482:
levels to ensure a tight fit. Following excavation and construction of the foundation, a steel frame erected two stories high, to which timber components were anchored. The whole thing was sequenced. Upon truck arrival, Glulam beams and columns and CrossLam panels were lifted by a tower crane directly from the truck bed into position. Each component was labeled and designated for a specific location in the structure. As everything was prefabricated, very few workers were needed, which means less cost, improved safety, better coordination, and added accountability. Construction was quick, and less waste on-site was observed due to its prefabrication and modular installation. Each floor was assembled in five days. CLT is not cheap, but cost savings were made due to construction speed and reduced waste.
36:
1855:
352:(IBC), under Type III-A construction which limits wood buildings to six stories with height 85’ but designers planned for 8 stories, which led to extra time and cost in getting approvals as the City of Portland had never reviewed a tall CLT project before. In the end, City and state officials waived restrictive codes under the IBC section 104.11 for Alternate materials and method requests (AMMR). They were responsible for reviewing the
553:
539:
1867:
481:
framed for steel connections based on the CadWork 3D model. Before mass timber was fabricated, Kaiser+Path designed a mini-Carbon12 cross-section to ensure the look, constructability, and mobility. when the mock-up arrived at the site, it was installed and evaluated. Also, It identified the tolerance
388:
The spacious, 1,600 square-foot wood-filled residences feature floor-to-ceiling glass and light-filled open-floor plans, equipped with seismic alarm technology and spacious patios. There are no shared walls between units that provide a similar acoustic experience as living in a detached single-family
526:
As Carbon12 was permitted on the special provision, its performance is monitored by the
Colorado School of Mines. This engineering data was somewhat useful in making changes in the 2021 IBC code permitting up to 18 stories. The firm is now in the design and research phase for The Spar, which aspires
310:
and 12 Northeast
Fremont Street. It was designed, developed, and built by Ben Kaiser of PATH Architecture and Kaiser Group Inc., using CLT panels made by Structurlam. With a rooftop deck, the height is 95 ft. (29 m). Work on the Carbon12 started in July 2016, and it was completed in 2018. It is
505:
approach with the subcontractors for the
Mechanical, Electrical, Plumbing, and Fire systems (MEPF). So they were involved in the predesign phase itself, which helped them create a sequencing plan to install their systems without impeding other's work. As the floors were identical, improvements were
343:
with load capacities stronger than steel and fire resilience beyond those required to meet US building code standards. These improved qualities, alongside the historical construction of tall wood buildings in Europe, have led to an acceptance of wood in US construction, and new building codes are
376:
The building measures 85 feet (26 m) high for 8 floors, with two ground-floor retail spaces that activate the neighborhood beneath 14 condominium units (2 units per floor). Each unit has a recessed balcony and a dedicated elevator entrance. It has an underground
522:
In Feb 2019, Carbon12 was the recipient of the 2019 Wood Design Awards (Best multi-family wood design) awarded by the
Woodworks. In 2017, the building was featured in the Portland business journal and Daily journal of commerce as the year's transformational project.
409:
structural building material that sequesters carbon and acts as a natural insulator that dampens sound and holds in warmth. 132 tons of carbon were sequestered in the CLT, glulam columns and beams of Carbon12. Additionally, having exposed wood interiors provide
465:
The building was constructed by PATH + Kaiser group from
Portland, which also did work on the Radiator building, Oregon (Mass timber building). Munzing structural engineering, LLC provided the best solutions to integrate steel and wood systems in the building.
485:
Mass timber can be installed in any temperature and weather condition. Still, when it rained almost constantly for a few weeks, breathable SBS sheets were used, and fans circulated warm air to bring the moisture in the CLT down to the acceptable levels.
347:
The Carbon12 building ran in the USDA's Tall Wood
Buildings contest (2014) but did not win the prize. However, Kaieser+Path decided to build it anyway and owned the proposed building site, a competition requirement. This building was subject to the 2015
513:
building code did not account for tall timber buildings (8 stories), designers showed the building's safety aspects through computer simulations and modeling. Moreover, sensors were placed beneath the building to monitor the building performance.
392:
Residents of the Carbon12 have given interviews describing the building as "beautiful" and "bright". Few residents were happy with their savings on utilities, commuting expenses, and some residents have also applauded the building's commitment to
1323:
493:
system to meet the code demand of STC and IIC ratings of 60 and above the code minimum of 50 for residential use. So, Kaiser+Path hired multiple subcontractors to install the initial insulation and base layers, another to install the
444:
produced and
Utility bills. The exterior of the property features clad in vertically striated metal paneling, and a deep cut in façade, drawing light into the central interiors, like a shaft of sunlight penetrating a dense forest.
477:. CLT was made up of many layers of adhered lumber boards stacked at 90° angles for better structural rigidity in both directions. These large panels can be made up to 12 feet wide by 60 feet long. Glulam beams and columns were
339:), antiquated building codes in the United States discouraged wood frame construction in 5-floor buildings or higher for many years. With the advancement of science, construction technologies and innovation have led to
363:
Given the rising popularity of wood construction, Carbon12's title of the tallest wood building in the United States is already being challenged by a 148 feet (45 m), 11-floor wood-framing building in
Portland,
750:
Song, Jianwei; Chen, Chaoji; Zhu, Shuze; Zhu, Mingwei; Dai, Jiaqi; Ray, Upamanyu; Li, Yiju; Kuang, Yudi; Li, Yongfeng (2018-02-07). "Processing bulk natural wood into a high-performance structural material".
452:
system (VRF), an interconnected system that shares the load, making it efficient. The waste produced during the construction process was less due to the modular construction but still recycled and used as
813:
1312:
385:(glulam), and CLT (cross-laminated timber) in its structural system. Steel is used in the core and for connecting braces, and concrete for the basement, ground floor, and garage (automated garage).
1428:
414:
experiences, and timber's ability to char delivers natural fire protection. Furthermore, Carbon12 uses a
Buckling-restrained brace frame system to handle an earthquake or other natural disasters.
1396:
999:
1359:
397:, which accommodates individuals who are not typically considered in the use of a building and might otherwise find themselves unable to access areas of a structure or their home.
1908:
1913:
1903:
1108:
607:
1488:
805:
1257:
638:
1898:
1421:
1575:
906:
844:
1385:
992:
112:
1348:
727:
1197:
969:
1871:
932:"How a small, tenacious team opened the door for American builders to reduce their reliance on concrete and steel in favor of CLT"
1543:
527:
to become the tallest mass timber building globally, with 36 stories and almost 600,000 sq. ft. of office and commercial space.
1893:
1618:
1167:
1100:
939:
1693:
1568:
1035:
381:, which is remote controlled that moves cars to their parking spots on a conveyor system. The building employs mass timber,
360:
was present when the building reached its peak height. The Carbon12 is acclaimed as a booster for Oregon's timber industry.
604:
1663:
1484:
1230:
436:
on the roof for the hot water system and exterior lighting reduces damage to the environment by decreasing the amount of
1290:
1078:
1688:
1653:
1819:
1673:
1461:
323:
and its street address (12 NE Fremont St.). The Carbon12 building is advertised to be one of the most efficient and
1859:
1787:
1561:
843:. General Technical Report FPL–GTR–247. USDA, US Forest Services, Forest Products Laboratory (published May 2018).
695:
580:
1518:
876:
1137:
1770:
1724:
1253:
630:
417:
The building's design makes it environmentally friendly, using technologies such as floor-to-ceiling insulated
1668:
1658:
1623:
1628:
105:
1744:
1608:
898:
665:
349:
835:
1809:
1804:
1643:
1633:
335:
While the use of timber frames for constructing 1-2 story buildings is typical in many countries (see:
1814:
1648:
736:
449:
1734:
378:
324:
1754:
1584:
292:
1101:"Who's moving into the nation's tallest timber building? Portlanders with lofty dreams (photos)"
724:
570:
469:
The primary structure is CLT, which was fabricated at the
Structurlam production facilities in
382:
296:
176:
1190:
1824:
1714:
1598:
307:
35:
1130:"Building with wood is a beautiful, sustainable, and impactful way to combat climate change"
834:
Zelinka, Samuel; Hasburgh, Laura; Bourne, Keith; Tucholski, David; Ouellette, Jason (2018).
1739:
1683:
575:
365:
8:
961:
544:
784:
1678:
776:
768:
295:
neighborhood, in the United States. The eight-story structure built with Oregon-made
1159:
931:
1638:
788:
760:
474:
422:
394:
316:
288:
88:
78:
1485:"Mass timber: The next great disruption of construction, wood products industries"
1840:
1698:
1027:
731:
611:
495:
340:
299:(CLT) became the tallest wood building in the United States upon its completion.
441:
336:
1222:
1887:
1729:
1282:
1070:
772:
616:
558:
127:
114:
98:
498:
topping slab, and finally, one more to install the finished floor products.
1719:
1548:
780:
502:
433:
1553:
1453:
1613:
437:
356:
and safety aspects through a performance-based analysis. Oregon Governor
764:
687:
662:"The Big Reveal_ How One Firm Built the Tallest CLT Structure in the US"
405:
Carbon12 is constructed with sustainably harvested and certified CLT, a
1749:
426:
418:
357:
353:
1510:
868:
1129:
993:"Getting to Yes: Making Effective Use of the Alternate Means Process"
490:
470:
411:
406:
303:
68:
17:
1386:"Construction with cross-laminated timber in multi-story buildings"
425:
and maximize natural daylight. An efficient lighting system using
566:
454:
806:"What the Fire Service Needs to Know about Tall Wood Buildings"
510:
440:
needed for the building's domestic, which lowers the amount of
320:
312:
271:
833:
661:
605:
Oregon pushes for wooden skyscrapers to revive timber industry
538:
1065:
1063:
1061:
1059:
1057:
1055:
1053:
1254:"The country's tallest timber building wraps up in Portland"
837:
Compartment Fire Testing of a Two-Story Mass Timber Building
1160:"Carbon12 Structural design and environmental features and"
1384:
Teibinger, Dr.Martin; Matzinger, Irmgard (February 2013).
1050:
429:
with remote control systems and sensors for common areas.
478:
1189:
Popovski, Marjan; Karacabeyli, Erol (11 December 2020).
1277:
1275:
1191:"Seismic behavior of cross-laminated timber structures"
1909:
Buildings and structures in Northeast Portland, Oregon
1022:
1020:
1427:. Woodworks. Wood product council. 28 February 2019.
1349:"Steel tolerances in section 7.13 of the ASIC 303-16"
1914:
Wooden buildings and structures in the United States
1422:"WoodWorks Announces 2019 Wood Design Award Winners"
1313:"Concrete tolerances in section 4 of the ACI 117-10"
1272:
534:
1904:
Buildings and structures in Eliot, Portland, Oregon
1188:
1017:
1383:
926:
924:
899:"Carbon12 Tall wood prize competition application"
719:
717:
715:
713:
600:
598:
596:
1885:
990:
921:
991:Malinowski, Michael F.; Klein, Andrew (2016).
749:
710:
660:kaiser, Ben; Salvin, Kristin (12 March 2020).
593:
368:,(USDA winning proposal) under construction.
1569:
659:
489:A combination of materials was used for the
319:was one of the primary motivators to choose
1583:
1899:Buildings and structures completed in 2018
1576:
1562:
247:Tallest wood building in the United States
1223:"Carbon 12 Creates a New Class of Condos"
517:
400:
1356:American institute of steel construction
569:the largest wooden structure, made from
1251:
1886:
1482:
1434:from the original on 30 September 2020
1252:Hilburg, Jonathan (19 December 2017).
664:. Kaiser group and Path architecture.
1694:Vancouver Avenue First Baptist Church
1557:
1365:from the original on 12 November 2020
1260:from the original on 29 November 2020
879:from the original on 3 September 2020
186:42,000 sq ft (3,900 m)
1866:
1491:from the original on 1 December 2020
1329:from the original on 25 October 2020
1293:from the original on 1 December 2020
1233:from the original on 24 January 2021
1203:from the original on 21 January 2022
1170:from the original on 1 December 2020
1140:from the original on 1 December 2020
1081:from the original on 1 December 2020
1038:from the original on 15 January 2021
1005:from the original on 24 January 2021
972:from the original on 3 December 2020
942:from the original on 1 December 2020
909:from the original on 15 January 2023
800:
798:
668:from the original on 20 October 2021
641:from the original on 20 January 2021
1664:Lewis and Elizabeth Van Vleet House
1619:Dean's Beauty Salon and Barber Shop
371:
344:being proposed to adjust for this.
306:building situated on the corner of
223:Munzing Structural Engineering, LLC
13:
1689:Smithson and McKay Brothers Blocks
1654:Jensen Investment Company Building
631:"Carbon12 Building for the future"
302:Carbon12 is an 85 ft. (26 m)
23:Mixed-use in Oregon, United States
14:
1925:
1674:Portland Van and Storage Building
1537:
1521:from the original on 4 April 2020
1464:from the original on 4 April 2020
1402:from the original on 25 July 2019
795:
311:named after the atomic weight of
1865:
1854:
1853:
1788:Women Making History in Portland
1483:Devlin, Sherry (18 March 2019).
962:"Codes-standards/building codes"
698:from the original on 1 June 2020
581:List of tallest wooden buildings
551:
537:
34:
1503:
1476:
1446:
1414:
1377:
1341:
1305:
1245:
1215:
1182:
1152:
1122:
1111:from the original on 2018-11-28
1093:
984:
954:
891:
850:from the original on 2018-11-29
816:from the original on 2018-11-28
460:
40:The building's exterior in 2021
861:
827:
743:
680:
653:
623:
1:
1894:2018 establishments in Oregon
1659:Legacy Emanuel Medical Center
1624:Elmer and Linnie Miller House
1256:. The Architect's Newspaper.
586:
448:Carbon12 uses an electric LG
327:wooden buildings in the U.S.
1629:Frederick Armbruster Cottage
1071:"New heights in mass timber"
7:
1609:Charles E. Johnson Building
1320:American concrete institute
1032:RDH making buildings better
530:
501:Carbon12 was built using a
350:International Building Code
10:
1930:
1805:Albina/Mississippi station
1644:Henry C. Leutgert Building
1634:Frederick Torgler Building
330:
15:
1849:
1833:
1815:Emanuel Hospital Heliport
1797:
1779:
1763:
1707:
1649:Hryszko Brothers Building
1591:
737:Daily Journal of Commerce
725:Wood: the sky's the limit
506:made as they progressed.
450:Variable Refrigerant Flow
269:
264:
256:
251:
243:
235:
231:KPFF Consulting Engineers
227:
219:
211:
203:
198:
190:
182:
172:
167:
159:
151:
143:
104:
94:
84:
74:
64:
54:
49:
45:
33:
28:
379:Automated parking system
341:engineered wood products
325:environmentally friendly
287:is a wooden building in
1755:Widmer Brothers Brewery
1585:Eliot, Portland, Oregon
199:Design and construction
1283:"Construction Process"
571:glued laminated timber
518:Recognition and legacy
401:Environmental features
383:glued laminated timber
297:cross-laminated timber
177:Cross laminated timber
128:45.54814°N 122.66645°W
1825:North Williams Avenue
1599:Billy Webb Elks Lodge
1028:"Carbon12 case study"
966:American wood council
354:building's structural
308:North Williams Avenue
16:For the isotope, see
1684:Simon Abraham Duplex
1544:Project presentation
576:Framework (building)
144:Construction started
133:45.54814; -122.66645
765:10.1038/nature25476
545:Architecture portal
220:Structural engineer
163:85 feet (26 m)
124: /
75:Architectural style
50:General information
1715:Bernstein's Bagels
1393:HFA Schriftenreihe
730:2017-09-01 at the
610:2017-09-01 at the
421:windows to reduce
1881:
1880:
1679:Rinehart Building
1287:Building Carbon12
1164:Building Carbon12
1134:Building Carbon12
1075:Building Carbon12
936:Building Carbon12
759:(7691): 224–228.
723:Garrett Andrews,
509:Because the 2015
315:(12 AMU), as the
282:
281:
260:22 parking spaces
252:Other information
207:PATH Architecture
204:Architecture firm
168:Technical details
1921:
1869:
1868:
1857:
1856:
1639:H. C. Keck House
1578:
1571:
1564:
1555:
1554:
1531:
1530:
1528:
1526:
1507:
1501:
1500:
1498:
1496:
1480:
1474:
1473:
1471:
1469:
1450:
1444:
1443:
1441:
1439:
1433:
1426:
1418:
1412:
1411:
1409:
1407:
1401:
1390:
1381:
1375:
1374:
1372:
1370:
1364:
1353:
1345:
1339:
1338:
1336:
1334:
1328:
1317:
1309:
1303:
1302:
1300:
1298:
1279:
1270:
1269:
1267:
1265:
1249:
1243:
1242:
1240:
1238:
1219:
1213:
1212:
1210:
1208:
1202:
1195:
1186:
1180:
1179:
1177:
1175:
1156:
1150:
1149:
1147:
1145:
1126:
1120:
1119:
1117:
1116:
1097:
1091:
1090:
1088:
1086:
1067:
1048:
1047:
1045:
1043:
1024:
1015:
1014:
1012:
1010:
1004:
997:
988:
982:
981:
979:
977:
958:
952:
951:
949:
947:
928:
919:
918:
916:
914:
895:
889:
888:
886:
884:
865:
859:
858:
856:
855:
849:
842:
831:
825:
824:
822:
821:
802:
793:
792:
747:
741:
721:
708:
707:
705:
703:
684:
678:
677:
675:
673:
657:
651:
650:
648:
646:
637:. 19 July 2018.
627:
621:
602:
561:
556:
555:
554:
547:
542:
541:
475:British Columbia
423:thermal bridging
395:universal design
372:Building details
317:carbon footprint
289:Portland, Oregon
278:
275:
273:
139:
138:
136:
135:
134:
129:
125:
122:
121:
120:
117:
89:Portland, Oregon
79:Natural building
60:
38:
26:
25:
1929:
1928:
1924:
1923:
1922:
1920:
1919:
1918:
1884:
1883:
1882:
1877:
1845:
1841:Weed the People
1829:
1810:Broadway Bridge
1793:
1775:
1759:
1740:Portland Cà Phê
1703:
1699:Wonder Ballroom
1587:
1582:
1540:
1535:
1534:
1524:
1522:
1509:
1508:
1504:
1494:
1492:
1481:
1477:
1467:
1465:
1452:
1451:
1447:
1437:
1435:
1431:
1424:
1420:
1419:
1415:
1405:
1403:
1399:
1388:
1382:
1378:
1368:
1366:
1362:
1351:
1347:
1346:
1342:
1332:
1330:
1326:
1315:
1311:
1310:
1306:
1296:
1294:
1281:
1280:
1273:
1263:
1261:
1250:
1246:
1236:
1234:
1221:
1220:
1216:
1206:
1204:
1200:
1193:
1187:
1183:
1173:
1171:
1158:
1157:
1153:
1143:
1141:
1128:
1127:
1123:
1114:
1112:
1099:
1098:
1094:
1084:
1082:
1069:
1068:
1051:
1041:
1039:
1026:
1025:
1018:
1008:
1006:
1002:
995:
989:
985:
975:
973:
960:
959:
955:
945:
943:
930:
929:
922:
912:
910:
897:
896:
892:
882:
880:
867:
866:
862:
853:
851:
847:
840:
832:
828:
819:
817:
804:
803:
796:
748:
744:
732:Wayback Machine
722:
711:
701:
699:
686:
685:
681:
671:
669:
658:
654:
644:
642:
629:
628:
624:
620:, 30 April 2017
612:Wayback Machine
603:
594:
589:
557:
552:
550:
543:
536:
533:
520:
496:gypsum concrete
463:
403:
374:
333:
270:
236:Main contractor
132:
130:
126:
123:
118:
115:
113:
111:
110:
58:
41:
24:
21:
12:
11:
5:
1927:
1917:
1916:
1911:
1906:
1901:
1896:
1879:
1878:
1876:
1875:
1863:
1850:
1847:
1846:
1844:
1843:
1837:
1835:
1831:
1830:
1828:
1827:
1822:
1820:Fremont Bridge
1817:
1812:
1807:
1801:
1799:
1795:
1794:
1792:
1791:
1783:
1781:
1777:
1776:
1774:
1773:
1767:
1765:
1761:
1760:
1758:
1757:
1752:
1747:
1745:Queen of Sheba
1742:
1737:
1732:
1727:
1722:
1717:
1711:
1709:
1705:
1704:
1702:
1701:
1696:
1691:
1686:
1681:
1676:
1671:
1666:
1661:
1656:
1651:
1646:
1641:
1636:
1631:
1626:
1621:
1616:
1611:
1606:
1601:
1595:
1593:
1589:
1588:
1581:
1580:
1573:
1566:
1558:
1552:
1551:
1546:
1539:
1538:External links
1536:
1533:
1532:
1502:
1487:. Treesource.
1475:
1445:
1413:
1376:
1340:
1304:
1271:
1244:
1214:
1181:
1151:
1121:
1092:
1049:
1016:
983:
953:
920:
890:
860:
826:
794:
742:
740:, 8 March 2017
709:
679:
652:
622:
591:
590:
588:
585:
584:
583:
578:
573:
563:
562:
548:
532:
529:
519:
516:
462:
459:
442:greenhouse gas
402:
399:
373:
370:
337:timber framing
332:
329:
280:
279:
267:
266:
262:
261:
258:
254:
253:
249:
248:
245:
241:
240:
237:
233:
232:
229:
228:Civil engineer
225:
224:
221:
217:
216:
213:
209:
208:
205:
201:
200:
196:
195:
192:
188:
187:
184:
180:
179:
174:
170:
169:
165:
164:
161:
157:
156:
153:
149:
148:
145:
141:
140:
108:
102:
101:
96:
92:
91:
86:
82:
81:
76:
72:
71:
66:
62:
61:
56:
52:
51:
47:
46:
43:
42:
39:
31:
30:
22:
9:
6:
4:
3:
2:
1926:
1915:
1912:
1910:
1907:
1905:
1902:
1900:
1897:
1895:
1892:
1891:
1889:
1874:
1873:
1864:
1862:
1861:
1852:
1851:
1848:
1842:
1839:
1838:
1836:
1832:
1826:
1823:
1821:
1818:
1816:
1813:
1811:
1808:
1806:
1803:
1802:
1800:
1796:
1790:
1789:
1785:
1784:
1782:
1778:
1772:
1769:
1768:
1766:
1762:
1756:
1753:
1751:
1748:
1746:
1743:
1741:
1738:
1736:
1733:
1731:
1730:Gotham Tavern
1728:
1726:
1723:
1721:
1718:
1716:
1713:
1712:
1710:
1706:
1700:
1697:
1695:
1692:
1690:
1687:
1685:
1682:
1680:
1677:
1675:
1672:
1670:
1667:
1665:
1662:
1660:
1657:
1655:
1652:
1650:
1647:
1645:
1642:
1640:
1637:
1635:
1632:
1630:
1627:
1625:
1622:
1620:
1617:
1615:
1612:
1610:
1607:
1605:
1602:
1600:
1597:
1596:
1594:
1590:
1586:
1579:
1574:
1572:
1567:
1565:
1560:
1559:
1556:
1550:
1547:
1545:
1542:
1541:
1520:
1516:
1512:
1506:
1490:
1486:
1479:
1463:
1459:
1455:
1449:
1430:
1423:
1417:
1398:
1394:
1387:
1380:
1361:
1357:
1350:
1344:
1325:
1321:
1314:
1308:
1292:
1288:
1284:
1278:
1276:
1259:
1255:
1248:
1232:
1228:
1224:
1218:
1199:
1192:
1185:
1169:
1165:
1161:
1155:
1139:
1135:
1131:
1125:
1110:
1106:
1105:The Oregonian
1102:
1096:
1080:
1076:
1072:
1066:
1064:
1062:
1060:
1058:
1056:
1054:
1037:
1033:
1029:
1023:
1021:
1001:
994:
987:
971:
967:
963:
957:
941:
937:
933:
927:
925:
908:
904:
900:
894:
878:
874:
870:
864:
846:
839:
838:
830:
815:
811:
807:
801:
799:
790:
786:
782:
778:
774:
770:
766:
762:
758:
754:
746:
739:
738:
733:
729:
726:
720:
718:
716:
714:
697:
693:
689:
683:
667:
663:
656:
640:
636:
632:
626:
619:
618:
617:The Oregonian
613:
609:
606:
601:
599:
597:
592:
582:
579:
577:
574:
572:
568:
565:
564:
560:
559:Oregon portal
549:
546:
540:
535:
528:
524:
515:
512:
507:
504:
499:
497:
492:
487:
483:
480:
476:
472:
467:
458:
456:
451:
446:
443:
439:
435:
430:
428:
424:
420:
415:
413:
408:
398:
396:
390:
386:
384:
380:
369:
367:
361:
359:
355:
351:
345:
342:
338:
328:
326:
322:
318:
314:
309:
305:
300:
298:
294:
290:
286:
277:
268:
263:
259:
255:
250:
246:
242:
238:
234:
230:
226:
222:
218:
214:
210:
206:
202:
197:
193:
189:
185:
181:
178:
175:
171:
166:
162:
158:
154:
150:
146:
142:
137:
109:
107:
103:
100:
99:United States
97:
93:
90:
87:
83:
80:
77:
73:
70:
67:
63:
57:
53:
48:
44:
37:
32:
27:
19:
1870:
1858:
1786:
1720:Bridges Cafe
1603:
1549:CLT Handbook
1523:. Retrieved
1514:
1505:
1493:. Retrieved
1478:
1466:. Retrieved
1457:
1448:
1436:. Retrieved
1416:
1404:. Retrieved
1392:
1379:
1367:. Retrieved
1355:
1343:
1331:. Retrieved
1319:
1307:
1295:. Retrieved
1286:
1262:. Retrieved
1247:
1235:. Retrieved
1226:
1217:
1205:. Retrieved
1184:
1172:. Retrieved
1163:
1154:
1142:. Retrieved
1133:
1124:
1113:. Retrieved
1104:
1095:
1083:. Retrieved
1074:
1040:. Retrieved
1031:
1007:. Retrieved
986:
974:. Retrieved
965:
956:
944:. Retrieved
935:
911:. Retrieved
902:
893:
881:. Retrieved
872:
863:
852:. Retrieved
836:
829:
818:. Retrieved
809:
756:
752:
745:
735:
700:. Retrieved
691:
682:
670:. Retrieved
655:
643:. Retrieved
634:
625:
615:
525:
521:
508:
503:design-build
500:
488:
484:
468:
464:
461:Construction
447:
434:solar panels
431:
416:
404:
391:
387:
375:
362:
346:
334:
301:
284:
283:
274:.carbon12pdx
239:Kaiser Group
215:Kaiser Group
85:Town or city
1771:Dawson Park
1725:Cotton Club
1614:Davis Block
1525:16 December
1495:16 December
1468:15 December
1438:15 December
1406:13 December
1369:12 December
1333:12 December
1297:14 December
1264:13 December
1237:12 December
1207:16 December
1174:15 December
1144:14 December
1085:13 December
1042:13 December
1009:13 December
976:12 December
946:14 December
913:12 December
903:Kaieserpath
883:12 December
702:15 December
672:14 December
645:16 December
635:Structurlam
438:fossil fuel
432:The use of
191:Floor count
131: /
119:122°39′59″W
106:Coordinates
1888:Categories
1780:Public art
1750:Tamale Boy
1669:Mayo House
1515:Kaiserpath
1511:"The Spar"
1458:Kaiserpath
1115:2018-11-21
873:Kaiserpath
869:"Carbon12"
854:2018-11-21
820:2018-11-21
688:"Carbon12"
587:References
427:LED lights
419:fiberglass
358:Kate Brown
116:45°32′53″N
1764:Geography
1592:Buildings
1227:Thinkwood
810:Firehouse
773:0028-0836
471:Penticton
412:biophilic
407:renewable
366:Framework
304:mixed-use
244:Known for
212:Developer
152:Completed
69:Mixed-use
59:Completed
18:Carbon-12
1860:Category
1708:Business
1604:Carbon12
1519:Archived
1489:Archived
1462:Archived
1454:"Awards"
1429:Archived
1397:Archived
1360:Archived
1324:Archived
1291:Archived
1258:Archived
1231:Archived
1198:Archived
1168:Archived
1138:Archived
1109:Archived
1079:Archived
1036:Archived
1000:Archived
970:Archived
940:Archived
907:Archived
877:Archived
845:Archived
814:Archived
781:29420466
728:Archived
696:Archived
692:Carbon12
666:Archived
639:Archived
608:Archived
531:See also
491:acoustic
285:Carbon12
173:Material
29:Carbon12
1872:Commons
1834:Related
1798:Transit
789:4469909
567:ATLAS-I
455:biofuel
331:History
265:Website
257:Parking
95:Country
1395:(40).
787:
779:
771:
753:Nature
511:Oregon
389:home.
321:timber
313:carbon
160:Height
55:Status
1432:(PDF)
1425:(PDF)
1400:(PDF)
1389:(PDF)
1363:(PDF)
1352:(PDF)
1327:(PDF)
1316:(PDF)
1201:(PDF)
1194:(PDF)
1003:(PDF)
996:(PDF)
848:(PDF)
841:(PDF)
785:S2CID
293:Eliot
1527:2020
1497:2020
1470:2020
1440:2020
1408:2020
1371:2020
1335:2020
1299:2020
1266:2020
1239:2020
1209:2020
1176:2020
1146:2020
1087:2020
1044:2020
1011:2020
978:2020
948:2020
915:2020
885:2020
777:PMID
769:ISSN
704:2020
674:2020
647:2020
276:.com
183:Size
155:2018
147:2016
65:Type
761:doi
757:554
479:CNC
291:'s
272:www
1890::
1735:Ox
1517:.
1513:.
1460:.
1456:.
1391:.
1358:.
1354:.
1322:.
1318:.
1289:.
1285:.
1274:^
1229:.
1225:.
1196:.
1166:.
1162:.
1136:.
1132:.
1107:.
1103:.
1077:.
1073:.
1052:^
1034:.
1030:.
1019:^
998:.
968:.
964:.
938:.
934:.
923:^
905:.
901:.
875:.
871:.
812:.
808:.
797:^
783:.
775:.
767:.
755:.
734:,
712:^
694:.
690:.
633:.
614:,
595:^
473:,
457:.
1577:e
1570:t
1563:v
1529:.
1499:.
1472:.
1442:.
1410:.
1373:.
1337:.
1301:.
1268:.
1241:.
1211:.
1178:.
1148:.
1118:.
1089:.
1046:.
1013:.
980:.
950:.
917:.
887:.
857:.
823:.
791:.
763::
706:.
676:.
649:.
194:8
20:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.