53: 40: 60: 400:, the concessionary for energy distribution in northwestern Peru. The power plant is to accomplish a 90% national electrification level of the country by the year 2010 by using a zero emission energy source. 286:
the channel drainage system in the lower Chira (10,000,000 m excavation in total) flows through over 1,000 structures on the channel network (overflows, outlets, gates, etc.)
381: 415: 377:
The original design brief was to revitalise the Piura valley, which was short of water, and provide modern irrigation for approximately 350 km of arable land.
253: 85: 469: 397: 283:
the headwater discharge and the headwater channel with a capacity of 70 m/s (8,00,000 m excavation and 1,000,000 m of concrete for channel lining);
216:
The Poechos Reservoir is situated in the northernmost part of Peru, in the lower flow of the rivers Chira and Piura, about 50 km north of
428: 277:
the concrete gravitational block of the overflow structure (400,000 m concrete) with radial gates with a total capacity up to , 500 m/s;
225: 385: 416:
http://www.elregionalpiura.com.pe/index.php/locales/148-otros-distritos/8750-reservorio-poechos-cumple-39-anos-al-servicio-de-piura
374:
The irrigation dam is 49 m high and 9 km wide at crest and at its bottom has a conduit to discharge water at a rate of 4 m/s.
343:
which is circa 35 km long with a capacity of 7 m/s for irrigation of about 70 km (in total about 5,000,000 m excavation);
271:
the rock filled Poechos dam (9 km long with a maximum height of about 55 m and a total excavation volume of 9,000,000 m;
346:
about 60 km of dykes along the regulated river bed in the lower Chira flow (about 5,500,000 m of embankment).
52: 464: 248:. Construction was carried out in four phases, the first of which was constructed by Yugoslav contractor 329:
which is 75 m long, has a maximum height of 12 m and has gates with a total capacity of up to 5,000 m/s;
192:. Its purpose is to improve the accumulation of water stocks in the upper part of Peru's Chira basin by 371:
The capacity of the reservoir is 1,000,000,000 m, its catchment area 14,000 m, its maximum depth 46 m.
224:. It is located on 4° 3' southern latitude and 80° 2' western longitude at an altitude of 98 m in the 444: 17: 205: 249: 245: 117: 8: 449: 274:
the diversion tunnel built into the bottom outlet with a maximum capacity of 14 m/s;
303:
which is 220 m long with a maximum height of 20 m and a gate capacity of 3,000 m/s;
241: 256:. Works started on 24 June 1972, with inauguration taking place on 4 June 1976. 139: 129: 458: 193: 100: 87: 280:
the safety overflow of circa 200 m length with a capacity up to 10,000 m/s;
221: 312:
the channel system with supporting structures over an area of 350 km.
336:
with a capacity of 25,500 m/s over 56 km which irrigate 150 km;
181: 362:
the 15.4 MW Poechos I Hydroelectric Project which was completed in 2004.
306:
the main channel, which is 42 km long and has a capacity of 45 m/s;
197: 122: 39: 389: 201: 229: 189: 244:
and infrastructure policies led by the military dictatorship of
309:
the protecting embankments (60 km long) along the Piura;
252:
and supervised by the Peruvian subsidiary of British company
217: 359:
the 12.5 MW Curumuy dam and power plant, completed in 2000;
185: 145: 393: 232:, approximately 30 km from the border with Ecuador. 380:The Poechos I Hydroelectric Plant is operated by 456: 78: 267:The first phase included the construction of 450:Chira-Piura Water Management System, Peru 350: 316: 290: 262: 59: 470:Buildings and structures in Piura Region 392:in installed capacity and generates 60 134:14,000 m (150,000 sq ft) 14: 457: 388:). The Poechos I power house has 15.4 180:is a middle-sized reservoir on Peru's 259:Phases of the project go as follow: 240:The system was built in support of 24: 25: 481: 438: 58: 51: 38: 167:406,500,000 cubic metres (1.436 421: 409: 321:The third phase consisted of 13: 1: 403: 366: 445:UNFCCC Project 0086: Poechos 228:district of the province of 7: 211: 184:in the border area between 10: 486: 355:The final phase included 295:The second phase covered 235: 163: 155: 151: 138: 128: 116: 77: 46: 37: 32: 382:Sindicato Energético S.A 159:46 m (151 ft) 351:Phase 4 (2002 to 2004) 332:the headwater channel 317:Phase 3 (1985 to 1997) 291:Phase 2 (1978 to 1985) 263:Phase 1 (1970 to 1977) 206:electricity generation 254:Binnie & Partners 246:Juan Velasco Alvarado 220:, the capital of the 101:4.66861°S 80.50361°W 171:10 cu ft) 106:-4.66861; -80.50361 97: /  465:Reservoirs in Peru 325:the headwater dam 299:the headwater dam 429:""Poechos", Perú" 178:Poechos Reservoir 175: 174: 66:Poechos Reservoir 33:Poechos Reservoir 16:(Redirected from 477: 433: 432: 425: 419: 413: 170: 112: 111: 109: 108: 107: 102: 98: 95: 94: 93: 90: 80: 62: 61: 55: 42: 30: 29: 21: 485: 484: 480: 479: 478: 476: 475: 474: 455: 454: 441: 436: 427: 426: 422: 414: 410: 406: 398:Electronoroeste 369: 353: 319: 293: 265: 242:agrarian reform 238: 214: 168: 142: countries 105: 103: 99: 96: 91: 88: 86: 84: 83: 73: 72: 71: 70: 69: 68: 67: 63: 28: 23: 22: 15: 12: 11: 5: 483: 473: 472: 467: 453: 452: 447: 440: 439:External links 437: 435: 434: 420: 407: 405: 402: 368: 365: 364: 363: 360: 352: 349: 348: 347: 344: 337: 330: 318: 315: 314: 313: 310: 307: 304: 292: 289: 288: 287: 284: 281: 278: 275: 272: 264: 261: 237: 234: 213: 210: 173: 172: 165: 161: 160: 157: 153: 152: 149: 148: 143: 136: 135: 132: 130:Catchment area 126: 125: 120: 114: 113: 81: 75: 74: 65: 64: 57: 56: 50: 49: 48: 47: 44: 43: 35: 34: 26: 9: 6: 4: 3: 2: 482: 471: 468: 466: 463: 462: 460: 451: 448: 446: 443: 442: 430: 424: 417: 412: 408: 401: 399: 396:annually for 395: 391: 387: 383: 378: 375: 372: 361: 358: 357: 356: 345: 342: 338: 335: 331: 328: 324: 323: 322: 311: 308: 305: 302: 298: 297: 296: 285: 282: 279: 276: 273: 270: 269: 268: 260: 257: 255: 251: 250:Energoprojekt 247: 243: 233: 231: 227: 223: 219: 209: 207: 203: 199: 195: 194:flood control 191: 187: 183: 179: 166: 162: 158: 154: 150: 147: 144: 141: 137: 133: 131: 127: 124: 121: 119: 115: 110: 82: 76: 54: 45: 41: 36: 31: 19: 423: 411: 379: 376: 373: 370: 354: 340: 339:the channel 333: 326: 320: 300: 294: 266: 258: 239: 222:Piura Region 215: 177: 176: 164:Water volume 27:Lake in Peru 182:Chira River 104: / 79:Coordinates 459:Categories 418:in Spanish 404:References 367:Capacities 301:Los Ejedos 198:irrigation 156:Max. depth 92:80°30′13″W 123:reservoir 89:4°40′07″S 226:Lancones 212:Location 202:drainage 386:SINERSA 327:Sullana 236:History 230:Sullana 190:Ecuador 18:Poechos 334:Norte 218:Piura 140:Basin 394:GW·h 204:and 188:and 186:Peru 146:Peru 118:Type 341:Sur 461:: 390:MW 208:. 200:, 196:, 431:. 384:( 169:× 20:)

Index

Poechos

Poechos Reservoir is located in Peru
4°40′07″S 80°30′13″W / 4.66861°S 80.50361°W / -4.66861; -80.50361
Type
reservoir
Catchment area
Basin
Peru
Chira River
Peru
Ecuador
flood control
irrigation
drainage
electricity generation
Piura
Piura Region
Lancones
Sullana
agrarian reform
Juan Velasco Alvarado
Energoprojekt
Binnie & Partners
Sindicato Energético S.A
SINERSA
MW
GW·h
Electronoroeste
http://www.elregionalpiura.com.pe/index.php/locales/148-otros-distritos/8750-reservorio-poechos-cumple-39-anos-al-servicio-de-piura

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.