Knowledge

Refueling and overhaul

Source 📝

350: 532: 66: 318: 487: 128: 25: 579:
about halfway through their desired 50-year life spans. Because carriers can last so long before being retired, they are refueled and refurbished with an RCOH to extend their usable lifetime. At the same time a ship is refueled, it is given a complex overhaul in which broken, worn or obsolete parts
415:
have formed in the core, and the core has become highly radioactive. Refueling involves taking the expended core out of the reactor and putting in a new core with fresh nuclear fuel. Because it is so radioactive, removing a core with spent nuclear fuel from a reactor requires elaborate radiological
266:
with new fuel and a general maintenance fix-up, renovation, and often modernization of the entire ship. In theory, such process could simply involve only refueling or only an overhaul, but in practice, nuclear refueling is always combined with an overhaul. An ROH usually takes one to two years for
584:
and warfighting capabilities, its internal distribution systems are upgraded, and allowance is made for future upgrades over the ship’s remaining operational service life. Given the size of an aircraft carrier and the number of systems and subsystems it has, an RCOH is extremely complex, costly
384:
to bring it to desired temperatures, pressures, and other conditions. During the ROH, ship's Navy crew stand shutdown watches, and civilian shipyard workers do much of the repair, maintenance, and installation work. All personnel in an ROH maintenance work area are commonly required to wear a
500:
During an overhaul, an extensive testing program is conducted. Numerous test procedures that have been written are followed, data is recorded as required, and logs of the testing are kept. Tests that can be conducted include:
424:
and require special radiological handling and disposal precautions. In addition to radiological training and qualification required for working in radiation areas or with radioactive materials or contamination,
310:, so the ship's keel area will rest on the blocks as the water is pumped out. At the end of the ROH, the drydock is refilled with water so the ship can be re-floated and removed from the dock. 282:
aircraft carriers). For modern submarines and aircraft carriers, ROHs are typically carried out about midway through their operating lifespan. There are also shorter maintenance fix-ups called
722: 521:
relief pressure setpoints. At the finish of the ROH, the testing data records are bound and retained as a permanent documentation record resulting from the ROH.
517:, and testing of electrical and mechanical setpoints for various types of equipment such as sensor input setpoints for various kinds of automatic trips and 581: 635: 192: 396:
prototype plants have also undergone similar refueling and overhauls, not at a shipyard but at whatever facility they are located.
164: 623: 145: 38: 601: 437:
The overhaul commonly includes extensive maintenance and renovation work and checks of various systems and equipment aboard the
171: 286:
for ships periodically at shipyards. A particularly lengthy refueling, maintenance, and modernization process for a nuclear
178: 472:
and special operations force insertion platforms which can carry up to 66 special operations personnel. The first four
441:. A major overhaul also typically includes upgrading various systems and equipment to modernize them; for example, old 306:, which is then closed off from the sea. Water is evacuated from the drydock with keel blocks pre positioned under the 687: 457: 416:
handling precautions. All materials that came in contact with the critical core, including the internal surfaces and
229: 211: 109: 87: 52: 404:
In a nuclear-powered ship, the nuclear fuel is essentially a solid inside a reactor core which is inside the ship's
80: 580:
are repaired or replaced and systems are modernized. The modernization typically includes an upgrade of the ship’s
160: 480: 479:
submarines have undergone such conversions during their midlife refueling and overhauls. For more details, see
524:
As the ship is readied, toward the end of the ROH, the power plant is warmed or brought back up to the desired
149: 564: 276: 538: 717: 322: 44: 349: 456:
An example of renovation work done during refueling and overhauls of submarines is the conversion of a
612: 545: 421: 408:. Once a reactor core has gone critical, meaning it has been used during a reactor operation, highly 255: 185: 675: 461: 412: 326: 74: 602:
Unmanned Undersea Vehicles And Guided Missile Submarines: Technological and Operational Synergies
469: 417: 330: 138: 665: 502: 91: 531: 525: 473: 639: 271:. Time periods between ROHs on a ship have varied historically from about 5–20 years (for 8: 490: 468:
and their silos out of the missile section in the submarine, and replacing them with 154
446: 712: 585:(several billion dollars), and time-consuming. Each RCOH is planned to take 46 months. 568: 442: 426: 243: 380:
To start ROH, operating procedures are used to shut down and cool down the propulsion
267:
submarines and up to almost three years for an aircraft carrier, performed at a naval
683: 465: 453:
well in advance and new equipment is obtained for any replacements or installations.
369: 307: 664:
Schank, John F.; Mark V. Arena; Denis Rushworth; John Birkler; James Chiesa (2002).
679: 572: 535: 510: 287: 405: 353: 663: 706: 393: 429:
to workers is monitored to ensure maximum exposure limits are not exceeded.
576: 518: 263: 317: 409: 381: 509:, testing of fluid systems and other pressure boundaries which includes 486: 272: 127: 450: 449:
equipment. The work for such overhauls is typically planned out by
386: 365: 268: 548: 506: 337: 303: 16:
Extensive maintenance period for nuclear powered US Navy vessels
251: 514: 438: 259: 290:
can last up to almost three years and be referred to as a
575:
that power some aircraft carriers typically use up their
624:
USS Theodore Roosevelt Headed Into Mid-Life Overhaul
464:(SSGN). Such a conversion consists of taking the 24 152:. Unsourced material may be challenged and removed. 555: 481:Ohio-class submarine § SSBN/SSGN conversions 302:At a shipyard, a ship to undergo ROH goes into a 704: 368:(2001). (Note blocks, in dark shadow, under the 723:Nuclear-powered ships of the United States Navy 528:and pressure so it can be started when ready. 53:Learn how and when to remove these messages 667:Refueling and Complex Overhaul of the USS 563:is a process for refueling and upgrading 262:, which involves replacement of expended 230:Learn how and when to remove this message 212:Learn how and when to remove this message 110:Learn how and when to remove this message 530: 496:in drydock undergoing conversion to SSGN 485: 348: 316: 73:This article includes a list of general 705: 561:Refueling and Complex Overhaul (RCOH) 292:Refueling and Complex Overhaul (RCOH) 150:adding citations to reliable sources 121: 59: 18: 13: 254:process or procedure performed on 79:it lacks sufficient corresponding 14: 734: 613:CVN-68 Nimitz-class Modernization 565:nuclear-powered aircraft carriers 458:fleet ballistic missile submarine 445:equipment may be replaced by new 34:This article has multiple issues. 671:(CVN 68): Lessons for the Future 636:"Refueling and Complex Overhaul" 126: 64: 23: 137:needs additional citations for 42:or discuss these issues on the 628: 617: 606: 595: 556:Refueling and Complex Overhaul 1: 588: 399: 248:Refueling and Overhaul (ROH) 7: 432: 10: 739: 657: 422:radioactively contaminated 297: 546:Newport News Shipbuilding 275:) to up to 25 years (for 676:Santa Monica, California 470:Tomahawk cruise missiles 462:guided missile submarine 413:nuclear fission products 161:"Refueling and overhaul" 94:more precise citations. 552: 497: 373: 344: 534: 526:operating temperature 489: 352: 320: 341:filled with seawater 250:refers to a lengthy 146:improve this article 511:hydrostatic testing 362:drained of seawater 718:United States Navy 553: 498: 466:ballistic missiles 447:digital electronic 427:radiation exposure 420:, are considered 374: 345: 244:United States Navy 505:to test critical 443:analog electrical 378: 377: 240: 239: 232: 222: 221: 214: 196: 120: 119: 112: 57: 730: 699: 697: 696: 680:Rand Corporation 651: 650: 648: 647: 638:. Archived from 632: 626: 621: 615: 610: 604: 599: 573:nuclear reactors 536:Aircraft carrier 313: 312: 288:aircraft carrier 235: 228: 217: 210: 206: 203: 197: 195: 154: 130: 122: 115: 108: 104: 101: 95: 90:this article by 81:inline citations 68: 67: 60: 49: 27: 26: 19: 738: 737: 733: 732: 731: 729: 728: 727: 703: 702: 694: 692: 690: 660: 655: 654: 645: 643: 634: 633: 629: 622: 618: 611: 607: 600: 596: 591: 558: 541:Abraham Lincoln 435: 406:nuclear reactor 402: 300: 256:nuclear-powered 236: 225: 224: 223: 218: 207: 201: 198: 155: 153: 143: 131: 116: 105: 99: 96: 86:Please help to 85: 69: 65: 28: 24: 17: 12: 11: 5: 736: 726: 725: 720: 715: 701: 700: 688: 659: 656: 653: 652: 627: 616: 605: 593: 592: 590: 587: 582:combat systems 557: 554: 513:to detect any 434: 431: 401: 398: 376: 375: 346: 299: 296: 284:availabilities 238: 237: 220: 219: 134: 132: 125: 118: 117: 72: 70: 63: 58: 32: 31: 29: 22: 15: 9: 6: 4: 3: 2: 735: 724: 721: 719: 716: 714: 711: 710: 708: 691: 689:0-8330-3288-7 685: 681: 677: 673: 672: 668: 662: 661: 642:on 2009-02-23 641: 637: 631: 625: 620: 614: 609: 603: 598: 594: 586: 583: 578: 574: 570: 566: 562: 550: 547: 543: 542: 537: 533: 529: 527: 522: 520: 516: 512: 508: 504: 495: 494: 488: 484: 482: 478: 476: 471: 467: 463: 459: 454: 452: 448: 444: 440: 430: 428: 423: 419: 418:coolant water 414: 411: 407: 397: 395: 394:naval reactor 390: 388: 383: 371: 367: 363: 359: 357: 351: 347: 342: 339: 335: 334: 328: 324: 319: 315: 314: 311: 309: 305: 295: 293: 289: 285: 281: 279: 274: 270: 265: 261: 257: 253: 249: 245: 234: 231: 216: 213: 205: 194: 191: 187: 184: 180: 177: 173: 170: 166: 163: –  162: 158: 157:Find sources: 151: 147: 141: 140: 135:This article 133: 129: 124: 123: 114: 111: 103: 93: 89: 83: 82: 76: 71: 62: 61: 56: 54: 47: 46: 41: 40: 35: 30: 21: 20: 693:. Retrieved 670: 666: 644:. Retrieved 640:the original 630: 619: 608: 597: 577:nuclear fuel 560: 559: 540: 523: 519:safety valve 499: 492: 474: 460:(SSBN) to a 455: 436: 403: 391: 379: 361: 355: 340: 332: 301: 291: 283: 277: 264:nuclear fuel 247: 241: 226: 208: 199: 189: 182: 175: 168: 156: 144:Please help 139:verification 136: 106: 97: 78: 50: 43: 37: 36:Please help 33: 503:radiography 410:radioactive 392:Land-based 382:power plant 360:in drydock 92:introducing 707:Categories 695:2010-12-04 646:2009-07-04 589:References 356:Greenville 273:submarines 172:newspapers 75:references 39:improve it 713:Shipyards 539:USS  491:USS  451:engineers 400:Refueling 358:(SSN-772) 252:refitting 202:June 2009 100:July 2009 45:talk page 433:Overhaul 387:hard hat 366:shipyard 333:Michigan 269:shipyard 658:Sources 569:US Navy 567:in the 551:in 1990 549:drydock 338:drydock 304:drydock 298:Process 242:In the 186:scholar 88:improve 686:  669:Nimitz 571:. The 477:-class 343:(2002) 280:-class 278:Nimitz 258:naval 188:  181:  174:  167:  159:  77:, but 544:in a 515:leaks 507:welds 364:at a 325:(now 321:Then 260:ships 193:JSTOR 179:books 684:ISBN 493:Ohio 475:Ohio 439:ship 370:hull 354:USS 331:USS 327:SSGN 323:SSBN 308:hull 165:news 372:.) 336:in 148:by 709:: 682:. 678:: 674:. 483:. 389:. 329:) 294:. 246:, 48:. 698:. 649:. 233:) 227:( 215:) 209:( 204:) 200:( 190:· 183:· 176:· 169:· 142:. 113:) 107:( 102:) 98:( 84:. 55:) 51:(

Index

improve it
talk page
Learn how and when to remove these messages
references
inline citations
improve
introducing
Learn how and when to remove this message

verification
improve this article
adding citations to reliable sources
"Refueling and overhaul"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
Learn how and when to remove this message
United States Navy
refitting
nuclear-powered
ships
nuclear fuel
shipyard
submarines
Nimitz-class
aircraft carrier
drydock