to fund the construction of this energy project. The government contributed US$ 27.3 million to project costs. As of 5 May 2016, the feasibility studies, population resettlement plans and the acquisition of a procurement consultant had been completed. Work on soliciting of a contractor began in
583:
529:
556:
329:
The work includes the construction of 132kV substations at Gulu, Nebbi and Arua, and the expansion of the existing 132kV substation at Lira. If the Lira substation cannot be expanded for technical reasons, a brand new second 132kV substation will be built at Lira.
51:
685:
351:
174:
293:, approximately 173 kilometres (107 mi) away, by road. From Nebbi, the power line turns northwest and runs another 80 kilometres (50 mi), to end in the city of
305:
This power line is intended to transmit electricity in an improved, sustainable manner to Uganda's
Northern Region and extend the national electric grid to the
643:
739:
412:
724:
614:
367:
155:
447:
729:
274:
The 132 kilo Volt power line starts at the 132kV substation at Lira, approximately 337 kilometres (209 mi), by road, north of
677:
339:
413:"Project Appraisal Document: Grid Expansion And Reinforcement Project: Lira-Gulu-Nebbi-Arua High Voltage Transmission Line"
297:. The power line which does not track the roads all the time has a total length of about 294 kilometres (183 mi).
370:
energized the Nebbi substation on this line, thereby connecting the West Nile sub-region to Uganda's national grid.
384:
282:, the largest city in Northern Uganda, a distance of approximately 110 kilometres (68 mi), by road from Lira.
477:
44:
678:
Final
Resettlement Action Plan For Lira-Gulu-Nebbi-Arua High Voltage Power Line (132kV). 21 March 2016
734:
278:, Uganda's capital and largest city. The power line travels in a general northwesterly direction to
263:
310:
306:
145:
8:
448:"West Nile Connected To The National Grid As Museveni Commissions New 132kV Power Line"
358:. Construction was expected to last two years and conclude in the second half of 2022.
338:
The government of Uganda obtained financing in the amount of US$ 100 million, from the
347:
170:
644:"West Nile connected to national grid as Museveni commissions new 132kv power line"
379:
420:
290:
718:
700:
687:
619:
481:
318:
259:
251:
66:
53:
285:
From Gulu, the power line continues in a general southwesterly direction to
247:
94:
588:
561:
534:
507:
356:
Central
Southern China Electric Power Design Institute Company Limited
275:
112:
243:
130:
98:
37:
673:
Website of the Uganda
Electricity Transmission Company Limited
286:
116:
294:
279:
255:
126:
108:
478:"Lira-Gulu-Nebbi-Arua Transmission Line: Project Overview"
242:
is an operational high voltage electricity power line in
672:
410:
346:
In July 2020, the construction contract was awarded to
350:
of India and a joint venture company comprising
411:
Zayra Romo; Mbuso
Gwafila; et al. (5 May 2016).
445:
612:
503:"Road Distance Between Kampala City And Lira City"
343:September 2016, with completion expected in 2022.
716:
641:
368:Uganda Electricity Transmission Company Limited
156:Uganda Electricity Transmission Company Limited
615:"UETCL to relocate 700 graves for power line"
530:"Travel Distance From Lira City To Gulu City"
475:
246:. It connects the high voltage substation at
740:Proposed electric power transmission systems
240:Lira–Gulu–Nebbi–Arua High Voltage Power Line
24:Lira–Gulu–Nebbi–Arua High Voltage Power Line
480:. Fortitude Valley, Queensland, Australia:
725:High-voltage transmission lines in Uganda
324:
584:"Travel Distance Between Nebbi And Arua"
254:, to another high voltage substation at
717:
613:Tobbias Jolly Owiny (27 August 2020).
557:"Road Distance Between Gulu And Nebbi"
446:Muhamadi Byemboijana (4 August 2024).
352:AVIC International Holding Corporation
175:AVIC International Holding Corporation
340:International Development Association
608:
606:
471:
469:
441:
439:
406:
404:
402:
400:
13:
14:
751:
666:
642:Kenneth Kazibwe (4 August 2024).
635:
603:
576:
549:
522:
495:
466:
436:
397:
385:List of power stations in Uganda
730:Energy infrastructure in Africa
361:
333:
226:
1:
390:
7:
373:
300:
269:
10:
756:
348:KEC International Limited
225:
217:
213:183 mi (295 km)
209:
201:
196:
188:
180:
166:
161:
151:
141:
136:
122:
104:
90:
82:
43:
33:
28:
23:
162:Construction information
309:. This is in line with
476:SMEC Holdings (2019).
325:Associated substations
197:Technical information
137:Ownership information
701:2.73722°N 32.30500°E
421:The World Bank Group
311:government of Uganda
307:West Nile sub-region
181:Construction started
146:Government of Uganda
67:2.73722°N 32.30500°E
16:Power line in Uganda
697: /
63: /
706:2.73722; 32.30500
650:. Kampala, Uganda
623:. Kampala, Uganda
454:. Kampala, Uganda
236:
235:
171:KEC International
83:General direction
72:2.73722; 32.30500
747:
735:Energy in Uganda
712:
711:
709:
708:
707:
702:
698:
695:
694:
693:
690:
660:
659:
657:
655:
648:Nile Post Uganda
639:
633:
632:
630:
628:
610:
601:
600:
598:
596:
580:
574:
573:
571:
569:
553:
547:
546:
544:
542:
526:
520:
519:
517:
515:
499:
493:
492:
490:
488:
473:
464:
463:
461:
459:
452:SoftPower Uganda
443:
434:
433:
431:
429:
424:. Washington, DC
417:
408:
380:Energy in Uganda
366:In August 2024,
321:status by 2040.
266:of the country.
228:
78:
77:
75:
74:
73:
68:
64:
61:
60:
59:
56:
21:
20:
755:
754:
750:
749:
748:
746:
745:
744:
715:
714:
705:
703:
699:
696:
691:
688:
686:
684:
683:
669:
664:
663:
653:
651:
640:
636:
626:
624:
611:
604:
594:
592:
582:
581:
577:
567:
565:
555:
554:
550:
540:
538:
528:
527:
523:
513:
511:
501:
500:
496:
486:
484:
474:
467:
457:
455:
444:
437:
427:
425:
415:
409:
398:
393:
376:
364:
336:
327:
303:
272:
264:Northern Region
202:Type of current
71:
69:
65:
62:
57:
54:
52:
50:
49:
17:
12:
11:
5:
753:
743:
742:
737:
732:
727:
681:
680:
675:
668:
667:External links
665:
662:
661:
634:
602:
575:
548:
521:
494:
465:
435:
395:
394:
392:
389:
388:
387:
382:
375:
372:
363:
360:
335:
332:
326:
323:
302:
299:
291:Nebbi District
271:
268:
234:
233:
230:
223:
222:
219:
215:
214:
211:
207:
206:
203:
199:
198:
194:
193:
190:
186:
185:
182:
178:
177:
168:
164:
163:
159:
158:
153:
149:
148:
143:
139:
138:
134:
133:
124:
120:
119:
106:
105:Passes through
102:
101:
92:
88:
87:
84:
80:
79:
47:
41:
40:
35:
31:
30:
26:
25:
15:
9:
6:
4:
3:
2:
752:
741:
738:
736:
733:
731:
728:
726:
723:
722:
720:
713:
710:
679:
676:
674:
671:
670:
649:
645:
638:
622:
621:
620:Daily Monitor
616:
609:
607:
591:
590:
585:
579:
564:
563:
558:
552:
537:
536:
531:
525:
510:
509:
504:
498:
483:
482:SMEC Holdings
479:
472:
470:
453:
449:
442:
440:
423:
422:
414:
407:
405:
403:
401:
396:
386:
383:
381:
378:
377:
371:
369:
359:
357:
353:
349:
344:
341:
331:
322:
320:
319:middle income
316:
312:
308:
298:
296:
292:
288:
283:
281:
277:
267:
265:
262:, all in the
261:
260:Arua District
257:
253:
252:Lira District
249:
245:
241:
231:
224:
220:
216:
212:
208:
204:
200:
195:
191:
187:
183:
179:
176:
172:
169:
165:
160:
157:
154:
150:
147:
144:
140:
135:
132:
128:
125:
121:
118:
114:
110:
107:
103:
100:
96:
93:
89:
85:
81:
76:
48:
46:
42:
39:
36:
32:
27:
22:
19:
682:
652:. Retrieved
647:
637:
627:13 September
625:. Retrieved
618:
595:13 September
593:. Retrieved
587:
578:
568:13 September
566:. Retrieved
560:
551:
541:13 September
539:. Retrieved
533:
524:
514:13 September
512:. Retrieved
506:
497:
487:13 September
485:. Retrieved
456:. Retrieved
451:
426:. Retrieved
419:
365:
362:Developments
355:
345:
337:
334:Construction
328:
314:
304:
284:
273:
239:
237:
210:Total length
86:East to West
18:
704: /
589:Google Maps
562:Google Maps
535:Google Maps
508:Google Maps
317:to achieve
315:Vision 2040
229:of circuits
167:Contractors
70: /
45:Coordinates
719:Categories
692:32°18′18″E
689:02°44′14″N
428:10 January
391:References
218:AC voltage
58:32°18′18″E
55:02°44′14″N
654:4 August
458:4 August
374:See also
301:Overview
270:Location
189:Expected
152:Operator
29:Location
586:(Map).
559:(Map).
532:(Map).
505:(Map).
276:Kampala
113:Pakwach
34:Country
244:Uganda
173:&
131:Uganda
99:Uganda
38:Uganda
416:(PDF)
289:, in
287:Nebbi
258:, in
250:, in
221:132kV
142:Owner
117:Nebbi
656:2024
629:2020
597:2020
570:2020
543:2020
516:2020
489:2020
460:2024
430:2018
354:and
295:Arua
280:Gulu
256:Arua
248:Lira
238:The
192:2024
184:2020
127:Arua
109:Gulu
95:Lira
91:From
313:'s
227:No.
721::
646:.
617:.
605:^
468:^
450:.
438:^
418:.
399:^
205:AC
129:,
123:To
115:,
111:,
97:,
658:.
631:.
599:.
572:.
545:.
518:.
491:.
462:.
432:.
232:2
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.