239:. A concrete masonry gravity dam diverts water from the upper Ndurumu River into the intake and settling area. From there, it flows through a 440 metres (1,440 ft) power canal, then down a steel penstock to the turbogenerator. Given the available river flow, the station was designed to allow for later installation of a second turbine in the powerhouse.
256:
251:
421:
Kizza, Michael; Kyaruzi, Alexander; Nyamichaba Oonge, Zablon
Isaboke; Rurihose, Fidèle; Ruhamya, Colleta; Kigobe, Max; Joel, Nobert; Nagawa, Helen (2010),
98:
483:
275:(800 kW) power plants would soon by connected to the national grid through the Musasa substation, which woud be connected by a 30 kV line to the
511:
404:
247:
Buhiga
Hydroelectric Power Station was commissioned in 1984. The project was funded by the Mission of the Eglise Episcopale du Burundi.
35:
216:
268:
272:
441:
299:
196:
422:
424:
Future
Hydropower Scenarios Under the Influence of Climate Change for the Riparian Countries of Lake Victoria Basin
454:
235:
The power station has a hydraulic head of 26 metres (85 ft) and installed power of 220 kW using an
506:
212:
330:
328:
326:
456:
Study on the interconnection of the electricity networks of the Nile equatorial lakes countries
323:
220:
158:
476:
Burundi. Institutional requirements and technical alternatives for a small hydropower program
276:
8:
173:
236:
453:
334:
261:
143:
133:
200:
188:
86:
62:
369:
311:
474:
500:
113:
100:
219:. It is about 600 metres (2,000 ft) south-southeast of the dam on the
381:
462:, vol. 1 – Power supply and demand analysis, NELSAP, October 2007
403:
317:
420:
375:
290:
which included plans to double the capacity of the Buhiga station.
257:
Direction
Generale de L'Hydraulique et de l'Electrification Rurales
347:
345:
343:
76:
357:
340:
224:
440:
387:
42:
50:
335:
Study on the interconnection of the electricity networks
473:
Zimmermann, Robert; Inversin, Allen (February 1983),
250:
In 1991 the hydropower plants of Buhiga (240 KW) and
484:United States Agency for International Development
472:
363:
351:
498:
211:The power station is to the southeast of the
279:substation. The project was financed by the
449:, Global Environment Facility (GEF), 2015
318:Centrale Hydroélectrique de Buhiga Google
288:National strategy for electricity access
271:(280 kW), Buhiga (240 kW) and
512:Hydroelectric power stations in Burundi
499:
281:Programme de réhabilitation du Burundi
223:. It supplies the city of Buhiga and
195:) is an 0.47 megawatts (630 hp)
405:"Centrale Hydroélectrique de Buhiga"
199:hydroelectric power station in the
13:
193:Centrale Hydroélectrique de Buhiga
185:Buhiga Hydroelectric Power Station
67:Centrale Hydroélectrique de Buhiga
25:Buhiga Hydroelectric Power Station
14:
523:
443:GEF-6 Project Identification Form
388:GEF-6 Project Identification Form
300:List of power stations in Burundi
267:In 2007 it was expected that the
254:(70KW), both run at that time by
286:In 2012 the government issued a
41:
34:
364:Zimmermann & Inversin 1983
352:Zimmermann & Inversin 1983
1:
430:, University of Dar es Salaam
305:
260:(DGHER), were handed over to
230:
7:
293:
206:
10:
528:
396:
242:
172:
164:
154:
149:
139:
129:
92:
82:
72:
58:
29:
24:
213:Buhiga District Hospital
16:Power station in Burundi
174:Installed capacity
192:
159:Ndurumu River (Ruvubu)
66:
19:Dam in Karuzi Province
114:3.04009°S 30.153656°E
165:Commission date
119:-3.04009; 30.153656
110: /
376:Kizza et al. 2010
237:Ossberger turbine
182:
181:
150:Dam and spillways
519:
492:
491:
490:
481:
469:
468:
467:
461:
450:
448:
437:
436:
435:
429:
417:
416:
415:
391:
385:
379:
373:
367:
361:
355:
349:
338:
332:
321:
315:
262:REGIDESO Burundi
215:and the town of
197:run-of-the-river
144:REGIDESO Burundi
125:
124:
122:
121:
120:
115:
111:
108:
107:
106:
103:
45:
44:
38:
22:
21:
527:
526:
522:
521:
520:
518:
517:
516:
507:Karuzi Province
497:
496:
495:
488:
486:
479:
465:
463:
459:
446:
433:
431:
427:
413:
411:
399:
394:
386:
382:
374:
370:
362:
358:
350:
341:
333:
324:
316:
312:
308:
296:
264:for operation.
245:
233:
209:
201:Karuzi Province
118:
116:
112:
109:
104:
101:
99:
97:
96:
87:Karuzi Province
54:
53:
52:
51:
48:
47:
46:
20:
17:
12:
11:
5:
525:
515:
514:
509:
494:
493:
470:
451:
438:
418:
400:
398:
395:
393:
392:
380:
368:
356:
339:
322:
309:
307:
304:
303:
302:
295:
292:
244:
241:
232:
229:
208:
205:
180:
179:
176:
170:
169:
166:
162:
161:
156:
152:
151:
147:
146:
141:
137:
136:
131:
127:
126:
94:
90:
89:
84:
80:
79:
74:
70:
69:
60:
56:
55:
49:
40:
39:
33:
32:
31:
30:
27:
26:
18:
15:
9:
6:
4:
3:
2:
524:
513:
510:
508:
505:
504:
502:
485:
478:
477:
471:
458:
457:
452:
445:
444:
439:
426:
425:
419:
410:
406:
402:
401:
389:
384:
377:
372:
366:, p. 46.
365:
360:
354:, p. 52.
353:
348:
346:
344:
336:
331:
329:
327:
319:
314:
310:
301:
298:
297:
291:
289:
284:
282:
278:
274:
270:
265:
263:
259:
258:
253:
248:
240:
238:
228:
226:
222:
221:Ndurumu River
218:
214:
204:
202:
198:
194:
190:
186:
177:
175:
171:
167:
163:
160:
157:
153:
148:
145:
142:
138:
135:
132:
128:
123:
95:
91:
88:
85:
81:
78:
75:
71:
68:
64:
61:
59:Official name
57:
37:
28:
23:
487:, retrieved
475:
464:, retrieved
455:
442:
432:, retrieved
423:
412:, retrieved
408:
390:, p. 7.
383:
378:, p. 7.
371:
359:
313:
287:
285:
280:
266:
255:
249:
246:
234:
210:
203:of Burundi.
184:
183:
409:Google Maps
117: /
93:Coordinates
501:Categories
489:2024-08-18
466:2024-08-18
434:2024-08-18
414:2024-08-18
306:References
105:30°09′13″E
283:(PREBU).
269:Marangara
231:Technical
102:3°02′24″S
294:See also
207:Location
155:Impounds
140:Owner(s)
83:Location
397:Sources
273:Kayenzi
243:History
130:Purpose
77:Burundi
73:Country
252:Ruyigi
225:Karuzi
217:Buhiga
189:French
178:240 kW
63:French
480:(PDF)
460:(PDF)
447:(PDF)
428:(PDF)
277:Ngozi
134:Power
168:1984
503::
482:,
407:,
342:^
325:^
227:.
191::
65::
337:.
320:.
187:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.