the two countries agreed to proceed with a two-year planning phase. This included an economic assessment, environmental considerations and will determine the placement of the cable and onshore stations, while a decision initially due on the project is foreseen for 2020 or 2021. In May 2018, the
903:
1192:
459:
granted permission for the onshore portion of the project while in August 2022, the
Department for Housing Local Government and Heritage granted the project a foreshore licence, an important permit for the undersea work involved.
863:
395:, "The Celtic Interconnector will bring tangible benefits to the citizens of both France and Ireland by promoting the use of renewable energy, bringing down electricity prices, and helping ensure security of energy supply".
837:
1164:
470:
In
November 2022, final construction and finance agreements were signed off by the Irish and French governments at the Irish embassy in Paris with the interconnector "due to be completed and operational by 2026".
429:
Three potential landing sites on the Cork coast were identified and six locations (Ballyadam, Leamlara, Knockraha, Pigeon Hill, Kilquane and
Ballyvatta) were under consideration for the HVDC converter station.
451:
As of 2021, the cable was expected to be operational in line with the original schedule, by 2026. In August 2021, the project was at step five in the planning process and was expected to continue until 2022.
1202:
1187:
633:
60:
100:
964:
983:
1207:
281:
under construction between the southern coast of
Ireland and the north-west coast of France. It will be the first such interconnector between the two countries.
408:
project was granted a foreshore license to begin marine surveys for the potential landing sites at
Ballinwilling, Claycastle and Redbarn beaches, County Cork.
1212:
997:
740:[France-Ireland Direct Current line pushes the boundaries of the European electricity super-grid]. L'Usine Nouvelle. 6 December 2019. Archived from
782:
662:
866:[Celtic Interconnector: Accord Signed For Construction Of First Electrical Link between France and Ireland]. La Tribune. 25 November 2022.
711:
467:
granted a licence for the project to proceed. This was the last major license required before Step 6 construction could start in late 2022.
1073:
475:
361:
187:
437:
on electricity trading over the existing
Ireland – UK HVDC interconnectors, planning for the Celtic Interconnector had accelerated.
318:
Of its total length of 575 km (357 miles), 500 km (311 miles) will pass through Irish, British and French waters of the
812:
1096:
878:
1020:
949:
1159:
931:
364:
for the purpose of improving security of supply, reducing consumer electricity costs and supporting the development of
291:
stated in 2022 that the interconnector was arguably "the most important Irish infrastructure project for this decade".
1050:
1197:
755:
689:
783:"EUR 4 million EU funding for proposed electricity link between France and Ireland - Energy - European Commission"
864:"Celtic Interconnector: accord signé pour construire la première liaison électrique entre la France et l'Irlande"
840:[France-Ireland Electrical Link Project to Continue Despite EUR 550 million cost increase] (in French).
464:
53:
545:
1128:. Marine Management Organisation. To access, view the Public Register searching for Case Ref: MLA/2021/00323
550:
354:
274:
738:"La ligne France-Irlande en courant continu repousse les frontières du super-réseau électrique européen"
917:
634:"President Hollande and An Taoiseach Kenny agree €1 billion Ireland-France Electricity Interconnector"
838:"Le projet de liaison électrique France-Irlande maintenu malgré un surcoût de 550 millions d'euros"
412:
422:
By 2019, the project had been designated a
European Project of Common Interest as part of the
278:
918:"European bank to help fund electricity cable linking Ireland and France in light of Brexit"
8:
445:
423:
456:
965:"Shortlist of sites chosen for submarine electricity cable between France and Ireland"
535:
404:
392:
1121:
998:"EirGrid and RTE Sign €530 million Funding Agreement for the Celtic Interconnector"
984:"Part of €930m Celtic Interconnector may run along former Midleton-Youghal railway"
760:
540:
365:
1169:
334:, which will be the first between the two countries, has a planned capacity of 700
1193:
Electrical interconnectors to and from the
Synchronous Grid of Continental Europe
968:
563:
513:
331:
1181:
527:
499:
116:
102:
76:
62:
1165:
Poste
Electrique De La Martyre, Unnamed Road, 29800 La Martyre, France (map)
712:"Celtic Interconnector: interconnection project between France and Ireland"
1152:
312:
1021:"EirGrid hits 'critical milestone' in €1bn Celtic Interconnector project"
602:
342:
304:
841:
319:
308:
160:
718:. p. Overview:What does the Celtic Interconnector Project entail?
383:
As of
November 2022, the interconnector was expected to cost €1.6
555:
478:
had started work in La Martyre on the converter station there called
388:
300:
568:
271:
813:"Subsea electricity cable linking Ireland and France powers ahead"
1203:
Proposed electric power infrastructure in the Republic of Ireland
589:
576:
559:
521:
357:
288:
183:
42:
904:"Eirgrid Plc - Ballinwilling, Claycastle & Redbarn Beaches"
598:
594:
585:
581:
572:
434:
415:
funding as part of preparations by Ireland for Brexit, for €530
46:
715:
482:. The converter station is scheduled to be completed by 2026.
376:
In 2016 the interconnector had an initial expected cost of €1
1188:
Electrical interconnectors to and from the island of Ireland
223:
690:"Celtic Interconnector will lead to lower prices - Ryan"
411:
In 2018, the project was given preliminary approval for
906:. Department of Housing, Local Government and Heritage.
1160:
Map with power line and tentative substation locations
1074:"Celtic Interconnector is granted planning permission"
489:
879:"Ireland-France power link reaches planning stage"
932:"EU Backs Celtic Interconnector and Harmony Link"
806:
804:
448:funding agreement for the Celtic Interconnector.
353:The project is a joint venture between the Irish
1208:Proposed electric power infrastructure in France
1179:
345:communications link between Ireland and France.
284:Trial operation is planned to commence in 2026.
440:In December 2020, EirGrid and RTE signed a €520
1094:
950:"Celtic Interconnector - What's Happening Now"
801:
683:
681:
679:
628:
626:
624:
622:
620:
618:
1097:"Government licenses Irish-French power line"
981:
962:
341:The project also includes plans for a direct
1213:Proposed electric power transmission systems
1114:
990:
748:
676:
657:
655:
615:
1045:
1043:
1041:
325:
28:Knockraha, Ireland and La Martyre, France
1071:
1000:. Celtic Interconnector. 9 December 2020
876:
652:
433:By 2019, due to the potential impact of
1038:
1018:
687:
362:Réseau de Transport d'Électricité (RTE)
1180:
16:Power line between France and Ireland
1126:MMO: View Applications and Documents
1095:O'Halloran, Barry (31 August 2022).
810:
775:
663:"Celtic Interconnector Newsletter 1"
403:In July 2016, after completion of a
371:
348:
299:The cable is due to run between the
688:Meskill, Tommy (25 November 2022).
13:
704:
398:
355:transmission system operator (TSO)
14:
1224:
1144:
963:O'Riordan, Sean (11 April 2019).
877:Bairstow, Jonny (25 July 2016).
520:
506:
492:
1088:
1065:
1019:Darmody, Jenny (16 July 2021).
1012:
975:
956:
942:
924:
920:. The Journal. 15 October 2018.
910:
896:
870:
856:
387:billion. According to the then
88:Celtic Interconnector - Ireland
1072:Goodbody, Will (23 May 2022).
982:O'Riordan, Sean (8 May 2019).
830:
730:
672:(Press release). October 2023.
465:Marine Management Organisation
128:Celtic Interconnector - France
1:
811:Hunt, Gordon (21 July 2016).
608:
546:Electricity sector in Ireland
463:On 14 September 2022, the UK
551:Electricity sector in France
7:
597:, cable project to connect
584:, cable project to connect
571:, cable project to connect
558:, cable project to connect
485:
275:high-voltage direct current
10:
1229:
1122:"Case ref: MLA/2021/00323"
249:
237:
233:575 km (357 mi)
229:
219:
211:
206:
198:
193:
179:
174:
166:
156:
148:
140:
52:
38:
33:
26:
21:
413:European Investment Bank
294:
287:The director general of
194:Construction information
1198:HVDC transmission lines
1051:"Celtic Interconnector"
756:"Celtic Interconnector"
326:Technical specification
117:48.443194°N 4.197306°W
77:51.915806°N 8.230194°W
279:submarine power cable
265:Celtic Interconnector
207:Technical information
175:Ownership information
22:Celtic Interconnector
122:48.443194; -4.197306
82:51.915806; -8.230194
817:siliconrepublic.com
446:European Commission
424:European Super Grid
112: /
72: /
938:. 4 December 2019.
883:energylivenews.com
844:. 10 November 2022
307:, Ireland, to the
170:La Martyre, France
152:Knockraha, Ireland
986:. Irish Examiner.
936:Subsea World News
536:Energy in Ireland
405:feasibility study
372:Project economics
349:Project promoters
261:
260:
141:General direction
1220:
1156:
1155:
1153:Official website
1138:
1137:
1135:
1133:
1118:
1112:
1111:
1109:
1107:
1092:
1086:
1085:
1083:
1081:
1069:
1063:
1062:
1060:
1058:
1047:
1036:
1035:
1033:
1031:
1025:Silicon Republic
1016:
1010:
1009:
1007:
1005:
994:
988:
987:
979:
973:
972:
960:
954:
953:
952:. EirGrid Group.
946:
940:
939:
928:
922:
921:
914:
908:
907:
900:
894:
893:
891:
889:
874:
868:
867:
860:
854:
853:
851:
849:
834:
828:
827:
825:
823:
808:
799:
798:
796:
794:
779:
773:
772:
770:
768:
761:eirgridgroup.com
752:
746:
745:
744:on 15 June 2007.
734:
728:
727:
725:
723:
708:
702:
701:
699:
697:
685:
674:
673:
670:eirgridgroup.com
667:
659:
650:
649:
647:
645:
630:
541:Energy in France
530:
525:
524:
516:
511:
510:
509:
502:
497:
496:
495:
474:In October 2023
457:An Bord Pleanála
443:
418:
386:
379:
366:renewable energy
337:
270:
256:
244:
136:
135:
133:
132:
131:
129:
124:
123:
118:
113:
110:
109:
108:
105:
96:
95:
93:
92:
91:
89:
84:
83:
78:
73:
70:
69:
68:
65:
19:
18:
1228:
1227:
1223:
1222:
1221:
1219:
1218:
1217:
1178:
1177:
1175:
1151:
1150:
1147:
1142:
1141:
1131:
1129:
1120:
1119:
1115:
1105:
1103:
1101:The Irish Times
1093:
1089:
1079:
1077:
1070:
1066:
1056:
1054:
1049:
1048:
1039:
1029:
1027:
1017:
1013:
1003:
1001:
996:
995:
991:
980:
976:
961:
957:
948:
947:
943:
930:
929:
925:
916:
915:
911:
902:
901:
897:
887:
885:
875:
871:
862:
861:
857:
847:
845:
836:
835:
831:
821:
819:
809:
802:
792:
790:
781:
780:
776:
766:
764:
754:
753:
749:
736:
735:
731:
721:
719:
710:
709:
705:
695:
693:
686:
677:
665:
661:
660:
653:
643:
641:
632:
631:
616:
611:
526:
519:
512:
507:
505:
498:
493:
491:
488:
441:
416:
401:
399:Project history
384:
377:
374:
360:and French TSO
351:
335:
330:The electrical
328:
297:
268:
254:
242:
220:Type of current
215:submarine cable
127:
125:
121:
119:
115:
114:
111:
106:
103:
101:
99:
98:
97:
87:
85:
81:
79:
75:
74:
71:
66:
63:
61:
59:
58:
29:
17:
12:
11:
5:
1226:
1216:
1215:
1210:
1205:
1200:
1195:
1190:
1173:
1172:
1170:RTE video clip
1167:
1162:
1157:
1146:
1145:External links
1143:
1140:
1139:
1113:
1087:
1064:
1037:
1011:
989:
974:
969:Irish Examiner
955:
941:
923:
909:
895:
869:
855:
829:
800:
789:. 28 June 2017
774:
747:
729:
703:
675:
651:
640:. 21 July 2016
638:4coffshore.com
613:
612:
610:
607:
606:
605:
592:
579:
566:
564:United Kingdom
553:
548:
543:
538:
532:
531:
517:
514:Ireland portal
503:
487:
484:
400:
397:
393:Micheál Martin
373:
370:
350:
347:
332:interconnector
327:
324:
311:substation in
303:substation in
296:
293:
259:
258:
251:
247:
246:
239:
235:
234:
231:
227:
226:
221:
217:
216:
213:
209:
208:
204:
203:
200:
196:
195:
191:
190:
181:
177:
176:
172:
171:
168:
164:
163:
158:
157:Passes through
154:
153:
150:
146:
145:
142:
138:
137:
56:
50:
49:
40:
36:
35:
31:
30:
27:
24:
23:
15:
9:
6:
4:
3:
2:
1225:
1214:
1211:
1209:
1206:
1204:
1201:
1199:
1196:
1194:
1191:
1189:
1186:
1185:
1183:
1176:
1171:
1168:
1166:
1163:
1161:
1158:
1154:
1149:
1148:
1127:
1123:
1117:
1102:
1098:
1091:
1075:
1068:
1052:
1046:
1044:
1042:
1026:
1022:
1015:
999:
993:
985:
978:
970:
966:
959:
951:
945:
937:
933:
927:
919:
913:
905:
899:
884:
880:
873:
865:
859:
843:
839:
833:
818:
814:
807:
805:
788:
784:
778:
763:
762:
757:
751:
743:
739:
733:
717:
713:
707:
691:
684:
682:
680:
671:
664:
658:
656:
639:
635:
629:
627:
625:
623:
621:
619:
614:
604:
600:
596:
593:
591:
587:
583:
580:
578:
574:
570:
567:
565:
561:
557:
554:
552:
549:
547:
544:
542:
539:
537:
534:
533:
529:
528:Energy portal
523:
518:
515:
504:
501:
500:France portal
490:
483:
481:
477:
472:
468:
466:
461:
458:
455:In May 2022,
453:
449:
447:
438:
436:
431:
427:
425:
420:
414:
409:
406:
396:
394:
390:
381:
369:
367:
363:
359:
356:
346:
344:
339:
333:
323:
321:
316:
314:
310:
306:
302:
292:
290:
285:
282:
280:
276:
273:
266:
252:
248:
240:
236:
232:
228:
225:
222:
218:
214:
210:
205:
201:
197:
192:
189:
185:
182:
178:
173:
169:
165:
162:
159:
155:
151:
147:
143:
139:
134:
94:
57:
55:
51:
48:
44:
41:
37:
32:
25:
20:
1174:
1132:14 September
1130:. Retrieved
1125:
1116:
1106:13 September
1104:. Retrieved
1100:
1090:
1080:13 September
1078:. Retrieved
1067:
1055:. Retrieved
1028:. Retrieved
1024:
1014:
1002:. Retrieved
992:
977:
958:
944:
935:
926:
912:
898:
886:. Retrieved
882:
872:
858:
846:. Retrieved
832:
820:. Retrieved
816:
791:. Retrieved
787:ec.europa.eu
786:
777:
765:. Retrieved
759:
750:
742:the original
732:
720:. Retrieved
706:
694:. Retrieved
669:
642:. Retrieved
637:
479:
473:
469:
462:
454:
450:
439:
432:
428:
421:
410:
402:
382:
375:
352:
340:
329:
317:
298:
286:
283:
264:
262:
238:Power rating
230:Total length
104:48°26′35.5″N
64:51°54′56.9″N
1030:8 September
848:11 November
696:25 November
603:Netherlands
343:fibre optic
315:, France.
305:County Cork
144:north-south
120: /
107:4°11′50.3″W
80: /
67:8°13′48.7″W
54:Coordinates
1182:Categories
842:La Tribune
609:References
480:Ar Merzher
320:Celtic Sea
309:La Martyre
250:DC voltage
161:Celtic Sea
126: (
86: (
1057:12 August
1053:. EirGrid
1004:12 August
793:12 August
767:12 August
556:Greenlink
419:million.
389:Taoiseach
380:billion.
313:Finistère
301:Knockraha
888:8 August
822:8 August
722:11 April
644:8 August
569:NordLink
562:and the
486:See also
444:million
267:is a 700
199:Expected
180:Partners
34:Location
590:Germany
577:Germany
560:Ireland
358:EirGrid
289:EirGrid
277:(HVDC)
184:EirGrid
43:Ireland
39:Country
599:Norway
595:NorNed
586:Norway
582:NorGer
573:Norway
442:
435:Brexit
417:
385:
378:
336:
269:
255:
243:
47:France
1076:. RTÉ
692:. RTÉ
666:(PDF)
295:Route
253:± 320
1134:2022
1108:2022
1082:2022
1059:2021
1032:2021
1006:2021
890:2016
850:2022
824:2016
795:2017
769:2017
724:2020
698:2022
646:2016
601:and
588:and
575:and
338:MW.
263:The
224:HVDC
212:Type
202:2026
149:From
716:RTÉ
476:RTE
241:700
188:RTE
1184::
1124:.
1099:.
1040:^
1023:.
967:.
934:.
881:.
815:.
803:^
785:.
758:.
714:.
678:^
668:.
654:^
636:.
617:^
426:.
391:,
368:.
322:.
272:MW
257:kV
245:MW
186:,
167:To
45:,
1136:.
1110:.
1084:.
1061:.
1034:.
1008:.
971:.
892:.
852:.
826:.
797:.
771:.
726:.
700:.
648:.
130:)
90:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.