300:, to construct up to 61 two or three-bladed turbines with a total installed capacity of 86 MW. This was subject to construction in a phased manner so that potential environmental impacts could be understood. Each turbine was limited to 16-20 m in rotor diameter, rated at 1.0-2.4 MW, and connected to the grid by 6.6 kV cable.
381:. These are all three-bladed horizontal-axis turbines with an 18 m rotor diameter, that reach the 1.5 MW rated power at a current speed of 3 m/s. They are mounted on three-legged gravity foundations that sit on the seabed, each weighing around 350 tonnes with six 200 tonne ballast blocks.
321:
Phase 1b was initially planned to add a further 4 MW comprising two AR2000 turbines, with another 73.5 MW in Phase 1c. Phase 1b was then revised to installing four turbines, bringing the total to eight. This required the
Section 36 consent to be varied, to allow the additional two turbines
336:
Four further contracts totalling 21.94 MW were awarded in the CfD AR5 auction in
September 2023. An application was then submitted to vary the license conditions, to permit a smaller number of larger turbines to be used. These would be up to 24 m in diameter, remove the limit on the rated
317:
Some elements of the project were constructed outwith the licensed area, however after statutory consultation Marine
Scotland varied the license in September 2017 to extend the consented site area. It was considered there were no additional impacts and that asking for full removal may have had
340:
As of
January 2024, the plan is to install the next 28 MW of turbines as Phase 2 to be commissioned by 2027, and a further 22 MW as Phase 3 by 2028. Phase 2 is planned to consist of a further 10 turbines.
313:
In
December 2016 it was announced that the first turbine had begun full power operations, and all four turbines were installed by February 2017. Phase 1 (formerly called Phase 1a) began operations in April 2018.
306:
granted the project a license in
January 2014. This initially only lasted until the end of 2020, but was extended in July 2016 to cover the period until 1 January 2041 or 25 years after completion of phase 1a.
539:
384:
The turbines in phase 1 are connected to the onshore power conversion centre at Ness of Quoys by an individual cable per turbine. These are laid on the seabed, with landfall by 550 m long
330:
310:
Construction work on the project started in
January 2015, building an access road towards the sea where the onshore power conversion building would be located.
1004:
388:
conduits, installed in July 2015. The cables were installed by James Fisher Marine
Services by November 2015, with a total length of 11 km. This used the
528:
347:
The site has the potential for a further 312 MW to be deployed beyond that, subject to expanding the consent. This would amount to 398 MW in total.
370:
690:
953:
350:
By 2018 the four turbines had produced 8 GWh. In 2019, they produced 13.8 GWh. Total cumulative production was 51 GWh by March 2023.
472:
500:
897:
639:
580:
46:
916:
333:(CfD) Allocation Round 4 (AR4), which will be used to support the construction of Phase 2 which is now due to be commissioned in 2027
1084:
846:
793:
767:
553:
934:
717:
344:
In
September 2024, the MeyGen project was awarded a further 9 MW in the CfD AR6 auction, to be delivered in 2028/29.
640:"Marine Licence - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth - 04577 | Marine Scotland Information"
385:
358:
979:
253:
The high speed of currents in the area, reaching up to 5 m/s (11 mph), made the chosen site in the
326:
246:. Meygen was claimed to be the "world’s largest tidal stream power project". There are plans for up to 400
742:
664:
917:"A tidal project in Scottish waters just generated enough electricity to power nearly 4,000 homes"
447:
227:
It is currently being constructed in a phased manner. The first phase of the project uses four 1.5
1066:
136:
125:
374:
239:
231:
MW turbines with 18 m (59 ft) rotor diameter which were installed submerged on the
94:
337:
power per turbine, and increase the maximum voltage of the underwater cables to 33 kV.
117:
325:
In July 2022, MeyGen plc was awarded a contract to supply 28 MW of electricity to the
297:
8:
389:
243:
557:
303:
270:
173:
221:
1038:
871:
534:
451:
378:
821:
421:
274:
254:
217:
183:
1078:
266:
61:
48:
1052:
477:
278:
195:
898:"SIMEC Atlantis partners with GE on world's largest tidal stream turbine"
322:
above the six permitted in Phase 1. However, this phase did not proceed.
213:
265:
In
October 2010, the newly named "MeyGen" tidal project from the nearby
529:"Wave goodbye to hope of tidal energy exports, Scots politicians told"
691:"Atlantis' first MeyGen tidal turbine starts operating at full power"
614:
290:
1060:
1005:"Subsea Cables Successfully Deployed in MeyGen Tidal Energy Project"
954:"Simec Atlantis Energy wins £1.5m Scot Gov grant for Meygen project"
473:"World's first large-scale tidal energy farm launches in Scotland"
369:
Phase 1 of the project comprises four 1.5 MW turbines, three
1046:
397:
361:
in 2020, to develop a sub-sea hub to connect multiple turbines.
581:"World's biggest 'wave farm' in crisis as RWE npower pulls out"
400:
window. The onshore power conversion equipment was supplied by
232:
216:
plant in the north of Scotland. The project is located in the
448:"Scotland unveils world's largest tidal stream power project"
847:"Contracts for Difference (CfD) Allocation Round 6: results"
794:"Contracts for Difference (CfD) Allocation Round 5: results"
768:"Contracts for Difference (CfD) Allocation Round 4: results"
501:"Atlantis installs fourth and final Meygen Phase 1A turbine"
242:, although previously by Tidal Power Scotland Limited and
935:"SAE Deploys Upgraded Turbine at MeyGen Tidal Power Site"
401:
269:
and "Gen" for generation was created by a consortium of
296:
A consent was granted in 2013, under Section 36 of the
1028:
977:
527:
1076:
257:well suited to this type of energy generation.
519:
743:"MeyGen Tidal Power Project, Pentland Firth"
612:
357:million Scottish Government grant from the
220:, specifically the Inner Sound between the
978:rebeccavandenberge (16 September 2015).
945:
914:
718:"Meygen Starts 25 year operations phase"
572:
277:and received operational lease from the
615:MeyGen Tidal Array EIA Screening Report
554:"Major Scottish tidal project unveiled"
1077:
980:"Atlantis Team Rocking MeyGen Project"
951:
864:
578:
525:
445:
364:
816:
814:
737:
735:
733:
731:
715:
377:AR1500 developed in conjunction with
895:
634:
632:
608:
606:
604:
602:
465:
915:Frangoul, Anmar (27 January 2020).
359:Saltire Tidal Energy Challenge Fund
13:
811:
728:
446:Dickie, Mure (12 September 2016).
396:, and was completed over a 2½ day
289:years. In 2011 Norwegian partners
250:MW to be installed at the site.
14:
1096:
665:"MeyGen construction work starts"
629:
613:Xodus Group (22 September 2023).
599:
542:from the original on 12 May 2022.
439:
1085:Tidal power stations in Scotland
1059:
1045:
1031:
716:White, Matthew (12 April 2008).
238:The project is owned and run by
997:
971:
952:McPhee, David (25 March 2020).
927:
908:
896:Hill, Joshua S (24 June 2019).
889:
839:
786:
760:
709:
683:
657:
579:Donald, Colin (24 July 2011).
546:
526:Connor, Steve (10 July 2013).
493:
414:
386:horizontal directional drilled
112:Tidal power station
1:
407:
293:pulled out of the project.
7:
224:and the Scottish mainland.
210:MeyGen tidal energy project
184:Annual net output
10:
1101:
939:Offshore Engineer Magazine
669:Offshore Engineer Magazine
260:
353:The project received £1.5
192:
182:
172:
160:
156:
151:
134:
116:
111:
103:
93:
85:
77:
40:
32:
28:
23:
371:Andritz Hydro Hammerfest
331:Contracts for difference
1067:Renewable energy portal
174:Nameplate capacity
86:Construction began
178:6 MW (4 × 1.5 MW)
165:Units operational
126:Tidal stream generator
876:SIMEC ATLANTIS ENERGY
240:SIMEC Atlantis Energy
152:Power generation
107:SIMEC Atlantis Energy
16:Tidal energy facility
235:in winter 2016/17.
95:Commission date
62:58.65833°N 3.12500°W
1009:Hydro International
481:. 12 September 2016
373:AH1000 MK1 and one
365:Project description
244:Scottish Enterprise
214:tidal stream energy
58: /
558:New Civil Engineer
507:. 20 February 2017
375:Atlantis Resources
318:adverse impacts.
271:Atlantis Resources
135:Type of
67:58.65833; -3.12500
1011:. 3 November 2015
697:. 7 December 2016
671:. 21 January 2015
560:. 28 October 2010
285:MW project for 25
203:
202:
1092:
1069:
1064:
1063:
1055:
1050:
1049:
1041:
1036:
1035:
1034:
1021:
1020:
1018:
1016:
1001:
995:
994:
992:
990:
975:
969:
968:
966:
964:
949:
943:
942:
931:
925:
924:
912:
906:
905:
893:
887:
886:
884:
882:
868:
862:
861:
859:
857:
843:
837:
836:
834:
832:
818:
809:
808:
806:
804:
790:
784:
783:
781:
779:
764:
758:
757:
755:
753:
739:
726:
725:
713:
707:
706:
704:
702:
695:Power Technology
687:
681:
680:
678:
676:
661:
655:
654:
652:
650:
636:
627:
626:
624:
622:
610:
597:
596:
594:
592:
576:
570:
569:
567:
565:
550:
544:
543:
531:
523:
517:
516:
514:
512:
497:
491:
490:
488:
486:
469:
463:
462:
460:
458:
443:
437:
436:
434:
432:
418:
356:
288:
284:
249:
230:
222:Island of Stroma
196:edit on Wikidata
73:
72:
70:
69:
68:
63:
59:
56:
55:
54:
51:
21:
20:
1100:
1099:
1095:
1094:
1093:
1091:
1090:
1089:
1075:
1074:
1073:
1072:
1065:
1058:
1051:
1044:
1039:Scotland portal
1037:
1032:
1030:
1025:
1024:
1014:
1012:
1003:
1002:
998:
988:
986:
976:
972:
962:
960:
950:
946:
933:
932:
928:
913:
909:
894:
890:
880:
878:
870:
869:
865:
855:
853:
845:
844:
840:
830:
828:
820:
819:
812:
802:
800:
792:
791:
787:
777:
775:
774:. UK Government
766:
765:
761:
751:
749:
741:
740:
729:
714:
710:
700:
698:
689:
688:
684:
674:
672:
663:
662:
658:
648:
646:
644:marine.gov.scot
638:
637:
630:
620:
618:
611:
600:
590:
588:
577:
573:
563:
561:
552:
551:
547:
535:The Independent
524:
520:
510:
508:
499:
498:
494:
484:
482:
471:
470:
466:
456:
454:
452:Financial Times
444:
440:
430:
428:
420:
419:
415:
410:
379:Lockheed Martin
367:
354:
304:Marine Scotland
298:Electricity Act
286:
282:
263:
247:
228:
199:
188:10.2 GWh (2023)
147:
144:Horizontal axis
130:
66:
64:
60:
57:
52:
49:
47:
45:
44:
17:
12:
11:
5:
1098:
1088:
1087:
1071:
1070:
1056:
1042:
1027:
1026:
1023:
1022:
996:
970:
944:
941:. 5 July 2023.
926:
907:
888:
863:
838:
826:SAE Renewables
810:
785:
759:
727:
708:
682:
656:
628:
598:
571:
545:
518:
492:
464:
438:
426:SAE Renewables
412:
411:
409:
406:
366:
363:
275:Morgan Stanley
262:
259:
255:Pentland Firth
218:Pentland Firth
201:
200:
193:
190:
189:
186:
180:
179:
176:
170:
169:
166:
162:
161:
158:
157:
154:
153:
149:
148:
146:
145:
141:
139:
132:
131:
129:
128:
122:
120:
114:
113:
109:
108:
105:
101:
100:
97:
91:
90:
87:
83:
82:
79:
75:
74:
42:
38:
37:
34:
30:
29:
26:
25:
15:
9:
6:
4:
3:
2:
1097:
1086:
1083:
1082:
1080:
1068:
1062:
1057:
1054:
1048:
1043:
1040:
1029:
1010:
1006:
1000:
985:
984:Offshore Wind
981:
974:
959:
955:
948:
940:
936:
930:
922:
918:
911:
903:
899:
892:
877:
873:
867:
852:
848:
842:
827:
823:
817:
815:
799:
795:
789:
773:
769:
763:
748:
744:
738:
736:
734:
732:
723:
719:
712:
696:
692:
686:
670:
666:
660:
645:
641:
635:
633:
616:
609:
607:
605:
603:
586:
585:Sunday Herald
582:
575:
559:
555:
549:
541:
537:
536:
530:
522:
506:
502:
496:
480:
479:
474:
468:
453:
449:
442:
427:
423:
417:
413:
405:
403:
399:
395:
391:
387:
382:
380:
376:
372:
362:
360:
351:
348:
345:
342:
338:
334:
332:
328:
323:
319:
315:
311:
308:
305:
301:
299:
294:
292:
280:
276:
272:
268:
267:Castle of Mey
258:
256:
251:
245:
241:
236:
234:
225:
223:
219:
215:
211:
207:
197:
191:
187:
185:
181:
177:
175:
171:
167:
164:
163:
159:
155:
150:
143:
142:
140:
138:
133:
127:
124:
123:
121:
119:
115:
110:
106:
102:
98:
96:
92:
88:
84:
80:
76:
71:
43:
39:
35:
31:
27:
22:
19:
1053:Water portal
1013:. Retrieved
1008:
999:
987:. Retrieved
983:
973:
961:. Retrieved
958:Energy Voice
957:
947:
938:
929:
920:
910:
902:RenewEconomy
901:
891:
879:. Retrieved
875:
866:
854:. Retrieved
850:
841:
829:. Retrieved
825:
801:. Retrieved
797:
788:
776:. Retrieved
771:
762:
750:. Retrieved
746:
721:
711:
699:. Retrieved
694:
685:
673:. Retrieved
668:
659:
647:. Retrieved
643:
619:. Retrieved
589:. Retrieved
584:
574:
562:. Retrieved
548:
533:
521:
509:. Retrieved
504:
495:
483:. Retrieved
478:The Guardian
476:
467:
455:. Retrieved
441:
429:. Retrieved
425:
416:
393:
383:
368:
352:
349:
346:
343:
339:
335:
324:
320:
316:
312:
309:
302:
295:
279:Crown Estate
264:
252:
237:
226:
209:
205:
204:
18:
856:3 September
803:25 November
722:4c Offshore
591:17 February
511:26 February
505:4c Offshore
431:18 December
394:Siem Daya 1
208:(full name
81:Operational
65: /
41:Coordinates
1015:27 January
989:27 January
881:13 January
831:27 January
778:13 January
752:27 January
701:9 December
675:27 January
649:27 January
621:27 January
564:9 December
485:9 December
457:9 December
408:References
50:58°39′30″N
747:NS Energy
587:. Glasgow
398:neap tide
291:Statkraft
273:Limited,
1079:Category
872:"MeyGen"
822:"MeyGen"
617:(Report)
540:Archived
422:"MeyGen"
281:to a 400
104:Owner(s)
53:3°7′30″W
36:Scotland
963:20 July
392:vessel
329:in the
327:GB grid
261:History
212:) is a
33:Country
851:GOV.UK
798:GOV.UK
772:GOV.UK
355:
287:
283:
248:
233:seabed
229:
206:MeyGen
78:Status
24:MeyGen
194:[
1017:2024
991:2024
965:2020
921:CNBC
883:2023
858:2024
833:2024
805:2023
780:2023
754:2024
703:2016
677:2024
651:2024
623:2024
593:2024
566:2016
513:2017
487:2016
459:2016
433:2023
118:Type
99:2016
89:2014
402:ABB
137:TSG
1081::
1007:.
982:.
956:.
937:.
919:.
900:.
874:.
849:.
824:.
813:^
796:.
770:.
745:.
730:^
720:.
693:.
667:.
642:.
631:^
601:^
583:.
556:.
538:.
532:.
503:.
475:.
450:.
424:.
404:.
390:DP
1019:.
993:.
967:.
923:.
904:.
885:.
860:.
835:.
807:.
782:.
756:.
724:.
705:.
679:.
653:.
625:.
595:.
568:.
515:.
489:.
461:.
435:.
198:]
168:4
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.