25: 91: 591: 928:) station was moved 600 metres (2,000 ft) towards Feucht and renamed as Feucht-Moosbach to improve its accessibility to the Moosbach district. Altdorf West station was re-established to promote the development of a residential and commercial area on the western edge of Altdorf, including two schools. The train crossing point was moved from Winkelhaid station, where the crossing loop was removed, to Ludersheim station, which gained a passing loop. 374: 367: 634: 580: 323: 641: 443: 316: 706: 450: 258: 529: 663: 609: 555: 501: 418: 891:
During the electrification of the main line between Nuremberg and Regensburg, which began in May 1950, there were calls for the electrification of the section of the branch line to the town of Altdorf. The efforts were successful, so that the first electric railcars ran on the line on 2 September
923:
The works included the refurbishment of the superstructure and the removal of many level crossings to improve line speed from 60 to 100 km/h and the rehabilitation of the track bed. The branch line was upgraded to main line standards. The platforms of the existing intermediate stations were
912:, the line from Feucht to Altdorf. Preparatory work began in 1984 and work on adapting the line for S-Bahn operations began on 15 June 1988, with work completed for the opening of S-Bahn services on the line on 22 November 1992. The cost of building the works for the entire 389: 884:(branch lines) on 29 April 1869 made it possible to connect Altdorf to the Nuremberg–Regensburg line in Feucht. The line was finally opened on 15 October 1878 by the 1084: 779: 1069: 924:
brought up to S-Bahn standards with 145 metres (475 ft) long and 96 centimetres (38 in) high platforms. Moosbach (formerly
772: 1079: 1074: 990: 674: 765: 68: 46: 39: 1059: 905: 841: 465: 338: 192: 1064: 952:. Before the S-Bahn era it was served by class 432 electric multiple units and later by electric locomotives of 717: 885: 880:
and the railway was seen as a competitor to the canal. Only the enactment of a law for the construction of
813: 273: 224: 397: 909: 33: 904:, it was determined that the first stage of construction should include, in addition to the lines 845: 512: 473: 187: 829: 346: 281: 50: 825: 8: 937: 865: 195: 620: 566: 986: 849: 90: 901: 805: 594: 949: 913: 723: 482: 429: 298: 291: 179: 1053: 953: 917: 198: 941: 877: 869: 1006:
Seiler, Jürgen (2001). "Erste Baustufe der Nürnberger S-Bahn vollendet".
853: 151: 957: 861: 809: 117: 873: 817: 857: 1034:
Franke, Werner; Schilcher, Alex; et al. (1992).
848:
via Feucht to Altdorf and then continuing along the
820:
station, and runs from there to the east through the
804:
is a single-track main-line railway running through
840:At its opening the line already connected with the 590: 844:. There were plans as early as 1836 to extend the 983:Eisenbahnatlas Deutschland (German railway atlas) 1051: 864:. The plans, however, were not realised because 679: 461: 385: 334: 269: 219: 1033: 999: 985:. Schweers + Wall. 2009. pp. 89, 162–3. 975: 773: 895: 1085:Buildings and structures in Nürnberger Land 1029:(in German). Egglham: Bufe-Fachbuch-Verlag. 780: 766: 1024: 69:Learn how and when to remove this message 32:This article includes a list of general 1052: 1038:(in German). Darmstadt: Hestra-Verlag. 1005: 18: 13: 1070:Standard gauge railways in Germany 38:it lacks sufficient corresponding 14: 1096: 842:line from Nuremberg to Regensburg 366: 948:(carriages), designated as line 936:Today the line is operated with 916:service amounted to 587 million 900:When it was decided to build an 704: 661: 639: 632: 607: 589: 579: 578: 553: 527: 499: 448: 441: 416: 372: 365: 321: 314: 256: 89: 23: 1027:150 Jahre Eisenbahn in Nürnberg 944:electric locomotives with four 640: 442: 373: 315: 1080:1878 establishments in Germany 650:Ludersheim substation junction 633: 322: 95:Map of the Feucht–Altdorf line 1: 1008:Eisenbahntechnische Rundschau 963: 931: 886:Royal Bavarian State Railways 812:. It is the extension of the 754:Source: German railway atlas 705: 449: 257: 1075:Railway lines opened in 1878 968: 528: 466:Nuremberg–Regensburg railway 339:Nuremberg–Regensburg railway 7: 1025:Bräunlein, Manfred (1985). 902:S-Bahn network in Nuremberg 662: 608: 554: 500: 417: 10: 1101: 1018: 835: 390:Feucht–Wendelstein railway 146:11.6 km (7.2 mi) 896:Conversion for the S-Bahn 716: 698: 675:Altdorf West (b Nürnberg) 673: 655: 648: 626: 619: 601: 587: 572: 565: 547: 539: 521: 511: 493: 457: 435: 428: 410: 381: 359: 330: 308: 265: 250: 246: 235: 204: 186: 150: 142: 137: 129: 124: 113: 105: 100: 88: 83: 1036:S-Bahn Nürnberg Netz '92 814:Nuremberg–Feucht railway 274:Nuremberg–Feucht railway 1060:Branch lines in Bavaria 1010:(in German) (7/8): 438. 808:in the German state of 53:more precise citations. 16:Railway line in Germany 1065:Nuremberg S-Bahn lines 802:Feucht–Altdorf railway 828:Imperial Forest”) to 718:Altdorf (b Nürnberg) 920:(€300.13 million). 822:Lorenzer Reichswald 1042:Die Deutsche Bahn 992:978-3-89494-139-0 798: 797: 794: 793: 790: 789: 749: 748: 692: 691: 479: 478: 403: 402: 352: 351: 287: 286: 79: 78: 71: 1092: 1039: 1030: 1012: 1011: 1003: 997: 996: 979: 938:push-pull trains 816:, which ends at 806:Middle Franconia 782: 775: 768: 762: 728: 726: 708: 707: 680: 665: 664: 643: 642: 636: 635: 611: 610: 593: 592: 582: 581: 557: 556: 531: 530: 503: 502: 487: 485: 462: 452: 451: 445: 444: 420: 419: 386: 376: 375: 369: 368: 335: 325: 324: 318: 317: 303: 301: 296: 294: 270: 260: 259: 233: 232: 220: 206: 205: 182: 176: 174: 173: 169: 166: 158: 93: 84:Feucht – Altdorf 81: 80: 74: 67: 63: 60: 54: 49:this article by 40:inline citations 27: 26: 19: 1100: 1099: 1095: 1094: 1093: 1091: 1090: 1089: 1050: 1049: 1040:(reprinted as: 1021: 1016: 1015: 1004: 1000: 993: 981: 980: 976: 971: 966: 934: 898: 838: 786: 760: 729: 724: 722: 714: 709: 694: 671: 666: 651: 644: 637: 617: 612: 597: 583: 563: 558: 543: 537: 532: 517: 513:Feucht-Moosbach 509: 504: 489: 483: 481: 453: 446: 426: 421: 406: 377: 370: 355: 326: 319: 304: 299: 297: 292: 290: 261: 244: 227: 211: 188:Electrification 178: 171: 167: 164: 162: 161:4 ft  160: 156: 96: 75: 64: 58: 55: 45:Please help to 44: 28: 24: 17: 12: 11: 5: 1098: 1088: 1087: 1082: 1077: 1072: 1067: 1062: 1046: 1045: 1031: 1020: 1017: 1014: 1013: 998: 991: 973: 972: 970: 967: 965: 962: 940:, composed of 933: 930: 918:Deutsche Marks 897: 894: 846:Ludwig Railway 837: 834: 796: 795: 792: 791: 788: 787: 785: 784: 777: 770: 761:This diagram: 759: 756: 755: 751: 750: 747: 746: 744: 742: 740: 738: 736: 734: 731: 730: 720: 715: 712: 710: 703: 701: 699: 696: 695: 690: 689: 685: 684: 677: 672: 669: 667: 660: 658: 656: 653: 652: 649: 647: 645: 638: 631: 629: 627: 624: 623: 618: 615: 613: 606: 604: 602: 599: 598: 588: 586: 584: 577: 575: 573: 570: 569: 564: 561: 559: 552: 550: 548: 545: 544: 541: 538: 535: 533: 526: 524: 522: 519: 518: 515: 510: 507: 505: 498: 496: 494: 491: 490: 477: 476: 469: 468: 458: 456: 454: 447: 440: 438: 436: 433: 432: 427: 424: 422: 415: 413: 411: 408: 407: 401: 400: 393: 392: 382: 380: 378: 371: 364: 362: 360: 357: 356: 350: 349: 342: 341: 331: 329: 327: 320: 313: 311: 309: 306: 305: 285: 284: 277: 276: 266: 264: 262: 255: 253: 251: 248: 247: 245: 242: 240: 238: 236: 229: 228: 223: 213: 212: 209: 202: 201: 190: 184: 183: 180:standard gauge 154: 148: 147: 144: 140: 139: 135: 134: 131: 127: 126: 122: 121: 115: 111: 110: 107: 103: 102: 98: 97: 94: 86: 85: 77: 76: 59:September 2017 31: 29: 22: 15: 9: 6: 4: 3: 2: 1097: 1086: 1083: 1081: 1078: 1076: 1073: 1071: 1068: 1066: 1063: 1061: 1058: 1057: 1055: 1048: 1043: 1037: 1032: 1028: 1023: 1022: 1009: 1002: 994: 988: 984: 978: 974: 961: 959: 955: 951: 947: 943: 939: 929: 927: 921: 919: 915: 911: 907: 903: 893: 889: 887: 883: 882:Vizinalbahnen 879: 875: 871: 868:favoured the 867: 866:King Ludwig I 863: 859: 855: 851: 847: 843: 833: 831: 827: 823: 819: 815: 811: 807: 803: 783: 778: 776: 771: 769: 764: 763: 758: 757: 753: 752: 745: 743: 741: 739: 737: 735: 733: 732: 727: 719: 711: 702: 700: 697: 687: 686: 682: 681: 676: 668: 659: 657: 654: 646: 630: 628: 625: 622: 614: 605: 603: 600: 596: 585: 576: 574: 571: 568: 560: 551: 549: 546: 542:(closed 1988) 534: 525: 523: 520: 516:(opened 1992) 514: 506: 497: 495: 492: 488: 486: 475: 471: 470: 467: 464: 463: 455: 439: 437: 434: 431: 423: 414: 412: 409: 405: 399: 395: 394: 391: 388: 387: 379: 363: 361: 358: 354: 348: 344: 343: 340: 337: 336: 328: 312: 310: 307: 302: 295: 289: 283: 279: 278: 275: 272: 271: 263: 254: 252: 249: 241: 239: 237: 234: 231: 230: 226: 222: 221: 218: 215: 214: 208: 207: 203: 200: 197: 194: 193:15 kV/16.7 Hz 191: 189: 185: 181: 157:1,435 mm 155: 153: 149: 145: 141: 136: 132: 128: 123: 119: 116: 112: 108: 104: 99: 92: 87: 82: 73: 70: 62: 52: 48: 42: 41: 35: 30: 21: 20: 1047: 1041: 1035: 1026: 1007: 1001: 982: 977: 945: 935: 925: 922: 899: 890: 881: 872:between the 870:Ludwig Canal 839: 821: 801: 799: 459: 383: 332: 267: 216: 130:Route number 65: 56: 37: 960:carriages. 398:Wendelstein 152:Track gauge 143:Line length 106:Line number 51:introducing 1054:Categories 964:References 958:Silberling 932:Operations 862:Regensburg 860:rivers to 826:St. Lorenz 621:Ludersheim 567:Winkelhaid 474:Regensburg 34:references 969:Footnotes 954:class 141 942:class 143 850:Lauterach 347:Nuremberg 282:Nuremberg 210:Route map 138:Technical 120:, Germany 876:and the 856:and the 540:Hahnhof 199:catenary 175: in 101:Overview 1019:Sources 946:x-Wagen 926:Hahnhof 910:to Roth 906:to Lauf 836:History 830:Altdorf 810:Bavaria 170:⁄ 125:Service 118:Bavaria 47:improve 989:  892:1952. 874:Danube 818:Feucht 693: ) 683:opened 678:( 480: 430:Feucht 225:Legend 217: 114:Locale 36:, but 956:with 460: 404: 384: 353: 333: 288: 268: 133:890.2 987:ISBN 908:and 878:Main 858:Naab 854:Vils 800:The 781:edit 774:talk 767:view 713:11.6 688:1992 670:10.6 109:5933 616:9.3 595:A 3 562:7.6 536:4.9 508:4.3 472:to 425:0.0 396:to 345:to 280:to 1056:: 950:S2 914:S2 888:. 852:, 832:. 824:(“ 725:S2 484:S3 300:S3 293:S2 243:km 196:AC 177:) 1044:) 995:. 721:↑ 172:2 168:1 165:+ 163:8 159:( 72:) 66:( 61:) 57:( 43:.

Index

references
inline citations
improve
introducing
Learn how and when to remove this message

Bavaria
Track gauge
standard gauge
Electrification
15 kV/16.7 Hz
AC
catenary
Legend
Nuremberg–Feucht railway
Nuremberg
S2
S3
Nuremberg–Regensburg railway
Nuremberg
Feucht–Wendelstein railway
Wendelstein
Feucht
Nuremberg–Regensburg railway
Regensburg
S3
Feucht-Moosbach
Winkelhaid
A 3
Ludersheim

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.