186: 134:(SBB), the owners of half the bridge, refused a request for an updated report on the bridge. This was followed in 1991 by extensive repair work, including local reinforcement measures and renewed anti-corrosion measures, allowing the maximum speed for passenger trains to be raised to 45 kilometres per hour (28 mph) and extending the bridge’s useful remaining life to 40 years. Until the electrification of the Waldshut–Koblenz gap in 1999, passenger services on the bridge were carried out by 115:. The bridge was designed for two tracks, but only one track was installed. Due to increasing traffic loads, the bridge was strengthened in 1912 and 1913, being reinforced to carry 18 tonnes (20 tons) axle loads and then the track was moved from the eastern side of the bridge to the middle. The demolition of the bridge planned by the German army on 24 April 1945 was not in fact carried out, so the technical landmark of the bridge in its original design is still preserved today. 17: 375: 177:, took the axle loading of a fully loaded power car over the maximum 18 tonnes (20 tons) for the bridge. As a temporary solution, the power cars were locked out of use whilst passing over the bridge, and the trains limited to 10 kilometres per hour (6.2 mph). Following work on the bridge, these restrictions were lifted in early 2014. 219:
segment was built and the entire length of 131 metres (430 ft) was assembled. The actual installation of the bridge was carried with the support of piles in the Rhine, using of a 10.5-metre-long (34 ft) wooden launching nose, propelled over a runway. The launching of the superstructure was carried out using
205:
is made of wrought iron and is box shaped in cross-section. At has a continuous beam along its length. It has two vertical close-knit, grid-like lattice truss with a height of 5.13 metres (16.8 ft) and a track base of 4.95 metres (16.2 ft). The diagonal struts are formed from flat steel and
194:
viaduct with six semi-circular arches, having an inside diameter of 7.5 metres (25 ft). The greatly varying spans of the main bridge result from the nature of the currents in the Rhine. On the German side, after the line runs on an embankment for some 50 metres (160 ft), it crosses over the
193:
The c. 190-metre-long (620 ft) bridge section has a track on the upper level of the truss bridge and its spans over the Rhine consist of two outer spans that are 37.24 metres (122.2 ft) long and a central span of 54.90 metres (180.1 ft). This is followed on the Swiss bank by a brick
218:
The superstructure of the current bridge was assembled in three sections on the Waldshut bank in a temporary work hall. After completion of the first segment, it was rolled out of the hall. Then the second segment was built, and on its completion was connected with the first. Finally, the third
252: 209:
The foundation of the pillars are built on driven wooden piles that are about 10 metres (33 ft) long, topped by concrete pile caps. The tops of the pillars are 14 metres (46 ft) high and 3 metres (9.8 ft) wide and made of stone masonry.
95:
to construct the cross-border Turgi–Koblenz–Waldshut railway, including the Rhine bridge. Thus on 18 August 1859, the line was commissioned as the first connection between the
388: 126:
in 1974 estimated the bridge’s remaining useful life as 10 to 15 years, provided that new corrosion protection was applied; this was carried out in 1978. Ten years later
447: 379: 56: 457: 111:
designed the bridge and managed its construction. The steel superstructure was supplied and installed by the Gebrüder Benckiser company of
48:. It is the only major railway bridge over the Rhine, which is completely preserved in its original condition and is one of Europe's few 467: 432: 122:
of 10 kilometres per hour (6.2 mph) was imposed on the bridge because the bridge’s age and safety concerns. A report of the
29: 462: 357: 427: 88: 442: 477: 452: 338: 319: 437: 232: 173:
electric multiple units to the S27 line. Unfortunately the refurbishment, which included the introduction of
44:
and the border between Germany and Switzerland. It was the first railway bridge built over the Rhine below
92: 99:
and the Swiss railway network. The current main rail connection between Germany and Switzerland, the
220: 143: 123: 131: 185: 206:
riveted together at the intersections. The vertical pillars consist of four riveted corners.
135: 202: 170: 104: 49: 37: 8: 127: 195: 64: 353: 334: 315: 158:. In 2018, the S41 was shortened, now serving only the route between Winterthur and 174: 33: 151: 472: 100: 96: 45: 421: 403: 390: 139: 108: 72: 60: 16: 155: 142:. From 1999, SBB took over management of services on the bridge using 163: 147: 119: 112: 68: 159: 76: 347: 374: 276:
Ammann, Christian (March 2012). "News Round Up - Switzerland".
291:
Ammann, Christian (May 2014). "News Round Up - Switzerland".
52:. It is also one of the oldest railway bridges in the world. 41: 328: 162:; the service from Bülach to Waldshut was designated 146:. In 2007, about 34 trains daily operated as line 419: 348:Gesellschaft für Ingenieurbaukunst, ed. (2001). 448:Buildings and structures in Waldshut (district) 55:The bridge carries passenger services of line 352:(in German). Zürich: vdf Hochschulverlag AG. 169:In late 2011, the SBB introduced refurbished 329:Schlaich, Jörg; Schüller, Matthias (1999). 295:. Platform 5 Publishing Ltd. p. 54. 280:. Platform 5 Publishing Ltd. p. 57. 184: 28:is a single-track railway bridge on the 15: 420: 309: 290: 275: 333:(in German). Berlin: Bauwerk Verlag. 312:Eisenbahn-Rheinbrücken in Deutschland 331:Ingenieurbauführer Baden-Württemberg 269: 89:Grand Duchy of Baden State Railways 13: 458:Railway lines in Baden-Württemberg 314:(in German). Freiburg: EK-Verlag. 198:on a modern concrete arch bridge. 14: 489: 367: 103:, was opened 14 years later. The 373: 303: 180: 433:Railway bridges in Switzerland 310:Scharf, Hans-Wolfgang (2003). 284: 245: 233:List of bridges over the Rhine 30:Turgi–Koblenz–Waldshut railway 1: 380:Waldshut–Koblenz Rhine Bridge 238: 91:signed an agreement with the 26:Waldshut–Koblenz Rhine Bridge 20:Waldshut–Koblenz Rhine Bridge 468:Bridges in Baden-Württemberg 463:Railway lines in Switzerland 7: 226: 213: 10: 494: 428:Railway bridges in Germany 350:Schweizer Eisenbahnbrücken 201:The superstructure of the 93:Swiss Northeastern Railway 82: 443:Bridges completed in 1859 478:Truss bridges in Germany 453:Continuous truss bridges 293:Today's Railways Europe 221:human-powered transport 144:electric multiple units 130:closed the line, after 124:University of Karlsruhe 67:and Waldshut, and line 438:Bridges over the Rhine 404:47.609306°N 8.234056°E 190: 132:Swiss Federal Railways 87:On 26 August 1857 the 21: 188: 154:between Waldshut and 136:diesel multiple units 50:lattice truss bridges 19: 382:at Wikimedia Commons 203:lattice truss bridge 75:, operating between 63:, operating between 409:47.609306; 8.234056 400: /  128:Deutsche Bundesbahn 191: 22: 378:Media related to 359:978-3-7281-2786-0 253:"S-Bahnen Aargau" 189:Bridge from below 120:speed restriction 485: 415: 414: 412: 411: 410: 405: 401: 398: 397: 396: 393: 377: 363: 344: 325: 297: 296: 288: 282: 281: 278:Today's Railways 273: 267: 266: 264: 263: 257: 249: 175:air conditioning 493: 492: 488: 487: 486: 484: 483: 482: 418: 417: 408: 406: 402: 399: 394: 391: 389: 387: 386: 370: 360: 341: 322: 306: 301: 300: 289: 285: 274: 270: 261: 259: 255: 251: 250: 246: 241: 229: 216: 183: 101:Basel Link Line 85: 40:, crossing the 12: 11: 5: 491: 481: 480: 475: 470: 465: 460: 455: 450: 445: 440: 435: 430: 384: 383: 369: 368:External links 366: 365: 364: 358: 345: 339: 326: 320: 305: 302: 299: 298: 283: 268: 243: 242: 240: 237: 236: 235: 228: 225: 215: 212: 182: 179: 97:Baden Mainline 84: 81: 79:and Waldshut. 46:Lake Constance 9: 6: 4: 3: 2: 490: 479: 476: 474: 471: 469: 466: 464: 461: 459: 456: 454: 451: 449: 446: 444: 441: 439: 436: 434: 431: 429: 426: 425: 423: 416: 413: 381: 376: 372: 371: 361: 355: 351: 346: 342: 340:3-934369-01-4 336: 332: 327: 323: 321:3-88255-689-7 317: 313: 308: 307: 294: 287: 279: 272: 254: 248: 244: 234: 231: 230: 224: 222: 211: 207: 204: 199: 197: 187: 178: 176: 172: 167: 165: 161: 157: 153: 152:Zürich S-Bahn 149: 145: 141: 140:Deutsche Bahn 137: 133: 129: 125: 121: 116: 114: 110: 109:Robert Gerwig 106: 102: 98: 94: 90: 80: 78: 74: 73:Zurich S-Bahn 70: 66: 62: 61:Aargau S-Bahn 58: 53: 51: 47: 43: 39: 35: 31: 27: 18: 392:47°36′33.5″N 385: 349: 330: 311: 304:Bibliography 292: 286: 277: 271: 260:. Retrieved 247: 223:mechanisms. 217: 208: 200: 192: 181:Construction 168: 117: 86: 54: 25: 23: 407: / 422:Categories 395:8°14′2.6″E 262:2012-02-27 239:References 156:Winterthur 118:In 1967 a 107:architect 38:Koblenz AG 32:, between 171:Class 560 113:Pforzheim 227:See also 214:Assembly 34:Waldshut 150:of the 83:History 473:Aargau 356:  337:  318:  160:Bülach 77:Bülach 258:. SBB 256:(PDF) 105:Baden 65:Baden 42:Rhine 354:ISBN 335:ISBN 316:ISBN 36:and 24:The 196:E54 164:S36 148:S41 138:of 71:of 69:S36 59:of 57:S27 424:: 166:. 362:. 343:. 324:. 265:.

Index


Turgi–Koblenz–Waldshut railway
Waldshut
Koblenz AG
Rhine
Lake Constance
lattice truss bridges
S27
Aargau S-Bahn
Baden
S36
Zurich S-Bahn
Bülach
Grand Duchy of Baden State Railways
Swiss Northeastern Railway
Baden Mainline
Basel Link Line
Baden
Robert Gerwig
Pforzheim
speed restriction
University of Karlsruhe
Deutsche Bundesbahn
Swiss Federal Railways
diesel multiple units
Deutsche Bahn
electric multiple units
S41
Zürich S-Bahn
Winterthur

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.