was noticed in the dam. By 1979 the crack had grown to 46 m (150 ft) in length and was repaired. Inspection in 1983 revealed that the settling in the foundations and the movements of the dam had caused fracturing in the rock, resulting in significantly increasing the foundation's
239:
Monitoring of the dam revealed abnormal movement. Although dams normally move, the left side of the El Atazar Dam was moving more than the right because a support built on the dam's right made that side less flexible. In 1977 a
215:
When the dam was built, the decision was made to use the dam to store and regulate water only and not to provide energy. Construction started on the dam in 1968 and finished in 1972.
580: 524: 413: 223:
The dam is 134 m (440 ft) high and 52.3 m (171.6 ft) wide at the foundation. The reservoir capacity is 424,000,000 m (344,000 acre feet). It is a double
519: 529: 590: 570: 544: 539: 514: 391: 362: 62: 483: 387: 585: 443: 476: 565: 366: 341: 469: 246: 8: 50: 575: 258: 292: 452: 212:. Arch dams are thin and require less material to construct than other dam types. 447: 270: 496: 278: 559: 77: 64: 173: 197: 28: 274: 148: 319: 310: 301: 249:. The crack has been treated and since then the problems have abated. 156: 461: 224: 209: 265:. Its annual generation lies between 18,66 (2012) and 44,49 (1998) 262: 241: 228: 185: 440: 205: 201: 189: 193: 492: 266: 204:. The curved design of the dam is optimum for the narrow 257:
The dam supports a hydroelectric power plant with a
581:
Buildings and structures in the Community of Madrid
419:(in Spanish). www.fenercom.com. p. 57, 255–256 414:"LAS ENERGÍAS RENOVABLES EN LA COMUNIDAD DE MADRID" 557: 477: 281:is 56 m. Maximum flow per turbine is 8 m³/s. 277:) each. The turbine rotation is 500 rpm. The 208:in which it was built to retain water in the 200:, very close to where the Lozoya joins the 484: 470: 172: 558: 491: 453:Sociedad Española de Presas y Embalses 394:from the original on 27 September 2006 591:Reservoirs in the Community of Madrid 571:Hydroelectric power stations in Spain 465: 441:How is the way to build a Dam ? 13: 406: 14: 602: 434: 508: 318: 309: 300: 291: 27: 269:. The power station contains 2 380: 355: 334: 273:-generators with 4,78 MW (5,4 252: 1: 7: 234: 10: 607: 284: 16:Dam in Community of Madrid 503: 218: 163: 143: 135: 130: 122: 114: 109: 101: 93: 56: 46: 38: 26: 21: 327: 115:Height (foundation) 102:Construction began 586:Dams completed in 1972 363:"El Atazar Background" 178: 176: 78:40.91222°N 3.47333°W 388:"El Atazar Problem" 144:Total capacity 139:El Atazar Reservoir 74: /  51:Community of Madrid 446:2011-07-08 at the 259:nameplate capacity 179: 83:40.91222; -3.47333 553: 552: 171: 170: 164:Surface area 126:52.3 m (171.6 ft) 110:Dam and spillways 598: 513: 512: 511: 486: 479: 472: 463: 462: 457: 428: 427: 425: 424: 418: 410: 404: 403: 401: 399: 384: 378: 377: 375: 374: 365:. Archived from 359: 353: 352: 350: 349: 338: 322: 313: 304: 295: 154: 89: 88: 86: 85: 84: 79: 75: 72: 71: 70: 67: 31: 19: 18: 606: 605: 601: 600: 599: 597: 596: 595: 556: 555: 554: 549: 509: 507: 499: 490: 455: 448:Wayback Machine 437: 432: 431: 422: 420: 416: 412: 411: 407: 397: 395: 390:. Sim Science. 386: 385: 381: 372: 370: 361: 360: 356: 347: 345: 340: 339: 335: 330: 323: 314: 305: 296: 287: 271:Francis turbine 255: 237: 221: 152: 82: 80: 76: 73: 68: 65: 63: 61: 60: 34: 33:The dam in 2014 17: 12: 11: 5: 604: 594: 593: 588: 583: 578: 573: 568: 551: 550: 548: 547: 542: 537: 532: 527: 525:Puentes Viejas 522: 517: 504: 501: 500: 489: 488: 481: 474: 466: 460: 459: 450: 436: 435:External links 433: 430: 429: 405: 379: 354: 332: 331: 329: 326: 325: 324: 317: 315: 308: 306: 299: 297: 290: 286: 283: 279:hydraulic head 254: 251: 236: 233: 227:concrete arch 220: 217: 169: 168: 165: 161: 160: 145: 141: 140: 137: 133: 132: 128: 127: 124: 120: 119: 118:134 m (440 ft) 116: 112: 111: 107: 106: 103: 99: 98: 95: 91: 90: 58: 54: 53: 48: 44: 43: 40: 36: 35: 32: 24: 23: 15: 9: 6: 4: 3: 2: 603: 592: 589: 587: 584: 582: 579: 577: 574: 572: 569: 567: 566:Dams in Spain 564: 563: 561: 546: 543: 541: 538: 536: 533: 531: 528: 526: 523: 521: 518: 516: 506: 505: 502: 498: 494: 487: 482: 480: 475: 473: 468: 467: 464: 454: 451: 449: 445: 442: 439: 438: 415: 409: 393: 389: 383: 369:on 2006-12-30 368: 364: 358: 343: 337: 333: 321: 316: 312: 307: 303: 298: 294: 289: 288: 282: 280: 276: 272: 268: 264: 260: 250: 248: 243: 232: 230: 226: 216: 213: 211: 207: 203: 199: 195: 191: 187: 183: 182:El Atazar Dam 177:The reservoir 175: 166: 162: 158: 150: 146: 142: 138: 134: 129: 125: 121: 117: 113: 108: 104: 100: 96: 92: 87: 59: 55: 52: 49: 45: 41: 37: 30: 25: 22:El Atazar Dam 20: 534: 456:(in Spanish) 421:. Retrieved 408: 398:20 September 396:. Retrieved 382: 371:. Retrieved 367:the original 357: 346:. Retrieved 342:"Dam basics" 336: 256: 247:permeability 238: 222: 214: 198:Lozoya River 181: 180: 520:Riosequillo 253:Power plant 188:built near 81: / 57:Coordinates 560:Categories 423:2020-09-12 373:2006-12-31 348:2006-12-31 157:cu ft 66:40°54′44″N 576:Arch dams 535:El Atazar 530:El Villar 225:curvature 210:reservoir 147:426  131:Reservoir 97:Completed 69:3°28′24″W 545:La Oliva 540:La Parra 444:Archived 392:Archived 261:of 9,56 235:Problems 231:design. 229:buttress 186:arch dam 167:10.7 km² 155:10  47:Location 515:Pinilla 495:on the 458:profile 285:Gallery 196:on the 136:Creates 39:Country 497:Lozoya 219:Design 202:Jarama 190:Madrid 184:is an 123:Length 94:Status 417:(PDF) 344:. PBS 328:Notes 242:crack 206:gorge 194:Spain 151:(1.50 42:Spain 493:Dams 400:2018 105:1968 275:MVA 267:GWh 562:: 263:MW 192:, 149:hm 485:e 478:t 471:v 426:. 402:. 376:. 351:. 159:) 153:×

Index


Community of Madrid
40°54′44″N 3°28′24″W / 40.91222°N 3.47333°W / 40.91222; -3.47333
hm
cu ft

arch dam
Madrid
Spain
Lozoya River
Jarama
gorge
reservoir
curvature
buttress
crack
permeability
nameplate capacity
MW
GWh
Francis turbine
MVA
hydraulic head




"Dam basics"
"El Atazar Background"
the original

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.