Walney Wind Farm

Source 📝

31: 646: 2705: 1999: 660: 632: 1987: 2011: 406:. Until September 2012 it was the world's largest operational offshore wind farm, and regained this title when the expansion completed in September 2018. The first two phases were expected to generate about 1,300 GW·h/year of electricity, with a load factor of 43%. The Walney Extension opened in September 2018 with a further 87 619:
In 2014 a dive vessel, owned by Danish firm Offshore Marine Services, was carrying out routine inspection work when an anchor cable broke and the ship hit one of 102 turbines installed at the Walney Offshore Wind Farm. The UK’s Maritime and Coastguard Agency surveyed the crash site and reported that
606:
In November 2014 DONG Energy was given development consent for an extension to the Walney offshore wind farm. The development consent allowed a maximum of 207 turbines to be added to the existing 102 turbines. The maximum generating capacity of the extension was said to be 750 MW although DONG
593:
Walney 2 began sending power to the grid on 1 November 2011. In February 2012, DONG Energy claimed to have installed the 51 turbines in Walney 2 in 5 months and 14 days, including monopiles and complete turbines; about 3.25 days per turbine. Walney 1 took 7 months. The improvement is due to
940: 586:. All the construction work was expected to take less than 2 years, with both phases operational by the end of 2011. On 11 July 2011 Phase 1 became operational, comprising 51 turbines with an installed capacity of 183.6 MW. Its 2690: 1187: 816: 933: 733: 620:
a surface sheen stretching 33 feet wide and 0.7 nautical miles long was trailing the vessel. The agency said that, unlike heavier crude oil, the marine engine oil should evaporate or disperse naturally.
611:
for Phase 1, and the 7 MW Siemens gearless turbine for Phase 2. In April 2018, the final turbine of the 87 installed for Phase 1 was completed, with full operation commencing in September 2018.
607:
was reported to be proceeding with a project based around 660 MW. Offshore construction began in 2017, onshore support construction having started in 2015. In 2015 DONG chose the 8 MW
1046:
Aldersey-Williams, John; Broadbent, Ian; Strachan, Peter (2019). "Better estimates of LCOE from audited accounts – A new methodology with examples from United Kingdom offshore wind and CCGT".
2049: 894: 1219: 838: 2656: 1183: 2184: 1162: 1850: 813: 2450: 2445: 2373: 2144: 1113: 2353: 995: 2378: 2042: 1276: 700: 858: 725: 2269: 2729: 2035: 1138: 1082: 877: 368:(formerly Dong Energy), consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW and it was the world's 1942: 1316: 759: 962: 2014: 1960: 1659: 673: 2754: 1384: 898: 369: 1209: 1269: 1020: 2744: 835: 547:. The farm was constructed sequentially in two phases with overlapping installation activities to reduce the overall construction timeframe. 1159: 2003: 1306: 1262: 1699: 2749: 912: 1301: 1109: 1064: 988: 2739: 697: 594:
commonality of projects and resources. The wind farm was officially opened on 9 February 2012 by the new energy secretary,
544: 2244: 1794: 1250:
Documenting the installation of the landfall cable from WOW2 through the beach at Cleveleys to the substation at Stanah
2675: 2534: 1744: 1709: 315: 781: 79: 1920: 1729: 1285: 862: 678: 1614: 1135: 1079: 874: 543:
to develop a wind farm off Walney Island, as part of the second UK offshore wind farm tendering process known as
503: 2734: 2603: 1814: 1754: 384: 755: 2578: 2479: 1689: 1559: 2429: 2348: 2189: 2094: 1296: 1214: 966: 380: 2568: 2294: 1789: 1414: 2539: 2524: 2229: 2174: 1819: 1694: 30: 2709: 2573: 1749: 1704: 1674: 2608: 2368: 2358: 2309: 2274: 2224: 2194: 2179: 2169: 2164: 2124: 1860: 1719: 1684: 1624: 1604: 1524: 1444: 1439: 1024: 551: 558:
power cables, one for each phase, and two short onshore cables to connect to two existing onshore
2319: 2289: 2279: 2264: 2259: 2249: 2204: 2199: 2159: 1965: 1891: 1599: 1564: 1534: 1434: 1419: 665: 2314: 2304: 2299: 2219: 2129: 2058: 2027: 1970: 1896: 1784: 1579: 1549: 1529: 1494: 375:
The wind farms were developed by Walney (UK) Offshore Windfarms Limited, a partnership between
2670: 2583: 2284: 2239: 2209: 2154: 2134: 1901: 1835: 1609: 1544: 1509: 1489: 1474: 1449: 559: 391:, are in water depths ranging from 19m to 23m and cover an area of approximately 73 km. 127: 2593: 2254: 2234: 2139: 1779: 1594: 1584: 1464: 1429: 583: 598:, MP, although the last of the 51 turbines in Walney 2 were only activated in April 2012. 8: 1764: 1640: 1589: 1554: 1424: 1409: 1404: 1399: 1339: 365: 155: 2529: 2424: 2214: 2149: 2062: 1935: 1799: 1679: 1619: 1499: 1249: 563: 453: 399: 258: 178: 1184:"Final turbines installed as Walney wind farm prepares to meet demand | the Mail" 916: 2588: 1991: 1928: 1845: 1840: 1769: 1759: 814:
World's biggest offshore wind farm opens off Britain as new minister admits high cost
388: 150: 1855: 1804: 1645: 1514: 1254: 540: 645: 2409: 1734: 1724: 1519: 1469: 1459: 1364: 1166: 1142: 1086: 881: 842: 820: 704: 272: 1210:"Oil Spill Offshore Triggered When Maintenance Ship Hits Wind Turbine Generator" 2637: 2070: 1881: 1504: 1479: 1359: 1354: 651: 637: 587: 291: 250: 245: 240: 1714: 2723: 2464: 1569: 1454: 1374: 1344: 567: 349: 94: 81: 63: 1886: 1865: 1739: 407: 395: 170: 2622: 2405: 2333: 1539: 1090: 846: 789: 785: 608: 497: 376: 324: 2553: 2495: 2363: 1906: 1774: 1574: 1484: 1324: 410:
capable of generating 659 megawatts. And the area reaches 145 km.
1244: 2685: 2509: 579: 361: 345: 659: 2655: 595: 555: 403: 1045: 2079: 1329: 571: 357: 353: 67: 2057: 1986: 2680: 1369: 1334: 575: 550:
The project involved constructing the wind turbines and their
726:"World's largest offshore windfarm opens off Cumbrian coast" 2109: 1349: 928: 926: 720: 718: 716: 554:, building two offshore substations and installing two 1110:"UK OK to Dong's 660MW Walney Extension offshore wind" 539:
In 2004 DONG Energy was awarded a 50-year lease from
1284: 923: 713: 627: 383:. The farms, which are immediately northwest of the 16:
Offshore wind farm off the coast of Cumbria, England
915:. Lindoe Offshore Renewables Center. Archived from 897:. Lindoe Offshore Renewables Center. Archived from 1961:List of offshore wind farms in the United Kingdom 895:"Datasheet for site: Walney 1 Offshore Wind Farm" 674:List of offshore wind farms in the United Kingdom 2721: 710:, 6 September 2018. Accessed: 6 September 2018. 2630: 698:The World's Biggest Offshore Wind Farm Is Here 2730:Buildings and structures in Barrow-in-Furness 2043: 1270: 1070:, 9 February 2012. Accessed: 9 February 2012. 826:, 9 February 2012. Accessed: 9 February 2012. 2691:Pre-nationalisation electric power companies 905: 1245:Walney Extension offshore wind farm Website 887: 884:, 30 June 2018. Accessed: 8 September 2018. 809: 807: 35:Walney Wind Farm under construction in 2011 2050: 2036: 1277: 1263: 1307:Offshore wind power in the United Kingdom 1112:. www.rechargenews.com. 7 November 2014. 859:announcement on Walney Offshore Wind Farm 836:announcement on Walney Offshore Wind Farm 1700:European Offshore Wind Deployment Centre 804: 2755:Energy infrastructure completed in 2018 1104: 1102: 1100: 316:Related media on Commons 2722: 1302:Renewable energy in the United Kingdom 691: 574:and Phase 2 connects to substation at 570:. Phase 1 connects to a substation at 2517: 2031: 1258: 1222:from the original on 8 September 2014 1116:from the original on 11 February 2015 943:from the original on 8 September 2018 934:"Walney Extension Offshore Wind Farm" 736:from the original on 6 September 2018 582:. Both undersea cables pass close by 413: 2745:Offshore wind farms in the Irish Sea 2010: 1097: 762:from the original on 15 January 2011 191:107 m; 120 m; 154 m; 164 m 1190:from the original on 13 August 2018 1160:Napper Dong-ordre med ny supermølle 601: 13: 963:"Walney wind farm project history" 14: 2766: 2676:Lancashire Electric Power Company 1238: 1001:from the original on 10 July 2011 868: 394:Both of the first phases have 51 370:second largest offshore wind farm 2703: 2654: 2009: 1998: 1997: 1985: 1286:Wind power in the United Kingdom 679:Wind power in the United Kingdom 658: 644: 630: 590:has been estimated at £120/MWh. 29: 1202: 1176: 1158:Pedersen, Maria Berg Badstue. " 1152: 1134:Pedersen, Maria Berg Badstue. " 1128: 1073: 1058: 1039: 1013: 981: 955: 534: 202:73 km (28 sq mi) 2750:2018 establishments in England 1136:Dong vælger Vestas' supermølle 875:Walney Extension - 4C Offshore 852: 829: 774: 748: 385:West of Duddon Sands Wind Farm 1: 2710:North West England portal 2185:Dickinson Street (Manchester) 1080:Newsletter no 25 - April 2012 913:"Walney 2 Offshore Wind Farm" 865:. Accessed: 14 February 2012. 849:. Accessed: 14 February 2012. 756:"DONG Energy Project website" 684: 348:9 miles (14 km) west of 1297:Energy in the United Kingdom 1215:International Business Times 614: 476:Siemens SWT-3.6-120 (3.6 MW) 381:Scottish and Southern Energy 7: 2740:Round 2 offshore wind farms 2190:Fiddlers Ferry (Warrington) 782:"UKWED Offshore wind farms" 623: 562:for connection into the UK 424:Offshore construction start 292:Annual net output 238:MHI Vestas V164-8.25MW (40) 10: 2771: 2295:Stuart Street (Manchester) 1094:. Retrieved: 14 June 2012. 136:September 2018 (extension) 2699: 2663: 2652: 2621: 2561: 2552: 2508: 2488: 2472: 2463: 2438: 2417: 2404: 2387: 2341: 2332: 2180:Clarence Dock (Liverpool) 2145:Bloom Street (Manchester) 2135:Back o' th' Bank (Bolton) 2117: 2108: 2087: 2078: 2069: 1979: 1953: 1919: 1874: 1828: 1667: 1658: 1633: 1392: 1383: 1315: 1292: 1065:Walney opens for business 989:"Walney Project brochure" 364:. The group, operated by 321: 311: 306: 290: 271: 257: 218: 214: 209: 195: 187: 169: 164: 140: 126: 118: 110: 73: 58: 44: 40: 28: 23: 2230:Lister Drive (Liverpool) 1861:Sofia Offshore Wind Farm 344:are a group of offshore 235:Make and model 2245:Percival Lane (Runcorn) 1966:North Sea Offshore Grid 666:Renewable energy portal 259:Nameplate capacity 119:Construction began 2059:Electricity generation 1971:Wind power in Scotland 1745:Lynn and Inner Dowsing 566:. A cable was laid by 560:electrical substations 263:367 MW (phase 1 and 2) 223:Units operational 2735:Wind farms in England 2671:British Nuclear Fuels 2320:Whitebirk (Blackburn) 1992:Wind power portal 1021:"SSE - News articles" 210:Power generation 2604:West of Duddon Sands 1921:Installation vessels 1815:West of Duddon Sands 456:SWT-3.6-107 (3.6 MW) 436:Total capacity (MW) 273:Capacity factor 134:March 2012 (phase 2) 128:Commission date 2569:Askam & Ireleth 2175:Chamber Hall (Bury) 1660:Offshore wind farms 1560:Little Cheyne Court 1149:, 18 February 2015. 307:External links 188:Rotor diameter 91: /  2200:Greenhill (Oldham) 2063:North West England 1385:Onshore wind farms 1165:2015-04-02 at the 1141:2015-04-02 at the 1085:2012-06-04 at the 969:on 20 January 2011 880:2018-09-08 at the 841:2012-03-23 at the 819:2013-09-21 at the 703:2018-09-06 at the 414:Development phases 400:nameplate capacity 265:659 MW (extension) 2717: 2716: 2650: 2649: 2646: 2645: 2617: 2616: 2548: 2547: 2504: 2503: 2459: 2458: 2430:Red Moss Landfill 2400: 2399: 2328: 2327: 2285:Spa Road (Bolton) 2104: 2103: 2025: 2024: 1915: 1914: 1654: 1653: 1415:Askam and Ireleth 1027:on 14 August 2011 901:on 26 March 2011. 532: 531: 389:Ormonde Wind Farm 352:off the coast of 342:Walney Wind Farms 332: 331: 230:40 × 8.25 MW 226:102 × 3.6 MW 151:Greencoat UK Wind 66:off the coast of 2762: 2708: 2707: 2706: 2658: 2628: 2627: 2559: 2558: 2515: 2514: 2470: 2469: 2415: 2414: 2339: 2338: 2255:Ribble (Preston) 2115: 2114: 2085: 2084: 2076: 2075: 2052: 2045: 2038: 2029: 2028: 2013: 2012: 2001: 2000: 1990: 1989: 1856:Neart Na Gaoithe 1820:Westermost Rough 1795:Sheringham Shoal 1665: 1664: 1390: 1389: 1279: 1272: 1265: 1256: 1255: 1232: 1231: 1229: 1227: 1206: 1200: 1199: 1197: 1195: 1180: 1174: 1173:, 12 March 2015. 1156: 1150: 1132: 1126: 1125: 1123: 1121: 1106: 1095: 1077: 1071: 1062: 1056: 1055: 1043: 1037: 1036: 1034: 1032: 1023:. Archived from 1017: 1011: 1010: 1008: 1006: 1000: 993: 985: 979: 978: 976: 974: 965:. Archived from 959: 953: 952: 950: 948: 939:. Ørsted. 2018. 938: 930: 921: 920: 909: 903: 902: 891: 885: 872: 866: 856: 850: 833: 827: 811: 802: 801: 799: 797: 792:on 19 March 2011 788:. Archived from 778: 772: 771: 769: 767: 752: 746: 745: 743: 741: 722: 711: 695: 668: 663: 662: 654: 649: 648: 640: 635: 634: 633: 602:Walney Extension 584:Barrow Wind Farm 541:The Crown Estate 484:Walney Extension 418: 417: 336:Wind farm layout 325:edit on Wikidata 267:1,026 MW (total) 253:SWT-7.0-154 (47) 248:SWT-3.6-120 (51) 243:SWT-3.6-107 (51) 106: 105: 103: 102: 101: 96: 95:54.044°N 3.522°W 92: 89: 88: 87: 84: 33: 24:Walney Wind Farm 21: 20: 2770: 2769: 2765: 2764: 2763: 2761: 2760: 2759: 2720: 2719: 2718: 2713: 2704: 2702: 2695: 2659: 2642: 2631:Proposed/future 2613: 2574:Barrow Offshore 2544: 2500: 2484: 2455: 2439:Proposed/future 2434: 2396: 2388:Proposed/future 2383: 2324: 2100: 2065: 2056: 2026: 2021: 1984: 1975: 1949: 1911: 1870: 1824: 1725:Hywind Scotland 1705:Greater Gabbard 1650: 1629: 1520:Goonhilly Downs 1379: 1365:Talisman Energy 1311: 1288: 1283: 1241: 1236: 1235: 1225: 1223: 1208: 1207: 1203: 1193: 1191: 1182: 1181: 1177: 1167:Wayback Machine 1157: 1153: 1143:Wayback Machine 1133: 1129: 1119: 1117: 1108: 1107: 1098: 1087:Wayback Machine 1078: 1074: 1063: 1059: 1044: 1040: 1030: 1028: 1019: 1018: 1014: 1004: 1002: 998: 991: 987: 986: 982: 972: 970: 961: 960: 956: 946: 944: 936: 932: 931: 924: 911: 910: 906: 893: 892: 888: 882:Wayback Machine 873: 869: 857: 853: 843:Wayback Machine 834: 830: 821:Wayback Machine 812: 805: 795: 793: 780: 779: 775: 765: 763: 754: 753: 749: 739: 737: 724: 723: 714: 705:Wayback Machine 696: 692: 687: 664: 657: 650: 643: 636: 631: 629: 626: 617: 604: 537: 501: 416: 339: 338: 337: 328: 302: 286: 266: 264: 249: 244: 239: 229: 227: 205: 183: 165:Wind farm 160: 135: 133: 99: 97: 93: 90: 85: 82: 80: 78: 77: 54: 36: 17: 12: 11: 5: 2768: 2758: 2757: 2752: 2747: 2742: 2737: 2732: 2715: 2714: 2700: 2697: 2696: 2694: 2693: 2688: 2683: 2678: 2673: 2667: 2665: 2661: 2660: 2653: 2651: 2648: 2647: 2644: 2643: 2641: 2640: 2638:Mersey Barrage 2634: 2632: 2625: 2619: 2618: 2615: 2614: 2612: 2611: 2609:Winscales Moor 2606: 2601: 2596: 2591: 2586: 2581: 2576: 2571: 2565: 2563: 2556: 2550: 2549: 2546: 2545: 2543: 2542: 2537: 2532: 2527: 2521: 2519: 2512: 2506: 2505: 2502: 2501: 2499: 2498: 2492: 2490: 2486: 2485: 2483: 2482: 2476: 2474: 2467: 2461: 2460: 2457: 2456: 2454: 2453: 2448: 2442: 2440: 2436: 2435: 2433: 2432: 2427: 2421: 2419: 2412: 2402: 2401: 2398: 2397: 2395: 2394: 2391: 2389: 2385: 2384: 2382: 2381: 2376: 2371: 2366: 2361: 2356: 2351: 2349:Blackburn Mill 2345: 2343: 2336: 2330: 2329: 2326: 2325: 2323: 2322: 2317: 2312: 2307: 2302: 2297: 2292: 2287: 2282: 2277: 2272: 2267: 2262: 2257: 2252: 2247: 2242: 2237: 2232: 2227: 2222: 2217: 2212: 2207: 2202: 2197: 2192: 2187: 2182: 2177: 2172: 2167: 2162: 2157: 2152: 2147: 2142: 2137: 2132: 2127: 2121: 2119: 2112: 2106: 2105: 2102: 2101: 2099: 2098: 2095:Fiddlers Ferry 2091: 2089: 2082: 2073: 2071:Power stations 2067: 2066: 2055: 2054: 2047: 2040: 2032: 2023: 2022: 2020: 2019: 2007: 1995: 1980: 1977: 1976: 1974: 1973: 1968: 1963: 1957: 1955: 1951: 1950: 1948: 1947: 1940: 1937:MPI Resolution 1933: 1925: 1923: 1917: 1916: 1913: 1912: 1910: 1909: 1904: 1899: 1894: 1889: 1884: 1882:Atlantic Array 1878: 1876: 1872: 1871: 1869: 1868: 1863: 1858: 1853: 1848: 1843: 1838: 1832: 1830: 1826: 1825: 1823: 1822: 1817: 1812: 1807: 1802: 1797: 1792: 1787: 1782: 1777: 1772: 1767: 1762: 1757: 1752: 1747: 1742: 1737: 1732: 1727: 1722: 1720:Humber Gateway 1717: 1712: 1710:Gunfleet Sands 1707: 1702: 1697: 1692: 1687: 1682: 1677: 1671: 1669: 1662: 1656: 1655: 1652: 1651: 1649: 1648: 1643: 1637: 1635: 1631: 1630: 1628: 1627: 1625:Winscales Moor 1622: 1617: 1612: 1607: 1605:Trimdon Grange 1602: 1597: 1592: 1587: 1582: 1577: 1572: 1567: 1562: 1557: 1552: 1547: 1542: 1537: 1532: 1527: 1525:Great Eppleton 1522: 1517: 1512: 1507: 1502: 1497: 1492: 1487: 1482: 1480:Cold Northcott 1477: 1472: 1467: 1462: 1457: 1452: 1447: 1445:Brechfa Forest 1442: 1440:Braes of Doune 1437: 1432: 1427: 1422: 1420:Beinn an Tuirc 1417: 1412: 1407: 1402: 1396: 1394: 1387: 1381: 1380: 1378: 1377: 1372: 1367: 1362: 1360:SSE Renewables 1357: 1355:Siemens Gamesa 1352: 1347: 1342: 1337: 1332: 1327: 1321: 1319: 1313: 1312: 1310: 1309: 1304: 1299: 1293: 1290: 1289: 1282: 1281: 1274: 1267: 1259: 1253: 1252: 1247: 1240: 1239:External links 1237: 1234: 1233: 1201: 1175: 1151: 1127: 1096: 1072: 1068:RE News Europe 1057: 1038: 1012: 980: 954: 922: 919:on 2 May 2012. 904: 886: 867: 851: 828: 803: 773: 747: 712: 689: 688: 686: 683: 682: 681: 676: 670: 669: 655: 652:Weather portal 641: 638:England portal 625: 622: 616: 613: 603: 600: 588:levelised cost 536: 533: 530: 529: 526: 524: 521: 519: 517: 511: 510: 507: 504:Siemens Gamesa 494: 491: 488: 485: 481: 480: 477: 474: 471: 468: 465: 461: 460: 457: 451: 448: 445: 442: 438: 437: 434: 431: 428: 425: 422: 415: 412: 335: 334: 333: 330: 329: 322: 319: 318: 313: 309: 308: 304: 303: 301: 300: 299:1,300 GWh 296: 294: 288: 287: 285: 284: 281: 277: 275: 269: 268: 261: 255: 254: 251:Siemens Gamesa 246:Siemens Gamesa 241:Siemens Gamesa 236: 232: 231: 228:47 × 7 MW 224: 220: 219: 216: 215: 212: 211: 207: 206: 204: 203: 199: 197: 196:Site area 193: 192: 189: 185: 184: 182: 181: 175: 173: 167: 166: 162: 161: 159: 158: 153: 148: 144: 142: 138: 137: 132:2011 (phase 1) 130: 124: 123: 120: 116: 115: 112: 108: 107: 100:54.044; -3.522 75: 71: 70: 60: 56: 55: 53: 52: 51:United Kingdom 48: 46: 42: 41: 38: 37: 34: 26: 25: 15: 9: 6: 4: 3: 2: 2767: 2756: 2753: 2751: 2748: 2746: 2743: 2741: 2738: 2736: 2733: 2731: 2728: 2727: 2725: 2712: 2711: 2698: 2692: 2689: 2687: 2684: 2682: 2679: 2677: 2674: 2672: 2669: 2668: 2666: 2664:Organisations 2662: 2657: 2639: 2636: 2635: 2633: 2629: 2626: 2624: 2620: 2610: 2607: 2605: 2602: 2600: 2597: 2595: 2592: 2590: 2587: 2585: 2582: 2580: 2577: 2575: 2572: 2570: 2567: 2566: 2564: 2560: 2557: 2555: 2551: 2541: 2538: 2536: 2533: 2531: 2528: 2526: 2523: 2522: 2520: 2516: 2513: 2511: 2507: 2497: 2494: 2493: 2491: 2487: 2481: 2478: 2477: 2475: 2471: 2468: 2466: 2462: 2452: 2449: 2447: 2444: 2443: 2441: 2437: 2431: 2428: 2426: 2423: 2422: 2420: 2416: 2413: 2411: 2407: 2403: 2393: 2392: 2390: 2386: 2380: 2377: 2375: 2372: 2370: 2367: 2365: 2362: 2360: 2357: 2355: 2352: 2350: 2347: 2346: 2344: 2340: 2337: 2335: 2331: 2321: 2318: 2316: 2313: 2311: 2308: 2306: 2303: 2301: 2298: 2296: 2293: 2291: 2288: 2286: 2283: 2281: 2278: 2276: 2275:Slacks Valley 2273: 2271: 2268: 2266: 2263: 2261: 2258: 2256: 2253: 2251: 2248: 2246: 2243: 2241: 2238: 2236: 2233: 2231: 2228: 2226: 2223: 2221: 2218: 2216: 2213: 2211: 2208: 2206: 2203: 2201: 2198: 2196: 2193: 2191: 2188: 2186: 2183: 2181: 2178: 2176: 2173: 2171: 2168: 2166: 2163: 2161: 2158: 2156: 2153: 2151: 2148: 2146: 2143: 2141: 2138: 2136: 2133: 2131: 2128: 2126: 2123: 2122: 2120: 2116: 2113: 2111: 2107: 2096: 2093: 2092: 2090: 2086: 2083: 2081: 2077: 2074: 2072: 2068: 2064: 2060: 2053: 2048: 2046: 2041: 2039: 2034: 2033: 2030: 2018: 2017: 2008: 2006: 2005: 1996: 1994: 1993: 1988: 1982: 1981: 1978: 1972: 1969: 1967: 1964: 1962: 1959: 1958: 1956: 1952: 1946: 1945: 1944:MPI Discovery 1941: 1939: 1938: 1934: 1932: 1931: 1930:MPI Adventure 1927: 1926: 1924: 1922: 1918: 1908: 1905: 1903: 1900: 1898: 1895: 1893: 1892:Docking Shoal 1890: 1888: 1885: 1883: 1880: 1879: 1877: 1873: 1867: 1864: 1862: 1859: 1857: 1854: 1852: 1849: 1847: 1844: 1842: 1839: 1837: 1834: 1833: 1831: 1827: 1821: 1818: 1816: 1813: 1811: 1808: 1806: 1803: 1801: 1798: 1796: 1793: 1791: 1788: 1786: 1783: 1781: 1778: 1776: 1773: 1771: 1768: 1766: 1763: 1761: 1758: 1756: 1753: 1751: 1748: 1746: 1743: 1741: 1738: 1736: 1733: 1731: 1730:Kentish Flats 1728: 1726: 1723: 1721: 1718: 1716: 1713: 1711: 1708: 1706: 1703: 1701: 1698: 1696: 1693: 1691: 1688: 1686: 1683: 1681: 1678: 1676: 1673: 1672: 1670: 1666: 1663: 1661: 1657: 1647: 1644: 1642: 1639: 1638: 1636: 1632: 1626: 1623: 1621: 1618: 1616: 1613: 1611: 1608: 1606: 1603: 1601: 1600:Slieve Rushen 1598: 1596: 1593: 1591: 1588: 1586: 1583: 1581: 1578: 1576: 1573: 1571: 1570:Moel Maelogan 1568: 1566: 1565:Milton Keynes 1563: 1561: 1558: 1556: 1553: 1551: 1548: 1546: 1543: 1541: 1538: 1536: 1535:Holmside Hall 1533: 1531: 1528: 1526: 1523: 1521: 1518: 1516: 1513: 1511: 1508: 1506: 1503: 1501: 1498: 1496: 1493: 1491: 1488: 1486: 1483: 1481: 1478: 1476: 1473: 1471: 1468: 1466: 1463: 1461: 1458: 1456: 1455:Carland Cross 1453: 1451: 1448: 1446: 1443: 1441: 1438: 1436: 1435:Blyth Harbour 1433: 1431: 1428: 1426: 1423: 1421: 1418: 1416: 1413: 1411: 1408: 1406: 1403: 1401: 1398: 1397: 1395: 1391: 1388: 1386: 1382: 1376: 1375:ScottishPower 1373: 1371: 1368: 1366: 1363: 1361: 1358: 1356: 1353: 1351: 1348: 1346: 1345:REG WindPower 1343: 1341: 1338: 1336: 1333: 1331: 1328: 1326: 1323: 1322: 1320: 1318: 1314: 1308: 1305: 1303: 1300: 1298: 1295: 1294: 1291: 1287: 1280: 1275: 1273: 1268: 1266: 1261: 1260: 1257: 1251: 1248: 1246: 1243: 1242: 1221: 1217: 1216: 1211: 1205: 1189: 1185: 1179: 1172: 1171:Energy-supply 1168: 1164: 1161: 1155: 1148: 1147:Energy-supply 1144: 1140: 1137: 1131: 1115: 1111: 1105: 1103: 1101: 1093: 1092: 1088: 1084: 1081: 1076: 1069: 1066: 1061: 1053: 1049: 1048:Energy Policy 1042: 1026: 1022: 1016: 997: 990: 984: 968: 964: 958: 942: 935: 929: 927: 918: 914: 908: 900: 896: 890: 883: 879: 876: 871: 864: 860: 855: 848: 844: 840: 837: 832: 825: 824:The Telegraph 822: 818: 815: 810: 808: 791: 787: 783: 777: 761: 757: 751: 735: 731: 727: 721: 719: 717: 709: 706: 702: 699: 694: 690: 680: 677: 675: 672: 671: 667: 661: 656: 653: 647: 642: 639: 628: 621: 612: 610: 599: 597: 591: 589: 585: 581: 577: 573: 569: 568:Stemat Spirit 565: 564:National Grid 561: 557: 553: 548: 546: 542: 527: 525: 522: 520: 518: 516: 513: 512: 508: 505: 500:8.25 MW & 499: 495: 492: 489: 487:February 2017 486: 483: 482: 478: 475: 472: 469: 466: 463: 462: 458: 455: 452: 449: 446: 443: 440: 439: 435: 433:Turbine model 432: 429: 426: 423: 420: 419: 411: 409: 405: 401: 397: 392: 390: 386: 382: 378: 373: 371: 367: 363: 359: 355: 351: 350:Walney Island 347: 343: 326: 320: 317: 314: 310: 305: 298: 297: 295: 293: 289: 282: 279: 278: 276: 274: 270: 262: 260: 256: 252: 247: 242: 237: 234: 233: 225: 222: 221: 217: 213: 208: 201: 200: 198: 194: 190: 186: 180: 177: 176: 174: 172: 168: 163: 157: 154: 152: 149: 146: 145: 143: 139: 131: 129: 125: 121: 117: 113: 109: 104: 76: 72: 69: 65: 64:Walney Island 62:14km west of 61: 57: 50: 49: 47: 43: 39: 32: 27: 22: 19: 2701: 2598: 2535:Macclesfield 2451:Weston Point 2406:Incinerators 2374:Weston Point 2015: 2002: 1983: 1943: 1936: 1929: 1897:First Flight 1887:Celtic Array 1866:Triton Knoll 1809: 1785:Scroby Sands 1740:London Array 1580:Ovenden Moor 1550:Langley Park 1530:Hadyard Hill 1224:. Retrieved 1213: 1204: 1192:. Retrieved 1178: 1170: 1154: 1146: 1130: 1118:. Retrieved 1089: 1075: 1067: 1060: 1051: 1047: 1041: 1029:. Retrieved 1025:the original 1015: 1003:. Retrieved 983: 971:. Retrieved 967:the original 957: 945:. Retrieved 917:the original 907: 899:the original 889: 870: 854: 831: 823: 794:. Retrieved 790:the original 776: 764:. Retrieved 750: 738:. Retrieved 730:The Guardian 729: 707: 693: 618: 605: 592: 549: 538: 535:Construction 514: 402:of 367  393: 387:and west of 374: 341: 340: 18: 2584:Coal Clough 2525:Bromborough 2496:Calder Hall 2354:Bridgewater 1902:Navitus Bay 1841:East Anglia 1836:Dogger Bank 1755:North Hoyle 1715:Gwynt y Môr 1610:West Durham 1545:Knabs Ridge 1540:Kilgallioch 1510:Fraisthorpe 1490:Crystal Rig 1475:Coal Clough 1450:Burton Wold 1226:9 September 1120:11 February 1091:DONG Energy 947:7 September 847:DONG Energy 786:RenewableUK 740:6 September 708:fortune.com 609:Vestas V164 578:, south of 552:foundations 427:Inaugurated 377:DONG Energy 114:Operational 98: / 74:Coordinates 2724:Categories 2594:Scout Moor 2579:Burbo Bank 2540:Merseyside 2530:Ince A + B 2379:Winnington 2369:Rocksavage 2359:Carrington 2310:Warrington 2170:Chadderton 2165:Carrington 2125:Accrington 2097:(co-fires) 1907:Shell Flat 1851:Moray East 1780:Robin Rigg 1775:Rhyl Flats 1690:Burbo Bank 1595:Scout Moor 1585:Pates Hill 1575:Out Newton 1485:Conisholme 1465:Cefn Croes 1430:Blood Hill 1325:Ecotricity 796:8 November 685:References 498:MHI-Vestas 470:March 2012 467:March 2011 346:wind farms 83:54°02′38″N 2686:SP Manweb 2290:Stockport 2280:Southport 2265:St Helens 2260:Roosecote 2250:Radcliffe 2225:Lancaster 2205:Hartshead 2195:Fleetwood 1875:Cancelled 1765:Race Bank 1641:Den Brook 1590:Royd Moor 1555:Lindhurst 1425:Black Law 1410:Arecleoch 1405:Ardrossan 1400:Alltwalis 1317:Companies 1194:12 August 1031:23 August 615:Incidents 580:Fleetwood 545:"Round 2" 490:June 2018 398:giving a 372:in 2018. 362:Irish Sea 360:, in the 283:43 % 280:40 % 86:3°31′19″W 2364:Fellside 2315:Westwood 2305:Wallasey 2300:Trafford 2220:Kearsley 2160:Carlisle 2130:Agecroft 2004:Category 1829:Proposed 1800:Teesside 1790:Seagreen 1680:Beatrice 1634:Proposed 1620:Whitelee 1615:Westmill 1500:Delabole 1495:Dagenham 1220:Archived 1188:Archived 1163:Archived 1139:Archived 1114:Archived 1083:Archived 1054:: 25–35. 1005:20 April 996:Archived 973:20 April 941:Archived 878:Archived 839:Archived 817:Archived 766:20 April 760:Archived 734:Archived 701:Archived 624:See also 596:Ed Davey 556:undersea 464:Walney 2 441:Walney 1 430:Turbines 408:turbines 396:turbines 179:Offshore 141:Owner(s) 59:Location 2589:Ormonde 2480:Heysham 2465:Nuclear 2270:Salford 2240:Padiham 2210:Huncoat 2155:Burnley 2080:Biomass 2016:Commons 1846:Hornsea 1770:Rampion 1760:Ormonde 1695:Dudgeon 1330:Equinor 572:Heysham 528:1026.2 454:Siemens 358:England 354:Cumbria 312:Commons 68:Cumbria 45:Country 2681:Norweb 2599:Walney 2562:Active 2518:Closed 2489:Closed 2473:Active 2425:Bolton 2418:Active 2342:Active 2235:Nelson 2215:Ince A 2140:Barton 2118:Closed 2088:Closed 1810:Walney 1805:Thanet 1750:Methil 1675:Barrow 1668:Active 1646:Viking 1515:Garves 1393:Active 1370:Vestas 1340:Ørsted 1335:Innogy 576:Stanah 506:(7 MW) 479:183.6 459:183.6 366:Ørsted 156:Ørsted 111:Status 2623:Tidal 2410:Waste 1954:Other 1735:Lincs 1685:Blyth 1470:Clyde 1460:Carno 999:(PDF) 992:(PDF) 937:(pdf) 515:Total 502:47 × 496:40 × 421:Phase 323:[ 2554:Wind 2446:Ince 2150:Bold 2110:Coal 1505:Farr 1228:2014 1196:2018 1122:2015 1033:2011 1007:2017 975:2017 949:2018 798:2010 768:2017 742:2018 509:659 447:2011 444:2010 379:and 171:Type 147:PGGM 122:2010 2510:Oil 2334:Gas 2061:in 1350:RWE 1052:128 863:SSE 861:by 845:by 523:189 2726:: 1218:. 1212:. 1186:. 1169:" 1145:" 1099:^ 1050:. 994:. 925:^ 806:^ 784:. 758:. 732:. 728:. 715:^ 493:87 473:51 450:51 404:MW 356:, 2408:/ 2051:e 2044:t 2037:v 1278:e 1271:t 1264:v 1230:. 1198:. 1124:. 1035:. 1009:. 977:. 951:. 800:. 770:. 744:. 327:]

Index


Walney Island
Cumbria
54°02′38″N 3°31′19″W / 54.044°N 3.522°W / 54.044; -3.522
Commission date
Greencoat UK Wind
Ørsted
Type
Offshore
Siemens Gamesa
Siemens Gamesa
Siemens Gamesa
Nameplate capacity
Capacity factor
Annual net output
Related media on Commons
edit on Wikidata
wind farms
Walney Island
Cumbria
England
Irish Sea
Ørsted
second largest offshore wind farm
DONG Energy
Scottish and Southern Energy
West of Duddon Sands Wind Farm
Ormonde Wind Farm
turbines
nameplate capacity

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.