Knowledge

Ardey Railway

Source đź“ť

1279: 962: 425: 632: 561: 304: 969: 769: 536: 229: 1033: 1026: 1001: 994: 1052: 696: 608: 487: 401: 377: 353: 256: 916: 797: 746: 280: 939: 893: 870: 847: 822: 723: 656: 585: 511: 447: 328: 205: 26: 1310:
meaning that trains to Dortmund have to wait seven minutes for the oncoming trains, and also to the coupling of trains in Schwerte (also taking seven minutes). In the opposite direction the uncoupling of trains in Schwerte takes just three minutes and no specific period is required for stopping at Kalthof. Shortening of the travel time to Dortmund is planned.
1204:
to promote industry in Sümmern, Kalthof and Hennen. After the death of Fleitmann in 1904, the construction started in 1907 and it was completed a year later. Money provided in Fleitmann’s will for the construction of a railway was not used because it had been earmarked for the route favoured by him.
1147:
The section between Dortmund Central Station and Dortmund-Horde part of the railway route Dortmund-Soest, is double track and electrified and classified as a mainline railway. The northern part of the Ardey Railway between Dortmund-Horde and Schwerte is a double-track and non-electrified main line.
1216:
The opening ceremony took place on 30 September 1910, coinciding with the last stagecoach ride from Schwerte to Iserlohn, the day after scheduled traffic commenced. The other part of the line from Schwerte to Dortmund-Horde was opened two years later in October 2012 for freight operations and in
1208:
The construction of the railway was relatively expensive; 200,000 cubic metres of limestone were blasted just for a cutting in Iserlohn, where numerous fossils were found. Several embankments and bridges had to be built on the course of the line. The recently completed bridge over the Ruhr were
1309:
The average speed is highly directional. So trains to Dortmund from Iserlohn have an average speed of only 44 km/h, while trains from Dortmund to Iserlohn average 51 km/h. This is partly due to the out-dated signalling in Kalthof, which does not allow the simultaneous entry and exit of trains,
1313:
Rail services from Ardey are operated by DB Regio NRW, using LINT 41 diesel railcars in single or double traction, which are capable of operating at 120 km/h. Coupling/uncoupling is usually carried out in Schwerte. Occasionally LINT 27 (class 640) or
1269:
Passenger demand on the Dortmund-Horde–Schwerte section rose from about 3,000 to about 4,500 passengers between 1997 and 2008. Also on the Schwerte–Iserlohn section there has been passenger growth of about 50% to about 1,600 passengers a day.
1183:
After Iserlohn had been connected by rail to Letmathe in 1864, the chamber of commerce and industry campaigned in 1882 for the construction of a railway to the north towards Schwerte. Against resistance mainly from businessmen in the
1339:
Consideration is being given to having additional peak-hour trains skip some of the intermediate stations between Dortmund and Iserlohn. Thus, these trains would take just 35 to 38 minutes on the Dortmund–Iserlohn
1352:
It is interesting that the line does not have a single level crossing, but instead many overpasses and underpasses were built for even the smallest dirt roads, including single-lane tracks on high embankments.
1148:
Its maximum speed is 90 km/h. The southern section between Schwerte and Iserlohn is a single-track non-electrified branch line, with a passing loop at Kalthof. Most of this section can be run at 100 km/h.
1209:
severely damaged in a flood in February 1909 and had to be replaced. Overall, the line between Schwerte and Iserlohn had to overcome a height difference of 130 m. The construction cost 6 million
1333:
the signalling in Kalthof will be modernised so that simultaneous entrances to the station are possible, allowing the running time to be reduced by up to seven minutes (possibly by 2015).
1175:(association for the promotion of public transport in Ruhr-Lippe, ZRL) intends to build a connection between the two lines, including points, which would restore its status as a station. 1220:
In addition to the crossing loop at Kalthof, there was also a crossing loop at Ergste until 1981. Therefore, it had a second platform, traces of which can still be seen.
1192:, especially the then owner of the nickel plants in Iserlohn and Schwerte, Dr Theodor Fleitmann. He supported the construction of a railway through the valley of the 1343:
There is a long-term plan to extend the provision of services at 30-minute intervals all day from the Dortmund–Schwerte section to the Schwerte–Iserlohn section.
1223:
There is no freight traffic on the line any more. Sidings are still present in Kalthof (for Kettenwerk Thiele) and Hennen for the occasional transport of
386: 362: 1526: 410: 265: 1159:
and there is currently no connection between the Ardey Railway and the line to Letmathe in Iserlohn. Iserlohn is therefore formally not a
1217:
January 1913 for passenger operations. In contrast to the first section, this line was built for its full length as double track.
1536: 1531: 1378: 1213:, covering, among other things, the erection of 39 engineering structures and the moving of about one million m of earth. 313: 289: 1152: 1062: 978: 339: 1262:) and thus has the right to operate the line for another 12 years from the timetable change in December 2004, using 522: 1305:
from Monday to Friday every 30 minutes during the peak hour between Dortmund and Schwerte, connecting to Iserlohn.
1330:
In Iserlohn, a set of points is to be installed to reconnect the line to the line to the railway to Letmathe.
186: 1501: 1493: 1251: 1156: 496: 641: 617: 214: 473: 1124: 682: 1136: 708: 570: 68: 241: 8: 1263: 1475: 1436: 1410: 1374: 1336:
In Schwerte the passing track will be adapted so that passing trains can run faster.
1282: 1210: 1128: 1012: 1394:
Katja Hofbauer (30 September 2010). "160 000 SprengschĂĽsse machten den Weg frei".
1259: 1278: 1243: 1132: 1112: 1231: 138: 1520: 1255: 1239: 1164: 1315: 1289: 781: 1188:
valley, who advocated lines from Letmathe to Schwerte or from Iserlohn to
110: 1294: 1235: 1201: 1193: 1120: 1163:(station, which under German regulations must have at least one 1189: 833: 25: 1185: 1230:
In the 1990s and the early 2000s, services were provided by
1200:), however, decided that the line should be built along the 1224: 1302:daily every hour between Dortmund and Iserlohn and 1371:Eisenbahnatlas Deutschland (German railway atlas) 1326:The following upgrades to the line are proposed: 1090:* Planned installation of a shunting connection. 1518: 664: 455: 181: 1393: 1363: 1250:; apart from this line, it also includes the 1119:) is a 38 km long railway line running from 1227:transformers to the substation in SĂĽmmern. 1502:"Photographs of tunnel portals, line 2113" 1398:(in German). No. 228. p. IIS 7. 1499: 1277: 1527:Railway lines in North Rhine-Westphalia 1238:NRW won the contract for the so-called 1519: 1476:"Line 2103: Dortmund ↔ Dortmund-Hörde" 1437:"Line 2113: Dortmund-Hörde ↔ Schwerte" 1155:has been closed between Iserlohn and 1396:Iserlohner Kreisanzeiger und Zeitung 1461:Zweckverband Ruhr Lippe, meeting 65 1455: 160:: 100 km/h (62 mph) (max) 13: 1171:(halt) on two lines. However, the 154:: 90 km/h (56 mph) (max) 14: 1548: 1468: 1411:"Line 2841: Schwerte ↔ Iserlohn" 1050: 1031: 1024: 999: 992: 967: 960: 937: 914: 891: 868: 845: 820: 795: 767: 744: 721: 694: 654: 630: 606: 583: 559: 534: 509: 485: 445: 423: 399: 375: 351: 326: 302: 278: 254: 227: 203: 24: 961: 768: 535: 424: 1537:1908 establishments in Germany 1429: 1403: 1387: 1283:Iserlohn state railway station 1032: 1025: 1000: 993: 631: 560: 434:Phoenix-West steelworks siding 303: 1: 1092:Source: German railway atlas 1051: 968: 695: 607: 486: 400: 376: 352: 290:Osterath–Dortmund SĂĽd railway 255: 228: 1532:Railway lines opened in 1908 1173:Zweckverband SPNV Ruhr-Lippe 1153:Letmathe–Fröndenberg railway 1135:433) in the German state of 915: 796: 745: 279: 7: 1273: 938: 892: 869: 846: 821: 722: 655: 584: 510: 446: 327: 204: 10: 1553: 1504:(in German). Tunnelportale 1347: 1252:Dortmund-Sauerland-Express 1178: 340:Dortmund Signal-Iduna-Park 1373:. Schweers + Wall. 2009. 1321: 1266:41 (class 648) railcars. 1059: 1044: 1040: 1018: 1011: 986: 976: 954: 949: 931: 926: 908: 903: 885: 880: 862: 857: 839: 832: 814: 807: 789: 779: 761: 756: 738: 733: 715: 706: 688: 681: 648: 639: 624: 615: 600: 595: 577: 568: 553: 546: 528: 521: 503: 494: 479: 472: 439: 432: 417: 408: 393: 384: 369: 360: 345: 338: 320: 311: 296: 287: 272: 263: 248: 239: 221: 212: 197: 166: 145: 109: 101: 93: 88: 80: 75: 64: 51:(Dortmund-Hörde–Schwerte) 37: 32: 23: 19:Dortmund–Iserlohn railway 18: 1482:(in German). AndrĂ© Joost 1443:(in German). AndrĂ© Joost 1417:(in German). AndrĂ© Joost 1400:(Iserlohn local section) 1356: 1142: 105:2: Dortmund Hbf–Schwerte 548:Schwerte Tunnel (795 m) 152:Dortmund-Hörde–Schwerte 97:38 km (24 mi) 1494:Dortmund–Soest railway 1285: 1247: 1137:North Rhine-Westphalia 1116: 979:from Iserlohn-Letmathe 523:Dortmund-Aplerbeck SĂĽd 69:North Rhine-Westphalia 1281: 809:Flood channel(110 m) 734:Schwerte (Ruhr) Swf 314:to DO-LĂĽtgendortmund 1264:Alstom Coradia LINT 1234:railcars. In 2002, 57:(Schwerte–Iserlohn) 1286: 858:Hennen RWE siding 158:Schwerte-Iserlohn: 1380:978-3-89494-139-0 1105: 1104: 1101: 1100: 1097: 1096: 1085: 1084: 677: 676: 468: 467: 215:from Hamm (Westf) 159: 153: 58: 52: 46: 1544: 1513: 1511: 1509: 1491: 1489: 1487: 1480:NRW Rail Archive 1462: 1459: 1453: 1452: 1450: 1448: 1441:NRW Rail Archive 1433: 1427: 1426: 1424: 1422: 1415:NRW Rail Archive 1407: 1401: 1399: 1391: 1385: 1384: 1367: 1196:. The district ( 1167:) but instead a 1054: 1053: 1035: 1034: 1028: 1027: 1003: 1002: 996: 995: 971: 970: 964: 963: 950:Iserlohnerheide 941: 940: 918: 917: 895: 894: 872: 871: 849: 848: 824: 823: 799: 798: 771: 770: 748: 747: 725: 724: 698: 697: 665: 658: 657: 634: 633: 610: 609: 587: 586: 563: 562: 538: 537: 513: 512: 489: 488: 456: 449: 448: 427: 426: 403: 402: 379: 378: 355: 354: 330: 329: 306: 305: 282: 281: 258: 257: 231: 230: 207: 206: 195: 194: 182: 168: 167: 157: 151: 141: 135: 133: 132: 128: 125: 117: 102:Number of tracks 56: 50: 45:(Dortmund–Soest) 44: 28: 16: 15: 1552: 1551: 1547: 1546: 1545: 1543: 1542: 1541: 1517: 1516: 1507: 1505: 1485: 1483: 1474: 1471: 1466: 1465: 1460: 1456: 1446: 1444: 1435: 1434: 1430: 1420: 1418: 1409: 1408: 1404: 1392: 1388: 1381: 1369: 1368: 1364: 1359: 1350: 1324: 1318:DMUs are used. 1292:service RB 53 ( 1276: 1181: 1145: 1065: 1055: 1036: 1029: 1009: 1004: 997: 982: 972: 965: 947: 942: 924: 919: 901: 896: 878: 873: 855: 850: 830: 825: 810: 805: 800: 785: 777: 772: 754: 749: 731: 726: 711: 704: 699: 683:Schwerte (Ruhr) 679: 659: 644: 635: 620: 618:to Schwerte Ost 611: 596:Heide junction 593: 588: 573: 564: 549: 544: 539: 519: 514: 499: 490: 470: 450: 435: 428: 413: 404: 389: 380: 365: 363:to Rhenish line 356: 336: 331: 316: 307: 292: 283: 268: 259: 237: 232: 217: 208: 189: 173: 146:Operating speed 137: 130: 126: 123: 121: 120:4 ft  119: 115: 12: 11: 5: 1550: 1540: 1539: 1534: 1529: 1515: 1514: 1500:Lothar Brill. 1497: 1470: 1469:External links 1467: 1464: 1463: 1454: 1428: 1402: 1386: 1379: 1361: 1360: 1358: 1355: 1349: 1346: 1345: 1344: 1341: 1337: 1334: 1331: 1323: 1320: 1307: 1306: 1303: 1275: 1272: 1248:Sauerland-Netz 1180: 1177: 1144: 1141: 1103: 1102: 1099: 1098: 1095: 1094: 1087: 1086: 1083: 1082: 1080: 1078: 1076: 1074: 1072: 1070: 1067: 1066: 1063:line to Menden 1060: 1058: 1056: 1049: 1047: 1045: 1042: 1041: 1039: 1037: 1030: 1023: 1021: 1019: 1016: 1015: 1010: 1007: 1005: 998: 991: 989: 987: 984: 983: 977: 975: 973: 966: 959: 957: 955: 952: 951: 948: 945: 943: 936: 934: 932: 929: 928: 925: 922: 920: 913: 911: 909: 906: 905: 902: 899: 897: 890: 888: 886: 883: 882: 879: 876: 874: 867: 865: 863: 860: 859: 856: 853: 851: 844: 842: 840: 837: 836: 831: 828: 826: 819: 817: 815: 812: 811: 808: 806: 803: 801: 794: 792: 790: 787: 786: 784:bridge (198 m) 780: 778: 775: 773: 766: 764: 762: 759: 758: 755: 752: 750: 743: 741: 739: 736: 735: 732: 729: 727: 720: 718: 716: 713: 712: 707: 705: 702: 700: 693: 691: 689: 686: 685: 680: 675: 674: 670: 669: 662: 660: 653: 651: 649: 646: 645: 640: 638: 636: 629: 627: 625: 622: 621: 616: 614: 612: 605: 603: 601: 598: 597: 594: 591: 589: 582: 580: 578: 575: 574: 569: 567: 565: 558: 556: 554: 551: 550: 547: 545: 542: 540: 533: 531: 529: 526: 525: 520: 517: 515: 508: 506: 504: 501: 500: 495: 493: 491: 484: 482: 480: 477: 476: 474:Dortmund-Hörde 471: 466: 465: 461: 460: 453: 451: 444: 442: 440: 437: 436: 433: 431: 429: 422: 420: 418: 415: 414: 409: 407: 405: 398: 396: 394: 391: 390: 385: 383: 381: 374: 372: 370: 367: 366: 361: 359: 357: 350: 348: 346: 343: 342: 337: 334: 332: 325: 323: 321: 318: 317: 312: 310: 308: 301: 299: 297: 294: 293: 288: 286: 284: 277: 275: 273: 270: 269: 264: 262: 260: 253: 251: 249: 246: 245: 238: 235: 233: 226: 224: 222: 219: 218: 213: 211: 209: 202: 200: 198: 191: 190: 185: 175: 174: 171: 164: 163: 162: 161: 155: 147: 143: 142: 139:standard gauge 113: 107: 106: 103: 99: 98: 95: 91: 90: 86: 85: 82: 78: 77: 73: 72: 66: 62: 61: 60: 59: 53: 47: 39: 35: 34: 30: 29: 21: 20: 9: 6: 4: 3: 2: 1549: 1538: 1535: 1533: 1530: 1528: 1525: 1524: 1522: 1503: 1498: 1495: 1481: 1477: 1473: 1472: 1458: 1442: 1438: 1432: 1416: 1412: 1406: 1397: 1390: 1382: 1376: 1372: 1366: 1362: 1354: 1342: 1338: 1335: 1332: 1329: 1328: 1327: 1319: 1317: 1311: 1304: 1301: 1300: 1299: 1297: 1296: 1291: 1284: 1280: 1271: 1267: 1265: 1261: 1260:Hönnetal-Bahn 1257: 1256:Volmetal-Bahn 1253: 1249: 1245: 1241: 1240:Sauerland Net 1237: 1233: 1228: 1226: 1221: 1218: 1214: 1212: 1206: 1203: 1199: 1195: 1191: 1187: 1176: 1174: 1170: 1166: 1165:set of points 1162: 1158: 1154: 1149: 1140: 1138: 1134: 1130: 1126: 1122: 1118: 1114: 1110: 1109:Ardey Railway 1093: 1089: 1088: 1081: 1079: 1077: 1075: 1073: 1071: 1069: 1068: 1064: 1057: 1048: 1046: 1043: 1038: 1022: 1020: 1017: 1014: 1006: 990: 988: 985: 980: 974: 958: 956: 953: 944: 935: 933: 930: 921: 912: 910: 907: 898: 889: 887: 884: 875: 866: 864: 861: 852: 843: 841: 838: 835: 827: 818: 816: 813: 802: 793: 791: 788: 783: 774: 765: 763: 760: 751: 742: 740: 737: 728: 719: 717: 714: 710: 701: 692: 690: 687: 684: 672: 671: 667: 666: 661: 652: 650: 647: 643: 642:from Arnsberg 637: 628: 626: 623: 619: 613: 604: 602: 599: 590: 581: 579: 576: 572: 566: 557: 555: 552: 541: 532: 530: 527: 524: 516: 507: 505: 502: 498: 492: 483: 481: 478: 475: 463: 462: 458: 457: 452: 443: 441: 438: 430: 421: 419: 416: 412: 411:Elias Railway 406: 397: 395: 392: 388: 382: 373: 371: 368: 364: 358: 349: 347: 344: 341: 333: 324: 322: 319: 315: 309: 300: 298: 295: 291: 285: 276: 274: 271: 267: 261: 252: 250: 247: 244: 243: 234: 225: 223: 220: 216: 210: 201: 199: 196: 193: 192: 188: 184: 183: 180: 177: 176: 170: 169: 165: 156: 150: 149: 148: 144: 140: 116:1,435 mm 114: 112: 108: 104: 100: 96: 92: 87: 83: 79: 74: 70: 67: 63: 54: 48: 42: 41: 40: 36: 31: 27: 22: 17: 1506:. Retrieved 1484:. Retrieved 1479: 1457: 1445:. Retrieved 1440: 1431: 1419:. Retrieved 1414: 1405: 1395: 1389: 1370: 1365: 1351: 1325: 1312: 1308: 1293: 1290:Regionalbahn 1287: 1268: 1229: 1222: 1219: 1215: 1207: 1197: 1182: 1172: 1168: 1160: 1150: 1146: 1108: 1106: 1091: 387:Rhenish line 242:Dortmund Hbf 240: 178: 81:Route number 1508:10 November 1486:10 November 1447:10 November 1421:10 November 1298:) operates 266:to Duisburg 111:Track gauge 94:Line length 38:Line number 1521:Categories 1295:Ardey-Bahn 1169:Haltepunkt 757:Wandhofen 1316:class 628 1232:class 624 1198:Landkreis 1117:Ardeybahn 571:from Unna 172:Route map 89:Technical 71:, Germany 1274:Services 1258:and the 1236:DB Regio 1202:Baarbach 1194:Elsebach 1129:Iserlohn 1125:Schwerte 1121:Dortmund 1013:Iserlohn 927:SĂĽmmern 904:Kalthof 709:to Hagen 134: in 33:Overview 1348:Notable 1179:History 1161:Bahnhof 1061:Former 881:Hennen 497:to Unna 129:⁄ 76:Service 1377:  1340:route. 1322:Future 1254:, the 1244:German 1190:Altena 1157:Menden 1113:German 834:Ergste 187:Legend 179: 65:Locale 1492:(see 1357:Notes 1211:marks 1186:Lenne 1143:Route 678: 663: 469: 459:173.0 454: 335:170.1 236:164.4 55:2841 49:2113 43:2103 1510:2013 1488:2013 1449:2013 1423:2013 1375:ISBN 1288:The 1151:The 1123:via 1107:The 877:10.0 854:10.2 829:15.2 804:15.9 782:Ruhr 776:16.5 753:16.9 730:18.6 703:19.2 673:19.7 668:10.3 1225:RWE 1133:KBS 1127:to 1008:0.0 946:4.5 923:5.4 900:7.7 592:7.5 543:6.0 518:3.8 464:0.0 84:433 1523:: 1478:. 1439:. 1413:. 1246:: 1139:. 1115:: 981:*) 136:) 1512:. 1496:) 1490:. 1451:. 1425:. 1383:. 1242:( 1131:( 1111:( 131:2 127:1 124:+ 122:8 118:(

Index


North Rhine-Westphalia
Track gauge
standard gauge
Legend
from Hamm (Westf)
Dortmund Hbf
to Duisburg
Osterath–Dortmund Süd railway
to DO-LĂĽtgendortmund
Dortmund Signal-Iduna-Park
to Rhenish line
Rhenish line
Elias Railway
Dortmund-Hörde
to Unna
Dortmund-Aplerbeck SĂĽd
from Unna
to Schwerte Ost
from Arnsberg
Schwerte (Ruhr)
to Hagen
Ruhr
Ergste
from Iserlohn-Letmathe
Iserlohn
line to Menden
German
Dortmund
Schwerte

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑