Knowledge

Tawa railway station

Source 📝

468:. This deviation offered a quicker route to Wellington; it was 3 km shorter, avoided the steep grades and sharp curvature of the Johnsonville route, and rejoined the original route north of the new Tawa station. The new deviation was built on the floor of the valley below the level of the old railway requiring the construction of a new railway yard, island station platform, and a new station building at Tawa. The old station building was used as an addition to a local church. 58: 496:
Tawa Station closed from 26 December 2012 to 20 May 2013 for replacing the station building and upgrading the platform and pedestrian overbridge. A shuttle bus service from the Tawa Junction temporary car park to an adjacent station, and a Rail Replacement Bus Stop on Duncan Street were provided. The
492:
The Greater Wellington Regional Council decided to replace the station building in June 2012; at an estimated cost for an erecting a new shelter in three months of about $ 600,000. The existing building would require earthquake strengthening and replacement of 80% of the structure, costing possibly $
471:
Freight services began using the deviation from 24 July 1935 and passenger services on 19 June 1937. On the latter date, the connection between Tawa and Johnsonville was severed and the double track deviation and the new station entered service allowing shorter journey times and a more intensive
422:
Arthur Leigh Hunt was employed from the WMR from 1892 to 1897, advancing from office boy at Thorndon to stationmaster. When he was a ticket clerk on the mail train coming south on a wild night with a “southerly” he was instructed at Paekakariki to cross with a special train at Tawa. The Tawa Flat
384:
Trains run every twenty minutes during daytime off-peak hours, more frequently during peak periods, and less frequently at night. Before July 2018, off-peak passenger train services between Wellington and Waikanae stopping at Tawa ran every thirty minutes but were increased to one every twenty
488:
In 2012, the station building was found to have a 10 cm lean and to be in poor condition due to major water leaks in the roof affecting the structure. The building was closed after an inspection in January while the work needed to repair or replace the building was assessed.
393:
Tawa Flat railway station was renamed Tawa railway station on 23 February 1959 in conjunction with the change of name of the Borough of Tawa Flat to the Borough of Tawa. The area that had previously been known as Tawa Flat then became known as Tawa.
409:
at which trains would only stop if signalled to do so by passengers wishing to board or alight. It was located on what is now Duncan Street north of the junction of Duncan Street and Tawa Street and close to and above the present northbound
423:
station had only one “dead end” siding which was too short for either train. So the south-bound train was split into A and C, the front and rear halves. The north-bound train was designated B and the following shunts were required:
497:
pedestrian overbridge remained open, apart from short term closures. The new station building opened on 20 May 2013. The new building has a series of decorative panels of the station history.
684: 374:
Off-peak trains stop at all stations between Wellington and Waikanae. During peak periods, trains from Wellington that stop at all stations may terminate at Porirua or
891: 886: 86: 819: 808: 356: 378:
and return to Wellington while a number of peak services run express between Wellington and Porirua and thus do not stop at Tawa.
398: 566: 881: 518: 830: 17: 121: 238: 381:
Travel times by train are fifteen minutes to Wellington, six minutes to Porirua, and forty-five minutes to Waikanae.
126: 449: 296: 473: 46: 401:(WMR) and the station opened on 24 September 1885. At this time, the railway followed a circuitous route via 375: 340: 316: 263: 402: 510: 348: 243: 460:
In the 1930s, the original WMR route from Wellington to Tawa was truncated at Johnsonville as the
507:
Rails through the Valley: The story of the construction and use of the railway lines through Tawa
411: 344: 258: 352: 405:
to reach Wellington and Tawa was 16.48 km from the terminus. The original station was a
8: 477: 465: 461: 336: 228: 364: 563: 514: 452:
in December 1908. In June 1909, the government approved £500 to upgrade the station.
368: 360: 320: 866: 538: 625: 570: 312: 875: 845: 832: 610: 101: 88: 49: 406: 308: 57: 332: 304: 251: 786:
Tawa Station and Melville Street Park and Ride closed for remedial work
436:
B places C into siding, then backs to main line and proceeds on its way
433:
A proceeds onto main line clear of the points by the length of B plus C
300: 319:, the southern terminus of the NIMT. The station serves the suburb of 439:
A backs into siding, couples onto C, and then proceeds on its way
448:
The WMR was purchased and incorporated into the network of the
705: 645: 660:, Volume 1: Wellington Provincial District (1897), 1072. 430:
B proceeds forward along main line clear of points to C
721:, fourth edition (Exeter: Quail Map Company, 1993), 16 299:(NIMT) and is part of the suburban rail network of 513:and David Parsons (2008, Tawa Historical Society) 483: 873: 480:north of Tawa was duplicated as far as Porirua. 397:The original line through Tawa was built by the 798:Christmas and New Year holiday period 2012/2013 539:"Kapiti Line (Waikanae – Wellington) – Metlink" 533: 531: 529: 892:Railway stations in New Zealand opened in 2013 887:Railway stations in New Zealand opened in 1885 315:, and is 13.75 kilometres (8.54 mi) from 76:Melville Street, Tawa, Wellington, New Zealand 595: 526: 371:, pass through the station but do not stop. 476:in June 1940, and on 15 December 1957, the 339:under the Metlink brand operating between 56: 626:A little about the Tawa Borough Council, 443: 586:timetable effective from 20 January 2016 427:A goes forward and reverses into siding 399:Wellington and Manawatu Railway Company 14: 874: 455: 755:"Tawa station has seen better days". 719:New Zealand Railway and Tramway Atlas 589: 472:timetable. The line through Tawa was 227: 669: 122:Greater Wellington Regional Council 24: 598:Tawa Flat and the Old Porirua Road 25: 903: 860: 600:. Wright and Carman. p. 235. 417: 181:relocated 24 July 1935 (freight); 493:2 million and taking 18 months. 820:Photos of new decorative panels 813: 809:Photo of new roof being lowered 802: 790: 778: 763: 748: 745:Murray and Parsons, pp. 226–227 739: 724: 711: 694: 678: 674:. Wellington: Reed. p. 60. 672:The Confessions of a Leigh Hunt 484:Replacement of station building 450:New Zealand Railways Department 297:North Island Main Trunk Railway 179:21 Sept 1885 (WMR as Tawa Flat) 867:Photos of Tawa Railway Station 770:"Train station plans sorted". 735:. 16 February 2012. p. 9. 663: 651: 634: 619: 604: 576: 556: 27:Railway station in New Zealand 13: 1: 500: 882:Rail transport in Wellington 335:commuter trains operated by 7: 670:Hunt, Arthur Leigh (1951). 573:, accessed 30 October 2007. 385:minutes from 15 July 2018. 351:. Services are operated by 326: 10: 908: 774:. 21 June 2012. p. 3. 759:. 5 May 2012. p. A13. 658:Cyclopaedia of New Zealand 630:. Retrieved 22 August 2016 615:. Retrieved 22 August 2016 564:Paraparaumu Line timetable 388: 317:Wellington railway station 102:41.1693000°S 174.8283889°E 62:1937–2013 station building 731:"Leaning Tower of Tawa". 613:Wellington City Libraries 282: 278: 274: 232: 224: 220: 215: 211: 203: 195: 187: 175: 170: 162: 157: 149: 141: 133: 117: 80: 72: 67: 55: 45: 34: 702:Rails out of the Capital 685:"Cabinet Appropriations" 642:Rails out of the Capital 183:19 June 1937 (passenger) 107:-41.1693000; 174.8283889 691:2885 (7 July 1909): 16. 569:11 October 2007 at the 412:Redwood railway station 353:electric multiple units 137:North Island Main Trunk 596:Carman, A. H. (1956). 444:Incorporation into NZR 717:John Yonge (editor), 363:carriage trains, the 846:41.1690°S 174.8285°E 784:Tranz Metro leaflet 464:and bypassed by the 291:, originally called 289:Tawa railway station 18:Tawa Railway Station 842: /  466:Tawa Flat deviation 462:Johnsonville Branch 456:Tawa Flat Deviation 337:Transdev Wellington 229:Transdev Wellington 98: /  68:General information 851:-41.1690; 174.8285 543:www.metlink.org.nz 365:Capital Connection 331:Tawa is served by 233:Following station 225:Preceding station 772:The Wellingtonian 757:The Dominion Post 733:The Wellingtonian 648:, 1970) pp. 24,75 584:Kapiti Train Line 519:978-0-473-14410-4 369:Northern Explorer 286: 285: 270: 269: 16:(Redirected from 899: 857: 856: 854: 853: 852: 847: 843: 840: 839: 838: 835: 822: 817: 811: 806: 800: 796:Metlink leaflet 794: 788: 782: 776: 775: 767: 761: 760: 752: 746: 743: 737: 736: 728: 722: 715: 709: 698: 692: 682: 676: 675: 667: 661: 655: 649: 638: 632: 623: 617: 608: 602: 601: 593: 587: 580: 574: 560: 554: 553: 551: 549: 535: 222: 221: 129:(platform, track 113: 112: 110: 109: 108: 103: 99: 96: 95: 94: 91: 60: 32: 31: 21: 907: 906: 902: 901: 900: 898: 897: 896: 872: 871: 863: 850: 848: 844: 841: 836: 833: 831: 829: 828: 826: 825: 818: 814: 807: 803: 795: 791: 783: 779: 769: 768: 764: 754: 753: 749: 744: 740: 730: 729: 725: 716: 712: 699: 695: 683: 679: 668: 664: 656: 652: 639: 635: 624: 620: 611:Tawa Heritage, 609: 605: 594: 590: 581: 577: 571:Wayback Machine 561: 557: 547: 545: 537: 536: 527: 503: 486: 458: 446: 420: 391: 359:(Matangi). Two 329: 313:island platform 266: 246: 182: 180: 125: 106: 104: 100: 97: 92: 89: 87: 85: 84: 63: 41: 40: 39: 28: 23: 22: 15: 12: 11: 5: 905: 895: 894: 889: 884: 870: 869: 862: 861:External links 859: 824: 823: 812: 801: 789: 777: 762: 747: 738: 723: 710: 693: 677: 662: 650: 633: 618: 603: 588: 575: 555: 524: 523: 522: 521: 502: 499: 485: 482: 457: 454: 445: 442: 441: 440: 437: 434: 431: 428: 419: 418:Train crossing 416: 390: 387: 328: 325: 309:double tracked 284: 283: 280: 279: 276: 275: 272: 271: 268: 267: 261: 256: 254: 249: 247: 241: 235: 234: 231: 226: 218: 217: 213: 212: 209: 208: 205: 204:Previous names 201: 200: 197: 193: 192: 189: 185: 184: 177: 173: 172: 168: 167: 164: 160: 159: 155: 154: 151: 147: 146: 143: 139: 138: 135: 131: 130: 119: 115: 114: 93:174°49′42.20″E 82: 78: 77: 74: 70: 69: 65: 64: 61: 53: 52: 43: 42: 37: 36: 35: 26: 9: 6: 4: 3: 2: 904: 893: 890: 888: 885: 883: 880: 879: 877: 868: 865: 864: 858: 855: 821: 816: 810: 805: 799: 793: 787: 781: 773: 766: 758: 751: 742: 734: 727: 720: 714: 708:, 1970] p. 75 707: 703: 697: 690: 689:Otago Witness 686: 681: 673: 666: 659: 654: 647: 643: 637: 631: 629: 622: 616: 614: 607: 599: 592: 585: 579: 572: 568: 565: 559: 544: 540: 534: 532: 530: 525: 520: 516: 512: 508: 505: 504: 498: 494: 490: 481: 479: 475: 469: 467: 463: 453: 451: 438: 435: 432: 429: 426: 425: 424: 415: 413: 408: 404: 400: 395: 386: 382: 379: 377: 372: 370: 366: 362: 361:diesel-hauled 358: 354: 350: 346: 342: 338: 334: 324: 322: 318: 314: 310: 306: 302: 298: 294: 290: 281: 277: 273: 265: 260: 257: 255: 253: 250: 248: 245: 240: 237: 236: 230: 223: 219: 214: 210: 206: 202: 198: 194: 190: 186: 178: 174: 169: 165: 161: 156: 152: 148: 144: 140: 136: 132: 128: 123: 120: 116: 111: 83: 79: 75: 71: 66: 59: 54: 51: 50:suburban rail 48: 44: 33: 30: 19: 827: 815: 804: 797: 792: 785: 780: 771: 765: 756: 750: 741: 732: 726: 718: 713: 701: 696: 688: 680: 671: 665: 657: 653: 641: 636: 628:tawalink.com 627: 621: 612: 606: 597: 591: 583: 578: 558: 546:. Retrieved 542: 511:Bruce Murray 506: 495: 491: 487: 478:single track 470: 459: 447: 421: 403:Johnsonville 396: 392: 383: 380: 373: 330: 295:, is on the 292: 288: 287: 158:Construction 153:Mainline (2) 90:41°10′9.48″S 29: 849: / 837:174°49′43″E 548:21 December 474:electrified 357:FT/FP class 333:Kapiti Line 305:New Zealand 252:Kapiti Line 196:Electrified 124:(buildings) 105: / 81:Coordinates 876:Categories 834:41°10′08″S 700:Hoy, D.G. 640:Hoy, D.G. 501:References 376:Plimmerton 341:Wellington 301:Wellington 264:Wellington 191:1937, 2013 562:metlink, 407:flag stop 307:. It is 293:Tawa Flat 207:Tawa Flat 199:June 1940 142:Platforms 582:metlink 567:Archived 367:and the 349:Waikanae 327:Services 311:with an 262:towards 244:Waikanae 242:towards 216:Services 127:KiwiRail 118:Owned by 73:Location 389:History 355:of the 345:Porirua 259:Redwood 188:Rebuilt 171:History 163:Parking 134:Line(s) 47:Metlink 517:  239:Linden 176:Opened 150:Tracks 145:Island 706:NZRLS 646:NZRLS 550:2019 515:ISBN 343:and 321:Tawa 38:Tawa 509:by 347:or 166:Yes 878:: 687:, 541:. 528:^ 414:. 323:. 303:, 704:( 644:( 552:. 20:)

Index

Tawa Railway Station
Metlink
suburban rail

41°10′9.48″S 174°49′42.20″E / 41.1693000°S 174.8283889°E / -41.1693000; 174.8283889
Greater Wellington Regional Council
KiwiRail
Transdev Wellington
Linden
Waikanae
Kapiti Line
Redwood
Wellington
North Island Main Trunk Railway
Wellington
New Zealand
double tracked
island platform
Wellington railway station
Tawa
Kapiti Line
Transdev Wellington
Wellington
Porirua
Waikanae
electric multiple units
FT/FP class
diesel-hauled
Capital Connection
Northern Explorer