Knowledge

North Tarrant Express

Source đź“ť

22: 589: 873: 697: 602: 792: 751: 813: 819: 757: 692: 687: 189: 184: 682: 636: 677: 608: 595: 161: 140: 82: 417:
On June 23, 2009, TxDOT awarded a comprehensive development agreement (CDA) for the North Tarrant Express project to NTE Mobility Partners. This concessions includes the design, development, construction, finance, maintenance, and operation of Segment 1 (West) and Segment 2 (East) for the duration of
513:
Pursuant to the additional agreement between TxDOT and NTE Mobility Partners Segments 3 LLC (NTEMP3), the developer (NTEMP3) will design, build, operate and maintain segment 3A (35W). TxDOT will build segment 3B (35W), from north of Loop 820 to U.S. 287, and will then turn it over to NTEMP3 who will
392:
For the 150,000+ cars a day that travel through the I-820 and SH 121/SR 183 corridor, drivers are no stranger to some of the bottlenecks that cause these delays. As one of the region's most important corridors, this stretch of highway has not kept up with the growth and North Texas' nearly
364:
The NTE project is completely reconstructing and upgrading existing general highway lanes. It is also improving and expanding frontage lanes to double the existing capacity. Moreover, adding TEXpress managed lanes, or tolled express lanes, is designed for commuters seeking the most reliable and
377:
in 2009 that focused on 11 metro areas, showed that North Texas would have a huge economic boost by alleviating traffic congestion, calculating the extra productivity from better movement of people and goods around the region. Wise infrastructure investments that eliminate gridlock and produce
488:
Segment 3C is from US 81 and 287 to Eagle Parkway. Construction began in September 2020. The public-private project will rebuild 6.7 miles of I-35W and add four TEXpress Lanes, auxiliary lanes and some frontage roads. Anticipated substantial completion is late
389:. The Reason study says the biggest economic gains would come from eliminating severe congestion, which could add $ 46 billion a year to the regional economy and over $ 3 billion in annual tax revenues. Dallas is the fourth fastest-growing city in the country. 365:
time-saving trip. The variable tolls are based on travel time with a minimum goal to maintain a 50 mph traffic flow on the highway; motorists can choose to use general highway lanes or tolled express lanes depending on their traveling objectives.
538:, a global public-private partnership investor/developer of public facilities; and the Dallas Police and Fire Pension System, the first U.S. pension fund in the country to invest in the building and maintenance of a major toll road project like NTE. 509:
The NTE is being designed, built, financed, operated and maintained by NTE Mobility Partners, which is working in close collaboration with TxDOT and local communities. This important highway project will be wholly owned by TxDOT.
339:(TxDOT) anticipate the new highway system will relieve traffic congestion, improve safety on its roadways and have integrated plans for the anticipated traffic growth in one of the country’s 343:. When the improvements are completed, the $ 2.5 billion North Tarrant Express will have upgraded main highway lanes, continuous frontage roads, and 13.3 miles (21.4 km) of newly added 478:
Segment 3A is 6.5 miles (10.5 km) of I-35W from north of I-30 to north of I-820 and includes the I-35W/I-820 interchange. Constructed by NTE Mobility Partners Segments 3, LLC (NTEMP3).
474:). Segment 3A has an expected completion date in 2018 and 3B in 2017. The I-35W project is the next part of the North Tarrant Express. It is divided into three segments: 426:
The West Segment (I-820) is 6.4 miles (10.3 km) in length and runs from I-35W on the west to the North East Mall interchange on the east across three cities (
107: 514:
be responsible for the operations and maintenance. NTEMP3 will also collect tolls generated on the managed toll lanes of the facility until 2061 paying off the
385:(DFW) was singled out in the study due to its poor showing in congestion indexes and ranked poorly in many indexes in the annual mobility study by the 969: 1374: 998: 378:
free-flowing road conditions will more than pay for themselves by boosting the region’s economy, and thus tax revenues to maintain the mobility.
470:
A construction agreement with TxDOT has initiated construction on Segments 3A (I-35W from downtown Fort Worth) & 3B (I-35W from I-30 to
393:
seven million residents. Dallas/Fort Worth commuters spend an average of two days a year stuck in traffic—the fifth-highest in the nation.
1335: 503: 1126: 350:
Construction began in late 2010 and was scheduled to be completed before the end of 2014, at least six months ahead of schedule.
283: 850: 357:(Downtown Fort Worth) to the I-820 interchange. The project will provide over $ 1.5 billion of needed infrastructure to the 278: 273: 253: 1099: 293: 1179: 1073: 1028: 336: 1322: 60: 1317: 1227: 397: 382: 340: 263: 38: 1202: 499: 386: 258: 31: 1275: 1369: 1153: 649: 435: 288: 172: 450:
interchange on the west to Industrial Boulevard in the east, across four cities (North Richland Hills,
245: 42: 1290: 1198: 1006: 353:
Also included in the North Tarrant Express' scope is the 10 miles (16 km) of I-35W from north of
716: 446:
The East Segment (SH 121/SR 183) is 6.9 miles (11.1 km) in length and runs from the
1334: 823: 795: 761: 712: 708: 639: 471: 320: 316: 196: 192: 1050: 1021: 704: 616: 482: 328: 143: 547: 515: 332: 8: 1130: 897: 268: 1051:"Gridlock and Growth: The Effect of Traffic Congestion on Regional Economic Performance" 1154:"InconsIstent TraffIc CondItIons ForcIng Texas Commuters to Allow Even More Extra TIme" 625: 431: 168: 1326: 877: 577: 427: 374: 358: 147: 920: 946: 534:, a world leader in private-sector development of transportation infrastructure; 447: 324: 37:
It may require cleanup to comply with Knowledge's content policies, particularly
1074:"Ending Traffic Congestion Would Boost DFW Economy by $ 17 Billion, Report Says" 404:'s NTE Mobility Partners to rebuild phase 1 of North Tarrant Express corridors. 776: 727: 700: 612: 519: 455: 312: 164: 1363: 831: 780: 459: 354: 216: 81: 666: 451: 438:). This segment includes 9 cross-street bridges and 21 on-ramps/off-ramps. 1253: 530:
NTE Mobility Partners LLC is a company with three shareholders, including
462:). This segment includes 9 cross-street bridges and 31 on- or off-ramps). 827: 765: 344: 1344: 481:
Segment 3B is 3.6 miles (5.8 km) of I-35W from north of I-820 to
1354: 921:"North Tarrant Express: Meeting the Needs of North Texas Commuters" 535: 1180:"Private Toll Lanes, Free Highways Merge First in Tarrant Project" 1196: 1104: 789: 747: 735: 657: 531: 401: 1349: 1049:
Hartgen, David T. & Fields, M. Gregory (August 27, 2009).
226: 840:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
1199:"Project Profiles: North Tarrant Express Segments 1 and 2A" 999:"NTE Segments 3A & 3B Project Reaches Financial Close" 30:
A major contributor to this article appears to have a
1022:"TxDOT Project Tracker: North Tarrant Express (NTE)" 800: 770: 738: 660: 311:) project is a total highway reconstruction of the 970:"North Tarrant Express Remains Ahead of Schedule" 1361: 498:The North Tarrant Express is a collaboration of 1152:Lomax, Tim; Schrank, David & Eisele, Bill. 1019: 889: 1151: 1178:Lindenberger, Michael A. (January 30, 2009). 1048: 1221: 1219: 1177: 1336:Template:Attached KML/North Tarrant Express 1247: 1245: 997:de la Peña, Patricia (September 19, 2013). 412: 996: 992: 990: 504:North Central Texas Council of Governments 1339: 1291:"North Tarrant Express Mobility Partners" 1254:"Infrastructure Projects: Interstate 35W" 1251: 1216: 658:Iron Horse Boulevard / Meadow Lakes Drive 61:Learn how and when to remove this message 1242: 1159:. Texas A&M Transportation Institute 95:North Tarrant Express highlighted in red 1375:Transportation in Tarrant County, Texas 1197:Office of Innovative Program Delivery. 1097: 987: 1362: 967: 331:and Industrial Boulevard in Northeast 1100:"America's 20 Fastest-Growing Cities" 1071: 1053:. Reason Foundation. Policy Study 371 918: 809: 805: 801:eastbound exit and westbound entrance 785: 771:eastbound exit and westbound entrance 743: 739:westbound exit and eastbound entrance 731: 674: 670: 661:westbound exit and eastbound entrance 653: 633: 629: 585: 581: 522:and then sharing profits with TxDOT. 502:(P3 or PPP), including TxDOT and the 1252:Hinkle, Robert & Hartzel, Tony. 1230:. Texas Department of Transportation 407: 15: 1098:Carlyle, Erin (February 14, 2014). 485:/US 287. Constructed by TxDOT. 13: 1029:Texas Department of Transportation 564: 337:Texas Department of Transportation 14: 1386: 1308: 1288: 1225: 1072:Jones, Rodger (August 28, 2009). 968:Graham, A. Lee (April 16, 2014). 944: 895: 871: 817: 811: 790: 755: 749: 695: 690: 685: 680: 675: 634: 606: 600: 593: 587: 465: 187: 182: 159: 138: 117:13.5 mi (21.7 km) 80: 41:. Please discuss further on the 20: 1282: 1268: 1190: 1171: 1145: 1119: 441: 421: 398:Texas Transportation Commission 1203:Federal Highway Administration 1186:– via TTC News Archives. 1091: 1065: 1042: 1013: 1005:. Nossaman LLP. Archived from 961: 938: 912: 387:Texas Transportation Institute 1: 883: 559: 541: 525: 7: 1256:. City of Fort Worth, Texas 862: 719: / Bedford-Euless Road 500:private and public partners 493: 383:Dallas–Fort Worth metroplex 373:A study by the free-market 10: 1391: 368: 341:fastest developing regions 323:(SH 121/SH 183, 974:Fort Worth Business Press 839: 835: 807: 787: 775: 745: 733: 726: 721: 672: 665: 655: 648: 644: 631: 624: 620: 583: 576: 571: 568: 563: 558: 555: 396:On January 29, 2009, the 241: 236: 232: 222: 212: 207: 203: 178: 153: 134: 129: 121: 113: 105: 100: 93: 77: 1340:KML is not from Wikidata 1127:"Top Metropolitan Areas" 846:     413:NTE Project (1 & 2W) 1228:"North Tarrant Express" 1184:The Dallas Morning News 1078:The Dallas Morning News 1076:. Transportation Blog. 949:. NTE Mobility Partners 926:. NTE Mobility Partners 919:Staff (July 28, 2011). 900:. NTE Mobility Partners 546:The entire route is in 520:private equity partners 798:(Industrial Boulevard) 321:State Highway 183 317:State Highway 121 1355:Drive On TEXpress App 1345:North Tarrant Express 1020:Fort Worth District. 878:U.S. Roads portal 333:Tarrant County, Texas 305:North Tarrant Express 108:NTE Mobility Partners 87:North Tarrant Express 39:neutral point of view 650:North Richland Hills 436:North Richland Hills 345:tolled managed lanes 173:North Richland Hills 1370:Toll roads in Texas 327:) corridor between 313:Interstate 820 155:Major intersections 1350:NTE TEXpress Lanes 1003:Infra Insight Blog 898:"Project Timeline" 400:voted 5–0 to hire 347:(TEXpress Lanes). 335:. The NTE and the 1009:on July 15, 2014. 860: 859: 851:Incomplete access 408:Route description 375:Reason Foundation 301: 300: 246:Highways in Texas 101:Route information 71: 70: 63: 34:with its subject. 1382: 1330: 1303: 1302: 1300: 1298: 1286: 1280: 1279: 1276:"I-35W Corridor" 1272: 1266: 1265: 1263: 1261: 1249: 1240: 1239: 1237: 1235: 1223: 1214: 1213: 1211: 1209: 1194: 1188: 1187: 1175: 1169: 1168: 1166: 1164: 1158: 1149: 1143: 1142: 1140: 1138: 1129:. Archived from 1123: 1117: 1116: 1114: 1112: 1095: 1089: 1088: 1086: 1084: 1069: 1063: 1062: 1060: 1058: 1046: 1040: 1039: 1037: 1035: 1026: 1017: 1011: 1010: 994: 985: 984: 982: 980: 965: 959: 958: 956: 954: 942: 936: 935: 933: 931: 925: 916: 910: 909: 907: 905: 893: 876: 875: 874: 853: 847: 822: 821: 820: 815: 814: 794: 793: 760: 759: 758: 753: 752: 699: 698: 694: 693: 689: 688: 684: 683: 679: 678: 642:(Denton Highway) 638: 637: 611: 610: 609: 604: 603: 598: 597: 596: 591: 590: 566: 561: 553: 552: 191: 190: 186: 185: 163: 162: 156: 142: 141: 84: 75: 74: 66: 59: 55: 52: 46: 32:close connection 24: 23: 16: 1390: 1389: 1385: 1384: 1383: 1381: 1380: 1379: 1360: 1359: 1341: 1338: 1333: 1332: 1331: 1315: 1311: 1306: 1296: 1294: 1293:. Cofiroute USA 1287: 1283: 1274: 1273: 1269: 1259: 1257: 1250: 1243: 1233: 1231: 1224: 1217: 1207: 1205: 1195: 1191: 1176: 1172: 1162: 1160: 1156: 1150: 1146: 1136: 1134: 1133:on May 29, 2014 1125: 1124: 1120: 1110: 1108: 1096: 1092: 1082: 1080: 1070: 1066: 1056: 1054: 1047: 1043: 1033: 1031: 1024: 1018: 1014: 995: 988: 978: 976: 966: 962: 952: 950: 947:"About the NTE" 943: 939: 929: 927: 923: 917: 913: 903: 901: 894: 890: 886: 872: 870: 865: 856: 849: 845: 841: 818: 816: 812: 810: 791: 756: 754: 750: 748: 696: 691: 686: 681: 676: 635: 607: 605: 601: 599: 594: 592: 588: 586: 544: 528: 496: 468: 448:North East Mall 444: 424: 415: 410: 371: 325:Airport Freeway 188: 183: 167:in Fort Worth, 160: 154: 139: 130:Major junctions 96: 89: 88: 85: 67: 56: 50: 47: 36: 25: 21: 12: 11: 5: 1388: 1378: 1377: 1372: 1358: 1357: 1352: 1347: 1314: 1313: 1312: 1310: 1309:External links 1307: 1305: 1304: 1281: 1267: 1241: 1215: 1189: 1170: 1144: 1118: 1090: 1064: 1041: 1012: 986: 960: 937: 911: 887: 885: 882: 881: 880: 868: 864: 861: 858: 857: 855: 854: 842: 837: 836: 834: 808: 806: 803: 802: 799: 788: 786: 784: 773: 772: 769: 746: 744: 741: 740: 737: 734: 732: 730: 724: 723: 722:I-820 exit 23A 720: 673: 671: 669: 663: 662: 659: 656: 654: 652: 646: 645: 643: 632: 630: 628: 622: 621: 619: 584: 582: 580: 574: 573: 570: 567: 562: 557: 548:Tarrant County 543: 540: 527: 524: 518:, TIFIA loan, 495: 492: 491: 490: 486: 479: 467: 464: 443: 440: 423: 420: 414: 411: 409: 406: 370: 367: 299: 298: 297: 296: 291: 286: 281: 276: 271: 266: 261: 256: 250: 249: 239: 238: 237:Highway system 234: 233: 230: 229: 224: 220: 219: 214: 210: 209: 205: 204: 201: 200: 180: 176: 175: 157: 151: 150: 136: 132: 131: 127: 126: 123: 119: 118: 115: 111: 110: 106:Maintained by 103: 102: 98: 97: 94: 91: 90: 86: 79: 78: 69: 68: 28: 26: 19: 9: 6: 4: 3: 2: 1387: 1376: 1373: 1371: 1368: 1367: 1365: 1356: 1353: 1351: 1348: 1346: 1343: 1342: 1337: 1328: 1324: 1320: 1319: 1292: 1285: 1277: 1271: 1255: 1248: 1246: 1229: 1222: 1220: 1204: 1200: 1193: 1185: 1181: 1174: 1155: 1148: 1132: 1128: 1122: 1107: 1106: 1101: 1094: 1079: 1075: 1068: 1052: 1045: 1030: 1023: 1016: 1008: 1004: 1000: 993: 991: 975: 971: 964: 948: 941: 922: 915: 899: 892: 888: 879: 869: 867: 866: 852: 844: 843: 838: 833: 830:South Entry, 829: 825: 804: 797: 782: 778: 774: 767: 764:north â€“ 763: 742: 729: 725: 718: 714: 710: 706: 702: 668: 664: 651: 647: 641: 627: 623: 618: 614: 579: 575: 554: 551: 549: 539: 537: 533: 523: 521: 517: 511: 507: 505: 501: 487: 484: 480: 477: 476: 475: 473: 472:U.S. 287 466:I-35W Project 463: 461: 457: 453: 449: 439: 437: 433: 429: 419: 405: 403: 399: 394: 390: 388: 384: 379: 376: 366: 362: 360: 356: 351: 348: 346: 342: 338: 334: 330: 326: 322: 318: 314: 310: 306: 295: 292: 290: 287: 285: 282: 280: 277: 275: 272: 270: 267: 265: 262: 260: 257: 255: 252: 251: 248: 247: 243: 242: 240: 235: 231: 228: 225: 221: 218: 217:United States 215: 211: 206: 202: 199:in Fort Worth 198: 194: 181: 179:East end 177: 174: 170: 166: 158: 152: 149: 145: 137: 135:West end 133: 128: 124: 120: 116: 112: 109: 104: 99: 92: 83: 76: 73: 65: 62: 54: 51:December 2014 44: 40: 35: 33: 27: 18: 17: 1316: 1297:December 12, 1295:. Retrieved 1284: 1270: 1260:December 12, 1258:. Retrieved 1234:December 12, 1232:. Retrieved 1208:December 12, 1206:. Retrieved 1192: 1183: 1173: 1163:December 12, 1161:. Retrieved 1147: 1135:. Retrieved 1131:the original 1121: 1111:December 12, 1109:. Retrieved 1103: 1093: 1083:December 12, 1081:. Retrieved 1077: 1067: 1057:December 12, 1055:. Retrieved 1044: 1034:December 12, 1032:. Retrieved 1015: 1007:the original 1002: 979:December 12, 977:. Retrieved 973: 963: 953:December 12, 951:. Retrieved 940: 930:December 12, 928:. Retrieved 914: 904:December 12, 902:. Retrieved 891: 848:   826:east â€“ 717:FM 1938 569:Destinations 545: 529: 512: 508: 497: 469: 445: 442:East Segment 425: 422:West Segment 416: 395: 391: 380: 372: 363: 352: 349: 315:(I-820) and 308: 304: 302: 244: 125:2010–present 72: 57: 48: 29: 828:DFW Airport 824:SH 183 796:FM 157 768:North Entry 766:DFW Airport 762:SH 121 736:Brown Trail 713:SH 183 709:SH 121 640:US 377 626:Haltom City 432:Haltom City 197:SH 121 193:SH 183 169:Haltom City 1364:Categories 884:References 705:SH 26 578:Fort Worth 506:(NCTCOG). 483:US 81 428:Fort Worth 418:52 years. 359:Fort Worth 254:Interstate 148:Fort Worth 542:Exit list 526:Developer 43:talk page 1318:KML file 1137:June 13, 863:See also 715: / 711: / 707: / 703: / 615:west to 556:Location 536:Meridiam 494:Partners 208:Location 195: / 1289:Staff. 1226:Staff. 945:Staff. 896:Staff. 777:Bedford 728:Bedford 456:Bedford 369:History 213:Country 122:Existed 1105:Forbes 832:Irving 781:Euless 532:Cintra 460:Euless 402:Cintra 361:area. 171:, and 114:Length 1157:(PDF) 1025:(PDF) 924:(PDF) 701:I-820 667:Hurst 617:I-35W 613:I-820 572:Notes 516:PAB's 489:2023. 452:Hurst 329:I-35W 284:FM/RM 279:Spurs 274:Loops 264:State 227:Texas 223:State 165:I-820 144:I-35W 1327:help 1323:edit 1299:2014 1262:2014 1236:2014 1210:2014 1165:2014 1139:2014 1113:2014 1085:2014 1059:2014 1036:2014 981:2014 955:2014 932:2014 906:2014 783:line 458:and 434:and 381:The 355:I-30 303:The 289:Park 269:Toll 309:NTE 294:Rec 146:in 1366:: 1325:• 1244:^ 1218:^ 1201:. 1182:. 1102:. 1027:. 1001:. 989:^ 972:. 565:km 560:mi 550:. 454:, 430:, 259:US 1329:) 1321:( 1301:. 1278:. 1264:. 1238:. 1212:. 1167:. 1141:. 1115:. 1087:. 1061:. 1038:. 983:. 957:. 934:. 908:. 779:– 319:/ 307:( 64:) 58:( 53:) 49:( 45:.

Index

close connection
neutral point of view
talk page
Learn how and when to remove this message
North Tarrant Express logo
NTE Mobility Partners
I-35W
Fort Worth
I-820
Haltom City
North Richland Hills
SH 183
SH 121
United States
Texas
Highways in Texas
Interstate
US
State
Toll
Loops
Spurs
FM/RM
Park
Rec
Interstate 820
State Highway 121
State Highway 183
Airport Freeway
I-35W

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑