East Side Big Pipe

Source 📝

91: 17: 70:
drains from sewer lines, built separate storm sewers in some locations, diverted surface streams away from the combined sewers, and added sumps and other devices to control surges of stormwater. These relatively low-cost efforts reduced the stormwater entering the system by more than 2 billion US gallons (7.6 
110:
that was 300 feet (91 m) long and had a cutting head that was 25 feet (7.6 m) in diameter. In addition to the tunnel and the pipe, the project involved building seven access shafts, connecting pipelines, and the Portsmouth Forcemain, which carries sewage from the Swan Island Pump Station to
44:
system of pipes, sumps, drains, pumps, and other infrastructure that transports sewage and stormwater run-off to the city's Columbia Boulevard Wastewater Treatment Plant. The East Side Big Pipe project, begun in 2006 and finished in 2011, was the largest of a 20-year series of projects designed to
121:
Costs associated with the CSO projects, which totaled about $ 1.4 billion, included $ 450 million for the East Side CSO Tunnel and $ 70 million for the Portsmouth Forcemain. Most of the financing for the projects is coming from sewer ratepayers and almost none from state or Federal
69:
Over the next 20 years, the city took a series of steps to reach its goals: a 99 percent reduction in CSOs into the Columbia Slough by the year 2000 and a 94 percent reduction in CSOs into the river by December 2011. As first steps, the city helped property owners disconnect their roof
98:
Work on the East Side Big Pipe began in 2006 and was completed in late 2011. Its tunnel is almost 6 miles (9.7 km) long. It lies at an average of 150 feet (46 m) below the surface along the east bank of the Willamette River from the intersection of Southeast 17th Avenue and McLoughlin
61:
From the mid-19th century until the mid-20th century, Portland's combined sewer system poured untreated sewage into the Willamette River and the Columbia Slough. In 1952, the city built its first plant to treat wastewater, which included stormwater run-off as well as raw sewage. However, the
130:
The route parallels the east side of the Willamette River mostly within a few blocks. Six vertical shafts were built to manage and facilitate tunnel construction. These are listed in reverse flow direction, or North to South.
193: 77:
By 2000, the city completed a more complicated project, the 3.5-mile (5.6 km) Columbia Slough Consolidation Conduit. A separate project completed in 2006 centered on construction of the 3.5-mile (5.6 km)
285: 239: 469: 423: 377: 331: 62:
existing sewer pipes were often overwhelmed by surges of stormwater from big storms, and the resulting CSOs continued to pollute the river and the slough. In 1991, the city signed an agreement with the
82:
and the Swan Island Pump Station. By late 2011, the city finished the largest of the CSO projects, the East Side Big Pipe. The combined projects were completed on schedule and met the intended goals.
669: 664: 106:
The East Side tunnel was the largest sewer construction project ever undertaken by the City of Portland. A contractor, Kiewit-Bilfinger Berger (KBB), used a
114:
The Portsmouth Forcemain, 3 miles (4.8 km) long and 66 inches (170 cm) in diameter, runs north from the pump station across Swan Island and under
53:. The combined projects were completed on time, and they reduced CSOs into the river by 94 percent and into the slough by more than 99 percent. 118:
and North Willamette Boulevard. There it meets the pre-existing Portsmouth Tunnel, which conveys combined sewage by gravity to the treatment plant.
63: 679: 689: 684: 139: 166: 674: 161: 156: 107: 100: 79: 8: 534: 613: 20:
Looking down the main construction shaft to the East Side Big Pipe during construction
639: 573: 46: 29: 151: 50: 41: 640:"Combined Sewer Overflow CSO Abatement Program: Final Report, 1991–2011" 658: 485: 471: 439: 425: 393: 379: 347: 333: 301: 287: 255: 241: 209: 195: 103:. The pipe in the tunnel has an inside diameter of 22 feet (6.7 m). 535:"Sewer Repair Portland OR - Trenchless Sewer Line & Drain Cleaning" 115: 33: 71: 142: 37: 90: 16: 45:
nearly eliminate combined sewer overflows (CSO)s into the
642:. Portland Bureau of Environmental Services. January 2012 111:the Columbia Boulevard Wastewater Treatment Plant. 656: 568: 566: 670:Sewerage infrastructure in the United States 665:Buildings and structures in Portland, Oregon 563: 576:. Portland Bureau of Environmental Services 64:Oregon Department of Environmental Quality 556: 554: 89: 15: 657: 551: 94:East Side Big Pipe under construction 85: 28:is a large sewer line and tunnel in 13: 14: 701: 66:to nearly eliminate these CSOs. 594:"Final Report", pp. 18–20 632: 606: 603:"Final Report, pp. 26–27 597: 588: 527: 518: 1: 680:2011 establishments in Oregon 524:"Final Report", pp. 4–5 511: 574:"East Side Big Pipe Project" 7: 167:GPX (secondary coordinates) 10: 706: 690:Southeast Portland, Oregon 685:Northeast Portland, Oregon 56: 162:GPX (primary coordinates) 137:Map all coordinates using 145:Download coordinates as: 125: 614:"East Side CSO Shafts" 486:45.48651°N 122.64755°W 440:45.50271°N 122.66139°W 394:45.50619°N 122.66278°W 348:45.51773°N 122.66250°W 302:45.52936°N 122.66649°W 256:45.53670°N 122.67524°W 210:45.55302°N 122.69564°W 95: 21: 157:GPX (all coordinates) 108:tunnel boring machine 93: 19: 560:"Final Report", p. 6 491:45.48651; -122.64755 445:45.50271; -122.66139 399:45.50619; -122.66278 353:45.51773; -122.66250 307:45.52936; -122.66649 261:45.53670; -122.67524 215:45.55302; -122.69564 80:West Side CSO Tunnel 481: /  435: /  389: /  343: /  297: /  251: /  205: /  616:. City of Portland 313:Steel Bridge shaft 280:Steel Bridge shaft 267:River Street shaft 234:River Street shaft 96: 40:. It is part of a 26:East Side Big Pipe 22: 675:Tunnels in Oregon 539:NWHomeServicesLLC 509: 508: 221:Port Center shaft 188:Port Center shaft 86:Technical details 697: 651: 649: 647: 626: 625: 623: 621: 610: 604: 601: 595: 592: 586: 585: 583: 581: 570: 561: 558: 549: 548: 546: 545: 531: 525: 522: 505: 504: 502: 501: 500: 498: 497:McLoughlin shaft 493: 492: 487: 482: 479: 478: 477: 474: 464:McLoughlin shaft 459: 458: 456: 455: 454: 452: 447: 446: 441: 436: 433: 432: 431: 428: 413: 412: 410: 409: 408: 406: 401: 400: 395: 390: 387: 386: 385: 382: 367: 366: 364: 363: 362: 360: 355: 354: 349: 344: 341: 340: 339: 336: 321: 320: 318: 317: 316: 314: 309: 308: 303: 298: 295: 294: 293: 290: 275: 274: 272: 271: 270: 268: 263: 262: 257: 252: 249: 248: 247: 244: 229: 228: 226: 225: 224: 222: 217: 216: 211: 206: 203: 202: 201: 198: 177: 176: 47:Willamette River 705: 704: 700: 699: 698: 696: 695: 694: 655: 654: 645: 643: 638: 635: 630: 629: 619: 617: 612: 611: 607: 602: 598: 593: 589: 579: 577: 572: 571: 564: 559: 552: 543: 541: 533: 532: 528: 523: 519: 514: 496: 494: 490: 488: 484: 483: 480: 475: 472: 470: 468: 467: 450: 448: 444: 442: 438: 437: 434: 429: 426: 424: 422: 421: 404: 402: 398: 396: 392: 391: 388: 383: 380: 378: 376: 375: 358: 356: 352: 350: 346: 345: 342: 337: 334: 332: 330: 329: 312: 310: 306: 304: 300: 299: 296: 291: 288: 286: 284: 283: 266: 264: 260: 258: 254: 253: 250: 245: 242: 240: 238: 237: 220: 218: 214: 212: 208: 207: 204: 199: 196: 194: 192: 191: 175: 174: 173: 172: 171: 128: 88: 59: 51:Columbia Slough 12: 11: 5: 703: 693: 692: 687: 682: 677: 672: 667: 653: 652: 634: 631: 628: 627: 605: 596: 587: 562: 550: 526: 516: 515: 513: 510: 507: 506: 465: 461: 460: 419: 415: 414: 373: 369: 368: 327: 323: 322: 281: 277: 276: 235: 231: 230: 189: 185: 184: 181: 170: 169: 164: 159: 154: 148: 135: 134: 133: 127: 124: 87: 84: 58: 55: 42:combined sewer 9: 6: 4: 3: 2: 702: 691: 688: 686: 683: 681: 678: 676: 673: 671: 668: 666: 663: 662: 660: 641: 637: 636: 615: 609: 600: 591: 575: 569: 567: 557: 555: 540: 536: 530: 521: 517: 503: 466: 463: 462: 457: 451:Taggart shaft 420: 418:Taggart shaft 417: 416: 411: 374: 371: 370: 365: 328: 325: 324: 319: 282: 279: 278: 273: 236: 233: 232: 227: 190: 187: 186: 182: 180:Location name 179: 178: 168: 165: 163: 160: 158: 155: 153: 150: 149: 147: 146: 141: 140:OpenStreetMap 138: 132: 123: 122:governments. 119: 117: 112: 109: 104: 102: 99:Boulevard to 92: 83: 81: 75: 73: 67: 65: 54: 52: 48: 43: 39: 35: 31: 27: 18: 644:. Retrieved 618:. Retrieved 608: 599: 590: 578:. Retrieved 542:. Retrieved 538: 529: 520: 144: 143: 136: 129: 120: 113: 105: 97: 76: 68: 60: 25: 23: 633:Works cited 620:October 15, 489: / 476:122°38′51″W 443: / 430:122°39′41″W 405:Opera shaft 397: / 384:122°39′46″W 372:Opera shaft 359:Alder Shaft 351: / 338:122°39′45″W 326:Alder Shaft 305: / 292:122°39′59″W 259: / 246:122°40′31″W 213: / 200:122°41′44″W 183:Coordinate 101:Swan Island 659:Categories 646:August 28, 580:August 28, 544:2022-09-16 512:References 495: ( 473:45°29′11″N 449: ( 427:45°30′10″N 403: ( 381:45°30′22″N 357: ( 335:45°31′04″N 311: ( 289:45°31′46″N 265: ( 243:45°32′12″N 219: ( 197:45°33′11″N 116:Waud Bluff 74:) a year. 34:U.S. state 49:and the 30:Portland 57:History 32:in the 38:Oregon 126:Route 648:2013 622:2013 582:2013 24:The 152:KML 36:of 661:: 565:^ 553:^ 537:. 72:Gl 650:. 624:. 584:. 547:. 499:) 453:) 407:) 361:) 315:) 269:) 223:)

Index


Portland
U.S. state
Oregon
combined sewer
Willamette River
Columbia Slough
Oregon Department of Environmental Quality
Gl
West Side CSO Tunnel

Swan Island
tunnel boring machine
Waud Bluff
OpenStreetMap
KML
GPX (all coordinates)
GPX (primary coordinates)
GPX (secondary coordinates)
45°33′11″N 122°41′44″W / 45.55302°N 122.69564°W / 45.55302; -122.69564 (Port Center shaft)
45°32′12″N 122°40′31″W / 45.53670°N 122.67524°W / 45.53670; -122.67524 (River Street shaft)
45°31′46″N 122°39′59″W / 45.52936°N 122.66649°W / 45.52936; -122.66649 (Steel Bridge shaft)
45°31′04″N 122°39′45″W / 45.51773°N 122.66250°W / 45.51773; -122.66250 (Alder Shaft)
45°30′22″N 122°39′46″W / 45.50619°N 122.66278°W / 45.50619; -122.66278 (Opera shaft)
45°30′10″N 122°39′41″W / 45.50271°N 122.66139°W / 45.50271; -122.66139 (Taggart shaft)
45°29′11″N 122°38′51″W / 45.48651°N 122.64755°W / 45.48651; -122.64755 (McLoughlin shaft)
"Sewer Repair Portland OR - Trenchless Sewer Line & Drain Cleaning"


Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.