Trans-Saharan gas pipeline

Source đź“ť

29: 400: 386: 372: 344:"only partners that can bring something to the project, not just money, should be there." Energy ministers of Algeria and Nigeria have said that "if things go well, there will be no need to bring international oil companies into the project" and "if the need for partnership in the project arises, not every partner will be welcome on board on the project." 307:
The annual capacity of the pipeline would be up to 30 billion cubic meters of natural gas. It would have a diameter of 48 to 56 inches (1,220 to 1,420 mm). The pipeline was originally expected to be operational by 2015. The original investment for the pipeline was expected to be around
209:
On the meeting on 20 February 2009, NNPC and Sonatrach agreed to proceed with the draft Memorandum of Understanding between three governments and the joint venture agreement. The intergovernmental agreement on the pipeline was signed by energy ministers of Nigeria, Niger and Algeria on 3 July 2009
316:
The pipeline is to be built and operated by the partnership between the NNPC and Sonatrach. The company would include also the Republic of Niger. Initially NNPC and Sonatrach would hold a total 90% of shares, while Niger would hold 10%.
299:. The length of the pipeline would be 4,128 kilometres (2,565 mi): 1,037 kilometres (644 mi) in Nigeria, 841 kilometres (523 mi) in Niger, and 2,310 kilometres (1,440 mi) in Algeria. 1013: 206:
for a feasibility study of the project. The feasibility study was completed in September 2006, and it found the pipeline to be technically and economically feasible and reliable.
675: 241: 28: 225:
of 2013. Nigeria, Niger and Algeria are among the least secure areas in the region because of various active terrorist movements that destabilise them.
1111: 1106: 732: 1116: 353: 820: 534: 887: 788: 854: 448: 666: 1081: 1071: 308:
US$ 10 billion and for gas gathering centers around $ 3 billion. As of 2019 the project was still in the prospect phase.
218: 1076: 512: 202:
signed the Memorandum of Understanding for preparations of the project. In June 2005, NNPC and Sonatrach signed a contract with
195: 114: 1049: 1096: 1086: 1101: 1091: 740: 276: 762: 272: 989: 229: 702: 591: 222: 246: 828: 940: 413: 798: 340:
have expressed interest in participating in the project. According to the Algerian energy minister
642: 324:
has negotiated with Nigeria about its possible participation in the project. Also Indian company
194:
The idea of the trans-Saharan pipeline was first proposed in the 1970s. On 14 January 2002, the
1054: 963: 228:
On 28 July 2022, the Algerian, Nigerian, and Nigerien ministers of energy signed in Algiers a
864: 458: 360:
and its people have been resolved, "any money put into the project will go down the drain."
1026: 917: 736: 564: 8: 985: 891: 296: 118: 912: 356:. A spokesman for the group warned that until issues regarding the exploitation of the 171: 337: 480: 616: 203: 595: 405: 391: 268: 260: 183: 83: 73: 1065: 377: 341: 237: 233: 535:"Study proves technical, economic feasibility of Trans-Saharan gas pipeline" 357: 168: 481:"Nigeria and Algeria begin study of $ 6 bn Trans-Saharan gas pipeline" 329: 271:
in Algeria. In Hassi R'Mel the pipeline is to connect to the existing
199: 110: 667:"TSGP: Algeria, Nigeria and Niger sign Memorandum of Understanding" 620: 292: 217:
Safety concerns about the operations have been heightened due to a
287:
pipelines. These supply Europe from the gas transmission hubs at
859: 793: 706: 453: 371: 321: 288: 179: 175: 87: 55: 47: 280: 284: 264: 211: 51: 1014:"Nigerian militants threaten proposed Trans-Sahara gas line" 888:"Gazprom In Talks To Join Trans-Saharan Pipeline - Official" 565:"Nigerian, Algerian Officials Discuss Saharan Gas Pipeline" 325: 733:"Nigeria, Algeria, Niger seal $ 10 bln gas pipeline deal" 333: 232:
for the implementation of the TSGP project, co-signed by
352:
The pipeline is opposed by the Nigerian militant group
964:"Trans-Saharan Gas Project 'Not For Sale' - Ministers" 855:"No deal yet on firms for Sahara gas pipeline-Khelil" 765:. Business Intelligence Middle East. 22 February 2009 592:"Nigeria, Algeria, Niger Sign Accord on Gas Pipeline" 513:"14tcf of gas reserved for Trans-Sahara gas pipeline" 763:"Trans-Saharan gas pipeline to reach Europe in 2015" 487:. Alexander's Gas & Oil Connections. 16 May 2005 367: 697: 695: 693: 1012: 665: 558: 556: 554: 552: 449:"Nigeria, Algeria agree to build Sahara gas link" 198:(NNPC) and Algerian national oil and gas company 1063: 955: 879: 848: 846: 789:"Total, Gazprom eye Sahara gas pipeline venture" 690: 354:Movement for the Emancipation of the Niger Delta 182:. It is seen as an opportunity to diversify the 782: 780: 549: 442: 440: 438: 436: 434: 432: 430: 428: 33:Location of Trans-Saharan gas pipeline (in red) 583: 962:Muhammad, Hamisu; Umar, Aisha (7 July 2009). 941:"Algeria ambassador urges for Indian embassy" 843: 347: 961: 777: 643:"A look at North Africa: Algeria's troubles" 425: 16:Natural gas pipeline from Nigeria to Algeria 635: 986:"Mend claims attack on Shell installation" 506: 504: 502: 27: 1112:Proposed energy infrastructure in Algeria 1107:Proposed energy infrastructure in Nigeria 1004: 905: 885: 527: 933: 703:"FACTBOX-Sonatrach and its gas partners" 609: 510: 1117:Proposed energy infrastructure in Niger 1010: 730: 499: 196:Nigerian National Petroleum Corporation 1064: 726: 724: 562: 886:Tumanjong, Emmanuel (31 March 2008). 755: 589: 302: 149:30 billion cubic meters per year 852: 786: 663: 446: 221:, culminating in incidents like the 219:terrorist insurgency in North Africa 721: 617:"Sahara gas pipeline gets go-ahead" 537:. Magharebia.com. 20 September 2006 473: 13: 943:. Business Standard. 20 April 2008 14: 1128: 1043: 921:. NHST Media Group. 16 April 2008 913:"Gazprom eyes Saharan pipe plans" 678:from the original on 29 July 2022 263:in Nigeria and run north through 1082:Natural gas pipelines in Algeria 1072:Natural gas pipelines in Nigeria 787:Fabi, Randy (25 February 2009). 563:Awhotu, Ese (20 February 2009). 511:Binniyat, Luka (10 March 2008). 398: 384: 370: 259:The pipeline is to start in the 978: 813: 1077:Natural gas pipelines in Niger 664:Saci, Yasmine (28 July 2022). 657: 1: 1011:Watkins, Eric (7 July 2009). 645:. Investvine. 24 January 2013 419: 141:4,128 km (2,565 mi) 1087:Proposed pipelines in Africa 853:Webb, Simon (30 June 2009). 731:Awoniyi, Ola (3 July 2009). 7: 990:Radio France Internationale 590:Okolo, Paul (3 July 2009). 447:Fabi, Randy (3 July 2009). 363: 311: 230:memorandum of understanding 10: 1133: 1050:NIGAL project presentation 348:Opposition to the pipeline 189: 165:Trans-African gas pipeline 157:Trans-Saharan gas pipeline 22:Trans-Saharan gas pipeline 1097:Algeria–Nigeria relations 414:West African Gas Pipeline 145: 137: 132: 124: 106: 98: 93: 79: 69: 61: 43: 38: 26: 21: 254: 223:In AmĂ©nas hostage crisis 1102:Algeria–Niger relations 1092:Niger–Nigeria relations 1055:Gaslink Nigeria Limited 242:Mahamane Sani Mahamadou 1019:Oil & Gas Journal 159:(TSGP; also known as 133:Technical information 1027:PennWell Corporation 890:. Downstream Today. 320:Russian gas company 892:Dow Jones Newswires 709:. 24 September 2007 297:Mediterranean coast 273:Trans-Mediterranean 119:Government of Niger 94:General information 966:. Downstream Today 801:on 1 February 2013 743:on 24 January 2013 571:. Downstream Today 303:Technical features 825:www.nnpcgroup.com 338:Royal Dutch Shell 186:'s gas supplies. 153: 152: 146:Maximum discharge 62:General direction 1124: 1038: 1037: 1035: 1033: 1016: 1008: 1002: 1001: 999: 997: 982: 976: 975: 973: 971: 959: 953: 952: 950: 948: 937: 931: 930: 928: 926: 909: 903: 902: 900: 898: 883: 877: 876: 874: 872: 863:. Archived from 850: 841: 840: 838: 836: 831:on 15 April 2019 827:. Archived from 817: 811: 810: 808: 806: 797:. Archived from 784: 775: 774: 772: 770: 759: 753: 752: 750: 748: 739:. Archived from 728: 719: 718: 716: 714: 699: 688: 687: 685: 683: 669: 661: 655: 654: 652: 650: 639: 633: 632: 630: 628: 613: 607: 606: 604: 602: 587: 581: 580: 578: 576: 560: 547: 546: 544: 542: 531: 525: 524: 522: 520: 508: 497: 496: 494: 492: 477: 471: 470: 468: 466: 457:. Archived from 444: 408: 403: 402: 401: 394: 389: 388: 387: 380: 375: 374: 251:, respectively. 250: 128:2015 (estimated) 31: 19: 18: 1132: 1131: 1127: 1126: 1125: 1123: 1122: 1121: 1062: 1061: 1046: 1041: 1031: 1029: 1009: 1005: 995: 993: 984: 983: 979: 969: 967: 960: 956: 946: 944: 939: 938: 934: 924: 922: 918:Upstream Online 911: 910: 906: 896: 894: 884: 880: 870: 868: 851: 844: 834: 832: 819: 818: 814: 804: 802: 785: 778: 768: 766: 761: 760: 756: 746: 744: 729: 722: 712: 710: 701: 700: 691: 681: 679: 662: 658: 648: 646: 641: 640: 636: 626: 624: 615: 614: 610: 600: 598: 588: 584: 574: 572: 561: 550: 540: 538: 533: 532: 528: 518: 516: 509: 500: 490: 488: 479: 478: 474: 464: 462: 445: 426: 422: 404: 399: 397: 390: 385: 383: 376: 369: 366: 350: 314: 305: 257: 244: 204:Penspen Limited 192: 167:) is a planned 34: 17: 12: 11: 5: 1130: 1120: 1119: 1114: 1109: 1104: 1099: 1094: 1089: 1084: 1079: 1074: 1058: 1057: 1052: 1045: 1044:External links 1042: 1040: 1039: 1003: 977: 954: 932: 904: 878: 867:on 8 July 2009 842: 812: 776: 754: 720: 689: 656: 634: 608: 582: 548: 526: 498: 472: 461:on 8 July 2009 423: 421: 418: 417: 416: 410: 409: 406:Nigeria portal 395: 392:Algeria portal 381: 365: 362: 349: 346: 313: 310: 304: 301: 277:Maghreb–Europe 256: 253: 191: 188: 184:European Union 161:NIGAL pipeline 151: 150: 147: 143: 142: 139: 135: 134: 130: 129: 126: 122: 121: 108: 104: 103: 100: 96: 95: 91: 90: 81: 77: 76: 74:Warri, Nigeria 71: 67: 66: 63: 59: 58: 45: 41: 40: 36: 35: 32: 24: 23: 15: 9: 6: 4: 3: 2: 1129: 1118: 1115: 1113: 1110: 1108: 1105: 1103: 1100: 1098: 1095: 1093: 1090: 1088: 1085: 1083: 1080: 1078: 1075: 1073: 1070: 1069: 1067: 1060: 1056: 1053: 1051: 1048: 1047: 1028: 1024: 1020: 1015: 1007: 992:. 5 July 2009 991: 987: 981: 965: 958: 942: 936: 920: 919: 914: 908: 893: 889: 882: 866: 862: 861: 856: 849: 847: 830: 826: 822: 821:"Nigeria Gas" 816: 800: 796: 795: 790: 783: 781: 764: 758: 742: 738: 734: 727: 725: 708: 704: 698: 696: 694: 677: 673: 668: 660: 644: 638: 623:. 3 July 2009 622: 618: 612: 597: 593: 586: 570: 566: 559: 557: 555: 553: 536: 530: 514: 507: 505: 503: 486: 482: 476: 460: 456: 455: 450: 443: 441: 439: 437: 435: 433: 431: 429: 424: 415: 412: 411: 407: 396: 393: 382: 379: 378:Energy portal 373: 368: 361: 359: 355: 345: 343: 342:Chakib Khelil 339: 335: 331: 327: 323: 318: 309: 300: 298: 295:on Algeria's 294: 290: 286: 282: 278: 274: 270: 266: 262: 252: 248: 243: 239: 238:Timipre Sylva 235: 234:Mohamed Arkab 231: 226: 224: 220: 215: 213: 207: 205: 201: 197: 187: 185: 181: 177: 173: 170: 166: 162: 158: 148: 144: 140: 136: 131: 127: 123: 120: 116: 112: 109: 105: 101: 97: 92: 89: 85: 82: 78: 75: 72: 68: 64: 60: 57: 53: 49: 46: 42: 37: 30: 25: 20: 1059: 1030:. Retrieved 1022: 1018: 1006: 994:. Retrieved 980: 968:. Retrieved 957: 945:. Retrieved 935: 923:. Retrieved 916: 907: 895:. Retrieved 881: 869:. Retrieved 865:the original 858: 833:. Retrieved 829:the original 824: 815: 803:. Retrieved 799:the original 792: 767:. Retrieved 757: 745:. Retrieved 741:the original 711:. Retrieved 680:. Retrieved 671: 659: 647:. Retrieved 637: 625:. Retrieved 611: 599:. Retrieved 585: 573:. Retrieved 568: 539:. Retrieved 529: 517:. Retrieved 489:. Retrieved 484: 475: 463:. Retrieved 459:the original 452: 351: 319: 315: 306: 261:Warri region 258: 227: 216: 208: 193: 164: 160: 156: 154: 125:Commissioned 947:23 February 769:23 February 713:23 February 575:23 February 519:23 February 358:Niger Delta 328:, France's 269:Hassi R'Mel 245: [ 169:natural gas 102:natural gas 84:Hassi R'Mel 65:south-north 1066:Categories 996:24 October 672:www.aps.dz 649:27 January 569:Leadership 515:. Vanguard 420:References 332:, Italy's 330:Total S.A. 835:24 August 596:Bloomberg 200:Sonatrach 111:Sonatrach 805:15 March 676:Archived 621:BBC News 485:This Day 364:See also 312:Operator 293:Beni Saf 172:pipeline 107:Partners 39:Location 860:Reuters 794:Reuters 707:Reuters 682:28 July 491:29 July 454:Reuters 334:Eni SpA 322:Gazprom 289:El Kala 190:History 180:Algeria 176:Nigeria 88:Algeria 56:Algeria 48:Nigeria 44:Country 1032:8 July 970:8 July 925:8 June 897:8 June 871:3 July 747:3 July 627:3 July 601:3 July 541:4 July 465:3 July 281:Medgaz 240:, and 138:Length 285:Galsi 265:Niger 255:Route 249:] 212:Abuja 174:from 52:Niger 1034:2009 998:2010 972:2009 949:2009 927:2008 899:2008 873:2009 837:2021 807:2009 771:2009 749:2009 715:2009 684:2022 651:2013 629:2009 603:2009 577:2009 543:2009 521:2009 493:2007 467:2009 336:and 326:GAIL 291:and 283:and 163:and 155:The 115:NNPC 99:Type 70:From 1023:107 737:AFP 267:to 210:in 178:to 1068:: 1025:. 1021:. 1017:. 988:. 915:. 857:. 845:^ 823:. 791:. 779:^ 735:. 723:^ 705:. 692:^ 674:. 670:. 619:. 594:. 567:. 551:^ 501:^ 483:. 451:. 427:^ 279:, 275:, 247:fr 236:, 214:. 117:, 113:, 86:, 80:To 54:, 50:, 1036:. 1000:. 974:. 951:. 929:. 901:. 875:. 839:. 809:. 773:. 751:. 717:. 686:. 653:. 631:. 605:. 579:. 545:. 523:. 495:. 469:.

Index

Location of Trans-Saharan gas pipeline (in red)
Nigeria
Niger
Algeria
Warri, Nigeria
Hassi R'Mel
Algeria
Sonatrach
NNPC
Government of Niger
natural gas
pipeline
Nigeria
Algeria
European Union
Nigerian National Petroleum Corporation
Sonatrach
Penspen Limited
Abuja
terrorist insurgency in North Africa
In Aménas hostage crisis
memorandum of understanding
Mohamed Arkab
Timipre Sylva
Mahamane Sani Mahamadou
fr
Warri region
Niger
Hassi R'Mel
Trans-Mediterranean

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑