The original bridge was built in November 1975. Its capacity proved insufficient for later traffic demands of more than 27,000 vehicles per day (soon to be up to 35,000 vehicles per day with the completion of the motorway works) and a duplicate bridge was constructed next to it. The new bridge was
109:
closed off the old bridge to make repairs, especially to reduce a sagging effect due to old tensioning cables. With the opening of the motorway on 6 December 2007 all bridge lanes were open. The new bridge also provides a cycle-way and walkway on the north side.
102:. The new bridge cost NZ$ 35 million and provides a 524 m long, 16.5m wide, 10-span crossing. This was designed to match the existing 457 m long existing 7-span cantilever bridge aesthetically. 105:
The bridges provide three lanes toward Greenhithe (an uphill gradient) and two lanes downhill. Prior to the first stage of the Upper Harbour Motorway opening,
220: 313: 342: 114: 145: 396: 381: 391: 286: 237: 386: 180: 321: 406: 30:
The bridge from the eastern (Greenhithe) end, with the walking / cycling paths and a memorial stone visible.
401: 74: 124:
for the first jumps testing the equipment for what was to eventually become the world's first commercial
62: 54: 168: 70: 198: 66: 291: 202: 113:
The bridge project, together with the causeway widening, has received a Silver Award from the
253: 99: 95: 8: 225: 106: 78: 176: 26: 18: 125: 375: 357: 344: 121: 58: 91: 228:, Media Release, Thursday 6 December 2007. Accessed 16 January 2008. 50: 249: 275:, Brochure of the '2007 ACENZ Awards of Excellence', Page 19 53:, New Zealand. It is technically two bridges, spanning the 221:
New SH18 Greenhithe motorway opens up growth opportunities
36:
Map of the two bridges that form the Upper Harbour Bridge
269:
Upper Harbour Bridge Duplication & Causeway Widening
287:"Get moving: New bridge open, now the old one's closed" 77:, and became even more important as a component of the 146:"Auckland's Waterview Tunnel open to traffic at last" 278: 194: 192: 373: 284: 240:(from the New Zealand Concrete Society website) 167:Reidy, Jade (2009). "How the West Was Run". In 160: 115:Association of Consulting Engineers New Zealand 189: 81:when the route was completed on 2 July 2017. 306: 120:The original bridge was in 1986 used by 25: 17: 264: 262: 215: 213: 211: 374: 199:Work on Upper Harbour Corridor Begins 166: 73:). It is an important connection for 259: 208: 13: 14: 418: 94:, and built between 2005–2006 by 320:. 23 August 2004. Archived from 285:Falconer, Phoebe (6 June 2006). 397:Concrete bridges in New Zealand 49:) is a motorway bridge in west 382:Upper Harbour Local Board Area 318:Unlimited – Inspiring Business 250:Upper Harbour duplicate bridge 243: 238:Upper Harbour Bridge datasheet 231: 173:West: The History of Waitakere 138: 1: 175:. Random House. p. 245. 131: 7: 90:designed and engineered by 10: 423: 148:. Stuff.co.nz. 2 July 2017 84: 22:The bridge from the north. 392:Bridges completed in 2006 201:(official website of the 387:North Shore, New Zealand 358:36.784903°S 174.667801°E 100:self-compacting concrete 55:Upper Waitematā Harbour 363:-36.784903; 174.667801 292:The New Zealand Herald 203:New Zealand Parliament 31: 23: 254:Fletcher Construction 171:; Kerr, Ruth (eds.). 96:Fletcher Construction 29: 21: 43:Upper Harbour Bridge 402:Bridges in Auckland 354: /  226:Transit New Zealand 314:"Can you Hackett?" 79:Western Ring Route 32: 24: 407:Waitematā Harbour 169:Macdonald, Finlay 57:, and connecting 47:Greenhithe Bridge 45:(also called the 414: 369: 368: 366: 365: 364: 359: 355: 352: 351: 350: 347: 334: 333: 331: 329: 310: 304: 303: 301: 299: 282: 276: 266: 257: 247: 241: 235: 229: 217: 206: 196: 187: 186: 164: 158: 157: 155: 153: 142: 75:State Highway 18 422: 421: 417: 416: 415: 413: 412: 411: 372: 371: 362: 360: 356: 353: 348: 345: 343: 341: 340: 338: 337: 327: 325: 324:on 17 July 2011 312: 311: 307: 297: 295: 283: 279: 267: 260: 248: 244: 236: 232: 218: 209: 197: 190: 183: 165: 161: 151: 149: 144: 143: 139: 134: 87: 39: 38: 37: 12: 11: 5: 420: 410: 409: 404: 399: 394: 389: 384: 336: 335: 305: 277: 258: 242: 230: 207: 188: 181: 159: 136: 135: 133: 130: 126:bungee jumping 86: 83: 35: 34: 33: 9: 6: 4: 3: 2: 419: 408: 405: 403: 400: 398: 395: 393: 390: 388: 385: 383: 380: 379: 377: 370: 367: 323: 319: 315: 309: 294: 293: 288: 281: 274: 270: 265: 263: 255: 251: 246: 239: 234: 227: 223: 222: 216: 214: 212: 204: 200: 195: 193: 184: 182:9781869790080 178: 174: 170: 163: 147: 141: 137: 129: 127: 123: 122:A. J. Hackett 118: 116: 111: 108: 103: 101: 97: 93: 82: 80: 76: 72: 68: 64: 63:West Auckland 60: 56: 52: 48: 44: 28: 20: 16: 339: 326:. Retrieved 322:the original 317: 308: 296:. Retrieved 290: 280: 272: 268: 245: 233: 219: 172: 162: 150:. Retrieved 140: 119: 112: 104: 88: 46: 42: 40: 15: 361: / 349:174°40′04″E 298:26 November 273:Innovate NZ 152:7 September 71:North Shore 59:Hobsonville 376:Categories 346:36°47′06″S 252:(from the 132:References 107:Transit NZ 67:Greenhithe 128:company. 256:website) 69:(on the 51:Auckland 328:20 July 85:History 179:  98:using 65:) and 330:2010 300:2011 177:ISBN 154:2017 92:Beca 61:(in 41:The 378:: 316:. 289:. 271:– 261:^ 224:– 210:^ 191:^ 117:. 332:. 302:. 205:) 185:. 156:.

Index



Auckland
Upper Waitematā Harbour
Hobsonville
West Auckland
Greenhithe
North Shore
State Highway 18
Western Ring Route
Beca
Fletcher Construction
self-compacting concrete
Transit NZ
Association of Consulting Engineers New Zealand
A. J. Hackett
bungee jumping
"Auckland's Waterview Tunnel open to traffic at last"
Macdonald, Finlay
ISBN
9781869790080


Work on Upper Harbour Corridor Begins
New Zealand Parliament



New SH18 Greenhithe motorway opens up growth opportunities
Transit New Zealand

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.