741:
718:
454:
480:
427:
382:
317:
447:
294:
529:
362:
287:
234:
505:
402:
337:
260:
37:
655:. The maximum speed on most of the line is 200 km/h (120 mph). As of 2022, no Dutch domestic rolling stock is capable of achieving this speed, as all existing rolling stock was limited to 160 km/h (99 mph). Also trains using the railway do not run faster than 140 km/h (87 mph) Since the trains currently running on the line only use train protection system
678:
to traverse the new track. Scheduled services began operating on Sunday, 9 December 2012. The journey from
Lelystad to Zwolle takes 25 minutes, reducing journey times from Amsterdam to Zwolle – and further north – by about 15 minutes. The total length of the new track is 50 km.
740:
667:
trains on the route, which are capable of achieving the higher speeds. Delays in manufacturing have caused their introduction to be no earlier than the second half of 2023, however.
747:
710:, includes a separate pedestrian and cycle track in addition to the double-tracked railway. It opened on 14 June 2011, replacing a rail-only twin-span
955:
629:
950:
876:
688:
965:
799:
707:
730:
The
Hanzelijn has shortened journey times between Zwolle and Amsterdam by at least 10 minutes, and up to 20 minutes for some journeys.
960:
849:
901:
824:
185:
167:
272:
246:
907:
882:
855:
664:
537:
189:
172:
777:
734:
express bus route 330, which connected
Lelystad and Zwolle, was discontinued upon opening of the Hanzelijn.
601:
215:
652:
413:
699:
671:
466:
462:
242:
17:
647:
Work started in
January 2007 and was completed in December 2012. Two new stations have been built:
648:
348:
152:
695:
763:
660:
541:
514:
80:
711:
8:
675:
180:
587:
702:
just before the 1 km (0.62 mi) high-level fixed bridge over the river
122:
616:, and provides a direct rail link between Flevoland and the north-east of the
944:
800:"Nieuwe treinen (ICNG) vertraagd, wijzigingen dienstregeling 2023 uitgesteld"
617:
117:
55:
659:, speed is limited to 140 km/h (87 mph) in practice. Operator
731:
717:
637:
628:
The
Hanzelijn project was essentially a less costly alternative to the
613:
633:
605:
157:
641:
597:
825:"45,000 travellers pack the train on Opening Day [Dutch]"
593:
687:
The line includes a 790 metres (2,590 ft) tunnel under the
755:
751:
703:
692:
656:
609:
488:
84:
714:
that had been in place since just after the Second World War.
691:(the semi-artificial channel separating the mainland from the
632:(Zuiderzee Line), a proposed new Lelystad-Groningen line via
36:
933:
65:
878:
Netherlands: Hanze Line construction ready to start
758:, viewed towards the East. This bridge carries the
942:
797:
210:
874:
670:On 6 December 2012 the railway was opened by
644:for which planning was cancelled in 2007.
612:, capital of the neighbouring province of
716:
14:
956:Buildings and structures in Overijssel
943:
951:Buildings and structures in Flevoland
596:line, finished in 2012. It connects
24:
966:Railway tunnels in the Netherlands
851:Largest Hanze Line contract signed
25:
977:
924:
903:Running faster in the Netherlands
682:
663:is planning to operate their new
961:Railway lines in the Netherlands
739:
725:
706:. This new bridge, known as the
527:
503:
478:
452:
445:
425:
400:
380:
360:
335:
315:
292:
285:
258:
232:
35:
798:treinreiziger.nl (2021-02-17).
623:
479:
426:
381:
316:
175:: 200 km/h (120 mph)
894:
868:
842:
817:
791:
453:
446:
293:
13:
1:
908:Railway Gazette International
883:Railway Gazette International
856:Railway Gazette International
784:
528:
361:
286:
233:
170:: 140 km/h (87 mph)
875:Peter Badcock (2006-12-01),
721:Tunnel under the Drontermeer
7:
771:
504:
401:
336:
259:
10:
982:
698:), and joins the existing
586:
536:
521:
512:
497:
487:
472:
461:
439:
434:
419:
412:
394:
389:
374:
369:
354:
347:
329:
324:
309:
304:
279:
270:
252:
241:
226:
195:
179:
163:
151:
116:
108:
103:
95:
90:
76:
71:
61:
51:
46:
34:
29:
712:vertical-lift drawbridge
579:Lelystad–Zwolle railway
112:50 km (31 mi)
764:Utrecht-Kampen railway
722:
700:Utrecht–Kampen railway
81:Nederlandse Spoorwegen
41:Route of the Hanzelijn
750:New rail bridge near
720:
581:, also known as the
829:hanzelijn-hattem.nl
370:Drontermeer tunnel
723:
696:Eastern Flevoland
676:Dutch Royal Train
600:, capital of the
575:
574:
571:
570:
567:
566:
563:
562:
16:(Redirected from
973:
932:
918:
917:
916:
915:
898:
892:
891:
890:
889:
872:
866:
865:
864:
863:
846:
840:
839:
837:
835:
821:
815:
814:
812:
811:
804:Treinreiziger.nl
795:
743:
591:
531:
530:
507:
506:
482:
481:
456:
455:
449:
448:
429:
428:
404:
403:
384:
383:
364:
363:
339:
338:
319:
318:
296:
295:
289:
288:
273:Lelystad Centrum
262:
261:
236:
235:
224:
223:
211:
197:
196:
146:
144:
143:
139:
136:
128:
66:www.hanzelijn.nl
39:
27:
26:
21:
981:
980:
976:
975:
974:
972:
971:
970:
941:
940:
930:
927:
922:
921:
913:
911:
900:
899:
895:
887:
885:
873:
869:
861:
859:
848:
847:
843:
833:
831:
823:
822:
818:
809:
807:
796:
792:
787:
774:
769:
768:
767:
754:over the river
749:
744:
728:
685:
626:
532:
508:
483:
457:
450:
430:
410:
405:
385:
365:
345:
340:
320:
302:
297:
290:
268:
263:
237:
218:
202:
171:
164:Operating speed
153:Electrification
141:
137:
134:
132:
131:4 ft
130:
126:
83:
42:
23:
22:
15:
12:
11:
5:
979:
969:
968:
963:
958:
953:
937:
936:
926:
925:External links
923:
920:
919:
893:
867:
841:
816:
789:
788:
786:
783:
782:
781:
773:
770:
746:
745:
738:
737:
736:
727:
724:
684:
683:Infrastructure
681:
625:
622:
592:), is a Dutch
573:
572:
569:
568:
565:
564:
561:
560:
558:
556:
554:
552:
550:
548:
545:
544:
535:
533:
526:
524:
522:
519:
518:
511:
509:
502:
500:
498:
495:
494:
486:
484:
477:
475:
473:
470:
469:
460:
458:
451:
444:
442:
440:
437:
436:
433:
431:
424:
422:
420:
417:
416:
411:
408:
406:
399:
397:
395:
392:
391:
388:
386:
379:
377:
375:
372:
371:
368:
366:
359:
357:
355:
352:
351:
346:
343:
341:
334:
332:
330:
327:
326:
323:
321:
314:
312:
310:
307:
306:
305:Lelystad yard
303:
300:
298:
291:
284:
282:
280:
277:
276:
269:
266:
264:
257:
255:
253:
250:
249:
240:
238:
231:
229:
227:
220:
219:
214:
204:
203:
200:
193:
192:
183:
177:
176:
165:
161:
160:
155:
149:
148:
120:
114:
113:
110:
106:
105:
101:
100:
97:
93:
92:
88:
87:
78:
74:
73:
69:
68:
63:
59:
58:
53:
49:
48:
44:
43:
40:
32:
31:
9:
6:
4:
3:
2:
978:
967:
964:
962:
959:
957:
954:
952:
949:
948:
946:
939:
935:
929:
928:
909:
905:
904:
897:
884:
880:
879:
871:
857:
853:
852:
845:
830:
826:
820:
805:
801:
794:
790:
779:
776:
775:
765:
761:
757:
753:
748:
742:
735:
733:
726:Journey times
719:
715:
713:
709:
705:
701:
697:
694:
690:
680:
677:
673:
672:Queen Beatrix
668:
666:
662:
658:
654:
650:
645:
643:
639:
635:
631:
630:Zuiderzeelijn
621:
619:
615:
611:
607:
603:
599:
595:
589:
584:
580:
559:
557:
555:
553:
551:
549:
547:
546:
543:
539:
534:
525:
523:
520:
517:
516:
510:
501:
499:
496:
493:
490:
485:
476:
474:
471:
468:
464:
459:
443:
441:
438:
432:
423:
421:
418:
415:
407:
398:
396:
393:
387:
378:
376:
373:
367:
358:
356:
353:
350:
342:
333:
331:
328:
322:
313:
311:
308:
299:
283:
281:
278:
275:
274:
265:
256:
254:
251:
248:
244:
239:
230:
228:
225:
222:
221:
217:
213:
212:
209:
206:
205:
199:
198:
194:
191:
187:
184:
182:
178:
174:
169:
166:
162:
159:
156:
154:
150:
127:1,435 mm
124:
121:
119:
115:
111:
107:
102:
98:
94:
89:
86:
82:
79:
75:
70:
67:
64:
60:
57:
54:
50:
45:
38:
33:
28:
19:
938:
912:, retrieved
910:, 2008-03-17
902:
896:
886:, retrieved
877:
870:
860:, retrieved
858:, 2009-05-26
850:
844:
832:. Retrieved
828:
819:
808:. Retrieved
803:
793:
778:ZwolleSpoort
759:
729:
686:
674:, using the
669:
646:
627:
624:Construction
582:
578:
576:
513:
491:
271:
207:
190:ETCS Level 2
834:12 December
689:Drontermeer
653:Kampen Zuid
618:Netherlands
414:Kampen Zuid
118:Track gauge
109:Line length
77:Operator(s)
56:Netherlands
945:Categories
931:(in Dutch)
914:2009-08-31
888:2009-08-31
862:2009-08-31
810:2022-12-29
806:(in Dutch)
785:References
762:, and the
732:Interliner
638:Heerenveen
614:Overijssel
585:(English:
467:Amersfoort
181:Signalling
934:Hanzelijn
760:Hanzelijn
708:Hanzeboog
693:reclaimed
634:Emmeloord
606:Flevoland
588:Hanseatic
583:Hanzelijn
201:Route map
158:1.5 kV DC
104:Technical
30:Hanzelijn
18:Hanzelijn
772:See also
642:Drachten
602:province
598:Lelystad
145: in
123:Standard
47:Overview
780:project
649:Dronten
608:, with
594:railway
349:Dronten
140:⁄
91:History
72:Service
62:Website
756:IJssel
752:Zwolle
704:IJssel
657:ATB-EG
610:Zwolle
542:Meppel
515:Zwolle
489:IJssel
247:Almere
216:Legend
208:
186:ATB-EG
168:ATB-EG
96:Opened
85:Arriva
52:Locale
492:river
465:from
245:from
836:2012
665:ICNG
651:and
640:and
590:Line
577:The
538:line
463:line
435:A28
409:34.2
390:N50
344:20.6
243:line
173:ETCS
99:2012
604:of
540:to
325:A6
301:3.2
267:0.0
129:or
947::
906:,
881:,
854:,
827:.
802:.
661:NS
636:,
620:.
188:,
838:.
813:.
766:.
147:)
142:2
138:1
135:+
133:8
125:(
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.