The project will include the construction of 15 towers – five in the forests, and the other 10 near the upper and ground stations. The foundations are to be built using the hand-dug caisson method to reduce on-site clearing. The PHC stated that only 50 trees would be affected by the construction,
383:
As the cable car project is to be undertaken on slopes between 25 and 35 degrees, federal government oversight was required, involving traffic impact (TIA) and environmental impact (EIA) assessments. To build and operate cable car systems at ecologically sensitive areas, the PHC sought technical
848: 379:
framework, with the selected developer given a 30-year concession to design, finance, build, operate and transfer the system. Six proposals were received by the Penang Hill Corporation (PHC) and in 2022, Malaysian firm Hartasuma Sdn Bhd was awarded the project.
425:
The cable car system is designed to cater to a capacity of 1,000 passengers per hour per direction, comprising 50 eight-seater carriages that travel at a speed of 6 m/s (20 ft/s). Citing extensive experience in ropeway engineering within
912: 838: 674: 781: 536: 333:
in 2019. The funicular railway had recorded a ridership of 1.74 million throughout 2018 and Penang officials were seeking an alternative mode of transportation to reduce the overdependence on the railway. The
639: 503: 745: 572: 1265: 902: 606: 661: 870: 1226: 1210: 32: 314:. The cable car line is projected to serve a capacity of 1,000 passengers per hour per direction. Construction of the line commenced in 2024 and will be completed by 2026. 771: 526: 1233: 1194: 629: 1242: 1178: 1258: 952: 710: 493: 735: 1249: 1185: 102: 562: 839:"CONCESSION AGREEMENT SIGNING CEREMONY - DEVELOPMENT OF BUKIT BENDERA CABLE CAR SERVICE UNDER DESIGN, FINANCE, BUILD, OPERATE AND TRANSFER MODE" 417:
presided over the groundbreaking ceremony in June that year. The cable car system is expected to be completed by the third quarter of 2026.
598: 662:"Press Statement by the Chief Minister of Penang YAB Tuan Chow Kon Yeow: Penang Hill Cable Car Project Request for Proposal (RFP) Awarded" 295: 945: 353: 813: 938: 400: 1304: 1141: 364:. As a result, federal allocations promised for the cable car project were cancelled. Despite this, in 2021, the 700: 376: 338:
allocated RM100 million for the cable car project in the 2020 budget, with additional costs to be borne by the
327: 1309: 1115: 1065: 977: 1136: 1043: 1025: 431: 411: 404: 403:
in 2021. In 2023, Chief Minister Chow announced that the cable car infrastructure would be provided by
247: 1053: 903:"Report: Penang Hill Corporation's RM245m cable car project will only affect about 50 trees, says GM" 1075: 1058: 871:"PM Anwar stresses cultural and environmental considerations for new Penang Hill cable car project" 843: 365: 410:
The cable car project received approval from federal government environmental regulators in 2024.
343: 335: 303: 527:"RM100m cable car allocation will spur Penang's tourism sector, says Penang Hill Corporation" 375:
for the project, citing "tremendous" public support. The project was to be awarded through a
1162: 1131: 372: 339: 8: 1217: 1002: 961: 740: 705: 634: 567: 498: 323: 311: 291: 82: 469: 361: 803: 1035: 443: 357: 772:"Penang Hill Corp expects to start construction of cable car project in Q2 2024" 1201: 1099: 1020: 464: 1298: 930: 414: 368: 117: 104: 1169: 1012: 982: 459: 347: 330: 287: 72: 969: 669: 393: 385: 307: 139: 907: 875: 776: 531: 994: 439: 221: 630:"Public supports RM150 mil Penang Hill cable car project, says Chow" 1083: 1048: 389: 808: 447: 427: 397: 299: 346:, was selected as the ground station over other areas such as 599:"State opens RFP for RM150 mil Penang Hill cable car project" 736:"Penang Hill cable car not 'mass rapid transport', says PHC" 494:"Penang mulls Botanic Gardens-Penang Hill cable car project" 434:
has been selected to provide the cable car infrastructure.
302:. The 2.73 km (1.70 mi) line will connect the 1287:
indicates an ongoing construction or proposed project.
563:"RM245mil Penang cable car project gets EIA approval" 342:. The Penang Rifle Club, situated adjacent to the 1296: 960: 322:A cable car system complementing the existing 946: 39: 16:Gondola lift in George Town, Penang, Malaysia 310:and is intended to complement the existing 953: 939: 769: 524: 360:-led federal government by the right-wing 701:"Penang Hill cable car project gets okay" 450:surrounding the lower end of the route. 560: 491: 1297: 698: 934: 900: 896: 894: 833: 831: 680:from the original on 16 February 2024 596: 816:from the original on 6 December 2023 765: 763: 730: 728: 627: 592: 590: 556: 554: 487: 485: 13: 915:from the original on 24 March 2024 891: 851:from the original on 19 April 2024 828: 796: 784:from the original on 19 April 2024 748:from the original on 19 April 2024 642:from the original on 19 April 2024 609:from the original on 19 April 2024 575:from the original on 19 April 2024 539:from the original on 19 April 2024 506:from the original on 19 April 2024 276:6 m/s (20 ft/s) (design) 14: 1321: 760: 725: 713:from the original on 9 March 2024 587: 551: 482: 168:RM245 million (US$ 59.18 million) 492:Nambiar, Predeep (16 Oct 2019). 38: 31: 1266:Permatang Tinggi–Batu Kawan BRT 863: 804:"Penang Hill Biosphere Reserve" 561:Nambiar, Predeep (3 Feb 2024). 692: 654: 628:Teoh, Jie Ying (11 Jan 2021). 621: 518: 262: 202: 146: 1: 475: 328:Malaysian Minister of Finance 1116:Penang International Airport 1066:Eastern and Oriental Express 597:Nasir, Sofia (11 Jan 2021). 326:was first announced by then 7: 453: 257:2.73 km (1.70 mi) 50:Location within George Town 10: 1326: 1026:Sungai Nibong Bus Terminal 962:Public transport in Penang 770:Opalyn Mok (17 May 2023). 699:Trisha, N. (15 Dec 2022). 525:Opalyn Mok (11 Oct 2019). 432:Doppelmayr/Garaventa Group 405:Doppelmayr/Garaventa Group 377:public–private partnership 356:led to the removal of the 354:A political crisis in 2020 317: 294:, the capital city of the 248:Doppelmayr/Garaventa Group 1305:Gondola lifts in Malaysia 1282: 1152: 1124: 1108: 1092: 1074: 1054:State Railway of Thailand 1034: 1011: 993: 968: 901:Seraj, Zaf (9 Mar 2024). 420: 272: 261: 253: 243: 238: 230: 220: 212: 201: 193: 185: 180: 172: 164: 156: 145: 133: 96: 88: 78: 68: 60: 55: 26: 21: 844:Chief Minister of Penang 396:had been inscribed as a 1234:Bukit Mertajam monorail 1036:Interstate rail service 340:Penang state government 226:1,000 per hour (design) 189:Penang Hill Corporation 366:state's Chief Minister 344:Penang Botanic Gardens 304:Penang Botanic Gardens 290:under construction in 1273:Penang Hill cable car 284:Penang Hill cable car 118:5.43639°N 100.29111°E 22:Penang Hill Cable Car 1142:Butterworth Terminal 1137:George Town Terminal 1132:Penang Ferry Service 373:request for proposal 1310:Transport in Penang 1218:Tanjong Tokong line 1003:Penang Hill Railway 741:Free Malaysia Today 635:Free Malaysia Today 568:Free Malaysia Today 499:Free Malaysia Today 430:-designated sites, 324:Penang Hill Railway 312:Penang Hill Railway 114: /  470:Langkawi Cable Car 362:Perikatan Nasional 336:federal government 239:Technical features 173:Construction begin 123:5.43639; 100.29111 64:Under construction 1292: 1291: 970:Urban transit bus 401:Biosphere Reserve 280: 279: 265:of support towers 197:Hartasuma Sdn Bhd 165:Construction cost 137:Penang Rifle Club 1317: 1264: 1261: 1250:George Town tram 1248: 1245: 1232: 1229: 1216: 1213: 1200: 1197: 1186:Butterworth line 1184: 1181: 1168: 1165: 955: 948: 941: 932: 931: 925: 924: 922: 920: 898: 889: 888: 886: 884: 867: 861: 860: 858: 856: 835: 826: 825: 823: 821: 800: 794: 793: 791: 789: 767: 758: 757: 755: 753: 732: 723: 722: 720: 718: 696: 690: 689: 687: 685: 679: 666: 658: 652: 651: 649: 647: 625: 619: 618: 616: 614: 594: 585: 584: 582: 580: 558: 549: 548: 546: 544: 522: 516: 515: 513: 511: 489: 264: 213:Carrier capacity 204: 148: 129: 128: 126: 125: 124: 119: 115: 112: 111: 110: 107: 42: 41: 35: 19: 18: 1325: 1324: 1320: 1319: 1318: 1316: 1315: 1314: 1295: 1294: 1293: 1288: 1278: 1259: 1256: 1243: 1240: 1227: 1224: 1211: 1208: 1195: 1192: 1179: 1176: 1163: 1160: 1148: 1120: 1104: 1088: 1070: 1030: 1007: 989: 964: 959: 929: 928: 918: 916: 899: 892: 882: 880: 869: 868: 864: 854: 852: 837: 836: 829: 819: 817: 802: 801: 797: 787: 785: 768: 761: 751: 749: 744:. 19 Mar 2024. 734: 733: 726: 716: 714: 697: 693: 683: 681: 677: 673:. 14 Dec 2022. 664: 660: 659: 655: 645: 643: 626: 622: 612: 610: 595: 588: 578: 576: 559: 552: 542: 540: 523: 519: 509: 507: 490: 483: 478: 456: 423: 384:expertise from 358:Pakatan Harapan 320: 306:to the peak of 296:Malaysian state 273:Operating speed 244:Manufactured by 138: 122: 120: 116: 113: 108: 105: 103: 101: 100: 51: 48: 47: 46: 45: 44: 43: 17: 12: 11: 5: 1323: 1313: 1312: 1307: 1290: 1289: 1283: 1280: 1279: 1277: 1276: 1269: 1253: 1237: 1221: 1205: 1202:Ayer Itam line 1189: 1173: 1156: 1154: 1153:Proposed plans 1150: 1149: 1147: 1146: 1145: 1144: 1139: 1128: 1126: 1122: 1121: 1119: 1118: 1112: 1110: 1106: 1105: 1103: 1102: 1096: 1094: 1090: 1089: 1087: 1086: 1080: 1078: 1076:Public bicycle 1072: 1071: 1069: 1068: 1063: 1062: 1061: 1051: 1046: 1040: 1038: 1032: 1031: 1029: 1028: 1023: 1021:Penang Sentral 1017: 1015: 1009: 1008: 1006: 1005: 999: 997: 995:Funicular rail 991: 990: 988: 987: 986: 985: 978:List of routes 974: 972: 966: 965: 958: 957: 950: 943: 935: 927: 926: 890: 862: 827: 795: 759: 724: 691: 653: 620: 586: 550: 517: 480: 479: 477: 474: 473: 472: 467: 465:Genting Skyway 462: 455: 452: 422: 419: 412:Prime Minister 319: 316: 278: 277: 274: 270: 269: 266: 259: 258: 255: 251: 250: 245: 241: 240: 236: 235: 232: 228: 227: 224: 218: 217: 214: 210: 209: 206: 199: 198: 195: 191: 190: 187: 183: 182: 178: 177: 174: 170: 169: 166: 162: 161: 158: 154: 153: 150: 143: 142: 135: 131: 130: 98: 94: 93: 90: 86: 85: 80: 76: 75: 70: 66: 65: 62: 58: 57: 53: 52: 49: 37: 36: 30: 29: 28: 27: 24: 23: 15: 9: 6: 4: 3: 2: 1322: 1311: 1308: 1306: 1303: 1302: 1300: 1286: 1281: 1275: 1274: 1270: 1268: 1267: 1262: 1254: 1252: 1251: 1246: 1238: 1236: 1235: 1230: 1222: 1220: 1219: 1214: 1206: 1204: 1203: 1198: 1190: 1188: 1187: 1182: 1174: 1172: 1171: 1166: 1158: 1157: 1155: 1151: 1143: 1140: 1138: 1135: 1134: 1133: 1130: 1129: 1127: 1123: 1117: 1114: 1113: 1111: 1107: 1101: 1098: 1097: 1095: 1091: 1085: 1082: 1081: 1079: 1077: 1073: 1067: 1064: 1060: 1059:Southern Line 1057: 1056: 1055: 1052: 1050: 1047: 1045: 1042: 1041: 1039: 1037: 1033: 1027: 1024: 1022: 1019: 1018: 1016: 1014: 1013:Bus terminals 1010: 1004: 1001: 1000: 998: 996: 992: 984: 981: 980: 979: 976: 975: 973: 971: 967: 963: 956: 951: 949: 944: 942: 937: 936: 933: 914: 910: 909: 904: 897: 895: 879:. 29 Jun 2024 878: 877: 872: 866: 850: 846: 845: 840: 834: 832: 815: 812:. June 2022. 811: 810: 805: 799: 783: 779: 778: 773: 766: 764: 747: 743: 742: 737: 731: 729: 712: 708: 707: 702: 695: 676: 672: 671: 663: 657: 641: 637: 636: 631: 624: 608: 604: 600: 593: 591: 574: 570: 569: 564: 557: 555: 538: 534: 533: 528: 521: 505: 501: 500: 495: 488: 486: 481: 471: 468: 466: 463: 461: 458: 457: 451: 449: 445: 441: 440:African tulip 435: 433: 429: 418: 416: 415:Anwar Ibrahim 413: 408: 406: 402: 399: 395: 391: 387: 381: 378: 374: 370: 369:Chow Kon Yeow 367: 363: 359: 355: 351: 349: 345: 341: 337: 332: 329: 325: 315: 313: 309: 305: 301: 297: 293: 289: 285: 275: 271: 267: 260: 256: 252: 249: 246: 242: 237: 233: 231:Trip duration 229: 225: 223: 219: 215: 211: 207: 200: 196: 192: 188: 184: 179: 175: 171: 167: 163: 159: 155: 151: 144: 141: 136: 132: 127: 99: 95: 91: 87: 84: 81: 77: 74: 71: 67: 63: 59: 54: 34: 25: 20: 1284: 1272: 1271: 1255: 1239: 1223: 1207: 1191: 1175: 1170:Mutiara line 1159: 983:Rapid Penang 917:. Retrieved 906: 881:. Retrieved 874: 865: 853:. Retrieved 842: 818:. Retrieved 807: 798: 786:. Retrieved 775: 750:. Retrieved 739: 715:. Retrieved 704: 694: 682:. Retrieved 668: 656: 644:. Retrieved 633: 623: 611:. Retrieved 602: 577:. Retrieved 566: 541:. Retrieved 530: 520: 508:. Retrieved 497: 460:Awana Skyway 436: 424: 409: 382: 371:announced a 352: 348:Teluk Bahang 331:Lim Guan Eng 321: 288:gondola lift 283: 281: 73:Gondola lift 1044:KTM Komuter 820:13 November 670:Penang Hill 394:Penang Hill 386:Switzerland 308:Penang Hill 292:George Town 254:Line length 205:of carriers 149:of stations 140:Penang Hill 121: / 109:100°17′28″E 97:Coordinates 83:George Town 1299:Categories 908:Malay Mail 876:Malay Mail 777:Malay Mail 532:Malay Mail 476:References 444:royal palm 438:primarily 234:10 minutes 603:The Vibes 222:Ridership 181:Operation 176:June 2024 106:5°26′11″N 1100:Trishaws 1084:LinkBike 913:Archived 849:Archived 814:Archived 782:Archived 746:Archived 711:Archived 706:The Star 684:19 April 675:Archived 640:Archived 607:Archived 573:Archived 537:Archived 504:Archived 454:See also 448:oil palm 194:Operator 157:Services 92:Malaysia 79:Location 56:Overview 1285:italics 1109:Airport 1049:KTM ETS 390:Austria 318:History 134:Termini 89:Country 1263:  1257:  1247:  1241:  1231:  1225:  1215:  1209:  1199:  1193:  1183:  1177:  1167:  1161:  1093:Others 919:19 Apr 855:19 Apr 809:UNESCO 788:19 Apr 752:19 Apr 717:19 Apr 646:19 Apr 613:19 Apr 579:19 Apr 543:19 Apr 510:19 Apr 428:UNESCO 421:Design 398:UNESCO 300:Penang 69:System 61:Status 883:2 Jul 678:(PDF) 665:(PDF) 286:is a 186:Owner 921:2024 885:2024 857:2024 822:2023 790:2024 754:2024 719:2024 686:2024 648:2024 615:2024 581:2024 545:2024 512:2024 446:and 388:and 282:The 1125:Sea 298:of 263:No. 203:No. 147:No. 1301:: 911:. 905:. 893:^ 873:. 847:. 841:. 830:^ 806:. 780:. 774:. 762:^ 738:. 727:^ 709:. 703:. 667:. 638:. 632:. 605:. 601:. 589:^ 571:. 565:. 553:^ 535:. 529:. 502:. 496:. 484:^ 442:, 407:. 392:; 350:. 268:15 208:50 1260:L 1244:L 1228:L 1212:L 1196:L 1180:L 1164:L 954:e 947:t 940:v 923:. 887:. 859:. 824:. 792:. 756:. 721:. 688:. 650:. 617:. 583:. 547:. 514:. 216:8 160:1 152:2

Index

Penang Hill cable car is located in Central George Town, Penang
Gondola lift
George Town
5°26′11″N 100°17′28″E / 5.43639°N 100.29111°E / 5.43639; 100.29111
Penang Hill
Ridership
Doppelmayr/Garaventa Group
gondola lift
George Town
Malaysian state
Penang
Penang Botanic Gardens
Penang Hill
Penang Hill Railway
Penang Hill Railway
Malaysian Minister of Finance
Lim Guan Eng
federal government
Penang state government
Penang Botanic Gardens
Teluk Bahang
A political crisis in 2020
Pakatan Harapan
Perikatan Nasional
state's Chief Minister
Chow Kon Yeow
request for proposal
public–private partnership
Switzerland
Austria

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑