Long Beach International Gateway

Source đź“ť

594: 365: 31: 636: 648: 426: 660: 86: 585:
halfway mark, and the two cable support towers were already more than 200 ft (61 m) high. On December 5, 2017, a "topping-out" ceremony was held to celebrate the completion of the two cable support towers. A virtual opening ceremony was held on October 2, 2020. Motor vehicle traffic opened in both directions on October 5, 2020, although the bicycle/pedestrian path remains incomplete as of August 2024.
576:(MSS), and is the first project in California to use a MSS. The MSS was designed to bridge the 235 ft (72 m) span between piers and to support the concrete as it was poured for each span. Once the concrete had cured, the MSS moved to the next pier and repeated the pour. The orange MSS was used on the western (Terminal Island) approach, and a similar blue MSS was used on the eastern approach. 1159:
bridge over the Los Angeles River. The total project cost is estimated to be $ 721,400,000 subject to escalation from a base November 2005 dollar. Project cost will be revised at environmental certification scheduled for third quarter of 2008. Caltrans fact sheet for project shows construction costs of $ 800,500,000 with $ 65,000,000 support costs.
916:
Note 7: TOWERS: At 515 feet tall, the bridges two towers will be the second-tallest of any cable-stayed bridge in the U.S. The steel-reinforced concrete towers will be supported by massive foundations. The tower design – unique to this bridge – transitions from an octagon shape at the base to diamond
355:
performed preliminary engineering for the main span and the approaches. Earlier reports had studied and discarded various alternatives, including an alternative alignment with a new bridge south of the existing bridge, rehabilitation of the existing bridge, and a tunnel instead of an elevated bridge.
584:
By October 2014, work had started on the pilings which would serve as foundations for the new bridge's piers. The two cable-stay support towers were started in March (eastern tower) and April 2015 (western tower). Approach spans were underway by April 2016. By August 2016, the project had passed the
1158:
This project consists of replacement of the aging Gerald Desmond Drive. The project location is in the Back Channel area of the Port of Long Beach, centered along Ocean Blvd. From the intersection of the Terminal Island Freeway (SR-47) at the western end to its terminus at the westerly end of the
372:
The 1968 roadway was four lanes (two in each direction) with a fifth climbing lane on each end. The replacement bridge carries a six-lane roadway with emergency lanes on each side, and the grade has been decreased by building a longer approach, despite the higher vertical clearance over the Back
568:
Another part of the cost increase and schedule delay is attributed to a 2013 redesign of the support towers. Caltrans and the Port of Long Beach required the tower redesign, executed by the SFI joint venture, allegedly to ensure seismic safety and to preserve long term structural integrity. The
512:
Three of the pre-qualified bidders submitted proposals by March 2012, with Kiewit dropping out at the bid stage. In May 2012, the Long Beach Board of Harbor Commissioners approved Port of Long Beach staff’s recommendation that the “best value” design-build proposal to replace the Gerald Desmond
919:
Note 8: CABLE-STAYED BRIDGE: The new bridge is a cable-stayed design, in which cables directly connect the towers to the road deck (unlike a traditional suspension bridge, which uses cables draped over towers). The entire length of the bridge – main span and approaches – will be 8,800
539:
The project was originally estimated to cost $ 800 million in 2008. By 2010, costs had increased to $ 1.1 billion, and funding identified in 2010 for the replacement bridge included $ 500 million contributed by Caltrans, $ 300 million contributed by the
560:
The new bridge was delayed shortly after breaking ground. The new piers were delayed by the relocation and/or removal of numerous old and active oil wells and utility lines, which prevented foundation work from beginning. The bridge is located in the midst of the
569:
redesign set the estimated completion of the bridge back by 12 to 18 months. Other cost increases are attributed to extra oversight required by innovative, yet contractually compliant products and materials proposed by the designers of the replacement bridge.
384:
The 1968 bridge was designated as a portion of Ocean Boulevard and was therefore operated by the City of Long Beach. When it opened to traffic on October 5, 2020, the replacement bridge was redesignated as the western (southern) extension of
381:, a longtime proponent of adding bike lanes to the new Gerald Desmond Bridge replacement and a descendant of one of the original founders of Long Beach. Mark Bixby died in a March 2011 plane crash at the Long Beach Airport. 433:
The replacement bridge was unanimously approved by the City of Long Beach in late September 2010. A project launch meeting was held at the Port of Long Beach on November 22, 2010, attended by Long Beach Mayor
535:
During the groundbreaking ceremony on January 8, 2013, two helicopters hovered 515 feet (157 m) above ground level, illustrating the height of the two cable towers for the planned replacement bridge.
374: 1351: 429:
Helicopters hover 515 feet (157 m) above the ground during the January 8, 2013 groundbreaking ceremony, illustrating the height of the two cable towers in the planned replacement bridge.
336:
with 205 feet (62 m) of vertical clearance to be built north of the existing bridge was identified as the preferred alternative in the final environmental impact report (2010 FEIR).
966: 922:
Note 9: SPAN: The main span and back spans of the bridge will be 2,000 feet long and 205 feet above the water. It will be the highest deck of any cable-stayed bridge in the U.S.
1407: 1172: 1325: 872: 1299: 924:
Note 10: EAST APPROACH: The 3,600-ft. east approach will connect the bridge to both the Long Beach (710) Freeway and east Ocean Boulevard toward downtown Long Beach.
48: 549: 624:
In May 2021, Senator Lena Gonzalez and Assemblyman O'Donnell announced that the name "Long Beach International Gateway" had been chosen through a public survey
1359: 1273: 339:
The new bridge allows access to the port for the tallest container ships after the older bridge is demolished. It is the first long-span cable-stayed bridge in
459:
Caltrans, Port of Long Beach, and Metro officials reviewed seven potential engineering and construction firms, selecting four as qualified final lead bidders:
1242: 1509: 1504: 1432: 824:
2015 Named Freeways, Highways, Structures and Other Appurtenances in California (Report). California Department of Transportation. 2016. p. 143.
1494: 1213: 609:
coordinated a community effort to decide if a new name was warranted. Family of Gerald Desmond and native Long Beach residents with former mayors
302: 772: 407:
The 2,000 ft (610 m) cable-stayed span, with a 1,000 ft (300 m) Main Span flanked by two 500 ft (150 m) Back Spans
1450: 606: 716:
Gerald Desmond Bridge Replacement Project: Final Environmental Impact Report / Environmental Assessment & Application Summary Report
974: 541: 617:
favored keeping the original name; Foster felt a change would be disrespectful to the namesake of the original bridge, civic leader
1197:
Edwards, Andrew (July 14, 2015). "Price tag to replace Gerald Desmond Bridge in Long Beach jumps by more than $ 200 million".
394: 439: 373:
Channel; the planned improvements brought the bridge up to current freeway standards. The replacement bridge also carries the
602: 513:
Bridge was submitted by the SFI joint venture team, comprising Shimmick Construction Company Inc., FCC Construction S.A. and
1499: 332:
decided it would be best, from an economical perspective, that the bridge be replaced. After several years of studies, a
849: 417:
As the tallest structure in the area, the 2020 cable-stayed bridge is a prominent addition to the Long Beach skyline.
675: 1136: 715: 517:, and the contract was awarded to the SFI JV in July 2012. Major participants in the joint venture also include 685: 344: 1040: 1018: 996: 937: 601:
For the first eight months after its opening, the bridge was called the Gerald Desmond Bridge Replacement.
479: 347:. For the bridge to be so tall, long approaches were required to allow trucks to cross. A joint venture of 41: 746: 572:
The roadway for the approach structures was supported during construction by an underlane self-launched
573: 1110: 798: 390: 472: 839: 747:"Supplemental funds allocation for Gerald Desmond Bridge design-build project resolution FA-16-07" 873:"Long Beach plane crash claims community leaders, member of founding Bixby family [BLOG]" 614: 483: 450: 435: 1408:"'A great honor': Family, friends of the late Mark Bixby tour new bike path named in his honor" 1352:"Twin 515-foot Columns Completed as City Celebrates "Topping Off" of New Gerald Desmond Bridge" 377:
and observation decks over the water along the south side of the bridge. The path is named for
306: 114: 1381: 680: 669: 414:
By extending the approach structures, approach grades are reduced to no more than 5 percent.
400:
From west to east, the new bridge spans a total of 8,800 feet (2,700 m), consisting of:
318: 138: 593: 410:
The 3,600 ft (1,100 m) East Approach (3,035 ft (925 m) in the 2010 FEIR)
562: 404:
The 2,800 ft (850 m) West Approach (3,117 ft (950 m) in the 2010 FEIR)
8: 348: 333: 298: 153: 364: 1087: 1062: 652: 610: 545: 518: 329: 1300:"Gerald Desmond Bridge project milestone marked by city, Port of Long Beach officials" 30: 664: 489:
Shimmick Construction Company (leading a joint venture of Shimmick, FCC Construction/
184: 1326:"Construction on $ 1.2- billion Gerald Desmond Bridge Project Passes Halfway Point" 640: 529: 514: 446: 442: 325:, a prominent civic leader and a former city attorney for the City of Long Beach. 368:
Illustration of the former Gerald Desmond Bridge and its cable-stayed replacement
314: 110: 1274:"How high-tech scaffolding is helping build Gerald Desmond Bridge in Long Beach" 897: 618: 597:
Long Beach International Gateway seen from the air, under construction in 2020.
453: 386: 322: 89: 914:
Note 1: WEST APPROACH: The 2,800-ft. west approach will be on Terminal Island.
565:, one of the most prolific oil-producing fields located in the United States. 1488: 63: 50: 1173:"Maze of oil wells, utility lines complicates Gerald Desmond Bridge project" 1243:"Workers laying foundation for the new Gerald Desmond Bridge in Long Beach" 635: 525: 378: 310: 100: 752:. Letter to Chair and Commissioners, California Transportation Commission 464: 967:"Gerald Desmond Bridge Construction Approved By Long Beach City Council" 647: 773:"Innovative System Ensures Vertical Alignment of Gerald Desmond Bridge" 494: 340: 1137:"Strategic Oversight Agreement for Gerald Desmond Bridge Replacement" 505: 490: 468: 425: 552:. As of 2016, the current project estimate is $ 1.5 billion. 501: 1451:"New Port Bridge Gets A Name: Long Beach International Gateway" 1433:"Who was Gerald Desmond, and why was a bridge named after him?" 1214:"Design issues delay Gerald Desmond Bridge replacement project" 1479: 799:"New Gerald Desmond: a Bridge to California's Economic Future" 328:
The 1968 steel arch bridge developed numerous issues, and the
35:
Road deck of Long Beach International Gateway at night; 2022
16:
Cable-stayed bridge in Long Beach, California, United States
352: 125: 713: 1063:"Harbor Commission Awards Bridge Design-Build Contract" 478:
Kiewit Infrastructure West (leading a joint venture of
1019:"Caltrans, Port Receive Bridge Replacement Proposals" 837: 1297: 1211: 1170: 1090:. Bridge Design & Engineering. August 10, 2010 1065:(Press release). Port of Long Beach. July 23, 2012 1021:(Press release). Port of Long Beach. March 2, 2012 999:(Press release). Port of Long Beach. March 4, 2011 997:"Caltrans, Port Select Bidders for Bridge Project" 343:and the first and only cable-stayed bridge in the 1043:(Press release). Port of Long Beach. May 16, 2012 389:(extending its terminus to its intersection with 1486: 1088:"Port of Long Beach approves bridge replacement" 1271: 1240: 1196: 964: 960: 958: 1041:"Commission OKs Desmond Bridge Recommendation" 532:used typically in infrastructure improvement. 321:, which was completed in 1968 and named after 1430: 1267: 1265: 1263: 1236: 1234: 870: 1323: 955: 504:/Trayor/Massman, Buckland & Taylor, and 263: (equivalent to $ 1,928,120,000 in 2023) 1349: 846:(Resolution). State of California. Ch. 109. 826:Mark Bixby Memorial Bicycle Pedestrian Path 792: 790: 788: 786: 375:Mark Bixby Memorial Bicycle-Pedestrian Path 1343: 1260: 1231: 796: 228:Shimmick/FCC/Impreglio (SFI) Joint Venture 1510:Cable-stayed bridges in the United States 1505:Bridges in Los Angeles County, California 1405: 1102: 740: 738: 736: 721:(Report). Port of Long Beach and Caltrans 463:Dragados USA (leading a joint venture of 1495:Bridges on the Interstate Highway System 938:"Gerald Desmond Bridge Nears Completion" 850:"Assembly Concurrent Resolution No. 100" 840:"Assembly Concurrent Resolution No. 100" 783: 770: 714:Parsons–HNTB Joint Venture (July 2010). 592: 579: 424: 363: 1082: 1080: 1487: 1298:Robes Meeks, Karen (October 1, 2014). 1171:Robes Meeks, Karen (October 5, 2013). 1108: 965:Zummallen, Ryan (September 29, 2010). 744: 733: 709: 707: 705: 703: 701: 555: 1382:"New Bridge Scheduled to Open Oct. 5" 1111:"Building Bridges, Raising Economies" 745:Ortega, Norma (October 19–20, 2016). 1212:Robes Meeks, Karen (June 24, 2014). 1077: 524:The project has been completed as a 500:Skanska (leading a joint venture of 1431:Rich Archbold (26 September 2020). 1406:Echeverry, Sebastian (2021-07-17). 935: 698: 456:and Caltrans Director Cindy McKim. 393:) and is now the responsibility of 13: 1272:Edwards, Andrew (April 18, 2016). 1241:Edwards, Andrew (April 22, 2015). 521:and Biggs Cardosa Associates Inc. 14: 1521: 1473: 771:Stocking, Angus (June 18, 2014), 676:Commodore Schuyler F. Heim Bridge 305:and a bicycle/pedestrian path in 1350:Ruiz, Jason (December 6, 2017). 871:Barboza, Tony (March 16, 2011). 658: 646: 634: 607:Assemblymember Patrick O'Donnell 288:Long Beach International Gateway 84: 29: 23:Long Beach International Gateway 1443: 1424: 1399: 1374: 1324:Aragon, Greg (August 3, 2016). 1317: 1291: 1205: 1190: 1164: 1129: 1055: 1033: 1011: 989: 842:. Session of the Legislature. 528:in contrast to the traditional 420: 929: 890: 864: 831: 817: 764: 686:List of Los Angeles bike paths 544:, $ 114 million from the 1: 936:Cho, Aileen (June 12, 2019). 691: 672:, the bridge that it replaced 548:, and $ 28 million from 345:Los Angeles metropolitan area 797:Gish, Judy (December 2010). 471:, Figg Bridge Engineers and 349:Parsons Transportation Group 163:8,800 ft (2,682 m) 7: 838:California State Assembly. 779:, Troy, Michigan: BNP Media 627: 10: 1526: 1500:Road bridges in California 1480:New GD Bridge project page 1457:. Long Beach. May 24, 2021 574:movable scaffolding system 317:. The bridge replaced the 301:that carries six lanes of 290:, originally known as the 179:1,000 ft (305 m) 92:, pedestrians and bicycles 1386:The Gerald Desmond Bridge 1304:Long Beach Press Telegram 1278:Long Beach Press Telegram 1247:Long Beach Press Telegram 1218:Long Beach Press Telegram 1199:Long Beach Press-Telegram 1177:Long Beach Press Telegram 902:New Gerald Desmond Bridge 588: 359: 280: 275: 267: 255: 247: 236:January 8, 2013 232: 222: 214: 206: 198: 193: 183: 175: 167: 159: 149: 144: 134: 120: 106: 96: 79: 40: 28: 21: 1330:Engineering News-Review 898:"New Bridge at a Glance" 473:Jacobs Engineering Group 202:Brownlie Ernst and Marks 171:515 ft (157 m) 942:Engineering News-Record 519:Arup North America Ltd. 189:205 ft (62 m) 844:Statutes of California 653:Engineering portal 598: 484:T.Y. Lin International 430: 369: 307:Long Beach, California 115:Long Beach, California 64:33.76488°N 118.22130°W 1117:. Caltrans District 7 805:. Caltrans District 7 681:Vincent Thomas Bridge 670:Gerald Desmond Bridge 665:California portal 596: 580:Construction progress 428: 367: 319:Gerald Desmond Bridge 215:Engineering design by 139:Gerald Desmond Bridge 1412:Long Beach Post News 1362:on February 17, 2018 977:on November 23, 2016 641:Transport portal 563:Wilmington Oil Field 440:U.S. Representatives 69:33.76488; -118.22130 1156:PROJECT DESCRIPTION 1146:. February 21, 2008 603:Mayor Robert Garcia 556:Construction issues 506:CH2M HILL Engineers 334:cable-stayed bridge 299:cable-stayed bridge 154:Cable-stayed bridge 60: /  777:Point of Beginning 599: 546:Port of Long Beach 431: 370: 330:Port of Long Beach 309:, west across the 295:Bridge Replacement 233:Construction start 1455:City News Service 917:shape at the top. 877:Los Angeles Times 284: 283: 261:US$ 1,500,000,000 256:Construction cost 1517: 1467: 1466: 1464: 1462: 1447: 1441: 1440: 1428: 1422: 1421: 1419: 1418: 1403: 1397: 1396: 1394: 1393: 1378: 1372: 1371: 1369: 1367: 1358:. Archived from 1347: 1341: 1340: 1338: 1336: 1321: 1315: 1314: 1312: 1310: 1295: 1289: 1288: 1286: 1284: 1269: 1258: 1257: 1255: 1253: 1238: 1229: 1228: 1226: 1224: 1209: 1203: 1202: 1194: 1188: 1187: 1185: 1183: 1168: 1162: 1161: 1153: 1151: 1141: 1133: 1127: 1126: 1124: 1122: 1106: 1100: 1099: 1097: 1095: 1084: 1075: 1074: 1072: 1070: 1059: 1053: 1052: 1050: 1048: 1037: 1031: 1030: 1028: 1026: 1015: 1009: 1008: 1006: 1004: 993: 987: 986: 984: 982: 973:. Archived from 962: 953: 952: 950: 948: 933: 927: 926: 911: 909: 894: 888: 887: 885: 883: 868: 862: 861: 859: 857: 847: 835: 829: 828: 821: 815: 814: 812: 810: 794: 781: 780: 768: 762: 761: 759: 757: 751: 742: 731: 730: 728: 726: 720: 711: 663: 662: 661: 651: 650: 639: 638: 530:design-bid-build 515:Impregilo S.p.A. 447:Laura Richardson 443:Dana Rohrabacher 262: 248:Construction end 243: 241: 225: 130: 127: 88: 87: 75: 74: 72: 71: 70: 65: 61: 58: 57: 56: 53: 33: 19: 18: 1525: 1524: 1520: 1519: 1518: 1516: 1515: 1514: 1485: 1484: 1476: 1471: 1470: 1460: 1458: 1449: 1448: 1444: 1429: 1425: 1416: 1414: 1404: 1400: 1391: 1389: 1380: 1379: 1375: 1365: 1363: 1356:Long Beach Post 1348: 1344: 1334: 1332: 1322: 1318: 1308: 1306: 1296: 1292: 1282: 1280: 1270: 1261: 1251: 1249: 1239: 1232: 1222: 1220: 1210: 1206: 1195: 1191: 1181: 1179: 1169: 1165: 1157: 1149: 1147: 1139: 1135: 1134: 1130: 1120: 1118: 1107: 1103: 1093: 1091: 1086: 1085: 1078: 1068: 1066: 1061: 1060: 1056: 1046: 1044: 1039: 1038: 1034: 1024: 1022: 1017: 1016: 1012: 1002: 1000: 995: 994: 990: 980: 978: 971:Long Beach Post 963: 956: 946: 944: 934: 930: 923: 921: 918: 915: 907: 905: 896: 895: 891: 881: 879: 869: 865: 855: 853: 848: 836: 832: 823: 822: 818: 808: 806: 795: 784: 769: 765: 755: 753: 749: 743: 734: 724: 722: 718: 712: 699: 694: 659: 657: 645: 633: 630: 611:Beverly O'Neill 591: 582: 558: 497:/Biggs Cardosa) 423: 362: 315:Terminal Island 271:October 5, 2020 260: 251:October 2, 2020 239: 237: 223: 185:Clearance below 145:Characteristics 124: 111:Terminal Island 85: 68: 66: 62: 59: 54: 51: 49: 47: 46: 36: 24: 17: 12: 11: 5: 1523: 1513: 1512: 1507: 1502: 1497: 1483: 1482: 1475: 1474:External links 1472: 1469: 1468: 1442: 1437:Press Telegram 1423: 1398: 1373: 1342: 1316: 1290: 1259: 1230: 1204: 1189: 1163: 1128: 1101: 1076: 1054: 1032: 1010: 988: 954: 928: 889: 863: 830: 816: 782: 763: 732: 696: 695: 693: 690: 689: 688: 683: 678: 673: 667: 655: 643: 629: 626: 619:Gerald Desmond 590: 587: 581: 578: 557: 554: 510: 509: 498: 487: 476: 454:Alan Lowenthal 422: 419: 412: 411: 408: 405: 397:, District 7. 391:State Route 47 361: 358: 323:Gerald Desmond 303:Interstate 710 292:Gerald Desmond 282: 281: 278: 277: 273: 272: 269: 265: 264: 257: 253: 252: 249: 245: 244: 234: 230: 229: 226: 224:Constructed by 220: 219: 216: 212: 211: 208: 204: 203: 200: 196: 195: 191: 190: 187: 181: 180: 177: 173: 172: 169: 165: 164: 161: 157: 156: 151: 147: 146: 142: 141: 136: 132: 131: 122: 118: 117: 108: 104: 103: 98: 94: 93: 81: 77: 76: 44: 38: 37: 34: 26: 25: 22: 15: 9: 6: 4: 3: 2: 1522: 1511: 1508: 1506: 1503: 1501: 1498: 1496: 1493: 1492: 1490: 1481: 1478: 1477: 1456: 1452: 1446: 1438: 1434: 1427: 1413: 1409: 1402: 1387: 1383: 1377: 1361: 1357: 1353: 1346: 1331: 1327: 1320: 1305: 1301: 1294: 1279: 1275: 1268: 1266: 1264: 1248: 1244: 1237: 1235: 1219: 1215: 1208: 1200: 1193: 1178: 1174: 1167: 1160: 1145: 1138: 1132: 1116: 1112: 1105: 1089: 1083: 1081: 1064: 1058: 1042: 1036: 1020: 1014: 998: 992: 976: 972: 968: 961: 959: 943: 939: 932: 925: 903: 899: 893: 878: 874: 867: 851: 845: 841: 834: 827: 820: 804: 800: 793: 791: 789: 787: 778: 774: 767: 748: 741: 739: 737: 717: 710: 708: 706: 704: 702: 697: 687: 684: 682: 679: 677: 674: 671: 668: 666: 656: 654: 649: 644: 642: 637: 632: 631: 625: 622: 620: 616: 612: 608: 604: 595: 586: 577: 575: 570: 566: 564: 553: 551: 547: 543: 537: 533: 531: 527: 522: 520: 516: 507: 503: 499: 496: 492: 488: 485: 481: 477: 474: 470: 466: 462: 461: 460: 457: 455: 452: 448: 444: 441: 437: 427: 418: 415: 409: 406: 403: 402: 401: 398: 396: 392: 388: 382: 380: 376: 366: 357: 354: 350: 346: 342: 337: 335: 331: 326: 324: 320: 316: 312: 308: 304: 300: 296: 293: 289: 279: 274: 270: 266: 258: 254: 250: 246: 235: 231: 227: 221: 217: 213: 209: 205: 201: 197: 192: 188: 186: 182: 178: 174: 170: 166: 162: 158: 155: 152: 148: 143: 140: 137: 133: 129: 123: 119: 116: 112: 109: 105: 102: 99: 95: 91: 82: 78: 73: 45: 43: 39: 32: 27: 20: 1459:. Retrieved 1454: 1445: 1436: 1426: 1415:. Retrieved 1411: 1401: 1390:. Retrieved 1388:. 2020-09-26 1385: 1376: 1366:February 16, 1364:. Retrieved 1360:the original 1355: 1345: 1333:. Retrieved 1329: 1319: 1307:. Retrieved 1303: 1293: 1281:. Retrieved 1277: 1250:. Retrieved 1246: 1221:. Retrieved 1217: 1207: 1198: 1192: 1180:. Retrieved 1176: 1166: 1155: 1150:November 21, 1148:. Retrieved 1143: 1131: 1119:. Retrieved 1114: 1109:Gish, Judy. 1104: 1092:. Retrieved 1069:November 22, 1067:. Retrieved 1057: 1045:. Retrieved 1035: 1023:. Retrieved 1013: 1001:. Retrieved 991: 981:November 22, 979:. Retrieved 975:the original 970: 945:. Retrieved 941: 931: 913: 908:November 22, 906:. Retrieved 901: 892: 882:November 21, 880:. Retrieved 876: 866: 856:November 21, 854:. Retrieved 843: 833: 825: 819: 809:November 21, 807:. Retrieved 802: 776: 766: 756:November 21, 754:. Retrieved 725:November 21, 723:. Retrieved 623: 600: 583: 571: 567: 559: 538: 534: 526:design-build 523: 511: 469:Dragados USA 458: 432: 421:Construction 416: 413: 399: 383: 371: 338: 327: 311:Back Channel 294: 291: 287: 285: 176:Longest span 160:Total length 101:Back Channel 1335:December 6, 1309:December 6, 1283:December 6, 1252:December 6, 1223:December 6, 1182:December 6, 1121:October 21, 1115:InsideSeven 1047:December 5, 1025:December 5, 1003:December 5, 803:InsideSeven 135:Preceded by 126:newgdbridge 83:6 lanes of 67: / 55:118°13′17″W 42:Coordinates 1489:Categories 1417:2021-08-07 1392:2020-09-28 1094:August 16, 692:References 615:Bob Foster 436:Bob Foster 379:Mark Bixby 341:California 240:2013-01-08 52:33°45′54″N 491:Impregilo 199:Architect 1144:Caltrans 947:June 14, 628:See also 465:CC Myers 395:Caltrans 276:Location 207:Designer 1461:May 28, 502:Skanska 451:Senator 297:, is a 238: ( 194:History 121:Website 97:Crosses 80:Carries 904:. 2016 852:. 2012 589:Naming 480:Kiewit 360:Design 268:Opened 168:Height 150:Design 107:Locale 1140:(PDF) 920:feet. 750:(PDF) 719:(PDF) 550:Metro 542:USDOT 387:I-710 259:est. 90:I-710 1463:2021 1368:2018 1337:2016 1311:2016 1285:2016 1254:2016 1225:2016 1184:2016 1152:2016 1123:2016 1096:2010 1071:2016 1049:2016 1027:2016 1005:2016 983:2016 949:2019 910:2016 884:2016 858:2016 811:2016 758:2016 727:2016 613:and 605:and 495:Arup 493:and 482:and 445:and 353:HNTB 351:and 286:The 218:Arup 210:Arup 128:.com 113:and 621:. 313:to 1491:: 1453:. 1435:. 1410:. 1384:. 1354:. 1328:. 1302:. 1276:. 1262:^ 1245:. 1233:^ 1216:. 1175:. 1154:. 1142:. 1113:. 1079:^ 969:. 957:^ 940:. 912:. 900:. 875:. 801:. 785:^ 775:, 735:^ 700:^ 467:, 449:, 438:, 1465:. 1439:. 1420:. 1395:. 1370:. 1339:. 1313:. 1287:. 1256:. 1227:. 1201:. 1186:. 1125:. 1098:. 1073:. 1051:. 1029:. 1007:. 985:. 951:. 886:. 860:. 813:. 760:. 729:. 508:) 486:) 475:) 242:)

Index


Coordinates
33°45′54″N 118°13′17″W / 33.76488°N 118.22130°W / 33.76488; -118.22130
I-710
Back Channel
Terminal Island
Long Beach, California
newgdbridge.com
Gerald Desmond Bridge
Cable-stayed bridge
Clearance below
cable-stayed bridge
Interstate 710
Long Beach, California
Back Channel
Terminal Island
Gerald Desmond Bridge
Gerald Desmond
Port of Long Beach
cable-stayed bridge
California
Los Angeles metropolitan area
Parsons Transportation Group
HNTB

Mark Bixby Memorial Bicycle-Pedestrian Path
Mark Bixby
I-710
State Route 47
Caltrans

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑