SOMAIR

Source 📝

234: 274:(HDPE) of 2 millimetres (0.079 in) thickness is laid over the clay layer. The optimized design adopted envisages minimizing the cut-and-fill earthworks and also ensure pad-drainage slopes to enable gravity drainage "through a solution channel to the ponds". The drainage pipes are perforated and are installed in a "herringbone pattern", in each cell. The collection of drainage water from each cell is achieved by linking them to a collector drainpipe which carries the drained water into the processing ponds. The piping system was fully camouflaged with fill of ore material. 111: 278:
3065 tU in 2012. Since 2010, the production from SOMAIR Lixi mine has been 1000 tU/yr. The mill capacity has also been upgraded to handle 3000 tU/year. This operation has an annual production rate of 1.4 Mt of low-grade ore with a yield of less than 0.1%U. The processed ore is converted into concentrates and then transported to the ports of Benin. From these ports, they are shipped to Comurhex in France.
226: 391:
Niger: 2001 Article IV Consultation, the Second Review and Second Annual Program Under the Poverty Reduction and Growth Facility Arrangement, and Request for Interim Assistance Under the Enhanced Initiative for Heavily Indebted Poor Countries--Staff Report; Public Information Notice and News Brief on
277:
According to the Red Book, the resource potential of the ore was 42,200 tU as of 2010; this includes conventional recovery of 42,200 tU of 0.25%U, and by heap leaching another 5500 tU at 0.07%U. The production of the SOMAIR mines have progressively increased from 1808 tU in 2009, 2726 tU in 2011 and
265:
During 2005–06, new leach pads were constructed over the old ones. The new leach pad is capable of handling 17 million tonnes of uranium ore which could yield 1.4 million tonnes of uranium extract per year. For the new leach pad, called a heap leach pad, associated with processing ponds, the design
261:
The extraction process was started during the late 1970s and early 1980s and involved the building of exclusive leach pad processing operations of the extracted uranium ores, apart from open cut mining. Initially, the Artois deposits were extracted by open cut mining up to 60 metres (200 ft)
210:(1966) and Akouta (1967). In 1971, SOMAIR became the first company to operate the Arlit mine. Yet another company, the Société Minière de Tassa N'Taghalgue (SMTT) assigned its mining rights in 1996 to SOMAIR before it dissolved. 266:
adopted at the SOMAR mining site is 30 metres (98 ft) in height. It is built up with 5 layers of 6 metres (20 ft) lift each. The leach pad and the pond are built over a layer of 300 millimetres (12 in) thick,
144:
deposit. The production peaked to 3065 tU in 2012. The resources, according to the Red Book, are assessed at 23,170 tU, as of 2010, at 42,200 tU of 0.25%U grade recoverable conventionally, and 5500 tU of 0.07%U grade from
423: 262:
depth with a production rate of 0.30 - 0.35% ore. Lower grade uranium is exploited up to deeper depths of 90 metres (300 ft)), but with lower ore extraction rate of 0.20 - 0.25%.
140:
deposit in 1971, mining 0.30 - 0.35% ore down to depth of 60 metres (200 ft) depth. By 1981, the company was producing 2100 tU/yr and by 2006 it was producing 1565 tU at the
633: 477: 249:. The company's two shareholders are Cogema (now Areva NC) and ONAREM (Office National des Ressources Minieres du Niger). The mine operations conform to the 424:"Potential Use of Radioactively Contaminated Mining Materials in the Construction of Residential Homes From Open Pit Uranium Mines in Gabon And Niger" 199: 202:(BRGM). Studies of its potential and quality were commenced by the French Atomic Energy Commission (CEA). Uranium deposits were also discovered in 452: 628: 287: 206:
formations in other locations in Niger such as Abokurum (1959), Madaouela (1963), Arlette, Ariege, Artois and Tassa/Taza (1965),
638: 548: 515: 400: 292: 217:, the restructured successor to Areva, signed an agreement to extend the operational life of the mine by 11 years to 2040. 571: 364: 297: 317: 600: 433:. Directorate-General For External Policies of the Union Directorate B, Policy Department. p. 19 271: 136:
in the mining area of its northern zone. Established in 1968, it started uranium mining at the
538: 505: 389: 233: 198:
The discovery of uranium in Niger dates to 1967. It was discovered at Azelik by the French
8: 172:
are the twin mining towns of SOMAIR. They are situated on the southern border of the
544: 511: 396: 177: 193: 110: 622: 531: 173: 169: 154: 146: 40: 453:"Left in the dust: AREVA's radioactive legacy in the desert towns of Niger" 149:. SOMAIR is one of two national mining companies in Niger, the other being 482: 180:. They are located 1,200 kilometres (750 mi) to the north-east of 507:
Francophone Africa, 1905-2005: A Century of Economic and Social Change
250: 207: 203: 176:, where uranium is extracted, and are on the western fringe of the 322: 242: 150: 65: 181: 115: 246: 225: 214: 165: 141: 137: 133: 119: 93: 50: 33: 267: 395:. International Monetary Fund. 1 March 2002. p. 25. 318:"RPT-Work resumes at Areva Somair uranium mine in Niger" 634:
Non-renewable resource companies established in 1968
564: 543:. OECD Publishing. 3 August 2010. pp. 305–. 620: 572:"Niger: Uranium mine set to operate until 2040" 540:Uranium 2009: Resources, Production and Demand 384: 382: 200:Bureau de Recherches Géologiques et Minières 379: 497: 232: 224: 109: 416: 288:List of countries by uranium production 621: 595: 593: 213:In May 2023, the Niger government and 503: 392:the Executive Board Discussion (EPub) 293:List of countries by uranium reserves 601:"SOMAIR Uranium Mine Heap Leach Pad" 510:. Allied Publishers. pp. 250–. 359: 357: 355: 353: 351: 349: 347: 345: 343: 341: 96:(63.4%), Government of Niger (36.6%) 590: 310: 13: 132:) is a national mining company of 114:SOMAIR's headquarters building in 14: 650: 629:Uranium mining companies of Niger 338: 298:Oil and mining industry of Niger 229:Arlit mine under SOMAIR in Niger 470: 445: 1: 303: 256: 220: 639:1968 establishments in Niger 237:Sign for the mine restaurant 160: 7: 367:. World Nuclear Association 281: 10: 655: 191: 187: 130:Société des Mines de l'Air 478:"Akokan and Arlit, Niger" 272:High-density polyethylene 100: 89: 84: 76: 71: 61: 56: 46: 39: 29: 24: 458:. Greenpeace. p. 10 184:, the capital of Niger. 431:Uranium Mining in Niger 16:Mining company of Niger 504:Singh, Daleep (2008). 238: 230: 122: 270:of low permeability. 245:, is a subsidiary of 236: 228: 113: 603:. SRK Consulting.com 101:Year of acquisition 21: 365:"Uranium in Niger" 239: 231: 123: 19: 550:978-92-64-04789-1 517:978-81-8424-258-4 402:978-1-4527-3932-8 108: 107: 646: 613: 612: 610: 608: 597: 588: 587: 585: 583: 568: 562: 561: 559: 557: 535: 529: 528: 526: 524: 501: 495: 494: 492: 490: 474: 468: 467: 465: 463: 457: 449: 443: 442: 440: 438: 428: 420: 414: 413: 411: 409: 386: 377: 376: 374: 372: 361: 336: 335: 333: 331: 326:. 21 August 2012 314: 22: 18: 654: 653: 649: 648: 647: 645: 644: 643: 619: 618: 617: 616: 606: 604: 599: 598: 591: 581: 579: 570: 569: 565: 555: 553: 551: 537: 536: 532: 522: 520: 518: 502: 498: 488: 486: 476: 475: 471: 461: 459: 455: 451: 450: 446: 436: 434: 426: 422: 421: 417: 407: 405: 403: 388: 387: 380: 370: 368: 363: 362: 339: 329: 327: 316: 315: 311: 306: 284: 259: 253:certification. 223: 196: 194:Mining in Niger 190: 163: 17: 12: 11: 5: 652: 642: 641: 636: 631: 615: 614: 589: 563: 549: 530: 516: 496: 469: 444: 415: 401: 378: 337: 308: 307: 305: 302: 301: 300: 295: 290: 283: 280: 258: 255: 222: 219: 192:Main article: 189: 186: 162: 159: 153:in the nearby 106: 105: 102: 98: 97: 91: 87: 86: 82: 81: 78: 74: 73: 69: 68: 63: 59: 58: 54: 53: 48: 44: 43: 37: 36: 31: 27: 26: 15: 9: 6: 4: 3: 2: 651: 640: 637: 635: 632: 630: 627: 626: 624: 602: 596: 594: 577: 573: 567: 552: 546: 542: 541: 534: 519: 513: 509: 508: 500: 485: 484: 479: 473: 454: 448: 432: 425: 419: 404: 398: 394: 393: 385: 383: 366: 360: 358: 356: 354: 352: 350: 348: 346: 344: 342: 325: 324: 319: 313: 309: 299: 296: 294: 291: 289: 286: 285: 279: 275: 273: 269: 263: 254: 252: 248: 244: 241:SOMAIR, like 235: 227: 218: 216: 211: 209: 205: 201: 195: 185: 183: 179: 178:Aïr Mountains 175: 174:Sahara Desert 171: 167: 158: 156: 152: 148: 147:heap leaching 143: 139: 135: 131: 127: 121: 117: 112: 103: 99: 95: 92: 88: 83: 79: 75: 70: 67: 64: 60: 55: 52: 49: 45: 42: 41:Agadez Region 38: 35: 32: 28: 23: 605:. Retrieved 580:. Retrieved 578:. 4 May 2023 575: 566: 554:. Retrieved 539: 533: 521:. Retrieved 506: 499: 487:. Retrieved 481: 472: 460:. Retrieved 447: 435:. Retrieved 430: 418: 406:. Retrieved 390: 369:. Retrieved 328:. Retrieved 321: 312: 276: 264: 260: 240: 212: 197: 164: 129: 125: 124: 483:Google Maps 623:Categories 576:Africanews 304:References 257:Production 221:Operations 57:Production 251:ISO 14001 208:Imouraren 204:sandstone 161:Geography 607:21 March 582:4 August 556:22 March 523:22 March 489:28 April 462:27 April 437:27 April 408:20 March 371:20 March 330:21 March 282:See also 62:Products 30:Location 25:Location 480:(Map). 323:Reuters 243:COMINAK 188:History 151:COMINAK 90:Company 72:History 66:uranium 47:Country 547:  514:  399:  182:Niamey 170:Akokan 155:Akokan 126:SOMAIR 116:Niamey 77:Opened 20:SOMAIR 456:(PDF) 427:(PDF) 247:Areva 215:Orano 166:Arlit 142:Tamou 138:Arlit 134:Niger 120:Niger 94:AREVA 85:Owner 51:Niger 34:Arlit 609:2013 584:2023 558:2013 545:ISBN 525:2013 512:ISBN 491:2013 464:2013 439:2013 410:2013 397:ISBN 373:2013 332:2013 268:clay 168:and 104:1969 80:1971 625:: 592:^ 574:. 429:. 381:^ 340:^ 320:. 157:. 118:, 611:. 586:. 560:. 527:. 493:. 466:. 441:. 412:. 375:. 334:. 128:(

Index

Arlit
Agadez Region
Niger
uranium
AREVA

Niamey
Niger
Niger
Arlit
Tamou
heap leaching
COMINAK
Akokan
Arlit
Akokan
Sahara Desert
Aïr Mountains
Niamey
Mining in Niger
Bureau de Recherches Géologiques et Minières
sandstone
Imouraren
Orano


COMINAK
Areva
ISO 14001
clay

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.