271:"The Crescent Hotel" is a curving arched building. It is designed to look like a crescent moon with its points on the surface of the Caspian Sea. The crescent shape of the building refers to one of the symbols of Azerbaijan, depicted on its national flag. The skyscraper’s arcuate configuration will not affect the interior of the hotel as the building will rely on two multi-storey column-like towers, which will create additional space and act as a support for the hotel. These supporting towers are called Eastern and Western in accordance with their location. "The Crescent Hotel" comprises 32 floors (28 storeys of the hotel itself standing over a 4-storeys podium). Upon completion, the hotel will comprise 230 guest rooms, 74 apartments and 16 villas. The total area is 177,969 m², parking is planned for 601 cars. "The Crescent Hotel" will be connected to the shore and other buildings of the project via a bridge. This hotel is planned to be a 'seven-star' facility. 354: 378: 390: 312:
entering the area. Once the fence was completed, water was pumped from the site, and it was filled with sand to create the foundation of the building. As of early 2013, the soil creating the artificial island has been formed, and foundation work for the Western and Eastern towers is completed. The piles constructed for "The Crescent Hotel", with a diameter 1500–2000 mm and a length 76.1 meters, are the biggest ever built in Azerbaijan. It was planned to build 464 piles by the end of 2013. By the beginning of 2015, development of both the Eastern and Western Towers had begun on the artificial island.
366: 402: 414: 426: 450: 462: 291:"The Crescent Place" consists of 3 basement floors and 32 overground levels: a 5-storey podium, 2 floors of town houses and a 25-storey residential tower with 2 additional penthouse levels. The Crescent Place will be located onshore next to the tower of "The Crescent City". This residential building, standing 170 metres tall, will include 168 apartments. The total area of the Crescent Place is 273 000 m², with space for approximately 100 retail outlets and an additional 40 food and beverage units. 31: 438: 316:
link-bridge between the column-like towers. This arch has a span of 90 meters which supports 5 hotel levels, hanging off the link-bridge truss. The Koltay Facades website stated that curved sides of the hotel represent an exciting challenge for engineers and designers; floor by floor, the slope of the glass is changing, and so are the components of the reaction forces on the slab, the appearance of the glass, the safety requirements, amongst the others.
234:, a well-known architectural review website, published an article about two projects designed by the Korean company, Heerim Architects, for construction in Baku. The projects, both with a lunar theme, were described as, "an attempt to reinvent the concept of the skyscraper beyond the traditional". The article described two skyscraper complexes, proposed for construction on neighbouring peninsulas, on opposite shores of 332:
By March 2014, the foundation of "Crescent City Tower" had been ready for concrete core pouring. As of beginning 2015, The Crescent City Tower was being constructed at 16-17 levels. In August 2015, the concrete core of the building reached up to the 30th level. By December 2015, the 43rd level of the
328:
By November 2013, 4 taps had been installed on the site of "The Crescent Place". The first floors of the podium were appearing above the fence. The construction of the residential tower, "The Crescent Place", had been started. By the beginning of 2015, 35th floor of The Crescent Place Tower was being
262:
The "Crescent Development Project" is situated with one part on the waterfront of Baku. An offshore part, which includes "The Crescent Hotel", will be located on an artificial island about 170 metres from shore. There will be an office tower ("The Crescent City"), and a residential high-rise building
341:
According to a spokesman of Ilk Construction, completion of the shell and core of "The Crescent Place" is scheduled for January 2015; the site of "The Crescent City" must be finished by May of the same year. Completion of the entire project was planned for the second half of 2017 but as of February
242:
near the seaport, acting as a counterpoint to "Full Moon Bay". Initially, the second project included a 32-storey crescent-shaped hotel (standing on its "horns" offshore), four high-rise residential buildings, and a 43-story business centre standing 203 metres tall (now called Crescent City Tower).
324:
Construction of the onshore foundation started in October 2009. For all parts of the coastline (sites of "The Crescent City" and "The Crescent Place"), 691 short piles with a diameter of 1.2 m and a depth of 26 meters have been installed . For the tower “The Crescent city” 118 deep piles (diameter
315:
Given the complexity of the building’s geometry, a number of contracting companies from the world-wide were engaged in the construction. Many of them faced challenges in achieving their goals. So, Derby Design Engineering cited that the main challenge was to design a constructible solution for the
311:
The plot for "The Crescent Hotel" lies within an area in the Caspian Sea. In May 2012, hehe setting was started. These piles were installed in two rows around the perimeter of the future hotel's location. A double metal fence was then installed around the site which restricted any additional water
283:. According to the project design, the facade of the building is cylindrical and slightly flattened at the north-south direction. The bottom of the tower is narrow and widens as it approaches the top which includes a concave notch. The shape of "The Crescent City" is designed to resemble a torch. 250:
and Port Baku Residence). After modification, the project consisted of a hotel ("The Crescent Hotel"), an office tower ("The Crescent City"), and a high-rise residential building with a podium ("The Crescent Place"). The previous name of the project, "Caspian Plus", was changed to "The Crescent
353: 238:. The first, Full Moon Bay, was to be constructed on the western side of the bay. It included a 158-meter, 35-storey, discoid hotel called "Palace of the Winds 1 and 2". The second complex, "Caspian Plus", had been proposed for construction on the eastern edge of 299:
According to a report published by the management company, almost all piling work for the project had been completed by November 2013. Nine percent of the entire project had been constructed. Ten percent of the coastal part of the Project had been completed.
425: 377: 342:
2019, technical difficulties have prevented the completion of the arch section that will ultimately join the two towers. The completion date is currently estimated as late 2020.(Update) The date of completion is unknown.
221:
The complex comprises an offshore hotel (Crescent Hotel), office tower (Crescent City), residential tower, and a retail and entertainment centre (Crescent Place). The project is intended to be an architectural landmark.
389: 365: 279:
The office tower, “The Crescent City”, is a 210-metre skyscraper with 43 overground levels. It is being built behind "The Crescent Hotel" on the waterfront next to the seaport of Baku and the
303:
In July 2015, DSA Architects International was appointed to take over multidisciplinary lead consultancy design services on the Crescent Development Project, with construction works ongoing.
431:
February 2015: General view on the project, Crescent Place is topped out, Crescent City is built at 18-19 levels, the first floors of The Crescent Hotel' towers are being built on the island
1020: 981: 401: 359:
Construction site (01.08.2012): It is seen the fenced area of the sea designated for "The Crescent Hotel"; piling works are being conducted for onshore part of the project
413: 243:
The fate of the related projects remained uncertain until October 2009 when foundation work in the location of the "Caspian Plus" complex was started.
525: 383:
Construction site (01.03.2013): An island has been created, beginning of piles testing on it; piling works for the onshore part is being completed
710: 195: 246:
The project has since been modified. A trio of high-rise residential buildings was removed to avoid visual overlapping of two other buildings (
449: 1030: 1050: 395:
Construction site (30.04.2013): Beginning of the piles construction on island; onshore part is ready for construction the podium
461: 437: 1040: 934: 1025: 590: 1045: 280: 964: 210:(formerly known as Caspian Plus) is skyscraper complex which is under construction on the Caspian Sea coast in 371:
Construction site (17.08.2012): Offshore site is being filled with sand in order to create artificial island
529: 1035: 912: 752: 561:"APA - Первые объекты возводимого в столице Азербайджана комплекса "Айпара" будут сданы в 2015 году" 837: 778: 684: 738: 959: 625: 8: 922: 902: 545: 407:
Construction site (18.03.2014): Podium, rising of Crescent Place concrete core, parking
506: 495: 484: 729: 263:
with a podium ("The Crescent Place"), on the coastline behind "The Crescent Hotel".
612: 419:
Completion of piling works for The Crescent Hotel on artificial island (18.03.2014)
247: 872: 883: 546:
Ilk Construction - Crescent Place & Park, Earthworks and RC Package Project
971: 942: 648: 1014: 996: 983: 873:
Malaysian company intends to participate in the project Crescent City in Baku
70: 897: 594: 917: 861: 850: 824: 813: 802: 672: 239: 235: 187:
DSA Architects International / Heerim Architects & Planners Co. Ltd.
62: 685:"Half moon hotel shows Baku's stellar architectural ambitions - CNN.com" 30: 215: 84: 319: 954: 560: 534: 58: 455:
March 2015: View on The Crescent Place and The Crescent Hotel
66: 928:
AZ Architecture & Engineering Developments (AZ A&E)
211: 80: 907: 838:"CRESCENT DEVELOPMENT – OFFSHORE STRUCTURES LA LUNA HOTEL" 1021:
Buildings and structures under construction in Azerbaijan
489: 325:
1500 mm, depth of 52-61,5 meters) were constructed.
16:
Buildings and structures under construction in Azerbaijan
829: 443:
February 2015: The Crescent City and The Crescent Hotel
927: 619: 932: 333:concrete core of the Crescent City was completed. 935:"G/P: Parametric Structure of the Crescent Hotel" 1012: 606: 604: 585: 583: 581: 703: 467:March 2015: Construction of The Crescent Hotel 643: 641: 639: 637: 635: 633: 601: 578: 320:Sites of The Crescent City and Crescent Place 306: 965:Inside Pictures of Crescent Moon Tower Dubai 851:Lotos.com.az: Completion work on short piles 555: 553: 153:The Crescent Place 170 m (560 ft) 630: 610: 151:The Crescent City 210 m (690 ft) 550: 539: 254:The project Full Moon Bay was cancelled. 969: 835: 591:"Kempinski Crescent Hotel & Leisure" 155:Crescent Hotel 166 m (545 ft) 1013: 972:"Crescent Bay Baku (video on Youtube)" 803:New stage of works at “Crescent” area 520: 518: 516: 514: 286: 266: 274: 13: 779:"Baku — signatures on the skyline" 511: 14: 1062: 891: 776: 1031:Buildings and structures in Baku 898:Heerim Architects & Planners 753:"Project Update: Crescent Place" 460: 448: 436: 424: 412: 400: 388: 376: 364: 352: 204:The Crescent Development Project 29: 23:The Crescent Development Project 877: 866: 855: 844: 818: 807: 796: 770: 745: 677: 666: 294: 1051:Retail buildings in Azerbaijan 526:"Crescent Development Project" 500: 478: 1: 472: 336: 7: 1041:Skyscraper office buildings 96:; 14 years ago 10: 1067: 933:Georgios Papadogeorgakis. 496:Heerim.com: Crescent Hotel 485:Heerim.com: Crescent Place 345: 307:Site of The Crescent Hotel 257: 225: 171:32 (28+4) (Crescent Hotel) 114:; 2 years ago 1026:Skyscrapers in Azerbaijan 737:Cite uses generic title ( 507:Heerim.com: Crescent City 191: 183: 178: 164: 159: 147: 142: 134: 126: 108: 90: 76: 54: 46: 41: 37: 28: 21: 1046:Residential skyscrapers 179:Design and construction 281:“JW Marriott Absheron” 251:Development Project". 997:40.37389°N 49.85917°E 913:ThorntonTomasetti.com 757:thorntontomasetti.com 109:Estimated completion 91:Construction started 993: /  923:ilkconstruction.com 174:32 (Crescent Place) 42:General information 1002:40.37389; 49.85917 691:. 16 November 2011 653:skyscrapernews.com 649:"Full Moon Rising" 287:The Crescent Place 267:The Crescent Hotel 232:skyscrapernews.com 230:In February 2008, 168:43 (Crescent City) 138:Gilan Construction 1036:Skyscraper hotels 275:The Crescent City 201: 200: 160:Technical details 94:October 2009 1058: 1008: 1007: 1005: 1004: 1003: 998: 994: 991: 990: 989: 986: 975: 953: 951: 950: 941:. Archived from 908:www.dsa-arch.com 903:GilanHolding.com 886: 881: 875: 870: 864: 859: 853: 848: 842: 841: 833: 827: 822: 816: 811: 805: 800: 794: 793: 791: 789: 774: 768: 767: 765: 763: 749: 743: 742: 735: 733: 725: 723: 721: 711:"Page Not Found" 707: 701: 700: 698: 696: 681: 675: 670: 664: 663: 661: 659: 645: 628: 623: 617: 616: 611:Koltay Facades. 608: 599: 598: 593:. Archived from 587: 576: 575: 573: 571: 557: 548: 543: 537: 533: 528:. Archived from 522: 509: 504: 498: 493: 487: 482: 464: 452: 440: 428: 416: 404: 392: 380: 368: 356: 248:Port Baku Towers 208:The Crescent Bay 122: 120: 115: 104: 102: 97: 33: 19: 18: 1066: 1065: 1061: 1060: 1059: 1057: 1056: 1055: 1011: 1010: 1001: 999: 995: 992: 987: 984: 982: 980: 979: 960:Archiloverz.org 948: 946: 894: 889: 884:Skyscraper City 882: 878: 871: 867: 860: 856: 849: 845: 834: 830: 823: 819: 812: 808: 801: 797: 787: 785: 775: 771: 761: 759: 751: 750: 746: 736: 727: 726: 719: 717: 709: 708: 704: 694: 692: 683: 682: 678: 671: 667: 657: 655: 647: 646: 631: 624: 620: 613:"Crescent Baku" 609: 602: 589: 588: 579: 569: 567: 559: 558: 551: 544: 540: 524: 523: 512: 505: 501: 494: 490: 483: 479: 475: 468: 465: 456: 453: 444: 441: 432: 429: 420: 417: 408: 405: 396: 393: 384: 381: 372: 369: 360: 357: 348: 339: 322: 309: 297: 289: 277: 269: 260: 228: 192:Main contractor 172: 169: 154: 152: 118: 116: 113: 100: 98: 95: 17: 12: 11: 5: 1064: 1054: 1053: 1048: 1043: 1038: 1033: 1028: 1023: 977: 976: 970:URBN Limited. 967: 962: 957: 930: 925: 920: 915: 910: 905: 900: 893: 892:External links 890: 888: 887: 876: 865: 854: 843: 836:Derby Design. 828: 817: 806: 795: 783:slideshare.net 769: 744: 702: 676: 665: 629: 626:Crescent Hotel 618: 600: 597:on 2015-12-08. 577: 549: 538: 532:on 2015-01-09. 510: 499: 488: 476: 474: 471: 470: 469: 466: 459: 457: 454: 447: 445: 442: 435: 433: 430: 423: 421: 418: 411: 409: 406: 399: 397: 394: 387: 385: 382: 375: 373: 370: 363: 361: 358: 351: 347: 344: 338: 335: 321: 318: 308: 305: 296: 293: 288: 285: 276: 273: 268: 265: 259: 256: 227: 224: 199: 198: 193: 189: 188: 185: 181: 180: 176: 175: 166: 162: 161: 157: 156: 149: 145: 144: 140: 139: 136: 132: 131: 128: 124: 123: 110: 106: 105: 92: 88: 87: 78: 74: 73: 56: 52: 51: 48: 44: 43: 39: 38: 35: 34: 26: 25: 15: 9: 6: 4: 3: 2: 1063: 1052: 1049: 1047: 1044: 1042: 1039: 1037: 1034: 1032: 1029: 1027: 1024: 1022: 1019: 1018: 1016: 1009: 1006: 973: 968: 966: 963: 961: 958: 956: 945:on 2015-01-08 944: 940: 939:georgiosp.com 936: 931: 929: 926: 924: 921: 919: 916: 914: 911: 909: 906: 904: 901: 899: 896: 895: 885: 880: 874: 869: 863: 858: 852: 847: 839: 832: 826: 821: 815: 810: 804: 799: 784: 780: 773: 758: 754: 748: 740: 731: 716: 712: 706: 690: 686: 680: 674: 669: 654: 650: 644: 642: 640: 638: 636: 634: 627: 622: 614: 607: 605: 596: 592: 586: 584: 582: 566: 562: 556: 554: 547: 542: 536: 531: 527: 521: 519: 517: 515: 508: 503: 497: 492: 486: 481: 477: 463: 458: 451: 446: 439: 434: 427: 422: 415: 410: 403: 398: 391: 386: 379: 374: 367: 362: 355: 350: 349: 343: 334: 330: 329:constructed. 326: 317: 313: 304: 301: 292: 284: 282: 272: 264: 255: 252: 249: 244: 241: 237: 233: 223: 219: 217: 213: 209: 205: 197: 196:Gilan Holding 194: 190: 186: 182: 177: 173: 167: 163: 158: 150: 146: 141: 137: 133: 129: 125: 111: 107: 93: 89: 86: 82: 79: 75: 72: 71:shopping mall 68: 64: 60: 57: 53: 49: 45: 40: 36: 32: 27: 24: 20: 978: 947:. Retrieved 943:the original 938: 879: 868: 862:Lotos.com.az 857: 846: 831: 825:Lotos.com.az 820: 814:Lotos.com.az 809: 798: 786:. Retrieved 782: 772: 760:. Retrieved 756: 747: 718:. Retrieved 714: 705: 693:. Retrieved 688: 679: 668: 656:. Retrieved 652: 621: 595:the original 568:. Retrieved 564: 541: 530:the original 502: 491: 480: 340: 331: 327: 323: 314: 310: 302: 298: 295:Construction 290: 278: 270: 261: 253: 245: 231: 229: 220: 207: 203: 202: 184:Architect(s) 170: 22: 1000: / 165:Floor count 63:residential 1015:Categories 988:49°51′33″E 985:40°22′26″N 949:2015-01-08 788:16 January 762:16 January 720:16 January 695:16 January 658:16 January 570:16 January 473:References 337:Completion 216:Azerbaijan 85:Azerbaijan 918:Lotos.com 715:aecom.com 673:Lotos.com 50:Completed 730:cite web 240:Baku Bay 236:Baku Bay 77:Location 955:Alt URL 777:AECOM. 535:Alt URL 346:Gallery 258:Project 226:History 127:Opening 117: ( 101:2009-10 99: ( 565:apa.az 143:Height 59:office 47:Status 135:Owner 67:hotel 790:2015 764:2015 739:help 722:2015 697:2015 660:2015 572:2015 212:Baku 148:Roof 130:2023 119:2022 112:2022 81:Baku 55:Type 689:CNN 214:, 206:or 1017:: 937:. 781:. 755:. 734:: 732:}} 728:{{ 713:. 687:. 651:. 632:^ 603:^ 580:^ 563:. 552:^ 513:^ 218:. 83:, 69:, 65:, 61:, 974:. 952:. 840:. 792:. 766:. 741:) 724:. 699:. 662:. 615:. 574:. 121:) 103:)

Index


office
residential
hotel
shopping mall
Baku
Azerbaijan
Gilan Holding
Baku
Azerbaijan
Baku Bay
Baku Bay
Port Baku Towers
“JW Marriott Absheron”
Construction site (01.08.2012): It is seen the fenced area of the sea designated for "The Crescent Hotel"; piling works are being conducted for onshore part of the project
Construction site (17.08.2012): Offshore site is being filled with sand in order to create artificial island
Construction site (01.03.2013): An island has been created, beginning of piles testing on it; piling works for the onshore part is being completed
Construction site (30.04.2013): Beginning of the piles construction on island; onshore part is ready for construction the podium
Construction site (18.03.2014): Podium, rising of Crescent Place concrete core, parking
Completion of piling works for The Crescent Hotel on artificial island (18.03.2014)
February 2015: General view on the project, Crescent Place is topped out, Crescent City is built at 18-19 levels, the first floors of The Crescent Hotel' towers are being built on the island
February 2015: The Crescent City and The Crescent Hotel
March 2015: View on The Crescent Place and The Crescent Hotel
March 2015: Construction of The Crescent Hotel
Heerim.com: Crescent Place
Heerim.com: Crescent Hotel