277:. The structure, built in the span of only 18 months, was completed in February 1961. It covers an overall area of 75,000 m2, with a usable area of 13,800 m, consisting of 3,600 m of conference halls, 5,500 m of offices and 4,700 m of general facilities. Its main characteristic is represented by the ācontinuous spacesā of the internal layout. Ten years later, in 1971, work was commenced on a project funded by the United Nations to extend the structure, which was completed in 1975. It consists of a block of 800 new offices, a 6-storey building to house the huge library and other buildings for general facilities. This extension work added a further 130,000 m.
292:
45:
288:, āthat it is possible to construct grand buildings here too , by erecting a couple of high-profile structures. It is not their complexity or size that matter, but the maximum possible use of home-produced materials, in order to shake our wealthy middle class (which keeps its money under the mattress) from the inactivity that also binds it in the field of construction, and stimulate it to invest its assets also in building to make this āgreat villageā a city and a true great capitalā.
29:
113:
52:
330:
to the two main halls, the United
Nations Conference Centre also has four additional conference rooms with a capacity for citing up to 115 people each. There are also ten caucus rooms used for break out sessions that can seat between 22 and 32 people: and two briefing rooms with a seating capacity of 44 and 64 people.
329:
The United
Nations Conference Centre (UNCC) has two main conference halls offering a combined space of 2,000 m with a total capability of hosting close to 1300 participants. The main hall can host completely separate events or be linked electronically for a fully coordinated conference. In addition
315:, a 150 m stained glass triptych. The work depicts images symbolizing African nations uniting to tackle poverty and disease. Also designed by Afework Tekle are the geometric design surrounding the central window, reminiscent of patterns of traditional
295:
African leaders and foreign diplomats sit in the
Plenary Hall of the United Nations building in Addis Ababa, Ethiopia, during the 12th African Union (AU) Summit Feb. 2, 2009.
480:
490:
495:
500:
262:
321:
clothing, which was added after the original design of the building to commemorate a construction worker that died during its construction.
132:
355:
485:
395:
44:
304:
125:
367:
291:
201:
281:
284:, Africa Hall was one of the two projects designed to demonstrate, in the words of Emperor
8:
362:
16:
Headquarter of the United
Nations Economic Commission for Africa in Addis Ababa, Ethiopia
405:
400:
76:
242:
285:
474:
308:
300:
147:
134:
465:
409:
28:
270:
100:
90:
274:
118:
80:
317:
175:
436:
307:(OAU) was founded on 25 May 1963. Also in this building is
460:
324:
299:It was here, in this conference center, that the
472:
461:United Nations Economic Commission for Africa
356:"Haile Selassie: A testimony for reappraisal"
263:United Nations Economic Commission for Africa
353:
349:
347:
345:
343:
290:
481:Buildings and structures in Addis Ababa
491:Government buildings completed in 1961
473:
431:
429:
427:
496:20th-century architecture in Ethiopia
389:
387:
340:
261:is the permanent headquarters of the
424:
393:
51:
13:
437:"United Nations Conference Centre"
384:
14:
512:
454:
501:African UnionāEthiopia relations
354:Mezzedimi, Arturo (April 1992).
325:United Nations Conference Centre
111:
50:
43:
27:
486:1961 establishments in Ethiopia
1:
333:
305:Organization of African Unity
7:
466:Website of Arturo Mezzedimi
10:
517:
313:Total Liberation of Africa
33:View of the 1975 addition.
248:
238:
233:
225:
220:
212:
207:
197:
189:
181:
171:
167:7,726 feet (2,355 m)
163:
124:
106:
96:
86:
72:
67:
38:
26:
21:
252:Varnero Construction plc
59:Location within Ethiopia
234:Design and construction
296:
202:Government of Ethiopia
311:'s most famous work,
294:
282:Addis Ababa City Hall
303:'s predecessor, the
182:Construction started
144: /
87:Architectural style
68:General information
406:Ethiopian Airlines
372:on October 4, 2013
297:
148:9.0147Ā°N 38.7620Ā°E
412:on August 4, 2012
256:
255:
221:Technical details
77:Conference centre
508:
448:
447:
445:
443:
433:
422:
421:
419:
417:
408:. Archived from
391:
382:
381:
379:
377:
371:
361:. Archived from
360:
351:
243:Arturo Mezzedimi
159:
158:
156:
155:
154:
149:
145:
142:
141:
140:
137:
117:
115:
114:
54:
53:
47:
31:
19:
18:
516:
515:
511:
510:
509:
507:
506:
505:
471:
470:
457:
452:
451:
441:
439:
435:
434:
425:
415:
413:
396:"Afework Tekle"
394:Voelkel, Hope.
392:
385:
375:
373:
365:
358:
352:
341:
336:
327:
280:Along with the
249:Main contractor
172:Current tenants
153:9.0147; 38.7620
152:
150:
146:
143:
138:
135:
133:
131:
130:
112:
110:
63:
62:
61:
60:
57:
56:
55:
34:
17:
12:
11:
5:
514:
504:
503:
498:
493:
488:
483:
469:
468:
463:
456:
455:External links
453:
450:
449:
423:
383:
338:
337:
335:
332:
326:
323:
286:Haile Selassie
254:
253:
250:
246:
245:
240:
236:
235:
231:
230:
227:
223:
222:
218:
217:
214:
210:
209:
205:
204:
199:
195:
194:
191:
187:
186:
183:
179:
178:
173:
169:
168:
165:
161:
160:
128:
122:
121:
108:
104:
103:
98:
94:
93:
88:
84:
83:
74:
70:
69:
65:
64:
58:
49:
48:
42:
41:
40:
39:
36:
35:
32:
24:
23:
15:
9:
6:
4:
3:
2:
513:
502:
499:
497:
494:
492:
489:
487:
484:
482:
479:
478:
476:
467:
464:
462:
459:
458:
438:
432:
430:
428:
411:
407:
403:
402:
397:
390:
388:
369:
364:
357:
350:
348:
346:
344:
339:
331:
322:
320:
319:
314:
310:
309:Afewerk Tekle
306:
302:
301:African Union
293:
289:
287:
283:
278:
276:
272:
268:
264:
260:
251:
247:
244:
241:
237:
232:
228:
224:
219:
215:
211:
206:
203:
200:
196:
193:February 1961
192:
188:
184:
180:
177:
174:
170:
166:
162:
157:
129:
127:
123:
120:
109:
105:
102:
99:
95:
92:
89:
85:
82:
78:
75:
71:
66:
46:
37:
30:
25:
20:
440:. Retrieved
414:. Retrieved
410:the original
399:
374:. Retrieved
363:the original
328:
316:
312:
298:
279:
266:
258:
257:
239:Architect(s)
271:Addis Ababa
269:) based in
259:Africa Hall
185:August 1959
151: /
126:Coordinates
101:Addis Ababa
22:Africa Hall
475:Categories
416:August 23,
376:August 22,
334:References
226:Floor area
139:38Ā°45ā²43ā³E
442:23 August
229:205,000 m
213:Top floor
190:Completed
164:Elevation
136:9Ā°00ā²53ā³N
91:Modernism
275:Ethiopia
119:Ethiopia
97:Location
401:Selamta
107:Country
81:offices
208:Height
198:Client
116:
359:(PDF)
318:shema
267:UNECA
176:UNECA
444:2013
418:2013
378:2013
73:Type
368:PDF
477::
426:^
404:.
398:.
386:^
342:^
273:,
79:,
446:.
420:.
380:.
370:)
366:(
265:(
216:7
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.