Knowledge

New Bullards Bar Dam

Source 📝

444: 435: 426: 417: 356:
a capacity of 810 cubic feet per second (23 m/s), running northwest to the Log Cabin Diversion Dam on Oregon Creek. From here the combined waters of the Middle Yuba and Oregon Creek are sent west into a shorter 1.3-mile (2.1 km) tunnel with a capacity of 1,100 cubic feet per second (31 m/s) into the eastern (Willow Creek) arm of New Bullards Bar Reservoir. The diversions add about 173.9 square miles (450 km) to the effective catchment area of New Bullards Bar Reservoir. The entire diversion and reservoir system is collectively known as the Yuba River Development Project.
34: 318: 406: 355:
The reservoir controls water flows from the North Yuba River, as well as from the Middle Yuba River and Oregon Creek via diversion tunnels. The Our House Diversion Dam is situated on the Middle Yuba about 8 miles (13 km) above its mouth and diverts water into a 5.5-mile (8.9 km) tunnel with
359:
Flood operations in the New Bullards Bar Reservoir water control manual are in part defined with being linked to operations in Marysville Dam. Marysville Dam was supposed to be built as part of a system of dams in the Sacramento Basin along with New Bullards Bar and Oroville Dam, but it was never
396:
The aforementioned 14-foot (4.3 m)-diameter penstock drains water from the New Bullards Bar Reservoir several miles through a mountain and down a large hill to deliver water to the New Colgate Powerhouse. In 2006 a 168-inch (4.3 m) butterfly valve was designed and manufactured in Europe for
664: 329:. The agency was created through an act of the state legislature in 1959 specifically to construct a flood control reservoir in response to a flooding event in 1955. The bulk of the financing for the dam came from the issuance of revenue bonds. The dam was completed in 1969. 388:
for the region. The small Fish Release powerhouse was constructed in 1986 at the base of the dam. It has a capacity of 150 kilowatts and generates power from water releases for fish on the Yuba River. Total annual generation at New Colgate Powerhouse is about 1,314,000
340:
in 1922. The dam generated power from 1924 until its inundation by the New Bullards Bar Reservoir in 1969. Although the 1899 diversion dam was washed away, the 1900 dam is still in place about a quarter mile (0.4 km) downstream from the present dam.
397:
installation in the penstock at the top of the hill to protect the powerhouse from flooding in the event that an earthquake or other event caused the penstock to rupture. This valve uses a design similar to that of the dam's base release works.
671: 383:
have a combined capacity of 340 megawatts and are the largest of their kind in the world. At maximum generation, the powerhouse utilizes a flow of 3,430 cubic feet per second (97 m/s), and is an important source of
608: 745: 482: 352:
provides flood control space between September 15 and May 31 of each year. There are 170,000 acre-feet (210,000,000 m) of flood control storage space between October 31 and March 31.
570: 1364: 752: 326: 368: 1384: 505: 1369: 583: 68: 1379: 738: 696: 462: 336:
built in 1899 and 1900 as well as a 200-foot (61 m) concrete arch dam built by the Yuba River Power Company and transferred to
1349: 721: 472: 360:
built. Marysville Dam is still a defining function in the downstream channel capacity constraints even though it is non-existent.
1000: 985: 1095: 1005: 914: 761: 477: 840: 1217: 866: 1222: 646: 980: 792: 337: 1374: 1283: 1133: 1123: 990: 909: 894: 814: 1202: 1182: 513: 443: 434: 425: 924: 416: 1187: 1273: 1268: 1090: 1025: 1015: 995: 1344: 1313: 1167: 467: 1227: 1212: 1177: 1159: 1118: 934: 899: 871: 349: 298: 184: 1237: 1192: 955: 939: 1323: 929: 824: 587: 1318: 1308: 1303: 294: 52: 540: 1197: 889: 919: 819: 1278: 1247: 1172: 1075: 787: 8: 1354: 1113: 904: 856: 385: 290: 718: 371:, which is located 5.2 miles (8.4 km) downstream. The added distance increases the 1359: 1232: 390: 265: 249: 1050: 1045: 690: 1252: 1030: 306: 286: 134: 1207: 1055: 725: 1128: 730: 621: 372: 259: 226: 203: 1338: 1070: 333: 236: 83: 70: 1138: 1060: 1035: 457: 380: 242: 161: 650: 33: 1085: 1020: 861: 622:"Climate Change and Flood Operations in the Sacramento Basin, California" 1242: 1080: 1065: 1010: 765: 332:
The dam is the fourth constructed on the Bullards Bar site, succeeding
317: 305:
10 m) of water. The dam serves for irrigation, drinking water and
282: 56: 805: 778: 405: 364: 278: 719:
New Bullards Bar Dam — Northern California Water Association
393:(MWh), while the Fish Release powerhouse produces 1,300 MWh. 409:
A view of Bullards Bar dam and reservoir from Marysville Rd
713: 1365:
Buildings and structures in Yuba County, California
301:, which can hold about 969,600 acre⋅ft (1.1960 1336: 760: 584:"California Hydroelectric Statistics & Data" 586:. California Energy Commission. Archived from 746: 325:New Bullards Bar Dam was constructed by the 566: 564: 562: 753: 739: 547:. California Department of Water Resources 171:160,000 cu ft/s (4,500 m/s) 32: 463:List of dams and reservoirs in California 1385:Hydroelectric power plants in California 559: 473:List of largest reservoirs of California 404: 316: 1370:United States local public utility dams 1337: 695:: CS1 maint: archived copy as title ( 535: 533: 531: 500: 498: 734: 512:. Stanford University. Archived from 483:List of tallest dams in United States 321:The 1922 PG&E dam at Bullards Bar 510:National Performance of Dams Program 478:List of power stations in California 528: 495: 208:489 sq mi (1,270 km) 13: 1218:Imperial Solar Energy Center South 991:Big Creek No. 1, 2, 2A, 3, 4 and 8 915:Los Esteros Critical Energy Center 609:General description of river basin 281:constructed in the early 1960s in 14: 1396: 1380:1969 establishments in California 1223:Imperial Solar Energy Center West 707: 442: 433: 424: 415: 338:Pacific Gas and Electric Company 1350:Dams in the Feather River basin 1284:Solar Energy Generating Systems 1208:Desert Stateline Solar Facility 910:Huntington Beach Energy Project 895:Donald Von Raesfeld Power Plant 545:California Data Exchange Center 1203:Centinela Solar Energy Project 1183:California Flats Solar Project 657: 639: 614: 602: 576: 363:The dam furnishes water via a 277:is a variable radius concrete 21:Dam in Yuba County, California 1: 1188:California Valley Solar Ranch 488: 344: 1274:Ivanpah Solar Power Facility 1269:Genesis Solar Energy Project 820:Puente Hills Energy Recovery 379:, elevation change. Its two 194:969,600 acre⋅ft (1.1960 7: 1314:San Gorgonio Pass Wind Farm 1168:Antelope Valley Solar Ranch 724:September 26, 2010, at the 571:YCWA Relicensing Fact Sheet 468:List of lakes in California 451: 289:. Located near the town of 216:4,810 acres (1,950 ha) 105:; 55 years ago 10: 1401: 1228:McCoy Solar Energy Project 1213:Desert Sunlight Solar Farm 1178:Blythe Solar Power Project 935:Russell City Energy Center 900:Gateway Generating Station 647:"Yuba County Water Agency" 367:through a mountain to the 350:New Bullards Bar Reservoir 312: 299:New Bullards Bar Reservoir 231:1,306 ft (398 m) 185:New Bullards Bar Reservoir 152:2,587 ft (789 m) 1296: 1261: 1238:Panoche Valley Solar Farm 1193:Campo Verde Solar Project 1158: 1151: 1104: 973: 964: 948: 880: 849: 833: 801: 772: 400: 258: 248: 235: 225: 220: 212: 202: 190: 180: 175: 167: 156: 148: 140: 130: 125: 117: 99: 62: 48: 40: 31: 26: 1324:Tehachapi Pass Wind Farm 930:Moss Landing Power Plant 841:Argus Cogeneration Plant 714:Yuba County Water Agency 541:"New Bullards Bar (BUL)" 327:Yuba County Water Agency 144:645 ft (197 m) 121:Yuba County Water Agency 1319:Shiloh Wind Power Plant 1309:Altamont Pass Wind Farm 1304:Alta Wind Energy Center 1031:Mammoth Pool Powerhouse 250:Installed capacity 1375:Dams completed in 1969 1198:Catalina Solar Project 1076:San Francisquito No. 1 890:Alamitos Energy Center 825:Sunshine Gas Producers 506:"New Bullards Bar Dam" 410: 369:New Colgate Powerhouse 322: 260:Annual generation 168:Spillway capacity 84:39.39333°N 121.14306°W 1091:White Rock Powerhouse 920:Metcalf Energy Center 408: 320: 1279:Mojave Solar Project 1248:Springbok Solar Farm 1173:Beacon Solar Project 1041:New Bullards Bar Dam 1026:Loon Lake Powerhouse 677:on February 22, 2014 653:on October 17, 2008. 611:ycwa-relicensing.com 590:on February 26, 2018 573:ycwa-relicensing.com 516:on December 12, 2012 297:, the dam forms the 275:New Bullards Bar Dam 89:39.39333; -121.14306 44:New Bullards Bar Dam 27:New Bullards Bar Dam 1139:William R. Gianelli 1036:Moccasin Powerhouse 1001:Caribou No. 1 and 2 905:Glenarm Power Plant 307:hydroelectric power 204:Catchment area 191:Total capacity 160:Concrete chute, 3x 80: /  1345:Dams in California 1233:Mount Signal Solar 1016:Jaybird Powerhouse 411: 323: 157:Spillway type 1332: 1331: 1292: 1291: 1147: 1146: 1051:New Exchequer Dam 1046:New Don Pedro Dam 996:Camino Powerhouse 986:Belden Powerhouse 272: 271: 213:Surface area 126:Dam and spillways 100:Opening date 16:Dam in California 1392: 1253:Topaz Solar Farm 1156: 1155: 1096:William E. Warne 981:Balch Powerhouse 971: 970: 755: 748: 741: 732: 731: 701: 700: 694: 686: 684: 682: 676: 670:. Archived from 669: 661: 655: 654: 649:. Archived from 643: 637: 636: 634: 632: 618: 612: 606: 600: 599: 597: 595: 580: 574: 568: 557: 556: 554: 552: 537: 526: 525: 523: 521: 502: 446: 437: 428: 419: 304: 287:North Yuba River 197: 135:North Yuba River 113: 111: 106: 95: 94: 92: 91: 90: 85: 81: 78: 77: 76: 73: 36: 24: 23: 1400: 1399: 1395: 1394: 1393: 1391: 1390: 1389: 1335: 1334: 1333: 1328: 1288: 1257: 1143: 1106: 1100: 1056:New Melones Dam 966: 960: 944: 882: 876: 867:Imperial Valley 845: 829: 803: 797: 793:Elkhorn Battery 776: 774: 768: 759: 726:Wayback Machine 710: 705: 704: 688: 687: 680: 678: 674: 667: 665:"Archived copy" 663: 662: 658: 645: 644: 640: 630: 628: 620: 619: 615: 607: 603: 593: 591: 582: 581: 577: 569: 560: 550: 548: 539: 538: 529: 519: 517: 504: 503: 496: 491: 454: 447: 438: 429: 420: 403: 347: 315: 302: 195: 109: 107: 104: 88: 86: 82: 79: 74: 71: 69: 67: 66: 22: 17: 12: 11: 5: 1398: 1388: 1387: 1382: 1377: 1372: 1367: 1362: 1357: 1352: 1347: 1330: 1329: 1327: 1326: 1321: 1316: 1311: 1306: 1300: 1298: 1294: 1293: 1290: 1289: 1287: 1286: 1281: 1276: 1271: 1265: 1263: 1259: 1258: 1256: 1255: 1250: 1245: 1240: 1235: 1230: 1225: 1220: 1215: 1210: 1205: 1200: 1195: 1190: 1185: 1180: 1175: 1170: 1164: 1162: 1153: 1149: 1148: 1145: 1144: 1142: 1141: 1136: 1131: 1126: 1121: 1116: 1110: 1108: 1102: 1101: 1099: 1098: 1093: 1088: 1083: 1078: 1073: 1068: 1063: 1058: 1053: 1048: 1043: 1038: 1033: 1028: 1023: 1018: 1013: 1008: 1003: 998: 993: 988: 983: 977: 975: 968: 962: 961: 959: 958: 952: 950: 946: 945: 943: 942: 937: 932: 927: 922: 917: 912: 907: 902: 897: 892: 886: 884: 878: 877: 875: 874: 869: 864: 859: 853: 851: 847: 846: 844: 843: 837: 835: 831: 830: 828: 827: 822: 817: 811: 809: 799: 798: 796: 795: 790: 784: 782: 770: 769: 762:Power stations 758: 757: 750: 743: 735: 729: 728: 716: 709: 708:External links 706: 703: 702: 656: 638: 613: 601: 575: 558: 527: 493: 492: 490: 487: 486: 485: 480: 475: 470: 465: 460: 453: 450: 449: 448: 441: 439: 432: 430: 423: 421: 414: 402: 399: 391:megawatt hours 373:hydraulic head 346: 343: 334:diversion dams 314: 311: 270: 269: 262: 256: 255: 252: 246: 245: 239: 233: 232: 229: 227:Hydraulic head 223: 222: 218: 217: 214: 210: 209: 206: 200: 199: 192: 188: 187: 182: 178: 177: 173: 172: 169: 165: 164: 158: 154: 153: 150: 146: 145: 142: 138: 137: 132: 128: 127: 123: 122: 119: 115: 114: 101: 97: 96: 64: 60: 59: 50: 46: 45: 42: 38: 37: 29: 28: 20: 15: 9: 6: 4: 3: 2: 1397: 1386: 1383: 1381: 1378: 1376: 1373: 1371: 1368: 1366: 1363: 1361: 1358: 1356: 1353: 1351: 1348: 1346: 1343: 1342: 1340: 1325: 1322: 1320: 1317: 1315: 1312: 1310: 1307: 1305: 1302: 1301: 1299: 1295: 1285: 1282: 1280: 1277: 1275: 1272: 1270: 1267: 1266: 1264: 1260: 1254: 1251: 1249: 1246: 1244: 1241: 1239: 1236: 1234: 1231: 1229: 1226: 1224: 1221: 1219: 1216: 1214: 1211: 1209: 1206: 1204: 1201: 1199: 1196: 1194: 1191: 1189: 1186: 1184: 1181: 1179: 1176: 1174: 1171: 1169: 1166: 1165: 1163: 1161: 1157: 1154: 1150: 1140: 1137: 1135: 1132: 1130: 1127: 1125: 1124:J.S. Eastwood 1122: 1120: 1117: 1115: 1112: 1111: 1109: 1103: 1097: 1094: 1092: 1089: 1087: 1084: 1082: 1079: 1077: 1074: 1072: 1071:Pine Flat Dam 1069: 1067: 1064: 1062: 1059: 1057: 1054: 1052: 1049: 1047: 1044: 1042: 1039: 1037: 1034: 1032: 1029: 1027: 1024: 1022: 1019: 1017: 1014: 1012: 1009: 1007: 1004: 1002: 999: 997: 994: 992: 989: 987: 984: 982: 979: 978: 976: 972: 969: 963: 957: 956:Diablo Canyon 954: 953: 951: 947: 941: 938: 936: 933: 931: 928: 926: 925:Midway Sunset 923: 921: 918: 916: 913: 911: 908: 906: 903: 901: 898: 896: 893: 891: 888: 887: 885: 879: 873: 870: 868: 865: 863: 860: 858: 855: 854: 852: 848: 842: 839: 838: 836: 832: 826: 823: 821: 818: 816: 815:Hyperion DGUP 813: 812: 810: 807: 800: 794: 791: 789: 788:Beacon BESS 1 786: 785: 783: 780: 771: 767: 763: 756: 751: 749: 744: 742: 737: 736: 733: 727: 723: 720: 717: 715: 712: 711: 698: 692: 673: 666: 660: 652: 648: 642: 627: 623: 617: 610: 605: 589: 585: 579: 572: 567: 565: 563: 551:September 29, 546: 542: 536: 534: 532: 520:September 29, 515: 511: 507: 501: 499: 494: 484: 481: 479: 476: 474: 471: 469: 466: 464: 461: 459: 456: 455: 445: 440: 436: 431: 427: 422: 418: 413: 412: 407: 398: 394: 392: 387: 386:peaking power 382: 381:Pelton wheels 378: 374: 370: 366: 361: 357: 353: 351: 342: 339: 335: 330: 328: 319: 310: 308: 300: 296: 292: 288: 284: 280: 276: 267: 263: 261: 257: 253: 251: 247: 244: 240: 238: 234: 230: 228: 224: 221:Power Station 219: 215: 211: 207: 205: 201: 193: 189: 186: 183: 179: 174: 170: 166: 163: 162:Tainter gates 159: 155: 151: 147: 143: 139: 136: 133: 129: 124: 120: 116: 102: 98: 93: 65: 61: 58: 54: 51: 47: 43: 41:Official name 39: 35: 30: 25: 19: 1061:Oroville Dam 1040: 1006:Devil Canyon 974:Conventional 679:. Retrieved 672:the original 659: 651:the original 641: 629:. Retrieved 626:eScholarship 625: 616: 604: 592:. Retrieved 588:the original 578: 549:. Retrieved 544: 518:. Retrieved 514:the original 509: 458:Oroville Dam 395: 376: 362: 358: 354: 348: 331: 324: 309:generation. 274: 273: 18: 1086:Trinity Dam 1021:Keswick Dam 862:The Geysers 681:February 4, 295:Yuba County 268:(2001–2012) 118:Operator(s) 87: / 75:121°08′35″W 63:Coordinates 53:Yuba County 1355:Yuba River 1339:Categories 1243:Solar Star 1134:Thermalito 1081:Shasta Dam 1066:Parker Dam 1011:Folsom Dam 850:Geothermal 766:California 489:References 345:Operations 283:California 198:10 m) 72:39°23′36″N 57:California 1360:Arch dams 594:April 26, 176:Reservoir 1105:Pumped- 967:electric 881:Natural 802:Biomass 775:storage 773:Battery 722:Archived 691:cite web 631:March 1, 452:See also 365:penstock 279:arch dam 237:Turbines 131:Impounds 49:Location 1262:Thermal 1129:O'Neill 1114:Castaic 1107:storage 965:Hydro- 949:Nuclear 872:Mammoth 313:History 291:Dobbins 285:on the 181:Creates 108: ( 940:Valley 401:Images 264:1,114 254:340 MW 243:Pelton 149:Length 141:Height 1152:Solar 1119:Helms 675:(PDF) 668:(PDF) 1297:Wind 857:Coso 834:Coal 804:(≥10 777:(≥10 697:link 683:2014 633:2016 596:2018 553:2012 522:2012 377:i.e. 110:1969 103:1969 883:gas 764:in 293:in 266:GWh 241:2x 1341:: 1160:PV 806:MW 779:MW 693:}} 689:{{ 624:. 561:^ 543:. 530:^ 508:. 497:^ 375:, 55:, 808:) 781:) 754:e 747:t 740:v 699:) 685:. 635:. 598:. 555:. 524:. 303:× 196:× 112:)

Index


Yuba County
California
39°23′36″N 121°08′35″W / 39.39333°N 121.14306°W / 39.39333; -121.14306
North Yuba River
Tainter gates
New Bullards Bar Reservoir
Catchment area
Hydraulic head
Turbines
Pelton
Installed capacity
Annual generation
GWh
arch dam
California
North Yuba River
Dobbins
Yuba County
New Bullards Bar Reservoir
hydroelectric power

Yuba County Water Agency
diversion dams
Pacific Gas and Electric Company
New Bullards Bar Reservoir
penstock
New Colgate Powerhouse
hydraulic head
Pelton wheels

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.