the two countries agreed to proceed with a two-year planning phase. This included an economic assessment, environmental considerations and will determine the placement of the cable and onshore stations, while a decision initially due on the project is foreseen for 2020 or 2021. In May 2018, the
903: 1192: 459:
granted permission for the onshore portion of the project while in August 2022, the Department for Housing Local Government and Heritage granted the project a foreshore licence, an important permit for the undersea work involved.
863: 395:, "The Celtic Interconnector will bring tangible benefits to the citizens of both France and Ireland by promoting the use of renewable energy, bringing down electricity prices, and helping ensure security of energy supply". 837: 1164: 470:
In November 2022, final construction and finance agreements were signed off by the Irish and French governments at the Irish embassy in Paris with the interconnector "due to be completed and operational by 2026".
429:
Three potential landing sites on the Cork coast were identified and six locations (Ballyadam, Leamlara, Knockraha, Pigeon Hill, Kilquane and Ballyvatta) were under consideration for the HVDC converter station.
451:
As of 2021, the cable was expected to be operational in line with the original schedule, by 2026. In August 2021, the project was at step five in the planning process and was expected to continue until 2022.
1202: 1187: 633: 60: 100: 964: 983: 1207: 281:
under construction between the southern coast of Ireland and the north-west coast of France. It will be the first such interconnector between the two countries.
408:
project was granted a foreshore license to begin marine surveys for the potential landing sites at Ballinwilling, Claycastle and Redbarn beaches, County Cork.
1212: 997: 740:[France-Ireland Direct Current line pushes the boundaries of the European electricity super-grid]. L'Usine Nouvelle. 6 December 2019. Archived from 782: 662: 866:[Celtic Interconnector: Accord Signed For Construction Of First Electrical Link between France and Ireland]. La Tribune. 25 November 2022. 711: 467:
granted a licence for the project to proceed. This was the last major license required before Step 6 construction could start in late 2022.
1073: 475: 361: 187: 437:
on electricity trading over the existing Ireland – UK HVDC interconnectors, planning for the Celtic Interconnector had accelerated.
318:
Of its total length of 575 km (357 miles), 500 km (311 miles) will pass through Irish, British and French waters of the
812: 1096: 878: 1020: 949: 1159: 931: 364:
for the purpose of improving security of supply, reducing consumer electricity costs and supporting the development of
291:
stated in 2022 that the interconnector was arguably "the most important Irish infrastructure project for this decade".
1050: 1197: 755: 689: 783:"EUR 4 million EU funding for proposed electricity link between France and Ireland - Energy - European Commission" 864:"Celtic Interconnector: accord signé pour construire la première liaison électrique entre la France et l'Irlande" 840:[France-Ireland Electrical Link Project to Continue Despite EUR 550 million cost increase] (in French). 464: 53: 545: 1128:. Marine Management Organisation. To access, view the Public Register searching for Case Ref: MLA/2021/00323 550: 354: 274: 738:"La ligne France-Irlande en courant continu repousse les frontières du super-réseau électrique européen" 917: 634:"President Hollande and An Taoiseach Kenny agree €1 billion Ireland-France Electricity Interconnector" 838:"Le projet de liaison électrique France-Irlande maintenu malgré un surcoût de 550 millions d'euros" 412: 422:
By 2019, the project had been designated a European Project of Common Interest as part of the
278: 918:"European bank to help fund electricity cable linking Ireland and France in light of Brexit" 8: 445: 423: 456: 965:"Shortlist of sites chosen for submarine electricity cable between France and Ireland" 535: 404: 392: 1121: 998:"EirGrid and RTE Sign €530 million Funding Agreement for the Celtic Interconnector" 984:"Part of €930m Celtic Interconnector may run along former Midleton-Youghal railway" 760: 540: 365: 1169: 334:, which will be the first between the two countries, has a planned capacity of 700 1193:
Electrical interconnectors to and from the Synchronous Grid of Continental Europe
968: 563: 513: 331: 1181: 527: 499: 116: 102: 76: 62: 1165:
Poste Electrique De La Martyre, Unnamed Road, 29800 La Martyre, France (map)
712:"Celtic Interconnector: interconnection project between France and Ireland" 1152: 312: 1021:"EirGrid hits 'critical milestone' in €1bn Celtic Interconnector project" 602: 342: 304: 841: 319: 308: 160: 718:. p. Overview:What does the Celtic Interconnector Project entail? 383:
As of November 2022, the interconnector was expected to cost €1.6
555: 478:
had started work in La Martyre on the converter station there called
388: 300: 568: 271: 813:"Subsea electricity cable linking Ireland and France powers ahead" 1203:
Proposed electric power infrastructure in the Republic of Ireland
589: 576: 559: 521: 357: 288: 183: 42: 904:"Eirgrid Plc - Ballinwilling, Claycastle & Redbarn Beaches" 598: 594: 585: 581: 572: 434: 415:
funding as part of preparations by Ireland for Brexit, for €530
46: 715: 482:. The converter station is scheduled to be completed by 2026. 376:
In 2016 the interconnector had an initial expected cost of €1
1188:
Electrical interconnectors to and from the island of Ireland
223: 690:"Celtic Interconnector will lead to lower prices - Ryan" 411:
In 2018, the project was given preliminary approval for
906:. Department of Housing, Local Government and Heritage. 1160:
Map with power line and tentative substation locations
1074:"Celtic Interconnector is granted planning permission" 489: 879:"Ireland-France power link reaches planning stage" 932:"EU Backs Celtic Interconnector and Harmony Link" 806: 804: 448:funding agreement for the Celtic Interconnector. 353:The project is a joint venture between the Irish 1208:Proposed electric power infrastructure in France 1179: 345:communications link between Ireland and France. 284:Trial operation is planned to commence in 2026. 440:In December 2020, EirGrid and RTE signed a €520 1094: 950:"Celtic Interconnector - What's Happening Now" 801: 683: 681: 679: 628: 626: 624: 622: 620: 618: 1097:"Government licenses Irish-French power line" 981: 962: 341:The project also includes plans for a direct 1213:Proposed electric power transmission systems 1114: 990: 748: 676: 657: 655: 615: 1045: 1043: 1041: 325: 28:Knockraha, Ireland and La Martyre, France 1071: 1000:. Celtic Interconnector. 9 December 2020 876: 652: 433:By 2019, due to the potential impact of 1038: 1018: 687: 362:RĂ©seau de Transport d'ÉlectricitĂ© (RTE) 1180: 16:Power line between France and Ireland 1126:MMO: View Applications and Documents 1095:O'Halloran, Barry (31 August 2022). 810: 775: 663:"Celtic Interconnector Newsletter 1" 403:In July 2016, after completion of a 371: 348: 299:The cable is due to run between the 688:Meskill, Tommy (25 November 2022). 13: 704: 398: 355:transmission system operator (TSO) 14: 1224: 1144: 963:O'Riordan, Sean (11 April 2019). 877:Bairstow, Jonny (25 July 2016). 520: 506: 492: 1088: 1065: 1019:Darmody, Jenny (16 July 2021). 1012: 975: 956: 942: 924: 920:. The Journal. 15 October 2018. 910: 896: 870: 856: 387:billion. According to the then 88:Celtic Interconnector - Ireland 1072:Goodbody, Will (23 May 2022). 982:O'Riordan, Sean (8 May 2019). 830: 730: 672:(Press release). October 2023. 465:Marine Management Organisation 128:Celtic Interconnector - France 1: 811:Hunt, Gordon (21 July 2016). 608: 546:Electricity sector in Ireland 463:On 14 September 2022, the UK 551:Electricity sector in France 7: 597:, cable project to connect 584:, cable project to connect 571:, cable project to connect 558:, cable project to connect 485: 275:high-voltage direct current 10: 1229: 1122:"Case ref: MLA/2021/00323" 249: 237: 233:575 km (357 mi) 229: 219: 211: 206: 198: 193: 179: 174: 166: 156: 148: 140: 52: 38: 33: 26: 21: 413:European Investment Bank 294: 287:The director general of 194:Construction information 1198:HVDC transmission lines 1051:"Celtic Interconnector" 756:"Celtic Interconnector" 326:Technical specification 117:48.443194°N 4.197306°W 77:51.915806°N 8.230194°W 279:submarine power cable 265:Celtic Interconnector 207:Technical information 175:Ownership information 22:Celtic Interconnector 122:48.443194; -4.197306 82:51.915806; -8.230194 817:siliconrepublic.com 446:European Commission 424:European Super Grid 112: /  72: /  938:. 4 December 2019. 883:energylivenews.com 844:. 10 November 2022 307:, Ireland, to the 170:La Martyre, France 152:Knockraha, Ireland 986:. Irish Examiner. 936:Subsea World News 536:Energy in Ireland 405:feasibility study 372:Project economics 349:Project promoters 261: 260: 141:General direction 1220: 1156: 1155: 1153:Official website 1138: 1137: 1135: 1133: 1118: 1112: 1111: 1109: 1107: 1092: 1086: 1085: 1083: 1081: 1069: 1063: 1062: 1060: 1058: 1047: 1036: 1035: 1033: 1031: 1025:Silicon Republic 1016: 1010: 1009: 1007: 1005: 994: 988: 987: 979: 973: 972: 960: 954: 953: 952:. EirGrid Group. 946: 940: 939: 928: 922: 921: 914: 908: 907: 900: 894: 893: 891: 889: 874: 868: 867: 860: 854: 853: 851: 849: 834: 828: 827: 825: 823: 808: 799: 798: 796: 794: 779: 773: 772: 770: 768: 761:eirgridgroup.com 752: 746: 745: 744:on 15 June 2007. 734: 728: 727: 725: 723: 708: 702: 701: 699: 697: 685: 674: 673: 670:eirgridgroup.com 667: 659: 650: 649: 647: 645: 630: 541:Energy in France 530: 525: 524: 516: 511: 510: 509: 502: 497: 496: 495: 474:In October 2023 457:An Bord Pleanála 443: 418: 386: 379: 366:renewable energy 337: 270: 256: 244: 136: 135: 133: 132: 131: 129: 124: 123: 118: 113: 110: 109: 108: 105: 96: 95: 93: 92: 91: 89: 84: 83: 78: 73: 70: 69: 68: 65: 19: 18: 1228: 1227: 1223: 1222: 1221: 1219: 1218: 1217: 1178: 1177: 1175: 1151: 1150: 1147: 1142: 1141: 1131: 1129: 1120: 1119: 1115: 1105: 1103: 1101:The Irish Times 1093: 1089: 1079: 1077: 1070: 1066: 1056: 1054: 1049: 1048: 1039: 1029: 1027: 1017: 1013: 1003: 1001: 996: 995: 991: 980: 976: 961: 957: 948: 947: 943: 930: 929: 925: 916: 915: 911: 902: 901: 897: 887: 885: 875: 871: 862: 861: 857: 847: 845: 836: 835: 831: 821: 819: 809: 802: 792: 790: 781: 780: 776: 766: 764: 754: 753: 749: 736: 735: 731: 721: 719: 710: 709: 705: 695: 693: 686: 677: 665: 661: 660: 653: 643: 641: 632: 631: 616: 611: 526: 519: 512: 507: 505: 498: 493: 491: 488: 441: 416: 401: 399:Project history 384: 377: 374: 360:and French TSO 351: 335: 330:The electrical 328: 297: 268: 254: 242: 220:Type of current 215:submarine cable 127: 125: 121: 119: 115: 114: 111: 106: 103: 101: 99: 98: 97: 87: 85: 81: 79: 75: 74: 71: 66: 63: 61: 59: 58: 29: 17: 12: 11: 5: 1226: 1216: 1215: 1210: 1205: 1200: 1195: 1190: 1173: 1172: 1170:RTE video clip 1167: 1162: 1157: 1146: 1145:External links 1143: 1140: 1139: 1113: 1087: 1064: 1037: 1011: 989: 974: 969:Irish Examiner 955: 941: 923: 909: 895: 869: 855: 829: 800: 789:. 28 June 2017 774: 747: 729: 703: 675: 651: 640:. 21 July 2016 638:4coffshore.com 613: 612: 610: 607: 606: 605: 592: 579: 566: 564:United Kingdom 553: 548: 543: 538: 532: 531: 517: 514:Ireland portal 503: 487: 484: 400: 397: 393:Micheál Martin 373: 370: 350: 347: 332:interconnector 327: 324: 311:substation in 303:substation in 296: 293: 259: 258: 251: 247: 246: 239: 235: 234: 231: 227: 226: 221: 217: 216: 213: 209: 208: 204: 203: 200: 196: 195: 191: 190: 181: 177: 176: 172: 171: 168: 164: 163: 158: 157:Passes through 154: 153: 150: 146: 145: 142: 138: 137: 56: 50: 49: 40: 36: 35: 31: 30: 27: 24: 23: 15: 9: 6: 4: 3: 2: 1225: 1214: 1211: 1209: 1206: 1204: 1201: 1199: 1196: 1194: 1191: 1189: 1186: 1185: 1183: 1176: 1171: 1168: 1166: 1163: 1161: 1158: 1154: 1149: 1148: 1127: 1123: 1117: 1102: 1098: 1091: 1075: 1068: 1052: 1046: 1044: 1042: 1026: 1022: 1015: 999: 993: 985: 978: 970: 966: 959: 951: 945: 937: 933: 927: 919: 913: 905: 899: 884: 880: 873: 865: 859: 843: 839: 833: 818: 814: 807: 805: 788: 784: 778: 763: 762: 757: 751: 743: 739: 733: 717: 713: 707: 691: 684: 682: 680: 671: 664: 658: 656: 639: 635: 629: 627: 625: 623: 621: 619: 614: 604: 600: 596: 593: 591: 587: 583: 580: 578: 574: 570: 567: 565: 561: 557: 554: 552: 549: 547: 544: 542: 539: 537: 534: 533: 529: 528:Energy portal 523: 518: 515: 504: 501: 500:France portal 490: 483: 481: 477: 472: 468: 466: 461: 458: 455:In May 2022, 453: 449: 447: 438: 436: 431: 427: 425: 420: 414: 409: 406: 396: 394: 390: 381: 369: 367: 363: 359: 356: 346: 344: 339: 333: 323: 321: 316: 314: 310: 306: 302: 292: 290: 285: 282: 280: 276: 273: 266: 252: 248: 240: 236: 232: 228: 225: 222: 218: 214: 210: 205: 201: 197: 192: 189: 185: 182: 178: 173: 169: 165: 162: 159: 155: 151: 147: 143: 139: 134: 94: 57: 55: 51: 48: 44: 41: 37: 32: 25: 20: 1174: 1132:14 September 1130:. Retrieved 1125: 1116: 1106:13 September 1104:. Retrieved 1100: 1090: 1080:13 September 1078:. Retrieved 1067: 1055:. Retrieved 1028:. Retrieved 1024: 1014: 1002:. Retrieved 992: 977: 958: 944: 935: 926: 912: 898: 886:. Retrieved 882: 872: 858: 846:. Retrieved 832: 820:. Retrieved 816: 791:. Retrieved 787:ec.europa.eu 786: 777: 765:. Retrieved 759: 750: 742:the original 732: 720:. Retrieved 706: 694:. Retrieved 669: 642:. Retrieved 637: 479: 473: 469: 462: 454: 450: 439: 432: 428: 421: 410: 402: 382: 375: 352: 340: 329: 317: 298: 286: 283: 264: 262: 238:Power rating 230:Total length 104:48°26′35.5″N 64:51°54′56.9″N 1030:8 September 848:11 November 696:25 November 603:Netherlands 343:fibre optic 315:, France. 305:County Cork 144:north-south 120: / 107:4°11′50.3″W 80: / 67:8°13′48.7″W 54:Coordinates 1182:Categories 842:La Tribune 609:References 480:Ar Merzher 320:Celtic Sea 309:La Martyre 250:DC voltage 161:Celtic Sea 126: ( 86: ( 1057:12 August 1053:. EirGrid 1004:12 August 793:12 August 767:12 August 556:Greenlink 419:million. 389:Taoiseach 380:billion. 313:Finistère 301:Knockraha 888:8 August 822:8 August 722:11 April 644:8 August 569:NordLink 562:and the 486:See also 444:million 267:is a 700 199:Expected 180:Partners 34:Location 590:Germany 577:Germany 560:Ireland 358:EirGrid 289:EirGrid 277:(HVDC) 184:EirGrid 43:Ireland 39:Country 599:Norway 595:NorNed 586:Norway 582:NorGer 573:Norway 442:  435:Brexit 417:  385:  378:  336:  269:  255:  243:  47:France 1076:. RTÉ 692:. RTÉ 666:(PDF) 295:Route 253:± 320 1134:2022 1108:2022 1082:2022 1059:2021 1032:2021 1006:2021 890:2016 850:2022 824:2016 795:2017 769:2017 724:2020 698:2022 646:2016 601:and 588:and 575:and 338:MW. 263:The 224:HVDC 212:Type 202:2026 149:From 716:RTÉ 476:RTE 241:700 188:RTE 1184:: 1124:. 1099:. 1040:^ 1023:. 967:. 934:. 881:. 815:. 803:^ 785:. 758:. 714:. 678:^ 668:. 654:^ 636:. 617:^ 426:. 391:, 368:. 322:. 272:MW 257:kV 245:MW 186:, 167:To 45:, 1136:. 1110:. 1084:. 1061:. 1034:. 1008:. 971:. 892:. 852:. 826:. 797:. 771:. 726:. 700:. 648:. 130:) 90:)

Index

Ireland
France
Coordinates
51°54′56.9″N 8°13′48.7″W / 51.915806°N 8.230194°W / 51.915806; -8.230194 (Celtic Interconnector - Ireland)
48°26′35.5″N 4°11′50.3″W / 48.443194°N 4.197306°W / 48.443194; -4.197306 (Celtic Interconnector - France)
Celtic Sea
EirGrid
RTE
HVDC
MW
high-voltage direct current
submarine power cable
EirGrid
Knockraha
County Cork
La Martyre
Finistère
Celtic Sea
interconnector
fibre optic
transmission system operator (TSO)
EirGrid
Réseau de Transport d'Électricité (RTE)
renewable energy
Taoiseach
Micheál Martin
feasibility study
European Investment Bank
European Super Grid
Brexit

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑