In June 2024, the contract for the construction of tunnels between the West Coast and Jurong Lake
District stations was awarded to a joint venture between Nishimatsu Construction Co Ltd and Okumura Corporation for S$ 242 million (US$ 177.4 million). In July, the contract for the design and
354:
Jurong Lake
District station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from
673:
504:
473:
642:
665:
387:, Transport Minister Iswaran stated a connection between the two stations is being studied, but added that the two stations are intended to serve "different commuter movement objectives".
496:
534:
556:
582:
465:
691:
99:
609:
634:
557:"LTA Awards Civil Contract for Design and Construction of Tunnels Between CRL West Coast Station and Jurong Lake District Station for Cross Island Line Phase 2"
1044:
1039:
713:
1034:
412:
442:
583:"LTA Awards Civil Contract for Design and Construction of CRL Jurong Lake District Station and Tunnels under the Cross Island Line Phase 2"
346:, Singapore. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.
721:
526:
371:
Jurong Lake
District station will serve the CRL and have an official station code of CR19. The station will be located in the future
363:
construction of this station was awarded to KTC Civil
Engineering & Construction Pte Ltd for S$ 590 million (US$ 432.5 million).
706:
666:"Authorities studying if Jurong Lake District, Jurong Town Hall stations will be linked as interchange: S. Iswaran"
699:
729:
335:
225:
69:
864:
380:
811:
790:
776:
497:"Cross Island Line phase 2 to open by 2032 with 6 MRT stations, from Turf City to Jurong Lake District"
762:
404:
297:
240:
980:
434:
134:
931:
924:
839:
885:
825:
384:
235:
78:
954:
910:
857:
832:
818:
783:
746:
376:
356:
339:
248:
149:
878:
610:"Construction work for Jurong Lake District MRT station to start in fourth quarter of 2024"
372:
8:
804:
769:
466:"Six more MRT stations will be built in Phase 2 of Cross Island Line; to open by 2032"
962:
917:
1009:
871:
797:
83:
Future site of the Jurong Lake
District station in the future Jurong Lake District
1028:
995:
114:
101:
343:
724:
359:
to this station. The station is expected to be completed in 2032.
990:
435:"குறுக்குத் தீவு ரயில்பாதையின் 2ஆம் கட்டம் 2032ல் திறப்பு"
739:
Italicised locations are currently not in operation
1026:
379:. Due to the station's proximity to the nearby
730:Mass Rapid Transit (MRT) stations in Singapore
16:Future Mass Rapid Transit station in Singapore
707:
45:
304:
53:
1045:Railway stations scheduled to open in 2032
714:
700:
77:
317:Jurong Lake District station in Singapore
1040:Mass Rapid Transit (Singapore) stations
519:
488:
457:
1035:Proposed railway stations in Singapore
1027:
645:from the original on 20 September 2022
607:
537:from the original on 20 September 2022
507:from the original on 20 September 2022
476:from the original on 20 September 2022
445:from the original on 21 September 2022
415:from the original on 21 September 2022
397:
695:
224:
676:from the original on 10 January 2023
463:
663:
601:
575:
549:
494:
464:Chew, Hui Min (20 September 2022).
13:
14:
1056:
664:Lee, Amanda (24 September 2022).
495:Kok, Yufeng (20 September 2022).
411:(in Chinese). 20 September 2022.
1003:
989:
723:
332:Jurong Lake District MRT station
303:
296:
657:
441:(in Tamil). 21 September 2022.
627:
427:
46:
1:
608:Chionh, Ning (31 July 2024).
390:
188:; 8 years' time
7:
635:"CR19 Jurong Lake District"
527:"Cross Island Line Phase 2"
10:
1061:
405:"跨岛线第二阶段将有六个地铁站 预计2032年竣工"
366:
349:
972:
945:
902:
849:
754:
745:
736:
291:
284:
280:
276:
272:
268:
229:
221:
217:
212:
208:
200:
182:
177:
169:
161:
156:
140:
130:
93:
88:
76:
67:
54:
23:
981:Land Transport Authority
903:Punggol Extension (2032)
381:Jurong Town Hall station
334:is a future underground
135:Land Transport Authority
115:1.327245°N 103.739080°E
55:ஜூரோங் லேக் வட்டாரம்
533:. 20 September 2022.
377:Ayer Rajah Expressway
338:(MRT) station on the
1010:Singapore portal
893:Jurong Lake District
373:Jurong Lake District
311:Jurong Lake District
120:1.327245; 103.739080
42:Jurong Lake District
111: /
89:General information
385:Jurong Region line
336:Mass Rapid Transit
230:Following station
226:Mass Rapid Transit
222:Preceding station
70:Mass Rapid Transit
1022:
1021:
996:Trains portal
941:
940:
747:Cross Island Line
670:The Straits Times
501:The Straits Times
357:Turf City station
342:(CRL) located in
340:Cross Island line
329:
328:
325:
324:
264:
263:
249:Cross Island Line
150:Cross Island Line
1052:
1008:
1007:
1006:
994:
993:
960:
957:
865:King Albert Park
752:
751:
728:
727:
716:
709:
702:
693:
692:
686:
685:
683:
681:
661:
655:
654:
652:
650:
631:
625:
624:
622:
620:
605:
599:
598:
596:
594:
579:
573:
572:
570:
568:
553:
547:
546:
544:
542:
523:
517:
516:
514:
512:
492:
486:
485:
483:
481:
461:
455:
454:
452:
450:
431:
425:
424:
422:
420:
401:
307:
306:
300:
282:
281:
219:
218:
196:
194:
189:
147:
126:
125:
123:
122:
121:
116:
112:
109:
108:
107:
104:
81:
58:
57:
56:
50:
49:
48:
40:
39:
38:
32:
21:
20:
1060:
1059:
1055:
1054:
1053:
1051:
1050:
1049:
1025:
1024:
1023:
1018:
1017:
1004:
1002:
988:
968:
955:
952:
937:
898:
845:
812:Serangoon North
741:
732:
722:
720:
690:
689:
679:
677:
662:
658:
648:
646:
633:
632:
628:
618:
616:
606:
602:
592:
590:
581:
580:
576:
566:
564:
555:
554:
550:
540:
538:
525:
524:
520:
510:
508:
493:
489:
479:
477:
462:
458:
448:
446:
433:
432:
428:
418:
416:
403:
402:
398:
393:
369:
352:
321:
320:
319:
318:
315:
314:
313:
312:
308:
287:
253:
243:
192:
190:
187:
152:
145:
119:
117:
113:
110:
105:
102:
100:
98:
97:
84:
63:
62:
61:
60:
59:
52:
51:
44:
43:
41:
36:
30:
29:
28:
17:
12:
11:
5:
1058:
1048:
1047:
1042:
1037:
1020:
1019:
1016:
1015:
1014:
1013:
999:
983:
974:
973:
970:
969:
967:
966:
949:
947:
943:
942:
939:
938:
936:
935:
928:
921:
914:
906:
904:
900:
899:
897:
896:
889:
882:
875:
868:
861:
853:
851:
850:Phase 2 (2032)
847:
846:
844:
843:
836:
829:
822:
815:
808:
801:
794:
791:Tampines North
787:
780:
777:Pasir Ris East
773:
766:
758:
756:
755:Phase 1 (2030)
749:
743:
742:
737:
734:
733:
719:
718:
711:
704:
696:
688:
687:
656:
626:
600:
589:. 31 July 2024
574:
563:. 19 June 2024
548:
518:
487:
456:
426:
395:
394:
392:
389:
368:
365:
351:
348:
327:
326:
323:
322:
316:
310:
309:
302:
301:
295:
294:
293:
292:
289:
288:
285:
278:
277:
274:
273:
270:
269:
266:
265:
262:
261:
256:
254:
252:Future service
251:
246:
244:
238:
232:
231:
228:
223:
215:
214:
210:
209:
206:
205:
202:
198:
197:
184:
180:
179:
175:
174:
171:
167:
166:
163:
162:Structure type
159:
158:
154:
153:
144:
142:
138:
137:
132:
128:
127:
95:
91:
90:
86:
85:
82:
74:
73:
65:
64:
27:
26:
25:
24:
15:
9:
6:
4:
3:
2:
1057:
1046:
1043:
1041:
1038:
1036:
1033:
1032:
1030:
1012:
1011:
1000:
998:
997:
992:
986:
985:
984:
982:
979:
976:
975:
971:
965:
964:
958:
951:
950:
948:
944:
934:
933:
929:
927:
926:
922:
920:
919:
915:
913:
912:
908:
907:
905:
901:
895:
894:
890:
888:
887:
883:
881:
880:
876:
874:
873:
869:
867:
866:
862:
860:
859:
855:
854:
852:
848:
842:
841:
837:
835:
834:
830:
828:
827:
823:
821:
820:
816:
814:
813:
809:
807:
806:
802:
800:
799:
795:
793:
792:
788:
786:
785:
781:
779:
778:
774:
772:
771:
767:
765:
764:
763:Aviation Park
760:
759:
757:
753:
750:
748:
744:
740:
735:
731:
726:
717:
712:
710:
705:
703:
698:
697:
694:
675:
671:
667:
660:
644:
640:
636:
630:
615:
611:
604:
588:
584:
578:
562:
558:
552:
536:
532:
528:
522:
506:
502:
498:
491:
475:
471:
467:
460:
444:
440:
436:
430:
414:
410:
406:
400:
396:
388:
386:
382:
378:
374:
364:
360:
358:
347:
345:
341:
337:
333:
299:
290:
283:
279:
275:
271:
267:
260:
257:
255:
250:
247:
245:
242:
241:Aviation Park
237:
234:
233:
227:
220:
216:
211:
207:
203:
199:
185:
181:
176:
172:
168:
164:
160:
155:
151:
143:
139:
136:
133:
129:
124:
96:
92:
87:
80:
75:
72:(MRT) station
71:
66:
35:
22:
19:
1001:
987:
977:
961:
930:
923:
916:
909:
892:
891:
884:
877:
870:
863:
856:
838:
831:
824:
817:
810:
803:
796:
789:
782:
775:
768:
761:
738:
680:24 September
678:. Retrieved
669:
659:
649:20 September
647:. Retrieved
638:
629:
617:. Retrieved
613:
603:
591:. Retrieved
586:
577:
565:. Retrieved
560:
551:
541:20 September
539:. Retrieved
530:
521:
511:20 September
509:. Retrieved
500:
490:
480:20 September
478:. Retrieved
469:
459:
449:21 September
447:. Retrieved
438:
429:
419:20 September
417:. Retrieved
408:
399:
370:
361:
353:
331:
330:
258:
157:Construction
33:
18:
963:Changi East
840:Bright Hill
439:tamilmurasu
344:Jurong East
201:Electrified
165:Underground
118: /
106:103°44′21″E
94:Coordinates
1029:Categories
886:West Coast
826:Ang Mo Kio
391:References
236:West Coast
170:Accessible
978:See also:
911:Pasir Ris
858:Turf City
833:Teck Ghee
819:Tavistock
784:Pasir Ris
375:near the
103:1°19′38″N
946:Depot(s)
879:Clementi
674:Archived
643:Archived
619:1 August
535:Archived
505:Archived
474:Archived
443:Archived
413:Archived
286:Location
259:Terminus
239:towards
213:Services
131:Owned by
932:Punggol
925:Riviera
805:Hougang
593:31 July
567:19 June
383:on the
367:Details
350:History
191: (
183:Opening
178:History
141:Line(s)
68:Future
959:
953:
770:Loyang
148:
146:
37:
31:
918:Elias
872:Maju
798:Defu
682:2022
651:2022
621:2024
595:2024
569:2024
543:2022
513:2022
482:2022
451:2022
421:2022
193:2032
186:2032
47:裕廊湖区
34:CR19
956:CRL
639:LTA
614:CNA
587:LTA
561:LTA
531:LTA
470:CNA
204:Yes
173:Yes
1031::
672:.
668:.
641:.
637:.
612:.
585:.
559:.
529:.
503:.
499:.
472:.
468:.
437:.
409:早报
407:.
715:e
708:t
701:v
684:.
653:.
623:.
597:.
571:.
545:.
515:.
484:.
453:.
423:.
195:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.