Knowledge

Tramway track

Source 📝

864: 822: 879: 837: 781: 895: 852: 793: 431: 56: 569:, especially when the roads were muddy from wet weather. The rails enabled a horse to easily pull a load of 10 tonnes compared to 1 tonne on a dirt road. The evolution of street tramway tracks paralleled the transition from horse power to mechanical and electric power. In a dirt road, the rails needed a foundation, usually a mass concrete raft. Highway authorities often made tramway companies pave the rest of the road, usually with granite or similar stone blocks, at extra cost. 595: 1033: 810: 700:
needed other developments, most notably heavier rails to cope with electric tramcars weighing 12 tonnes rather than the 4 tonne horse-drawn variety; switching points, as electric trams could not be pulled onto the correct track by horses; and the need for electrical connections, to provide the return
653:
The traditional form of grooved rail is the girder guard section illustrated below. This rail is a modified form of flanged rail and requires a special mounting for weight transfer and gauge stabilisation. If the weight is carried by the roadway subsurface, steel ties are needed at regular intervals
626:
or grassed surfaces (grassed track or track in a lawn). The head on the right-hand side of the rail bears the vehicle's weight. The guard on the left-hand side, which has ample room for wheel flanges, carries no weight but serves to minimize the chance of derailment if the wheel were to be deflected
732:
were set in the road surface, and energised by a passing tram, either mechanically or magnetically, to supply power through a skate carried under the tram. Unfortunately these systems all failed due to the problem of reliability and not always turning off after the tram had passed, resulting in the
727:
with electrical conductors were used. Examples of this were New York, Washington DC, Paris, London, Brussels and Budapest. The conduit system of electrical power was very expensive to install and maintain, although Washington did not close until 1962. Attempts were made with alternative systems not
638:
and rail equipment and helped develop tram lines in New York City and Paris. The invention of grooved rail enabled tramways to be laid without causing a nuisance to other road users, except unsuspecting cyclists, who could get their wheels caught in the groove. The grooves may become filled with
677:
A modern version of the grooved block rail has a lower mass and is inserted into a prefabricated spanning concrete girder such as the LR55 without web but fully supported by noise reducing polyurethane grout or a girder rail such as P-CAT City Metro is embedded. The prefabricated units if used
668:
Block rail is a lower profile form of girder guard rail, where the web is eliminated. In profile it is more like a solid form of bridge rail with a flangeway and guard added. Simply removing the web and combining the head section directly with the foot section would result in a weak rail, so
639:
gravel and dirt (particularly if infrequently used or after a period of idleness) and need clearing from time to time, this being done by a "scrubber" tram. Failure to clear the grooves can lead to a bumpy ride for the passengers, damage to either wheel or rail and possibly derailing.
1079: 572:
The first tramways had a rail projecting above the road surface, or a step set into the road, both of which were apt to catch the narrow tyres of horse-drawn carriages. The invention by
558:
Tramway tracks have been in existence since the mid-16th century. They were made of wood, but during the late 18th century iron and later steel came into use and then predominated.
1084: 863: 851: 753:, with a continuous cable carried in a conduit under the road, and with a slot in the road surface through which the tram could clasp the cable for motion. This 894: 821: 1069: 995: 836: 878: 678:
with ultra light trams can be embedded into existing road base with possibly a reduced requirement for underground services diversions.
413: 405: 780: 459: 1139: 1101: 409: 401: 919: 576:
in 1852 of grooved rail enabled tramways to be laid without causing a nuisance to other road users, except unsuspecting
1612: 397: 758: 697: 562: 249: 89: 17: 792: 342: 654:
to maintain the gauge. Installing these means that the whole surface needs to be excavated and reinstated.
1220: 1037: 934: 1074: 197: 192: 1149: 496: 724: 714: 452: 244: 1335: 1132: 970: 734: 718: 687: 357: 352: 347: 209: 66: 1642: 1569: 870: 372: 308: 104: 1607: 1320: 1161: 1054: 750: 377: 337: 259: 1637: 1479: 1303: 1235: 965: 484: 367: 264: 133: 71: 1459: 1439: 1205: 1091: 648: 495:. When there is no need for pedestrians or road vehicles to traverse the track, conventional 445: 382: 33: 1409: 1125: 975: 619: 519: 500: 387: 950: 598:
Grooved rail, used when track is laid in places traversed by other vehicles or pedestrians
8: 1484: 1256: 754: 729: 526: 488: 362: 160: 116: 1017: 615: 589: 1592: 1529: 1515: 1469: 1399: 843: 766: 320: 1055:
European Girder Guard Rail Sections and Tram/Street Car Grooved BLOCK Rail without Web
663: 1597: 1342: 1097: 1554: 1524: 1519: 1190: 738: 435: 286: 187: 170: 809: 1602: 1474: 1429: 1369: 1271: 1195: 1185: 1064: 944: 885: 723:
In some cities where overhead electric cables were deemed intrusive, underground
631: 573: 239: 234: 219: 1464: 1449: 1374: 1347: 1276: 960: 955: 929: 801: 254: 128: 47: 857:
A rough exothermic weld after removal of the mould, before grinding to profile
1631: 1564: 1559: 1549: 1510: 1454: 1362: 1357: 1325: 1175: 1157: 924: 702: 594: 507: 303: 229: 224: 202: 151: 111: 99: 55: 728:
needing overhead wires. There were many systems of “surface” contact, where
1494: 1444: 1424: 1384: 1286: 1266: 1251: 1230: 1225: 1215: 1075:
MRT Track & Services Co., Inc / Krupp, T and girder rails, scroll down.
1059: 939: 828: 798: 627:
from its normal position in which the flange is not laterally constrained.
623: 515: 511: 506:
Tram rails can be placed on several surfaces, such as on ground over which
430: 392: 182: 749:
Prior to the universal introduction of electric power, many tramways were
1419: 1379: 1291: 733:
occasional electrocution of horses and dogs. Since 2003, a new system of
535: 492: 476: 123: 1576: 1542: 1537: 1489: 1414: 1389: 1330: 1296: 1180: 480: 298: 293: 165: 138: 1117: 1006: 499:
is used. However, when such traffic exists, such as in urban streets,
1315: 1281: 1261: 1210: 1200: 762: 701:
path for the electric current, which was usually supplied through an
566: 94: 32:"Tram track" redirects here. For the medical usage of the term, see 1352: 1170: 523: 491:
steel rails, the distance between the heads of the rails being the
419: 769:
in Wales. These needed a rather more substantial track formation.
577: 1434: 1032: 905: 315: 1049: 214: 177: 901: 635: 561:
The first street tramways were laid in 1832 in New York by
546: 281: 1090:
Hilton, George W.; Due, John Fitzgerald (1 January 2000).
669:
additional thickness is required in the combined section.
530: 1044: 27:
Rail and components for trams or light rail vehicles
900:A specialised vehicle washing the tramway track in 580:, who could get their wheels caught in the groove. 634:, a French inventor who developed improvements in 1629: 1133: 672: 522:, with grooved rails usually embedded into a 453: 869:Pavement removed for repairs to the tracks, 518:are laid – as with railway tracks – or, for 1093:The Electric Interurban Railways in America 708: 1140: 1126: 460: 446: 1089: 622:designed for tramway or railway track in 593: 1147: 920:Difference between train and tram rails 529:. In some places, tracks are laid into 14: 1630: 1121: 649:Rail profile § Girder guard rail 630:Grooved rail was invented in 1852 by 642: 24: 692: 565:to assist horses pulling buses on 25: 1654: 1050:LR55 track suppliers and advisers 1026: 786:Tram track on Florent Pauwelslei. 1060:Testing Girder Rail on the MBTA. 1031: 893: 877: 862: 850: 835: 827:Light rail tracks with concrete 820: 808: 791: 779: 744: 590:Rail profile § Grooved rail 429: 54: 583: 1045:LR55 Track System Full details 1011: 1000: 989: 681: 664:Rail profile § Block rail 13: 1: 1096:. Stanford University Press. 982: 842:Joining tram tracks using an 761:in California as well as the 657: 483:operations. As with standard 245:Passenger traffic terminology 935:Minimum railway curve radius 533:surfaces; they are known as 7: 912: 10: 1659: 1348:Transfer table (traverser) 772: 737:has been installed in the 715:Conduit current collection 712: 685: 673:Prefabricated grooved rail 661: 646: 587: 553: 31: 1585: 1503: 1398: 1336:ground-level power supply 1244: 1156: 1085:ThyssenKrupp grooved rail 719:Ground-level power supply 688:List of tram track gauges 358:List of high-speed trains 829:railroad ties (sleepers) 709:Conduit and stud systems 1321:Railway electrification 487:, tram tracks have two 260:Railway nationalization 1070:Grooved or girder rail 996:Grooved or girder rail 966:Track transition curve 599: 368:Longest train services 250:Named passenger trains 1460:Platform screen doors 1040:at Wikimedia Commons 1018:P-CAT City Metro rail 757:can still be seen in 597: 383:Platform screen doors 34:Tram track (medicine) 1410:Anti-trespass panels 976:Tramway (industrial) 436:Transport portal 388:Railway speed record 1257:Classification yard 512:sleepers (US: ties) 363:List of train songs 240:High-speed railways 193:Couplers by country 42:Part of a series on 1516:Motive power depot 1470:Signalling control 951:Railway guide rail 600: 198:Coupler conversion 1625: 1624: 1343:Railway turntable 1164: 1103:978-0-8047-4014-2 1065:Wirth Girder Rail 1036:Media related to 888:in Brussels, 2018 643:Girder guard rail 516:flat-bottom rails 470: 469: 188:Railway couplings 171:Steam locomotives 16:(Redirected from 1650: 1520:Railway workshop 1236:Transition curve 1206:Fastening system 1160: 1142: 1135: 1128: 1119: 1118: 1114: 1112: 1110: 1035: 1020: 1015: 1009: 1007:LR55 prefab rail 1004: 998: 993: 971:Tram track gauge 897: 881: 866: 854: 839: 824: 812: 795: 783: 739:Bordeaux tramway 503:rails are used. 497:flat-bottom rail 462: 455: 448: 434: 433: 134:Gauge conversion 58: 39: 38: 21: 1658: 1657: 1653: 1652: 1651: 1649: 1648: 1647: 1643:Tram technology 1628: 1627: 1626: 1621: 1581: 1499: 1475:Structure gauge 1430:Defect detector 1402: 1394: 1240: 1196:Clip and scotch 1186:Breather switch 1152: 1146: 1108: 1106: 1104: 1029: 1024: 1023: 1016: 1012: 1005: 1001: 994: 990: 985: 980: 945:Railroad switch 915: 908: 898: 889: 882: 873: 867: 858: 855: 846: 844:exothermic weld 840: 831: 825: 816: 813: 804: 796: 787: 784: 775: 747: 735:surface contact 721: 713:Main articles: 711: 698:Electrification 695: 693:Electrification 690: 684: 675: 666: 660: 651: 645: 632:Alphonse Loubat 592: 586: 574:Alphonse Loubat 563:John Stephenson 556: 466: 428: 325: 274:Special systems 269: 235:Inter-city rail 220:Passenger train 145: 100:Railway station 77: 76: 37: 28: 23: 22: 15: 12: 11: 5: 1656: 1646: 1645: 1640: 1623: 1622: 1620: 1619: 1618: 1617: 1616: 1615: 1600: 1595: 1589: 1587: 1583: 1582: 1580: 1579: 1574: 1573: 1572: 1567: 1562: 1557: 1547: 1546: 1545: 1540: 1532: 1527: 1522: 1513: 1507: 1505: 1501: 1500: 1498: 1497: 1492: 1487: 1482: 1477: 1472: 1467: 1465:Railway signal 1462: 1457: 1452: 1450:Level crossing 1447: 1442: 1437: 1432: 1427: 1422: 1417: 1412: 1406: 1404: 1396: 1395: 1393: 1392: 1387: 1382: 1377: 1375:Track geometry 1372: 1367: 1366: 1365: 1355: 1350: 1345: 1340: 1339: 1338: 1333: 1328: 1326:overhead lines 1318: 1313: 1312: 1311: 1301: 1300: 1299: 1289: 1284: 1279: 1277:Gauntlet track 1274: 1269: 1264: 1259: 1254: 1248: 1246: 1242: 1241: 1239: 1238: 1233: 1228: 1223: 1221:Minimum radius 1218: 1213: 1208: 1203: 1198: 1193: 1188: 1183: 1178: 1173: 1167: 1165: 1154: 1153: 1150:infrastructure 1145: 1144: 1137: 1130: 1122: 1116: 1115: 1102: 1087: 1082: 1077: 1072: 1067: 1062: 1057: 1052: 1047: 1028: 1027:External links 1025: 1022: 1021: 1010: 999: 987: 986: 984: 981: 979: 978: 973: 968: 963: 961:Street running 958: 956:Reserved track 953: 948: 942: 937: 932: 930:Gauntlet track 927: 922: 916: 914: 911: 910: 909: 899: 892: 890: 883: 876: 874: 868: 861: 859: 856: 849: 847: 841: 834: 832: 826: 819: 817: 815:Grassed track 814: 807: 805: 802:gauntlet track 797: 790: 788: 785: 778: 774: 771: 746: 743: 710: 707: 694: 691: 686:Main article: 683: 680: 674: 671: 659: 656: 644: 641: 585: 582: 555: 552: 520:street running 468: 467: 465: 464: 457: 450: 442: 439: 438: 425: 424: 423: 422: 417: 395: 390: 385: 380: 375: 370: 365: 360: 355: 350: 345: 340: 332: 331: 327: 326: 324: 323: 318: 313: 312: 311: 301: 296: 291: 290: 289: 276: 275: 271: 270: 268: 267: 262: 257: 255:Rail subsidies 252: 247: 242: 237: 232: 227: 222: 217: 212: 207: 206: 205: 200: 195: 185: 180: 175: 174: 173: 163: 155: 154: 147: 146: 144: 143: 142: 141: 136: 131: 129:Variable gauge 121: 120: 119: 109: 108: 107: 97: 92: 84: 83: 82:Infrastructure 79: 78: 75: 74: 69: 63: 60: 59: 51: 50: 48:Rail transport 44: 43: 26: 18:Tramway tracks 9: 6: 4: 3: 2: 1655: 1644: 1641: 1639: 1638:Permanent way 1636: 1635: 1633: 1614: 1611: 1610: 1609: 1606: 1605: 1604: 1601: 1599: 1596: 1594: 1591: 1590: 1588: 1584: 1578: 1575: 1571: 1568: 1566: 1563: 1561: 1558: 1556: 1553: 1552: 1551: 1548: 1544: 1541: 1539: 1536: 1535: 1533: 1531: 1528: 1526: 1523: 1521: 1517: 1514: 1512: 1511:Coaling tower 1509: 1508: 1506: 1502: 1496: 1493: 1491: 1488: 1486: 1483: 1481: 1480:Signal bridge 1478: 1476: 1473: 1471: 1468: 1466: 1463: 1461: 1458: 1456: 1455:Loading gauge 1453: 1451: 1448: 1446: 1443: 1441: 1438: 1436: 1433: 1431: 1428: 1426: 1423: 1421: 1418: 1416: 1413: 1411: 1408: 1407: 1405: 1401: 1397: 1391: 1388: 1386: 1383: 1381: 1378: 1376: 1373: 1371: 1368: 1364: 1363:refuge siding 1361: 1360: 1359: 1356: 1354: 1351: 1349: 1346: 1344: 1341: 1337: 1334: 1332: 1329: 1327: 1324: 1323: 1322: 1319: 1317: 1314: 1310: 1309:tramway track 1307: 1306: 1305: 1302: 1298: 1295: 1294: 1293: 1290: 1288: 1285: 1283: 1280: 1278: 1275: 1273: 1270: 1268: 1265: 1263: 1260: 1258: 1255: 1253: 1250: 1249: 1247: 1243: 1237: 1234: 1232: 1229: 1227: 1224: 1222: 1219: 1217: 1214: 1212: 1209: 1207: 1204: 1202: 1199: 1197: 1194: 1192: 1189: 1187: 1184: 1182: 1179: 1177: 1174: 1172: 1169: 1168: 1166: 1163: 1159: 1155: 1151: 1143: 1138: 1136: 1131: 1129: 1124: 1123: 1120: 1105: 1099: 1095: 1094: 1088: 1086: 1083: 1081: 1078: 1076: 1073: 1071: 1068: 1066: 1063: 1061: 1058: 1056: 1053: 1051: 1048: 1046: 1043: 1042: 1041: 1039: 1034: 1019: 1014: 1008: 1003: 997: 992: 988: 977: 974: 972: 969: 967: 964: 962: 959: 957: 954: 952: 949: 946: 943: 941: 938: 936: 933: 931: 928: 926: 925:Grade (slope) 923: 921: 918: 917: 907: 903: 896: 891: 887: 880: 875: 872: 865: 860: 853: 848: 845: 838: 833: 830: 823: 818: 811: 806: 803: 800: 794: 789: 782: 777: 776: 770: 768: 764: 760: 759:San Francisco 756: 752: 745:Cable haulage 742: 740: 736: 731: 726: 720: 716: 706: 704: 703:overhead wire 699: 689: 679: 670: 665: 655: 650: 640: 637: 633: 628: 625: 621: 617: 613: 609: 605: 596: 591: 581: 579: 575: 570: 568: 564: 559: 551: 549: 548: 542: 541:grassed track 538: 537: 532: 528: 525: 521: 517: 513: 509: 508:track ballast 504: 502: 498: 494: 490: 486: 482: 478: 474: 473:Tramway track 463: 458: 456: 451: 449: 444: 443: 441: 440: 437: 432: 427: 426: 421: 418: 415: 411: 407: 403: 399: 396: 394: 391: 389: 386: 384: 381: 379: 376: 374: 371: 369: 366: 364: 361: 359: 356: 354: 351: 349: 346: 344: 341: 339: 336: 335: 334: 333: 329: 328: 322: 319: 317: 314: 310: 307: 306: 305: 304:Rapid transit 302: 300: 297: 295: 292: 288: 285: 284: 283: 280: 279: 278: 277: 273: 272: 266: 263: 261: 258: 256: 253: 251: 248: 246: 243: 241: 238: 236: 233: 231: 230:Regional rail 228: 226: 225:Commuter rail 223: 221: 218: 216: 215:Bogie (truck) 213: 211: 208: 204: 203:Dual coupling 201: 199: 196: 194: 191: 190: 189: 186: 184: 183:Railroad cars 181: 179: 176: 172: 169: 168: 167: 164: 162: 159: 158: 157: 156: 153: 152:rolling stock 149: 148: 140: 137: 135: 132: 130: 127: 126: 125: 122: 118: 115: 114: 113: 112:Railway track 110: 106: 103: 102: 101: 98: 96: 93: 91: 88: 87: 86: 85: 81: 80: 73: 72:Company types 70: 68: 65: 64: 62: 61: 57: 53: 52: 49: 46: 45: 41: 40: 35: 30: 19: 1495:Wayside horn 1445:Interlocking 1425:Catch points 1385:Water trough 1308: 1287:Passing loop 1267:Pocket track 1252:Balloon loop 1216:Ladder track 1107:. Retrieved 1092: 1030: 1013: 1002: 991: 940:Rail profile 799:Grooved-rail 751:cable hauled 748: 722: 696: 676: 667: 652: 629: 616:special rail 611: 607: 604:grooved rail 603: 601: 584:Grooved rail 571: 560: 557: 544: 540: 534: 505: 472: 471: 150:Service and 29: 1420:Buffer stop 1380:Water crane 1292:Track gauge 1231:Tie/Sleeper 1080:Block rails 1038:Tram tracks 741:by Alstom. 682:Track gauge 612:girder rail 608:groove rail 536:green track 493:track gauge 485:rail tracks 475:is used on 398:Terminology 343:Attractions 330:Miscellanea 166:Locomotives 124:Track gauge 117:Maintenance 1632:Categories 1593:Industrial 1577:Water stop 1538:for trains 1530:Roundhouse 1504:Structures 1490:Train stop 1440:Guard rail 1415:Block post 1403:and safety 1400:Signalling 1331:third rail 1304:Rail track 1297:dual gauge 1181:Baulk road 983:References 884:Temporary 767:Great Orme 662:See also: 658:Block rail 647:See also: 588:See also: 567:dirt roads 531:grass turf 510:topped by 481:light rail 348:By country 299:Interurban 294:Light rail 139:Dual gauge 90:Management 1543:for goods 1485:Tell-tale 1316:Rail yard 1282:Guide bar 1262:Headshunt 1245:Trackwork 1211:Fishplate 1201:Date nail 1162:(history) 545:track in 373:Modelling 353:Companies 338:Accidents 161:Operating 95:Rail yard 1598:Military 1555:building 1525:Platform 1435:Derailer 1353:Roll way 1272:Junction 1171:Axe ties 947:(points) 913:See also 886:turnouts 725:conduits 624:pavement 578:cyclists 527:pavement 524:concrete 489:parallel 477:tramways 420:Vactrain 210:Wheelset 1608:station 1603:Private 1550:Station 1226:Profile 1176:Ballast 1109:10 June 871:Toronto 773:Gallery 765:of the 618:with a 554:History 501:grooved 393:Suicide 378:Museums 309:History 287:History 265:Freight 67:History 1370:Switch 1358:Siding 1158:Tracks 1100:  906:Latvia 763:system 755:system 620:groove 316:Maglev 178:Trains 1586:Types 1565:ghost 1560:clock 1534:Shed 1148:Rail 730:studs 614:is a 610:, or 321:Urban 1613:list 1570:list 1191:Cant 1111:2014 1098:ISBN 902:Riga 717:and 636:tram 547:lawn 514:and 282:Tram 105:list 1390:Wye 543:or 479:or 1634:: 904:, 705:. 606:, 602:A 550:. 539:, 414:UK 412:, 410:NZ 408:, 406:NA 404:, 402:AU 1518:/ 1141:e 1134:t 1127:v 1113:. 461:e 454:t 447:v 416:) 400:( 36:. 20:)

Index

Tramway tracks
Tram track (medicine)
Rail transport

History
Company types
Management
Rail yard
Railway station
list
Railway track
Maintenance
Track gauge
Variable gauge
Gauge conversion
Dual gauge
rolling stock
Operating
Locomotives
Steam locomotives
Trains
Railroad cars
Railway couplings
Couplers by country
Coupler conversion
Dual coupling
Wheelset
Bogie (truck)
Passenger train
Commuter rail

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.