Lira–Gulu–Nebbi–Arua High Voltage Power Line

Source 📝

502: 342:
to fund the construction of this energy project. The government contributed US$ 27.3 million to project costs. As of 5 May 2016, the feasibility studies, population resettlement plans and the acquisition of a procurement consultant had been completed. Work on soliciting of a contractor began in
583: 529: 556: 329:
The work includes the construction of 132kV substations at Gulu, Nebbi and Arua, and the expansion of the existing 132kV substation at Lira. If the Lira substation cannot be expanded for technical reasons, a brand new second 132kV substation will be built at Lira.
51: 685: 351: 174: 293:, approximately 173 kilometres (107 mi) away, by road. From Nebbi, the power line turns northwest and runs another 80 kilometres (50 mi), to end in the city of 305:
This power line is intended to transmit electricity in an improved, sustainable manner to Uganda's Northern Region and extend the national electric grid to the
643: 739: 412: 724: 614: 367: 155: 447: 729: 274:
The 132 kilo Volt power line starts at the 132kV substation at Lira, approximately 337 kilometres (209 mi), by road, north of
677: 339: 413:"Project Appraisal Document: Grid Expansion And Reinforcement Project: Lira-Gulu-Nebbi-Arua High Voltage Transmission Line" 297:. The power line which does not track the roads all the time has a total length of about 294 kilometres (183 mi). 370:
energized the Nebbi substation on this line, thereby connecting the West Nile sub-region to Uganda's national grid.
384: 282:, the largest city in Northern Uganda, a distance of approximately 110 kilometres (68 mi), by road from Lira. 477: 44: 678:
Final Resettlement Action Plan For Lira-Gulu-Nebbi-Arua High Voltage Power Line (132kV). 21 March 2016
734: 278:, Uganda's capital and largest city. The power line travels in a general northwesterly direction to 263: 310: 306: 145: 8: 448:"West Nile Connected To The National Grid As Museveni Commissions New 132kV Power Line" 358:. Construction was expected to last two years and conclude in the second half of 2022. 338:
The government of Uganda obtained financing in the amount of US$ 100 million, from the
347: 170: 644:"West Nile connected to national grid as Museveni commissions new 132kv power line" 379: 420: 290: 718: 700: 687: 619: 481: 318: 259: 251: 66: 53: 285:
From Gulu, the power line continues in a general southwesterly direction to
247: 94: 588: 561: 534: 507: 356:
Central Southern China Electric Power Design Institute Company Limited
275: 112: 243: 130: 98: 37: 673:
Website of the Uganda Electricity Transmission Company Limited
286: 116: 294: 279: 255: 126: 108: 478:"Lira-Gulu-Nebbi-Arua Transmission Line: Project Overview" 242:
is an operational high voltage electricity power line in
672: 410: 346:
In July 2020, the construction contract was awarded to
350:
of India and a joint venture company comprising  
411:
Zayra Romo; Mbuso Gwafila; et al. (5 May 2016).
445: 612: 503:"Road Distance Between Kampala City And Lira City" 343:September 2016, with completion expected in 2022. 716: 641: 368:Uganda Electricity Transmission Company Limited 156:Uganda Electricity Transmission Company Limited 615:"UETCL to relocate 700 graves for power line" 530:"Travel Distance From Lira City To Gulu City" 475: 246:. It connects the high voltage substation at 740:Proposed electric power transmission systems 240:Lira–Gulu–Nebbi–Arua High Voltage Power Line 24:Lira–Gulu–Nebbi–Arua High Voltage Power Line 480:. Fortitude Valley, Queensland, Australia: 725:High-voltage transmission lines in Uganda 324: 584:"Travel Distance Between Nebbi And Arua" 254:, to another high voltage substation at 717: 613:Tobbias Jolly Owiny (27 August 2020). 557:"Road Distance Between Gulu And Nebbi" 446:Muhamadi Byemboijana (4 August 2024). 352:AVIC International Holding Corporation 175:AVIC International Holding Corporation 340:International Development Association 608: 606: 471: 469: 441: 439: 406: 404: 402: 400: 13: 14: 751: 666: 642:Kenneth Kazibwe (4 August 2024). 635: 603: 576: 549: 522: 495: 466: 436: 397: 385:List of power stations in Uganda 730:Energy infrastructure in Africa 361: 333: 226: 1: 390: 7: 373: 300: 269: 10: 756: 348:KEC International Limited 225: 217: 213:183 mi (295 km) 209: 201: 196: 188: 180: 166: 161: 151: 141: 136: 122: 104: 90: 82: 43: 33: 28: 23: 162:Construction information 309:. This is in line with 476:SMEC Holdings (2019). 325:Associated substations 197:Technical information 137:Ownership information 701:2.73722°N 32.30500°E 421:The World Bank Group 311:government of Uganda 307:West Nile sub-region 181:Construction started 146:Government of Uganda 67:2.73722°N 32.30500°E 16:Power line in Uganda 697: /  63: /  706:2.73722; 32.30500 650:. Kampala, Uganda 623:. Kampala, Uganda 454:. Kampala, Uganda 236: 235: 171:KEC International 83:General direction 72:2.73722; 32.30500 747: 735:Energy in Uganda 712: 711: 709: 708: 707: 702: 698: 695: 694: 693: 690: 660: 659: 657: 655: 648:Nile Post Uganda 639: 633: 632: 630: 628: 610: 601: 600: 598: 596: 580: 574: 573: 571: 569: 553: 547: 546: 544: 542: 526: 520: 519: 517: 515: 499: 493: 492: 490: 488: 473: 464: 463: 461: 459: 452:SoftPower Uganda 443: 434: 433: 431: 429: 424:. Washington, DC 417: 408: 380:Energy in Uganda 366:In August 2024, 321:status by 2040. 266:of the country. 228: 78: 77: 75: 74: 73: 68: 64: 61: 60: 59: 56: 21: 20: 755: 754: 750: 749: 748: 746: 745: 744: 715: 714: 705: 703: 699: 696: 691: 688: 686: 684: 683: 669: 664: 663: 653: 651: 640: 636: 626: 624: 611: 604: 594: 592: 582: 581: 577: 567: 565: 555: 554: 550: 540: 538: 528: 527: 523: 513: 511: 501: 500: 496: 486: 484: 474: 467: 457: 455: 444: 437: 427: 425: 415: 409: 398: 393: 376: 364: 336: 327: 303: 272: 264:Northern Region 202:Type of current 71: 69: 65: 62: 57: 54: 52: 50: 49: 17: 12: 11: 5: 753: 743: 742: 737: 732: 727: 681: 680: 675: 668: 667:External links 665: 662: 661: 634: 602: 575: 548: 521: 494: 465: 435: 395: 394: 392: 389: 388: 387: 382: 375: 372: 363: 360: 335: 332: 326: 323: 302: 299: 291:Nebbi District 271: 268: 234: 233: 230: 223: 222: 219: 215: 214: 211: 207: 206: 203: 199: 198: 194: 193: 190: 186: 185: 182: 178: 177: 168: 164: 163: 159: 158: 153: 149: 148: 143: 139: 138: 134: 133: 124: 120: 119: 106: 105:Passes through 102: 101: 92: 88: 87: 84: 80: 79: 47: 41: 40: 35: 31: 30: 26: 25: 15: 9: 6: 4: 3: 2: 752: 741: 738: 736: 733: 731: 728: 726: 723: 722: 720: 713: 710: 679: 676: 674: 671: 670: 649: 645: 638: 622: 621: 620:Daily Monitor 616: 609: 607: 591: 590: 585: 579: 564: 563: 558: 552: 537: 536: 531: 525: 510: 509: 504: 498: 483: 482:SMEC Holdings 479: 472: 470: 453: 449: 442: 440: 423: 422: 414: 407: 405: 403: 401: 396: 386: 383: 381: 378: 377: 371: 369: 359: 357: 353: 349: 344: 341: 331: 322: 320: 319:middle income 316: 312: 308: 298: 296: 292: 288: 283: 281: 277: 267: 265: 262:, all in the 261: 260:Arua District 257: 253: 252:Lira District 249: 245: 241: 231: 224: 220: 216: 212: 208: 204: 200: 195: 191: 187: 183: 179: 176: 172: 169: 165: 160: 157: 154: 150: 147: 144: 140: 135: 132: 128: 125: 121: 118: 114: 110: 107: 103: 100: 96: 93: 89: 85: 81: 76: 48: 46: 42: 39: 36: 32: 27: 22: 19: 682: 652:. Retrieved 647: 637: 627:13 September 625:. Retrieved 618: 595:13 September 593:. Retrieved 587: 578: 568:13 September 566:. Retrieved 560: 551: 541:13 September 539:. Retrieved 533: 524: 514:13 September 512:. Retrieved 506: 497: 487:13 September 485:. Retrieved 456:. Retrieved 451: 426:. Retrieved 419: 365: 362:Developments 355: 345: 337: 334:Construction 328: 314: 304: 284: 273: 239: 237: 210:Total length 86:East to West 18: 704: / 589:Google Maps 562:Google Maps 535:Google Maps 508:Google Maps 317:to achieve 315:Vision 2040 229:of circuits 167:Contractors 70: / 45:Coordinates 719:Categories 692:32°18′18″E 689:02°44′14″N 428:10 January 391:References 218:AC voltage 58:32°18′18″E 55:02°44′14″N 654:4 August 458:4 August 374:See also 301:Overview 270:Location 189:Expected 152:Operator 29:Location 586:(Map). 559:(Map). 532:(Map). 505:(Map). 276:Kampala 113:Pakwach 34:Country 244:Uganda 173:& 131:Uganda 99:Uganda 38:Uganda 416:(PDF) 289:, in 287:Nebbi 258:, in 250:, in 221:132kV 142:Owner 117:Nebbi 656:2024 629:2020 597:2020 570:2020 543:2020 516:2020 489:2020 460:2024 430:2018 354:and 295:Arua 280:Gulu 256:Arua 248:Lira 238:The 192:2024 184:2020 127:Arua 109:Gulu 95:Lira 91:From 313:'s 227:No. 721:: 646:. 617:. 605:^ 468:^ 450:. 438:^ 418:. 399:^ 205:AC 129:, 123:To 115:, 111:, 97:, 658:. 631:. 599:. 572:. 545:. 518:. 491:. 462:. 432:. 232:2

Index

Uganda
Coordinates
02°44′14″N 32°18′18″E / 2.73722°N 32.30500°E / 2.73722; 32.30500
Lira
Uganda
Gulu
Pakwach
Nebbi
Arua
Uganda
Government of Uganda
Uganda Electricity Transmission Company Limited
KEC International
AVIC International Holding Corporation
Uganda
Lira
Lira District
Arua
Arua District
Northern Region
Kampala
Gulu
Nebbi
Nebbi District
Arua
West Nile sub-region
government of Uganda
middle income
International Development Association
KEC International Limited

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.