243:
54:
31:
61:
365:
The project cost £30 million and the footprint of the buildings cover an area of 15,000 m (160,000 sq ft), with capacity to extend onsite as CAF own 46,000 m (500,000 sq ft). Expansion would have been be necessary to build the near 200-metre (660 ft) trains for
421:
restrictions came into effect. Bodyshell deliveries from Spain had ceased two weeks before the factory's closure, and although it was possible to continue building without the bodyshell deliveries, it was felt that it was unable to keep the workers at a safe distance from each other.
462:
CAF also have other business strands operating out of the
Newport site; all UK rolling stock works are concentrated on the site including design, system engineering and support to projects such as the
374:. Initially, the site had just 12 employees, but that stood at 200 by the start of 2020. The company expects that the order book will necessitate expanding to 300 staff to fulfil those orders.
342:
When searching for a possible site to construct trains in the UK, CAF looked at over 100 different locations before settling on one on a part of the defunct
999:
731:
358:, and the site has three main buildings: a three-road assembly plant, a five-road test shed, and a stores building. The west end of the site has a
879:
746:
773:
1019:
231:
207:
491:
388:
CAF had stated that should they be awarded the contract to build trains for HS2, then they would be assembled in South Wales on its
230:. The site was announced as a train-building factory in 2016 and was producing rolling stock by 2018. It is owned and operated by
415:
668:
1009:
705:
116:
1024:
801:
53:
255:
Since the 1990s, CAF have supplied trains for the UK rail network from its factories in Spain. Products have included
517:
1014:
471:
320:
355:
978:
751:
522:
362:, which enables easy access to lines without the need for excessive shunting, and a water test facility.
1029:
545:
Pritchard, Robert, ed. (October 2019). "Blue livery spreads to more of the West
Midlands Metro fleet".
1004:
851:
Harris, Nigel, ed. (8 April 2020). "UK train production stops but depots remain open for servicing".
463:
316:
399:
and engines are manufactured off site, and bodyshells specifically are produced at CAF's plants in
308:
246:
351:
574:
547:
451:
446:
441:
436:
431:
312:
304:
296:
288:
284:
280:
276:
268:
249:
242:
36:
371:
347:
710:
300:
39:
392:
platform. However in
December 2021, the contract was awarded to a competing manufacturer.
8:
359:
343:
336:
983:
828:
Clinnick, Richard (11 March 2020). "CAF's £30 million Welsh factory officially opens".
734:
467:
378:
324:
960:
943:
856:
833:
778:
649:
609:
556:
418:
292:
272:
802:"The Newport train factory bidding to build £2.7bn worth of new high-speed trains"
938:
806:
644:
381:
commenced in 2017, with work completed in July 2018. It was officially opened by
332:
328:
260:
256:
227:
104:
993:
964:
947:
860:
837:
653:
613:
560:
219:
161:
151:
131:
118:
906:
604:
367:
955:
Harris, Nigel, ed. (11 March 2020). "The inside story of CAF in the UK".
774:"Prince Charles visits Newport for official opening of new train factory"
382:
264:
552:
346:
in South Wales. The site is located alongside sidings which follow the
389:
30:
579:
404:
223:
100:
669:"The new train making factory that will provide jobs for hundreds"
880:"Prince of Wales inaugurates CAF's Newport rolling stock factory"
747:"Prince of Wales inaugurates CAF's Newport rolling stock factory"
411:, but assembly and other manufacturing is undertaken at Newport.
400:
642:
Harris, Nigel, ed. (11 March 2020). "Inside CAF's new factory".
602:
Bickerdyke, Paul (April 2020). "Royal opening for CAF Newport".
396:
492:"UK Northern introduces first nine CAF trains into service"
408:
942:. Vol. 77, no. 858. Stamford: Key Publishing.
936:
Sherratt, Philip (March 2020). "CAF builds for the UK".
686:
625:
623:
855:. No. 902. Peterborough: Bauer Media. p. 12.
832:. No. 900. Peterborough: Bauer Media. p. 10.
648:. No. 900. Peterborough: Bauer Media. p. 42.
608:. No. 287. Horncastle: Mortons Media. p. 12.
913:
414:
Production at the site was ceased in March 2020 after
620:
991:
518:"TransPennine Express introduces new Nova fleet"
189:500,000 square feet (46,000 m) (whole site)
187:160,000 square feet (15,000 m) (buildings)
874:
872:
870:
984:Recognising CAF’s Newport Plant #MadeInWales
867:
1000:Buildings and structures completed in 2018
959:. No. 900. Peterborough: Bauer Meda.
601:
29:
544:
222:factory located at Celtic Business Park,
42:that was completed at CAF Newport in 2019
935:
919:
827:
692:
629:
241:
16:Rolling stock factory in Newport, Wales
992:
954:
666:
799:
474:which were built outside of the UK.
732:New Manufacturing Facility, Newport
706:"Good news from Newport businesses"
575:"300 train building jobs announced"
60:
13:
1020:Railway workshops in Great Britain
14:
1041:
986:THE NEW WIPERS TIMES, 8 July 2020
972:
910:issue 340 September 2024 page 14
457:
425:
370:, if CAF had been successful in
59:
52:
904:LNER CAF fleet to be Class 897
898:
844:
821:
793:
766:
739:
725:
698:
667:Kelsey, Chris (22 March 2018).
377:Construction of the factory by
660:
635:
595:
567:
538:
510:
484:
1:
1010:Manufacturing plants in Wales
884:Railway Gazette International
752:Railway Gazette International
523:International Railway Journal
477:
1025:2018 establishments in Wales
800:Barry, Sion (11 June 2019).
7:
551:. No. 214. Sheffield:
10:
1046:
929:
466:passenger coaches for the
237:
203:
193:
183:
175:
167:
157:
147:
110:
96:
88:
80:
76:
47:
28:
23:
1015:Rail transport in Wales
68:Location of CAF Newport
281:Arriva Trains Northern
252:
385:on 21 February 2020.
348:South Wales Main Line
245:
711:Newport City Council
472:TransPennine Express
327:. CAF also supplied
323:and Mark 5s for the
321:TransPennine Express
301:West Midlands Trains
199:Celtic Business Park
548:Today's Railways UK
344:Llanwern steelworks
337:West Midlands Metro
309:Transport for Wales
247:Transport for Wales
197:1 Monks Ditch Drive
128: /
886:. 24 February 2020
526:. 25 November 2019
496:Railway Technology
468:Caledonian Sleeper
325:Caledonian Sleeper
253:
132:51.5798°N 2.9098°W
1030:CAF rolling stock
979:Official web page
779:South Wales Argus
735:Bowmer + Kirkland
695:, pp. 54–56.
419:social distancing
379:Bowmer + Kirkland
293:Arriva Rail North
213:
212:
1037:
1005:Economy of Wales
968:
951:
923:
917:
911:
902:
896:
895:
893:
891:
876:
865:
864:
848:
842:
841:
825:
819:
818:
816:
814:
797:
791:
790:
788:
786:
770:
764:
763:
761:
759:
743:
737:
729:
723:
722:
720:
718:
702:
696:
690:
684:
683:
681:
679:
664:
658:
657:
639:
633:
627:
618:
617:
599:
593:
592:
590:
588:
571:
565:
564:
542:
536:
535:
533:
531:
514:
508:
507:
505:
503:
488:
395:The bodyshells,
273:Heathrow Express
143:
142:
140:
139:
138:
137:51.5798; -2.9098
133:
129:
126:
125:
124:
121:
63:
62:
56:
33:
21:
20:
1045:
1044:
1040:
1039:
1038:
1036:
1035:
1034:
990:
989:
975:
939:Modern Railways
932:
927:
926:
918:
914:
903:
899:
889:
887:
878:
877:
868:
850:
849:
845:
826:
822:
812:
810:
807:Birmingham Post
798:
794:
784:
782:
772:
771:
767:
757:
755:
745:
744:
740:
730:
726:
716:
714:
704:
703:
699:
691:
687:
677:
675:
665:
661:
641:
640:
636:
628:
621:
600:
596:
586:
584:
573:
572:
568:
543:
539:
529:
527:
516:
515:
511:
501:
499:
490:
489:
485:
480:
460:
428:
356:Bristol Parkway
240:
198:
188:
136:
134:
130:
127:
122:
119:
117:
115:
114:
72:
71:
70:
69:
66:
65:
64:
43:
17:
12:
11:
5:
1043:
1033:
1032:
1027:
1022:
1017:
1012:
1007:
1002:
988:
987:
981:
974:
973:External links
971:
970:
969:
952:
931:
928:
925:
924:
912:
897:
866:
843:
820:
792:
765:
738:
724:
697:
685:
659:
634:
619:
594:
583:. 13 July 2017
566:
555:. p. 20.
537:
509:
482:
481:
479:
476:
459:
458:Other ventures
456:
455:
454:
449:
444:
439:
434:
427:
424:
383:Prince Charles
239:
236:
228:Newport, Wales
211:
210:
205:
201:
200:
195:
191:
190:
185:
181:
180:
177:
173:
172:
169:
165:
164:
159:
155:
154:
149:
145:
144:
112:
108:
107:
105:Newport, Wales
98:
94:
93:
90:
86:
85:
82:
78:
77:
74:
73:
67:
58:
57:
51:
50:
49:
48:
45:
44:
34:
26:
25:
15:
9:
6:
4:
3:
2:
1042:
1031:
1028:
1026:
1023:
1021:
1018:
1016:
1013:
1011:
1008:
1006:
1003:
1001:
998:
997:
995:
985:
982:
980:
977:
976:
966:
962:
958:
953:
949:
945:
941:
940:
934:
933:
922:, p. 54.
921:
920:Sherratt 2020
916:
909:
908:
901:
885:
881:
875:
873:
871:
862:
858:
854:
847:
839:
835:
831:
824:
809:
808:
803:
796:
781:
780:
775:
769:
754:
753:
748:
742:
736:
733:
728:
713:
712:
707:
701:
694:
693:Sherratt 2020
689:
674:
670:
663:
655:
651:
647:
646:
638:
632:, p. 57.
631:
630:Sherratt 2020
626:
624:
615:
611:
607:
606:
598:
582:
581:
576:
570:
562:
558:
554:
550:
549:
541:
525:
524:
519:
513:
498:. 1 July 2019
497:
493:
487:
483:
475:
473:
469:
465:
453:
450:
448:
445:
443:
440:
438:
435:
433:
430:
429:
426:Classes built
423:
420:
417:
412:
410:
406:
402:
398:
393:
391:
386:
384:
380:
375:
373:
369:
363:
361:
357:
353:
349:
345:
340:
338:
334:
330:
326:
322:
318:
314:
310:
306:
302:
298:
294:
290:
286:
282:
278:
274:
270:
266:
262:
258:
251:
248:
244:
235:
233:
229:
225:
221:
220:rolling stock
217:
209:
206:
202:
196:
192:
186:
182:
178:
174:
170:
166:
163:
162:Rolling stock
160:
156:
153:
152:Manufacturing
150:
146:
141:
113:
109:
106:
102:
99:
95:
91:
87:
83:
79:
75:
55:
46:
41:
38:
32:
27:
22:
19:
956:
937:
915:
907:Rail Express
905:
900:
888:. Retrieved
883:
852:
846:
829:
823:
811:. Retrieved
805:
795:
783:. Retrieved
777:
768:
756:. Retrieved
750:
741:
727:
715:. Retrieved
709:
700:
688:
676:. Retrieved
673:Wales Online
672:
662:
643:
637:
605:Rail Express
603:
597:
585:. Retrieved
578:
569:
546:
540:
528:. Retrieved
521:
512:
500:. Retrieved
495:
486:
461:
413:
394:
387:
376:
364:
341:
254:
215:
214:
18:
265:NI Railways
216:CAF Newport
135: /
111:Coordinates
24:CAF Newport
994:Categories
553:Platform 5
478:References
331:trams for
305:Class 197s
297:Class 196s
289:Class 331s
285:Class 195s
277:Class 333s
269:Class 332s
261:Class 4000
257:Class 3000
171:200 (2020)
120:51°34′47″N
965:0953-4563
948:0026-8356
861:0953-4563
838:0953-4563
654:0953-4563
614:1362-234X
561:1475-9713
452:Class 897
447:Class 331
442:Class 197
437:Class 196
432:Class 195
360:traverser
333:Edinburgh
313:Class 397
263:DMUs for
250:Class 197
176:Buildings
168:Employees
123:2°54′35″W
84:2017/2018
37:Class 195
890:14 March
813:15 March
785:15 April
758:15 April
717:15 April
678:14 April
587:14 March
580:BBC News
530:15 April
502:15 April
416:COVID-19
405:Zaragosa
350:between
335:and the
224:Llanwern
204:Owner(s)
158:Products
148:Industry
101:Llanwern
97:Location
89:Operated
930:Sources
401:Beasain
372:its bid
352:Newport
329:Urbos 3
317:Mark 5s
238:History
194:Address
963:
946:
859:
836:
652:
612:
559:
464:Mark 5
397:bogies
184:Volume
92:2018 -
390:Oaris
218:is a
81:Built
961:ISSN
957:Rail
944:ISSN
892:2020
857:ISSN
853:Rail
834:ISSN
830:Rail
815:2020
787:2020
760:2020
719:2020
680:2020
650:ISSN
645:Rail
610:ISSN
589:2020
557:ISSN
532:2020
504:2020
470:and
409:Irun
407:and
354:and
319:for
315:and
307:for
299:for
291:for
287:and
279:for
271:for
259:and
368:HS2
232:CAF
208:CAF
40:DMU
996::
882:.
869:^
804:.
776:.
749:.
708:.
671:.
622:^
577:.
520:.
494:.
403:,
339:.
311:,
303:,
295:,
283:,
275:,
267:,
234:.
226:,
103:,
35:A
967:.
950:.
894:.
863:.
840:.
817:.
789:.
762:.
721:.
682:.
656:.
616:.
591:.
563:.
534:.
506:.
179:4
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.