39:, China. It opened on 30 December 2022. The line is double-track, 160 kilometres (99 miles) long, and has a maximum speed of 160 kilometres per hour (99 miles per hour). The railway consists of Main line, Airport branch and Huangmaoping branch.
52:
56:
119:[New progress has been made on the East ring line of Chongqing Railway Hub! The main line is expected to be completed by the end of 2021].
64:
60:
151:
156:
146:
48:
24:
92:
116:
8:
75:
Huangmaoping branch runs from Shuitu railway station to
Huangmaoping railway station.
140:
32:
67:. It has a maximum speed of 120 kilometres per hour (75 miles per hour).
36:
95:[The full line of Chongqing east ring railway opens].
138:
139:
70:
21:Chongqing Railway Hub east ring line
13:
14:
168:
42:
65:Jiangbei Airport railway station
51:and joins the main line between
16:Railway line in Chongqing, China
59:. The branch also pass through
49:Chongqing North railway station
109:
85:
28:
1:
78:
152:Railway lines opened in 2022
117:"重庆铁路枢纽东环线有新进展!正线预计2021年底建成"
7:
157:Rail transport in Chongqing
10:
173:
47:A branch line runs from
147:Railway lines in China
71:Huangmaoping branch
164:
131:
130:
128:
127:
113:
107:
106:
104:
103:
89:
61:Jiangbei Airport
30:
172:
171:
167:
166:
165:
163:
162:
161:
137:
136:
135:
134:
125:
123:
115:
114:
110:
101:
99:
91:
90:
86:
81:
73:
45:
17:
12:
11:
5:
170:
160:
159:
154:
149:
133:
132:
108:
93:"重庆东环铁路全线开通运营"
83:
82:
80:
77:
72:
69:
44:
43:Airport branch
41:
15:
9:
6:
4:
3:
2:
169:
158:
155:
153:
150:
148:
145:
144:
142:
122:
118:
112:
98:
94:
88:
84:
76:
68:
66:
62:
58:
54:
50:
40:
38:
34:
26:
22:
124:. Retrieved
120:
111:
100:. Retrieved
96:
87:
74:
46:
33:railway line
20:
18:
141:Categories
126:2023-04-27
102:2023-04-27
97:China News
79:References
37:Chongqing
29:重庆铁路枢纽东环线
57:Tongjing
31:) is a
25:Chinese
27::
63:with
121:上游新闻
55:and
53:Gulu
19:The
35:in
143::
129:.
105:.
23:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.