33:
665:
637:
651:
40:
287:
The Rudi River, or Rudi Khola, is one of nine major tributaries of the Madi Nadi with basins that cover more than 11 square miles (28 km). The others are the Midim, Paste, Birdi, Khalte, Pisti, Risti, Sange and
Kalesti. The river's discharge is highest between mid-April and mid-December, when
344:
and volume from the
Chhedewa Khola and Rudi Khola to the head pond near Rudi B. The catchment was now 53.43 square kilometres (20.63 sq mi). The design was upgraded to 8.8MW with 276.89 metres (908.4 ft) net head and 3.72 cubic metres per second (131 cu ft/s) discharge at
323:
In
September 2016 work on Rudi A and Rudi B was halted due to floods and landslides. The main storage site of Rudi A was washed away, and the powerhouse had to be relocated. In July 2018 flooding again caused serious damage to the Rudi Khola A hydropower project, which was under construction. The
348:
Water is carried 6 kilometres (3.7 mi) to the Rudi A powerhouse from Kaski's Singdi Basin and
Lamjung's Singdi Dam. Components include the intake, 138 metres (453 ft) reinforced concrete approach culvert, head pond, 4,932 metres (16,181 ft) headrace pipe, surge tank, 1,070 metres
311:. Rudi A uses discharge from Rudi Khola and Chheduwa Khola, with a catchment area of 53.43 square kilometres (20.63 sq mi). The catchment area of Rudi Khola-B is 35.3 square kilometres (13.6 sq mi), and includes the whole Ligus khola basin.
319:
High
Himalayan Hydro Construction Pvt Ltd undertook civil construction, while North Hydro and Engineering was responsible to hydro mechanical construction and Toshiba Plant System and Service Corporation undertook the electro-mechanical construction.
380:
of Nepal. BHDCL has a 30-year power purchase agreement with Nepal
Electricity Authority (NEA) with contracted energy of 46,860,000 units for Rudi A and 33,210,000 units for Rudi B. Higher tariffs apply in the dry season than the wet season.
328:
pipe was destroyed and the recently completed road was badly damaged. The project was almost complete, including construction of the powerhouse, electromechanical connection of the turbine and generator, headworks and transmission line.
384:
The generation licence will expire in 2105-09-11 BS, after which the plant will be handed over to the government. The power station is connected to the national grid and the electricity is sold to Nepal
Electricity Authority.
893:
722:
360:
Power from Rudi B is carried on a 3.5 kilometres (2.2 mi) 33kV transmission line to the Rudi A switchyard. Power from Rudi A is carried on a 4.5 kilometres (2.8 mi) 33kV transmission line to
332:
Trial power generation from Rudi A began in
September 2018. The project began commercial operation on 19 May 2019. Total costs were Rs. 1,555 million, with a debt-equity ration of 68:32.
353:, each with a rated discharge of 1.86 cubic metres per second (66 cu ft/s) and rated head of 276.89 metres (908.4 ft). They power two horizontal 3 phase AC
340:
Rudi A was initially developed as a 6.8MW run-of-the-river hydroelectricity project. Later this was changed to become a tailrace project of Rudi-B. This created greater
704:
349:(3,510 ft) penstock connecting the surge tank to the powerhouse, and 72 metres (236 ft) tailrace canal. The powerhouse holds two 4840kW horizontal
970:
940:
87:
304:
950:
377:
802:
32:
965:
821:
295:
plants on the river operated by
Bindhyabasini Hydropower Development Company Limited (BHDCL). The 8.8 MW Rudi Khola-A is in
763:
222:
857:
841:
292:
189:
394:
249:
244:
873:
960:
239:
361:
184:
376:
The plant is owned and developed by
Bindhabasini Hydropower Development Company Pvt.Ltd. (BHDCL), an
670:
705:"Bindhyabasini Hydropower Company to issue IPO worth Rs.25 Crore; issue added to SEBON pipeline"
955:
742:
945:
354:
686:
8:
826:
807:
234:
463:
276:
206:
169:
451:
308:
262:
765:
Monthly Progress Report January, 2019 Rudi-A Small Hydro Power Project (8.8 MW)
553:
341:
300:
272:
75:
565:
934:
196:
102:
89:
912:
820:
469:
788:рдкрд╣рд┐рд░реЛрд▓реЗ рд░реБрджреА рд╣рд╛рдЗрдбреНрд░реЛрдорд╛ рдХреНрд╖рддрд┐, рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди рдорд┐рддрд┐ рд▓рдореНрдмрд┐рдпреЛ (Annapurna Post)
656:
642:
350:
577:
365:
296:
703:
457:
783:
724:
Grading Rationale: Bindhyabasini Hydropower Development Company Limited
894:"рд░реБрджреА 'рдП' рд░ рд░реБрджреА 'рдмреА' рд╕рд╛рдирд╛ рдЬрд▓рд╡рд┐рджреНрдпреБрдд рдЖрдпреЛрдЬрдирд╛ : рдирд┐рд░реНрдорд╛рдгрдХрд╛рд░реНрдп рдардкреНрдк"
664:
608:
288:
there is most rain, with less water from mid-December to mid-April.
225:
840:
743:"Floods in mountain watershed: A case of Madi River, Central Nepal"
559:
325:
762:
650:
571:
156:
368:. The variable flow means the power supply varies seasonally.
872:
822:"Rudi 'A' hydroproject to generate electricity from mid-July"
583:
543:
541:
516:
514:
275:
of Nepal that came into operation in 2019. The flow from the
862:, BHDC: Bindhyabasini Hydropower Development Company Limited
784:"рдкрд╣рд┐рд░реЛрд▓реЗ рд░реБрджреА рд╣рд╛рдЗрдбреНрд░реЛрдорд╛ рдХреНрд╖рддрд┐, рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди рдорд┐рддрд┐ рд▓рдореНрдмрд┐рдпреЛ"
499:
441:
439:
426:
424:
422:
589:
538:
526:
511:
475:
913:"рео.рео рд░реБрджреА 'рдП' рдЬрд▓рд╡рд┐рджреНрдпреБрдд рдЕрд╛рдпрд╛реЗрдЬрдирд╛рдмрд╛рдЯ рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди рд╕реБрд░реБ"
803:"Monsoon induced flood hits Rudi Khola 'A' hydel project"
436:
419:
271:
is a run-of-river hydro-electric plant located in the
632:
407:
146:
Bindhabasini Hydropower Development Company Pvt.Ltd
781:
505:
39:
932:
843:Rudi Khola - A Small Hydropower Project (8.8 MW)
910:
891:
859:Rudi Khola- B Small Hydropower Project (6.6 MW)
520:
487:
481:
470:Rudi тАШAтАЩ hydroproject to generate electricity..
856:
445:
303:. The 6.6 MW Rudi Khola-B is just upstream in
47:Location of Rudi A Hydropower Station in Nepal
721:
595:
547:
532:
430:
875:Salient Features of Rudi Khola- A SHP(8.8MW)
684:
282:
458:Bindhyabasini Hydropower Company to issue..
355:synchronous brushless excitation generators
971:Buildings and structures in Kaski District
371:
687:"рд░реБрджреАрдЦреЛрд▓рд╛рдорд╛ резрел.рек рдореЗрдЧрд╛рд╡рд╛рдЯ рд╡рд┐рджреНрдпреБрдд рдЙрддреНрдкрд╛рджрди"
279:is used to generate 8.8 MW electricity.
609:"Operating Projects- Hydro (Above 1MW)"
560:Rudi Khola - A Small Hydropower Project
933:
740:
413:
941:Hydroelectric power stations in Nepal
572:Monthly Progress Report January, 2019
357:, each with rated voltage of 6.3 kV.
800:
750:Journal of Hydrology and Meteorology
493:
741:Khanal, Narendra Raj (March 2004),
730:, CARE Ratings Nepal, February 2020
13:
782:Navin Raj Kuinkel (28 July 2018),
14:
982:
601:
584:Salient Features of Rudi Khola- A
293:run-of-the-river hydroelectricity
685:Belina Thapa (5 February 2020),
663:
649:
635:
38:
31:
951:Run-of-the-river power stations
615:
395:List of power stations in Nepal
314:
911:Yashada Sunuwar (2018-10-11),
892:Saroj Bhattarai (2016-09-11),
625:. Nepal Electricity Authority.
1:
400:
335:
966:2019 establishments in Nepal
7:
801:Rana, Ramji (6 July 2018),
388:
362:Nepal Electricity Authority
261:Rudi A Hydropower Station (
250:GPX (secondary coordinates)
10:
987:
677:
378:Independent Power Producer
283:Location and water supply
266:
245:GPX (primary coordinates)
220:Map all coordinates using
205:
195:
183:
175:
165:
155:
150:
142:
134:
126:
118:
81:
71:
63:
59:Rudi A Hydropower Project
55:
26:
22:Rudi A Hydropower Station
21:
228:Download coordinates as:
671:Renewable energy portal
623:Annual Report 2019/2046
372:Commercial arrangements
267:рд░реБрджреА A рдЬрд▓рд╡рд┐рджреНрдпреБрдд рдЖрдпреЛрдЬрдирд╛
207:Installed capacity
506:Navin Raj Kuinkel 2018
240:GPX (all coordinates)
157:Type of dam
103:28.23083┬░N 84.21667┬░E
16:Dam in Kaski District
521:Yashada Sunuwar 2018
482:Saroj Bhattarai 2016
176:Commission date
961:Irrigation in Nepal
827:The Himalayan Times
808:The Himalayan Times
99: /
446:Rudi Khola-B: BHDC
170:Rudi River (Nepal)
108:28.23083; 84.21667
711:, 17 January 2020
596:Grading Rationale
548:Grading Rationale
533:Grading Rationale
431:Grading Rationale
364:'s substation at
215:
214:
151:Dam and spillways
135:Opening date
978:
926:
925:
924:
907:
906:
905:
898:NepalEnergyForum
888:
887:
886:
880:
869:
868:
867:
853:
852:
851:
837:
836:
835:
817:
816:
815:
797:
796:
795:
778:
777:
776:
770:
759:
758:
757:
747:
737:
736:
735:
729:
718:
717:
716:
700:
699:
698:
673:
668:
667:
659:
654:
653:
645:
640:
639:
638:
627:
626:
619:
613:
612:
605:
599:
593:
587:
581:
575:
569:
563:
557:
551:
545:
536:
530:
524:
518:
509:
503:
497:
491:
485:
479:
473:
467:
461:
455:
449:
443:
434:
428:
417:
411:
309:Lamjung District
268:
190:Run-of-the-river
114:
113:
111:
110:
109:
104:
100:
97:
96:
95:
92:
42:
41:
35:
19:
18:
986:
985:
981:
980:
979:
977:
976:
975:
931:
930:
929:
922:
920:
903:
901:
884:
882:
878:
865:
863:
849:
847:
833:
831:
813:
811:
793:
791:
774:
772:
768:
755:
753:
745:
733:
731:
727:
714:
712:
696:
694:
680:
669:
662:
655:
648:
641:
636:
634:
631:
630:
621:
620:
616:
607:
606:
602:
594:
590:
582:
578:
570:
566:
558:
554:
546:
539:
531:
527:
519:
512:
504:
500:
492:
488:
480:
476:
468:
464:
456:
452:
444:
437:
429:
420:
412:
408:
403:
391:
374:
338:
317:
285:
258:
257:
256:
255:
254:
107:
105:
101:
98:
93:
90:
88:
86:
85:
51:
50:
49:
48:
45:
44:
43:
17:
12:
11:
5:
984:
974:
973:
968:
963:
958:
953:
948:
943:
928:
927:
908:
889:
870:
854:
838:
818:
798:
779:
760:
738:
719:
701:
681:
679:
676:
675:
674:
660:
646:
629:
628:
614:
600:
588:
576:
564:
552:
537:
525:
510:
498:
486:
474:
462:
450:
435:
418:
405:
404:
402:
399:
398:
397:
390:
387:
373:
370:
342:hydraulic head
337:
334:
316:
313:
301:Kaski District
291:There are two
284:
281:
273:Kaski District
253:
252:
247:
242:
237:
231:
218:
217:
216:
213:
212:
209:
203:
202:
199:
193:
192:
187:
181:
180:
177:
173:
172:
167:
163:
162:
159:
153:
152:
148:
147:
144:
140:
139:
136:
132:
131:
128:
124:
123:
120:
116:
115:
83:
79:
78:
76:Kaski District
73:
69:
68:
65:
61:
60:
57:
53:
52:
46:
37:
36:
30:
29:
28:
27:
24:
23:
15:
9:
6:
4:
3:
2:
983:
972:
969:
967:
964:
962:
959:
957:
956:Dams in Nepal
954:
952:
949:
947:
944:
942:
939:
938:
936:
918:
914:
909:
899:
895:
890:
877:
876:
871:
861:
860:
855:
845:
844:
839:
829:
828:
823:
819:
810:
809:
804:
799:
789:
785:
780:
767:
766:
761:
751:
744:
739:
726:
725:
720:
710:
706:
702:
692:
688:
683:
682:
672:
666:
661:
658:
652:
647:
644:
633:
624:
618:
610:
604:
597:
592:
585:
580:
573:
568:
561:
556:
549:
544:
542:
534:
529:
522:
517:
515:
507:
502:
495:
490:
483:
478:
471:
466:
459:
454:
447:
442:
440:
432:
427:
425:
423:
416:, p. 69.
415:
410:
406:
396:
393:
392:
386:
382:
379:
369:
367:
363:
358:
356:
352:
351:Pelton wheels
346:
343:
333:
330:
327:
321:
312:
310:
306:
302:
298:
294:
289:
280:
278:
274:
270:
264:
251:
248:
246:
243:
241:
238:
236:
233:
232:
230:
229:
224:
223:OpenStreetMap
221:
210:
208:
204:
200:
198:
194:
191:
188:
186:
182:
179:2075-12-05 BS
178:
174:
171:
168:
164:
160:
158:
154:
149:
145:
141:
137:
133:
129:
125:
121:
117:
112:
84:
80:
77:
74:
70:
66:
62:
58:
56:Official name
54:
34:
25:
20:
946:Gravity dams
921:, retrieved
916:
902:, retrieved
897:
883:, retrieved
874:
864:, retrieved
858:
848:, retrieved
842:
832:, retrieved
830:, 5 May 2018
825:
812:, retrieved
806:
792:, retrieved
787:
773:, retrieved
764:
754:, retrieved
752:, 1 1issue=1
749:
732:, retrieved
723:
713:, retrieved
708:
695:, retrieved
691:GorakhaPatra
690:
657:Water portal
643:Nepal portal
622:
617:
603:
598:, p. 5.
591:
586:, p. 3.
579:
574:, p. 1.
567:
555:
550:, p. 3.
535:, p. 1.
528:
501:
489:
477:
465:
453:
433:, p. 2.
409:
383:
375:
359:
347:
339:
331:
322:
318:
315:Construction
290:
286:
260:
259:
227:
226:
219:
919:(in Nepali)
900:(in Nepali)
790:(in Nepali)
709:Sharesansar
693:(in Nepali)
414:Khanal 2004
366:Mijuredanda
297:Mijuredanda
138:19 May 2019
130:Operational
106: /
82:Coordinates
935:Categories
923:2020-11-30
917:UrjaKhabar
904:2020-11-30
885:2020-11-30
866:2020-11-29
850:2020-11-30
834:2020-11-30
814:2020-11-29
794:2020-11-30
775:2020-11-30
756:2020-11-29
734:2020-11-29
715:2020-11-29
697:2020-11-30
401:References
336:Technology
277:Rudi River
94:84┬░13тА▓00тА│E
91:28┬░13тА▓51тА│N
494:Rana 2018
389:See also
326:penstock
197:Turbines
166:Impounds
143:Owner(s)
72:Location
771:, BHDCL
678:Sources
305:Pasguan
299:VDC of
161:Gravity
119:Purpose
64:Country
881:, BHDC
846:, BHDC
345:Q40%.
263:Nepali
211:8.8 MW
127:Status
879:(PDF)
769:(PDF)
746:(PDF)
728:(PDF)
307:VDC,
122:Power
67:Nepal
185:Type
235:KML
937::
915:,
896:,
824:,
805:,
786:,
748:,
707:,
689:,
540:^
513:^
438:^
421:^
265::
611:.
562:.
523:.
508:.
496:.
484:.
472:.
460:.
448:.
269:)
201:2
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.