Rudi A Hydropower Station

Source ЁЯУЭ

33: 665: 637: 651: 40: 287:
The Rudi River, or Rudi Khola, is one of nine major tributaries of the Madi Nadi with basins that cover more than 11 square miles (28 km). The others are the Midim, Paste, Birdi, Khalte, Pisti, Risti, Sange and Kalesti. The river's discharge is highest between mid-April and mid-December, when
344:
and volume from the Chhedewa Khola and Rudi Khola to the head pond near Rudi B. The catchment was now 53.43 square kilometres (20.63 sq mi). The design was upgraded to 8.8MW with 276.89 metres (908.4 ft) net head and 3.72 cubic metres per second (131 cu ft/s) discharge at
323:
In September 2016 work on Rudi A and Rudi B was halted due to floods and landslides. The main storage site of Rudi A was washed away, and the powerhouse had to be relocated. In July 2018 flooding again caused serious damage to the Rudi Khola A hydropower project, which was under construction. The
348:
Water is carried 6 kilometres (3.7 mi) to the Rudi A powerhouse from Kaski's Singdi Basin and Lamjung's Singdi Dam. Components include the intake, 138 metres (453 ft) reinforced concrete approach culvert, head pond, 4,932 metres (16,181 ft) headrace pipe, surge tank, 1,070 metres
311:. Rudi A uses discharge from Rudi Khola and Chheduwa Khola, with a catchment area of 53.43 square kilometres (20.63 sq mi). The catchment area of Rudi Khola-B is 35.3 square kilometres (13.6 sq mi), and includes the whole Ligus khola basin. 319:
High Himalayan Hydro Construction Pvt Ltd undertook civil construction, while North Hydro and Engineering was responsible to hydro mechanical construction and Toshiba Plant System and Service Corporation undertook the electro-mechanical construction.
380:
of Nepal. BHDCL has a 30-year power purchase agreement with Nepal Electricity Authority (NEA) with contracted energy of 46,860,000 units for Rudi A and 33,210,000 units for Rudi B. Higher tariffs apply in the dry season than the wet season.
328:
pipe was destroyed and the recently completed road was badly damaged. The project was almost complete, including construction of the powerhouse, electromechanical connection of the turbine and generator, headworks and transmission line.
384:
The generation licence will expire in 2105-09-11 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority.
893: 722: 360:
Power from Rudi B is carried on a 3.5 kilometres (2.2 mi) 33kV transmission line to the Rudi A switchyard. Power from Rudi A is carried on a 4.5 kilometres (2.8 mi) 33kV transmission line to
332:
Trial power generation from Rudi A began in September 2018. The project began commercial operation on 19 May 2019. Total costs were Rs. 1,555 million, with a debt-equity ration of 68:32.
353:, each with a rated discharge of 1.86 cubic metres per second (66 cu ft/s) and rated head of 276.89 metres (908.4 ft). They power two horizontal 3 phase AC 340:
Rudi A was initially developed as a 6.8MW run-of-the-river hydroelectricity project. Later this was changed to become a tailrace project of Rudi-B. This created greater
704: 349:(3,510 ft) penstock connecting the surge tank to the powerhouse, and 72 metres (236 ft) tailrace canal. The powerhouse holds two 4840kW horizontal 970: 940: 87: 304: 950: 377: 802: 32: 965: 821: 295:
plants on the river operated by Bindhyabasini Hydropower Development Company Limited (BHDCL). The 8.8 MW Rudi Khola-A is in
763: 222: 857: 841: 292: 189: 394: 249: 244: 873: 960: 239: 361: 184: 376:
The plant is owned and developed by Bindhabasini Hydropower Development Company Pvt.Ltd. (BHDCL), an
670: 705:"Bindhyabasini Hydropower Company to issue IPO worth Rs.25 Crore; issue added to SEBON pipeline" 955: 742: 945: 354: 686: 8: 826: 807: 234: 463: 276: 206: 169: 451: 308: 262: 765:
Monthly Progress Report January, 2019 Rudi-A Small Hydro Power Project (8.8 MW)
553: 341: 300: 272: 75: 565: 934: 196: 102: 89: 912: 820: 469: 788:рдкрд╣рд┐рд░реЛрд▓реЗ рд░реБрджреА рд╣рд╛рдЗрдбреНрд░реЛрдорд╛ рдХреНрд╖рддрд┐, рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди рдорд┐рддрд┐ рд▓рдореНрдмрд┐рдпреЛ (Annapurna Post) 656: 642: 350: 577: 365: 296: 703: 457: 783: 724:
Grading Rationale: Bindhyabasini Hydropower Development Company Limited
894:"рд░реБрджреА 'рдП' рд░ рд░реБрджреА 'рдмреА' рд╕рд╛рдирд╛ рдЬрд▓рд╡рд┐рджреНрдпреБрдд рдЖрдпреЛрдЬрдирд╛ : рдирд┐рд░реНрдорд╛рдгрдХрд╛рд░реНрдп рдардкреНрдк" 664: 608: 288:
there is most rain, with less water from mid-December to mid-April.
225: 840: 743:"Floods in mountain watershed: A case of Madi River, Central Nepal" 559: 325: 762: 650: 571: 156: 368:. The variable flow means the power supply varies seasonally. 872: 822:"Rudi 'A' hydroproject to generate electricity from mid-July" 583: 543: 541: 516: 514: 275:
of Nepal that came into operation in 2019. The flow from the
862:, BHDC: Bindhyabasini Hydropower Development Company Limited 784:"рдкрд╣рд┐рд░реЛрд▓реЗ рд░реБрджреА рд╣рд╛рдЗрдбреНрд░реЛрдорд╛ рдХреНрд╖рддрд┐, рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди рдорд┐рддрд┐ рд▓рдореНрдмрд┐рдпреЛ" 499: 441: 439: 426: 424: 422: 589: 538: 526: 511: 475: 913:"рео.рео рд░реБрджреА 'рдП' рдЬрд▓рд╡рд┐рджреНрдпреБрдд рдЕрд╛рдпрд╛реЗрдЬрдирд╛рдмрд╛рдЯ рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди рд╕реБрд░реБ" 803:"Monsoon induced flood hits Rudi Khola 'A' hydel project" 436: 419: 271:
is a run-of-river hydro-electric plant located in the
632: 407: 146:
Bindhabasini Hydropower Development Company Pvt.Ltd
781: 505: 39: 932: 843:Rudi Khola - A Small Hydropower Project (8.8 MW) 910: 891: 859:Rudi Khola- B Small Hydropower Project (6.6 MW) 520: 487: 481: 470:Rudi тАШAтАЩ hydroproject to generate electricity.. 856: 445: 303:. The 6.6 MW Rudi Khola-B is just upstream in 47:Location of Rudi A Hydropower Station in Nepal 721: 595: 547: 532: 430: 875:Salient Features of Rudi Khola- A SHP(8.8MW) 684: 282: 458:Bindhyabasini Hydropower Company to issue.. 355:synchronous brushless excitation generators 971:Buildings and structures in Kaski District 371: 687:"рд░реБрджреАрдЦреЛрд▓рд╛рдорд╛ резрел.рек рдореЗрдЧрд╛рд╡рд╛рдЯ рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди" 279:is used to generate 8.8 MW electricity. 609:"Operating Projects- Hydro (Above 1MW)" 560:Rudi Khola - A Small Hydropower Project 933: 740: 413: 941:Hydroelectric power stations in Nepal 572:Monthly Progress Report January, 2019 357:, each with rated voltage of 6.3 kV. 800: 750:Journal of Hydrology and Meteorology 493: 741:Khanal, Narendra Raj (March 2004), 730:, CARE Ratings Nepal, February 2020 13: 782:Navin Raj Kuinkel (28 July 2018), 14: 982: 601: 584:Salient Features of Rudi Khola- A 293:run-of-the-river hydroelectricity 685:Belina Thapa (5 February 2020), 663: 649: 635: 38: 31: 951:Run-of-the-river power stations 615: 395:List of power stations in Nepal 314: 911:Yashada Sunuwar (2018-10-11), 892:Saroj Bhattarai (2016-09-11), 625:. Nepal Electricity Authority. 1: 400: 335: 966:2019 establishments in Nepal 7: 801:Rana, Ramji (6 July 2018), 388: 362:Nepal Electricity Authority 261:Rudi A Hydropower Station ( 250:GPX (secondary coordinates) 10: 987: 677: 378:Independent Power Producer 283:Location and water supply 266: 245:GPX (primary coordinates) 220:Map all coordinates using 205: 195: 183: 175: 165: 155: 150: 142: 134: 126: 118: 81: 71: 63: 59:Rudi A Hydropower Project 55: 26: 22:Rudi A Hydropower Station 21: 228:Download coordinates as: 671:Renewable energy portal 623:Annual Report 2019/2046 372:Commercial arrangements 267:рд░реБрджреА A рдЬрд▓рд╡рд┐рджреНрдпреБрдд рдЖрдпреЛрдЬрдирд╛ 207:Installed capacity 506:Navin Raj Kuinkel 2018 240:GPX (all coordinates) 157:Type of dam 103:28.23083┬░N 84.21667┬░E 16:Dam in Kaski District 521:Yashada Sunuwar 2018 482:Saroj Bhattarai 2016 176:Commission date 961:Irrigation in Nepal 827:The Himalayan Times 808:The Himalayan Times 99: /  446:Rudi Khola-B: BHDC 170:Rudi River (Nepal) 108:28.23083; 84.21667 711:, 17 January 2020 596:Grading Rationale 548:Grading Rationale 533:Grading Rationale 431:Grading Rationale 364:'s substation at 215: 214: 151:Dam and spillways 135:Opening date 978: 926: 925: 924: 907: 906: 905: 898:NepalEnergyForum 888: 887: 886: 880: 869: 868: 867: 853: 852: 851: 837: 836: 835: 817: 816: 815: 797: 796: 795: 778: 777: 776: 770: 759: 758: 757: 747: 737: 736: 735: 729: 718: 717: 716: 700: 699: 698: 673: 668: 667: 659: 654: 653: 645: 640: 639: 638: 627: 626: 619: 613: 612: 605: 599: 593: 587: 581: 575: 569: 563: 557: 551: 545: 536: 530: 524: 518: 509: 503: 497: 491: 485: 479: 473: 467: 461: 455: 449: 443: 434: 428: 417: 411: 309:Lamjung District 268: 190:Run-of-the-river 114: 113: 111: 110: 109: 104: 100: 97: 96: 95: 92: 42: 41: 35: 19: 18: 986: 985: 981: 980: 979: 977: 976: 975: 931: 930: 929: 922: 920: 903: 901: 884: 882: 878: 865: 863: 849: 847: 833: 831: 813: 811: 793: 791: 774: 772: 768: 755: 753: 745: 733: 731: 727: 714: 712: 696: 694: 680: 669: 662: 655: 648: 641: 636: 634: 631: 630: 621: 620: 616: 607: 606: 602: 594: 590: 582: 578: 570: 566: 558: 554: 546: 539: 531: 527: 519: 512: 504: 500: 492: 488: 480: 476: 468: 464: 456: 452: 444: 437: 429: 420: 412: 408: 403: 391: 374: 338: 317: 285: 258: 257: 256: 255: 254: 107: 105: 101: 98: 93: 90: 88: 86: 85: 51: 50: 49: 48: 45: 44: 43: 17: 12: 11: 5: 984: 974: 973: 968: 963: 958: 953: 948: 943: 928: 927: 908: 889: 870: 854: 838: 818: 798: 779: 760: 738: 719: 701: 681: 679: 676: 675: 674: 660: 646: 629: 628: 614: 600: 588: 576: 564: 552: 537: 525: 510: 498: 486: 474: 462: 450: 435: 418: 405: 404: 402: 399: 398: 397: 390: 387: 373: 370: 342:hydraulic head 337: 334: 316: 313: 301:Kaski District 291:There are two 284: 281: 273:Kaski District 253: 252: 247: 242: 237: 231: 218: 217: 216: 213: 212: 209: 203: 202: 199: 193: 192: 187: 181: 180: 177: 173: 172: 167: 163: 162: 159: 153: 152: 148: 147: 144: 140: 139: 136: 132: 131: 128: 124: 123: 120: 116: 115: 83: 79: 78: 76:Kaski District 73: 69: 68: 65: 61: 60: 57: 53: 52: 46: 37: 36: 30: 29: 28: 27: 24: 23: 15: 9: 6: 4: 3: 2: 983: 972: 969: 967: 964: 962: 959: 957: 956:Dams in Nepal 954: 952: 949: 947: 944: 942: 939: 938: 936: 918: 914: 909: 899: 895: 890: 877: 876: 871: 861: 860: 855: 845: 844: 839: 829: 828: 823: 819: 810: 809: 804: 799: 789: 785: 780: 767: 766: 761: 751: 744: 739: 726: 725: 720: 710: 706: 702: 692: 688: 683: 682: 672: 666: 661: 658: 652: 647: 644: 633: 624: 618: 610: 604: 597: 592: 585: 580: 573: 568: 561: 556: 549: 544: 542: 534: 529: 522: 517: 515: 507: 502: 495: 490: 483: 478: 471: 466: 459: 454: 447: 442: 440: 432: 427: 425: 423: 416:, p. 69. 415: 410: 406: 396: 393: 392: 386: 382: 379: 369: 367: 363: 358: 356: 352: 351:Pelton wheels 346: 343: 333: 330: 327: 321: 312: 310: 306: 302: 298: 294: 289: 280: 278: 274: 270: 264: 251: 248: 246: 243: 241: 238: 236: 233: 232: 230: 229: 224: 223:OpenStreetMap 221: 210: 208: 204: 200: 198: 194: 191: 188: 186: 182: 179:2075-12-05 BS 178: 174: 171: 168: 164: 160: 158: 154: 149: 145: 141: 137: 133: 129: 125: 121: 117: 112: 84: 80: 77: 74: 70: 66: 62: 58: 56:Official name 54: 34: 25: 20: 946:Gravity dams 921:, retrieved 916: 902:, retrieved 897: 883:, retrieved 874: 864:, retrieved 858: 848:, retrieved 842: 832:, retrieved 830:, 5 May 2018 825: 812:, retrieved 806: 792:, retrieved 787: 773:, retrieved 764: 754:, retrieved 752:, 1 1issue=1 749: 732:, retrieved 723: 713:, retrieved 708: 695:, retrieved 691:GorakhaPatra 690: 657:Water portal 643:Nepal portal 622: 617: 603: 598:, p. 5. 591: 586:, p. 3. 579: 574:, p. 1. 567: 555: 550:, p. 3. 535:, p. 1. 528: 501: 489: 477: 465: 453: 433:, p. 2. 409: 383: 375: 359: 347: 339: 331: 322: 318: 315:Construction 290: 286: 260: 259: 227: 226: 219: 919:(in Nepali) 900:(in Nepali) 790:(in Nepali) 709:Sharesansar 693:(in Nepali) 414:Khanal 2004 366:Mijuredanda 297:Mijuredanda 138:19 May 2019 130:Operational 106: / 82:Coordinates 935:Categories 923:2020-11-30 917:UrjaKhabar 904:2020-11-30 885:2020-11-30 866:2020-11-29 850:2020-11-30 834:2020-11-30 814:2020-11-29 794:2020-11-30 775:2020-11-30 756:2020-11-29 734:2020-11-29 715:2020-11-29 697:2020-11-30 401:References 336:Technology 277:Rudi River 94:84┬░13тА▓00тА│E 91:28┬░13тА▓51тА│N 494:Rana 2018 389:See also 326:penstock 197:Turbines 166:Impounds 143:Owner(s) 72:Location 771:, BHDCL 678:Sources 305:Pasguan 299:VDC of 161:Gravity 119:Purpose 64:Country 881:, BHDC 846:, BHDC 345:Q40%. 263:Nepali 211:8.8 MW 127:Status 879:(PDF) 769:(PDF) 746:(PDF) 728:(PDF) 307:VDC, 122:Power 67:Nepal 185:Type 235:KML 937:: 915:, 896:, 824:, 805:, 786:, 748:, 707:, 689:, 540:^ 513:^ 438:^ 421:^ 265:: 611:. 562:. 523:. 508:. 496:. 484:. 472:. 460:. 448:. 269:) 201:2

Index

Rudi A Hydropower Station is located in Nepal
Kaski District
28┬░13тА▓51тА│N 84┬░13тА▓00тА│E / 28.23083┬░N 84.21667┬░E / 28.23083; 84.21667
Type of dam
Rudi River (Nepal)
Type
Run-of-the-river
Turbines
Installed capacity
OpenStreetMap
KML
GPX (all coordinates)
GPX (primary coordinates)
GPX (secondary coordinates)
Nepali
Kaski District
Rudi River
run-of-the-river hydroelectricity
Mijuredanda
Kaski District
Pasguan
Lamjung District
penstock
hydraulic head
Pelton wheels
synchronous brushless excitation generators
Nepal Electricity Authority
Mijuredanda
Independent Power Producer
List of power stations in Nepal