

โ†‘