3184:, all of the T1-series trains were transferred to the Bloor–Danforth line, where they replaced the remaining H4- and H6-series subway trains. The T1s are now the only trains operating on the line. The remaining H4 trains were retired from revenue service throughout the fall of 2011, and the last cars were decommissioned on January 27, 2012. They were the last version of TTC trains that were not equipped with air-conditioning systems (but instead used ceiling fans); they were also the last of which to be outfitted with larger orange upholstered bench seating and were mainly used on weekdays, most often during rush hour several years before their retirement. The H4s also had a similar interior design based on the H2 subway cars. The H6-series trains (which had bright orange doors and panels, individual seats, along with light brown floors, cream walls and brown simulated wood grain panels) were retired from service between 2013 and 2014; the final run for the last H6-series train took place on June 20, 2014. In the summer of 2016, a few TR trains were used on Line 2 because of an air conditioning malfunction in numerous individual T1 cars, combined with a
7937:
2610:
3769:
3359:
8541:
7955:
1554:
1465:
1366:
3300:
2921:
3826:). In November 2022, Metrolinx and Infrastructure Ontario announced that Scarborough Transit Connect was the successful bidder and would work with the province over an 18- to 24-month development phase to finalize the scope, risk allocation, project costs and project schedule. Once the development phase had concluded, Metrolinx would have the option to execute the project agreement with the development partner to progress to construction, which would include agreements on detailed designs and the final negotiated price. The scope of the SRS contract included the following:
2709:
9576:
8753:
8231:
7968:
44:
7925:
3015:
8945:
7981:
1046:
1390:
1320:
1335:
1306:
2186:
2161:
2126:
2110:
1538:
1513:
1448:
53:
2310:
1398:
1530:
1490:
1408:
1383:
2292:
1763:
1281:
1271:
707:
493:
2226:
1991:
1900:
1440:
1430:
1422:
843:
596:
7767:
2328:
1883:
1732:
1661:
1327:
1081:
987:
3867:
1056:
2964:
2176:
1591:
1522:
1415:
806:
775:
2698:
424:
1701:
683:
2263:
2241:
2168:
2031:
1637:
1288:
1263:
1073:
892:
751:
661:
537:
2221:
1051:
429:
3470:. The Government of Canada would fund the remaining one-third. Toronto City Council approved the extension by a vote of 24–20 on October 8, 2013. The subway route would extend eastward towards McCowan Road, via Eglinton Avenue and Danforth Road, and proceeding north towards the intersection of McCowan Road and Sheppard Avenue, via Scarborough City Centre. There would be three new stations at Lawrence Avenue East (serving the
2194:
2152:
2118:
2063:
1675:
1668:
1313:
1107:
1099:
1027:
859:
850:
783:
620:
568:
559:
466:
407:
434:
1969:
1947:
1925:
1892:
1861:
1839:
1817:
1615:
1569:
1482:
1296:
1221:
1199:
1177:
1155:
1133:
1091:
1019:
1009:
978:
916:
901:
823:
729:
639:
529:
521:
500:
486:
458:
399:
381:
360:
9462:
7931:
3258:
2299:
2285:
2086:
2055:
1739:
1725:
1001:
994:
924:
908:
815:
449:
9318:
9077:
8009:
7994:
2216:
867:
576:
389:
8988:
7826:
2007:
1793:
1779:
1352:
1237:
954:
940:
3324:. When the TTC replaces the T1 subway fleet, it will need space to store the new trains as they are delivered as well as new shops to service them. The Greenwood Yard will be inadequate as it is completely full with no room to expand, and because its facilities are optimized for two-car train sets rather than the six-car train sets of the proposed new fleet. The estimated cost of the new yard was $ 500
3133:
7781:
3218:
date on May 4, 2021, with potential suppliers to discuss the background, industry engagement, procurement model, and technical overview with interested NST manufacturers. The TTC later issued a request for proposal (RFP) on
October 13, 2022, to the prequalified proponents to submit proposals for delivering the NST. Prequalified rail vehicle manufacturers included
3099:. Valid proof-of-payment includes paper transfers – free supplementary tickets obtained at the point of entering the transit system that allow the rider to transfer to another route on a one-way continuous direction with no stopovers or backtracking permitted – and Presto cards, which provide unlimited two-hour transfers in any direction across the TTC network.
2665:, were proposed by the Toronto Planning Board in December 1943, although the report did not include costings. During the fall of 1911, the City of Toronto put out a tender for the construction of concrete tubes to carry a subway. However, when the cost of the subway was put to a referendum, the construction of the subway tunnels was rejected.
2898:. The fire destroyed four subway cars and some wall tiles, and resulted in a section of the subway being closed for a few days. As a result, the middle section of Christie station has different-coloured trim tiles. On September 19, 2007, the station modernization program was started. This program would result in making the subway system more
2776:
extension were authorized on
September 5, 1958 by the Ontario Municipal Board which sought a compromise between the involved communities. The financing of the project was controversial. For the first time, financing was to be split between the TTC and Metro Toronto, incurring a property tax increase. This was opposed by Etobicoke,
3556:
City planning staff estimated that the peak ridership of the one-stop extension to be 7,300 in the peak hour and peak direction, about half of the 15,000 peak ridership considered the low end to justify a subway. With the original three-stop extension, the peak ridership estimate was 9,500 to 14,000;
3056:
and construction of the exit structures in residential neighbourhoods, this portion of the program has become controversial, as some houses need to be removed to accommodate these secondary exits. Plans to add a second exit for
Donlands, Greenwood, and Woodbine stations were deferred in late February
2890:
for fare purposes, but the subway used a flat fare system, so they were treated as being part of Zone 1. This created problems when transferring from the subway to the buses, which were in different zones at the same location. The solution was a change in political thinking, where the subway was seen
2859:
Upon opening, the Bloor–Danforth line was well received: a survey taken four months later showed that the subway was used by 10,000 riders per hour. As a result, many bus and streetcar routes were either discontinued or shortened. Various bus and streetcar routes that connected to the subway stations
3524:
On
January 20, 2016, city staff issued a proposal to eliminate two of the three stops on the planned Scarborough Subway Extension and to terminate Line 2 Bloor–Danforth at Scarborough Town Centre. The planned intermediate stop at Lawrence Avenue would be eliminated along with the proposed stretch to
3204:
The TTC estimated that the T1 fleet's useful life would end in 2026. In 2017, the TTC planned to replace the T1 fleet with 62 new trains, possibly using the TR type from
Bombardier to eliminate the time needed to prototype a different model. However, in March 2019, the TTC reversed its decision and
3039:
was completed in 2007. This work provided direct access to bus platforms and a new streetcar platform, improving traffic control within the station. Victoria Park station's modernization project was completed between 2008 and 2011 to make the station more functional, attractive, better connected to
3571:
article points out there would be only one station within 6 kilometres of
Scarborough Town Centre but more stations are within 6 kilometres of other terminal stations to boost ridership. The SSE would have carried an estimated 31,000 riders per day as compared to 66,355 riders from Kipling to Jane
3394:
again proposed to extend the line northeastward as a replacement for the aging
Scarborough RT. In 2006, this proposal was then altered when Scarborough councillors agreed to support plans to refurbish the existing line using other light-metro options for Scarborough. Using heavy-rail rapid transit
3213:
billion required to replace the T1 fleet. Refurbishment would not include installing automatic train control (ATC) equipment on the T1 fleet, while new train sets would have included this feature, and this choice will thus delay the implementation of ATC on Line 2 by ten years. It was concurrently
3172:
group. These trains, which were a part of the H series, were similar to the M1-series trains with newer features such as electrically operated doors. With the introduction of the T1-series subway trains, the H1 and H2 trains were retired from service, while the remaining H4 trains (along with some
3079:
On
December 1, 2019, all subway station collector booths were permanently closed and replaced by roaming customer service attendants. While customers would still be able to pay their fares by senior or youth TTC tickets, tokens or day passes, these were no longer available for purchase at stations
3025:
As the stations on the line have begun to show signs of aging, the TTC has initiated a station modernization program aimed at improving accessibility and appearances at several subway stations. These modernizations include new and updated wall finishes, signage, lighting and public art, as well as
3006:. When they opened, Kipling and Kennedy stations were the only Line 2 stations not to use the Toronto Subway typeface. However, in late 2017, Kipling station was redesigned to use the Toronto Subway typeface as well, leaving Kennedy station being the sole station on Line 2 not to use the typeface.
3217:
On August 6, 2020, the TTC issued a request for information (RFI) to gather information from potential suppliers to identify those who would be interested in designing and supplying new subway trains (NST) to the TTC. The RFI closed on
September 18, 2020, and the TTC hosted an information session
3115:
The Route 300 Bloor–Danforth bus provides late-night service to the area around the stations when the subway is not in operation. This service operates frequently along Bloor Street and
Danforth Avenue between the East/West Mall and Kennedy station via Danforth Road, Brimley Road, Eglinton Avenue
2990:
and used a cycle that was similar to the design employed on the Yonge subway. This design consists of two colours for the tiles, one for main wall tiles and another for trim tiles near the ceiling of the stations. The station names on the main wall tiles use the colour of the trim tiles and vice
3287:
Lakeshore East and Stouffville line) tracks, it was possible for trains to be delivered directly to the subway. The CN rail tracks were converted to allow for the storage of more subway trains as the T1-series trains were shifted from Yonge–University–Spadina line to the Bloor–Danforth line. In
3478:
and Sheppard Avenue East. The city would also raise property taxes annually over the next three years. Digging of the extension was expected to begin as early as 2018, with a completion within five years. As a result of the extension's approval, the Eglinton Crosstown line would be cut back to
2739:
In the 1950s, there was intense debate over where the second Toronto subway line would run as it would affect how bus routes in Toronto's suburbs would operate. There were two main plans. While both shared the same route at the outer ends, the TTC favoured a route that continued eastwards from
3611:
billion in order to build a 34-bay bus terminal at Scarborough Town Centre, which was to be the largest bus terminal of the TTC system. Also, the projection for new riders for the extension was revised downwards to 2,300 per day, down from the 4,500 new riders estimated in the summer of 2016.
3805:
The stations, rails and systems (SRS) contract will be delivered using a progressive design–build delivery strategy. In September 2021, Metrolinx and Infrastructure Ontario released an RFQ to shortlist potential bidders. In February 2022, following the close of the RFQ process, Metrolinx and
3679:
The northern terminus of the extension will be at Sheppard Avenue East and McCowan Road; it will have an adjacent TTC bus terminal as well as a pick-up and drop-off area. The station entrance will be at Sheppard Avenue and McCowan Road. The station design will provide for future extension of
3638:
billion with a completion date estimated for end of 2027 and a delayed opening date of 2030 for the bus terminal at Scarborough Centre. In addition, plans for the extension to run ATC upon opening were dropped and instead replaced with the inclusion of "enabling works" allowing for ATC to be
2994:
This pattern is based on a design similar to the stations along the University line, which follow a regular pattern with some small variances, which are the result of multiple events. One of these tiling variances is located at Christie station, where some of the original tiles were replaced
2775:
In 1956, Toronto's midtown area was starting to experience growth. There was a public debate about the two schemes between the two chairmen and the municipalities that made up Metropolitan Toronto. The extension of the Yonge line along University Avenue, and the east–west Bloor–Danforth line
3043:
The second exit program was also included in station modernization projects after a fire safety audit revealed several at-risk stations with only one means of access and egress from the subway platform level to the street. Some stations with only one entrance/exit received a second means of
2680:
or multiple units (MUs) operated from 1950 to the opening of the subway line in 1966. The TTC favoured this route because the Prince Edward Viaduct made it easier to build a subway across the Don Valley, and the streetcar that ran along the route was filled with passengers travelling from
2807:
the Icos–Veder method). Other parts of the line were built above ground in grade-separated rail corridors. The line was 12.9 kilometres (8.0 mi) long, and ran about 20 to 40 metres (66 to 131 ft) north of Bloor Street and Danforth Avenue. The cost of the initial section was $
3057:
2011 due to lack of funding. In September 2017, the addition of elevators and a second exit/automatic entrance were completed at Woodbine station, rendering it fully accessible. As of July 2020, modernization work for Donlands station is planned to begin in the fourth quarter of 2020.
7368:
3615:
In March 2017, city staff estimated the extension would take six years to construct with an expected opening in the second quarter of 2026. The project was funded. On March 28, 2017, city council approved the design of the 6.2-kilometre (3.9 mi) extension via McCowan Road.
3996:
2588:". Unofficially, the subway lines were already numbered, but in October 2013, the TTC announced plans to give the lines an official number to help riders and visitors to navigate the system. The new signage reflecting this change began being installed in March 2014, with
2642:, should include a lower deck for a future subway. The lower deck was built, but the first plan for a line to use it was not made until June 15, 1933, when the TTC published a report which suggested construction of a subway and an expressway broadly following
2445:
and the line continues running a few metres north of Danforth Avenue until just east of Main Street, where it bends northeasterly and runs above-grade until just east of Warden station, where it continues underground to its eastern terminus, slightly east of
3160:
were exclusively confined to the Yonge–University line. In the 1980s, as the H-series trains took over, the M-series trains were only used during rush hour as the trains were linked to be made up of vehicles of a single class. With the introduction of the
3034:
stations are the first slated for modernization under this project, and Islington will also be modernized under larger capital projects aimed at greater accessibility and reconstruction of bus loading platforms. Construction of a second access route at
2625:
The earliest mention of rapid transit along the Bloor–Danforth line's route was made in a 1910 report that was prepared by an American firm of transit consultants. This study had been commissioned by a special commission, which included City Controller
3116:
East, North/South Service Road, Transway Crescent and Kennedy Road. On Sundays, these routes operate through the early morning hours, because the subway starts service at 8:00 a.m. instead of the usual 6:00 a.m. Frequency is 6 to 30 minutes.
2867:
running through to either Keele or Woodbine station, while other trains connected the latter two points. However, the manoeuvre made operation of both lines more difficult, and the practice was abandoned after the initial trial period, leaving
3662:
billion with an estimated completion date between 2029 and 2030. As with the three-stop proposal of 2013–2016, there would be three new stations located along McCowan Road at Lawrence Avenue, Scarborough Town Centre and Sheppard Avenue East.
3237:
In July 2023, the TTC cancelled its request for proposals to supply new subway cars due to a lack of funding. Before the cancellation, the TTC had hoped to purchase 80 new trains, 55 for Line 2 to replace the T1 fleet and 25 for growth on
3075:
can be purchased and loaded with money or digital monthly TTC passes at automatic fare vending machines, which also sell Presto 1-ride, 2-ride or day pass tickets. Presto cards and tickets are accepted at all TTC subway station entrances.
7360:
3703:(also to be decommissioned) and will occupy most of the block bounded by McCowan Road, Progress Avenue, Grangeway Avenue and Busby Drive. The main entrance will be near McCowan Road and Progress Avenue. The new station will have a new
3587:
billion because tunnels need to be deeper than expected in some places, with the new terminal station being 45 to 90 per cent deeper. An additional cost factor is that a high water table would require more concrete. There is also a $
3730:
On March 10, 2020, Metrolinx and Infrastructure Ontario issued a request for qualifications (RFQ) related to advance tunnelling works. On August 20, 2020, Metrolinx issued a request for proposals to shortlisted proponents, including
7283:
3440:
denounced the idea of light rail transit and instead proposed to replace the Scarborough RT with an extension of the Bloor–Danforth line. However, on March 31, 2011, Ford agreed with the provincial government that the province's
6378:
6067:
3776:
Construction on the extension began on June 23, 2021. The SSE tunnel will contain two tracks within a single bore of 10.7 metres (35 ft) in diameter and will be the largest subway tunnel by diameter in Toronto. The
3317:. It provides for the storage and cleaning of subway trains but not for maintenance. Since June 18, 2017, the yard stores and services four trains overnight with the remaining yard capacity used to store work equipment.
2948:; otherwise, it is offset to the north by about a city block. In some areas, it runs under parks and parking lots behind the businesses on the north side of the street, while other sections run under side streets.
3722:. There will be entrances at the northwest and southwest corners of Lawrence Avenue and McCowan Road. There will be a bus terminal on the south side of Lawrence Avenue between Valparaiso Avenue and McCowan Road.
6681:
6579:
4959:
6901:
6229:
6127:
3670:
billion over 60 years. Benefits included reducing travel time and cars on the road. Metrolinx CEO Phil Verster said the estimate of benefits was conservative and Metrolinx may improve the benefits over time.
7000:
6732:
6006:
3461:
On September 4, 2013, the province of Ontario decided to extend the Bloor–Danforth subway after all and announced that it would fund two-thirds of the 6.4 kilometres (4.0 mi) extension from Kennedy to
6097:
3747:. A launch shaft would be constructed at the northeast corner of Sheppard Avenue East and McCowan Road, with an extraction shaft along Eglinton Avenue on the east side of Midland Avenue. On May 25, 2021,
4003:
3885:, with a station added at the East Mall at a later date. The second included an additional 1.4 kilometres (0.87 mi) from Sherway Gardens to Dixie Road, while a further section from Dixie Road to
3124:
As of 2016, Line 2 was running at capacity with almost 26,000 peak-hour riders. Upgraded signalling would allow for more frequent trains and expand peak-hour capacity to almost 33,000 riders by 2031.
3797:'s stage persona and fictional character) had started digging at a speed of 10–15 metres (33–49 ft) per day. It will dig 6.9 kilometres (4.3 mi) of the 7.8-kilometre (4.8 mi) tunnel.
6765:
7541:
7473:
7195:
3165:(which had been used exclusively on the Yonge–University–Spadina line during their first years of service in the late 1990s), the M1-series trains were retired from service between 1998 and 1999.
6648:
6149:
3490:
to reduce the station spacing between Kennedy station and the next stop from about 4 km (2.5 mi) to 2 km (1.2 mi). At that time, he was told the extra station would add $ 100
7162:
6934:
3449:) over the Line 3 right-of-way instead. In June 2012, the idea of a Scarborough subway extension was a key part of Toronto's proposed OneCity transit plan. This plan was later rejected by the
7391:
7033:
3501:
However, a subsequent city staff report indicated that the proposed stations at Lawrence Avenue and at Sheppard Avenue had "little development potential" nearby and were too close to planned
3214:
revealed the TTC lacked the facilities to store and maintain a new fleet as a new Kipling carhouse, which was originally planned to open in the mid-2020s, was now scheduled to open in 2031.
6967:
6169:
3415:. The line would have used the right-of-way of the Scarborough RT, which would have been shut down for conversion to light rail, requiring bus substitution. Construction would have lasted 3
6615:
7272:
6868:
6798:
6332:
5444:
6368:
7593:
7459:
7421:
6059:
3658:
On April 10, 2019, Doug Ford, who had since become premier, announced that the province would revert the extension back to the three-stop proposal at an estimated cost of $ 5.5
7683:
3666:
In February 2020, Metrolinx released a cost–benefit analysis showing that the $ 5.5-billion project cost for the three-stop extension is double the estimated benefits of $ 2.8
3572:(five stations) and 96,660 riders from Finch to York Mills (four stations). The SSE would have performed better in ridership only against the terminal of the underperforming
2878:
In 1971, Metro Council insisted that the zone fare system be removed to allow residents of the suburbs to travel anywhere with a single fare. Prior to this, stations west of
7623:
6456:
6426:
6831:
5970:
5663:
2955:, which are located above the subway. Other stations are large facilities on the surface that also contain bus and/or streetcar platforms to allow transfers to take place.
5475:
3789:. Arriving in early 2022, the TBM was transported via sea in multiple shipments for reassembly at the launch site. By January 2023, the TBM (named "Diggy Scardust" after
3002:, the three of which have a tricolour design. The current terminus stations of Kipling and Kennedy stations, upon initial opening in 1980, resemble the second version of
6671:
6569:
2596:
being the first two stations updated. The subway was formerly internally known as route 601. Since the mid-2010s, it is publicly referred to as "Line 2 Bloor–Danforth".
7308:
6891:
6222:
4963:
3971:
4870:
3148:, which were among the first subway trains to be manufactured in Canada. At the time of construction, these subway cars were the longest in the world. As a result of
2799:
method, with some sections along University Avenue built using shield tunneling with manual excavation of the face – and even a short stretch using the
7338:
7228:
6486:
6119:
4077:
6722:
3249:
million for the purchase of 55 new subway trains to replace Line 2's T1 fleet, provided that the federal government and the city each make a matching contribution.
6990:
6546:
5996:
5905:
5325:
3242:. The city pledged to pay one-third of the $ 2.5 billion estimated cost, but the provincial and federal governments had not committed to pay the remaining amount.
2689:. To provide relief to this streetcar line and to ease expansion into the suburbs, the line was built a few metres north of both Bloor Street and Danforth Avenue.
7571:
6295:
6089:
5936:
5303:
3764:
activities necessary to build the tunnel (e.g. utility relocations, supports for shaft and headwalls, temporary power supply, lighting, ventilation, and drainage)
3557:
however, that estimate was reduced to 7,300 because of competition from the proposed SmartTrack and by the elimination of two of the three original stops. Mayor
3332:
million for planning work was included in the Capital Budget as of July 2017. As of March 2017, the TTC estimated that the Kipling Yard would open in 2031.
2677:
7653:
4119:
2860:
allowed the line to continue to grow and become more sustainable. The line carries an average of 503,060 passengers on weekdays during the 2015 operating year.
7511:
5058:
4775:
2764:, and after following Queen Street eastwards to Pape Avenue, turned north to rejoin the east–west route at Pape station. The eastern routing is similar to the
5557:
5409:
3205:
planned to delay the purchase of new train sets by refurbishing the T1 fleet to extend its life by a decade. The cost of refurbishment was estimated at $ 715
5527:
7874:
6400:
6037:
6755:
7533:
7481:
7185:
6516:
2381:
7096:
6638:
4212:
3379:. As multiple types of technologies were examined many politicians requested a subway extension instead of the then proposed streetcar line. Instead, a
7129:
3893:, which included three stations, was considered but rejected due to cost and planning considerations. This was replaced by a planned Dundas LRT run by
2422:
and is 26.2 kilometres (16.3 mi) in length. It opened on February 26, 1966, and extensions at both ends were completed in 1968 and again in 1980.
7152:
6924:
6705:
5623:
5358:
3943:
5505:
5269:
7399:
7023:
4641:"Consumer Price Index by product group, monthly, percentage change, not seasonally adjusted, Canada, provinces, Whitehorse, Yellowknife and Iqaluit"
294:
8502:
3565:
say a peak ridership of 7,300 would have still been acceptable as it was still greater than the 6,000 peak at terminal station Kipling. However, a
6957:
7815:
6605:
4988:
3156:
allowed the Bloor–Danforth line to operate efficiently between Islington and Warden without the need for a larger subway fleet. As a result, the
7736:
5609:
5383:
5027:
4572:
8199:
3684:
to terminate at this station, as well as further expansion of Line 2 north of the station. Besides TTC buses, the bus terminal will also serve
2795:
in the east on February 26, 1966. Nine men died during its construction in several incidents. Most of the line was built underground using the
7904:
6788:
4542:
4461:
Kaplan, Harold (1967). "The Toronto Transit Commission: A Case Study of the Structural-Functional Approach to Administrative Organizations".
6854:
5436:
6340:
5580:
5210:
7063:
3168:
Due to the opening of the Bloor–Danforth line and the additional services that were required, a new set of trains were purchased from the
2887:
2944:. The route's eastern terminus is located at Kennedy station. The line does not run under Bloor Street or Danforth Avenue, except at the
2780:, Mimico, New Toronto and Scarborough, who wanted the project to be funded solely by the TTC. The battle to stop the project went to the
7704:
5120:
3634:
In April 2019, city staff revised estimates for the SSE project, by then known as the Line 2 East Extension (L2EE), to a total of $ 3.87
7830:
7585:
6448:
5875:
7451:
7429:
9672:
8337:
8252:
8144:
5175:
3655:– pledged to work on and pay for the three-stop proposal. In July 2018, the TTC was still focused on building the one-stop proposal.
3508:
In 2016, when this proposal was abandoned, about five percent of the design was complete, and the cost was estimated at between $ 4.6
7675:
4266:
3836:
Three new stations: Lawrence Avenue and McCowan Road, Scarborough Centre, and a terminal station at McCowan Road and Sheppard Avenue
9004:
8434:
7867:
3881:, published in 2001, identified three possible western extensions to the line. The first was a 3.2-kilometre (2.0 mi) link to
3708:
3553:
billion saved was subsequently diverted back to the SSE to cover additional estimated construction costs for the one-stop subway.)
7615:
6422:
9667:
6821:
5962:
5653:
2995:
following the 1976 arson attack. The replacement trim tiles were differently coloured due to the lack of extra green trim tiles.
2374:
5467:
4151:
3758:
design and construction of launch and extraction shafts, tunnels, as well as headwalls for emergency exit buildings and stations
9662:
8204:
8134:
3715:
3471:
2991:
versa, except that some of the station names of the trim tiles are white instead of the main wall tile colour for readability.
9652:
8285:
8124:
7891:
7802:
7300:
4816:
4318:
3963:
3755:
tunnelling works for the 7.8-kilometre (4.8 mi) subway extension, from Kennedy Station to McCowan Road / Sheppard Avenue
3088:
2661:, but the plan was not implemented. Plans for a somewhat longer route, running east to west from Victoria Park Avenue to the
7797:
6262:
6200:
5845:
5815:
5785:
5696:
5241:
5150:
4937:
4863:
4840:
4749:
4673:
4439:
4409:
4379:
8495:
8454:
8152:
7330:
7220:
6478:
5718:
4903:
2951:
Most stations on the Bloor–Danforth line have side platforms. At the surface, some stations are designed to be a part of a
3346:
8741:
7860:
5080:
2974:
The pre-1980 subway stations of the Bloor–Danforth line follow a two-colour background and trim theme and use the unique
2724:, rapid development created a need for more public transit. A referendum on whether a subway should be constructed along
8480:
5329:
5299:
5050:
3288:
addition to providing storage for subway trains, the Greenwood Yard was also used to maintain vehicles that operated on
7846:
7563:
6538:
6284:
5928:
5897:
5413:
3751:
was selected to design, build and finance the tunnel. The scope of the advance tunnel contract included the following:
3486:, one of the city's deputy mayors, proposed a fourth stop along the Scarborough Subway Extension, at Danforth Road and
3404:
2367:
17:
8927:
3707:
serving TTC, GO Transit and Durham Region Transit buses. The bus terminal will be the western terminus of the planned
2998:
Other variations to the pattern can be observed at Islington and Warden stations, as well as at the former bus bay of
2271:
8652:
8309:
8194:
7645:
4355:
4109:
3546:
2819:
Once the line started full operation, construction of extensions to the Bloor–Danforth line began. The extensions to
2732:
in 1954 resulted in another plan by the TTC for a Bloor–Danforth line, this time without an expressway, costing $ 146
9019:
7503:
5553:
4782:
4512:
9209:
8439:
7936:
3445:
agency would convert the Scarborough RT to light rail as part of the proposed Eglinton Crosstown line project (now
3066:
2756:. The other plan, which was proposed by the city's planning department and endorsed by the Metro Toronto chairman,
5531:
5023:
9657:
8904:
8511:
8488:
8297:
8046:
3704:
2999:
2915:
2883:
2039:
6408:
6029:
3695:
The future Scarborough Centre station will be located on McCowan Road at a different location from the existing
9647:
9244:
8515:
8129:
7616:"Request for Proposals Issued to Shortlisted Teams for Scarborough Subway Extension Stations, Rail and Systems"
3231:
4710:
Filion, Pierre (200). "Balancing concentration and dispersion? Public policy and urban structure in Toronto".
3786:
3112:
The frequency for this line is 2 to 3 minutes during peak periods and 4 to 5 minutes during off-peak periods.
9183:
8899:
7085:
6508:
5752:
4640:
4625:
4208:
4036:
3433:
1999:
8920:
7121:
4283:
4238:
2249:
8036:
6702:
5627:
5351:
3940:
3718:
at the northwest corner of Lawrence Avenue East and McCowan Road in a different location from the existing
341:
5497:
5277:
2835:
million in 2023 dollars). On November 21, 1980, the line was extended to the current terminal stations of
8884:
8809:
8769:
8544:
8540:
7961:
7954:
3380:
3271:, which opened with the first segment of the line. Before the yard was built, the land was occupied by a
3239:
3049:
2933:
2820:
2752:, and also included an extension of the Yonge line from Union station northwards to meet the new line at
2729:
2609:
2585:
2474:
1933:
1553:
1464:
1365:
1141:
545:
9607:
8956:
8829:
8597:
8572:
8562:
7883:
7279:
6291:
4259:
4114:
3890:
3790:
3696:
3467:
2631:
2546:
2415:
1229:
78:
4992:
3603:
In February 2017, city staff reported that the estimated cost of the extension would increase by $ 150
3320:
The TTC is planning to build a new subway yard on the site of a former CPR freight yard, southwest of
9602:
9168:
8961:
8869:
8752:
8612:
8557:
8444:
8273:
8031:
7967:
7729:
5605:
5387:
4564:
3628:
3280:
3162:
3157:
3153:
3145:
3137:
3084:
2975:
2572:
to replace Line 3 Scarborough began on June 23, 2021. This project has no confirmed completion date.
1825:
308:
192:
43:
9133:
9126:
9119:
9112:
9105:
9098:
2863:
For the first six months of operation, the subway was operated as a single system, with trains from
8991:
8987:
8706:
8657:
8617:
8523:
8459:
8377:
8061:
3092:
3044:
access/egress during major overhauls at stations such as Pape and Dufferin. Other stations such as
2513:. To the west of Yorkville, the line continues along Bloor Street serving many communities such as
2006:
1792:
1778:
1351:
1236:
953:
939:
4534:
3529:'s branch to Markham. Also, the proposed change was to reduce the cost of the extension from $ 3.5
2580:
When the Bloor–Danforth line, the second subway line in the city, opened in 1966, it necessitated
8849:
8731:
8726:
8602:
8315:
8291:
8051:
7814:
7258:
3886:
3871:
3624:
3475:
3463:
3412:
3376:
3358:
2941:
2781:
2673:
2627:
2589:
2486:
1546:
285:
7186:"Costs of major transit projects will far exceed their benefits, according to Metrolinx reports"
5202:
3407:
included the refurbishment of the Scarborough RT using modern light rail transit as part of his
9552:
9332:
9237:
8716:
8677:
8627:
8303:
8279:
8257:
8187:
8182:
8041:
7914:
7586:"Request for Qualifications Issued for Scarborough Subway Extension Stations, Rail And Systems"
7059:
4078:"The TTC once knew how to move people but now we spend more time arguing than building subways"
2662:
2447:
692:
257:
58:
6369:"Doug Ford vows 3-stop Scarborough subway. The timeline could leave riders on buses for years"
3761:
supply of tunnel boring machines and installation of segmental pre-cast concrete tunnel liners
3525:
Sheppard Avenue. This revised plan would prevent the subway from competing for ridership with
3411:
plan. The light rail line would have run between Kennedy station and Sheppard Avenue East via
3299:
9592:
9508:
9475:
9174:
8711:
8696:
8682:
8367:
8167:
7697:
7425:
5124:
3851:
3778:
3719:
3685:
3450:
3313:(originally known as the Vincent Yard) is a small facility located between Keele station and
2945:
2765:
2761:
2728:
was held on January 1, 1946, and this proposal received majority support. The opening of the
2635:
2614:
2542:
2438:
1646:
1045:
5871:
3768:
2920:
9515:
9444:
9437:
9430:
9423:
9416:
9409:
9402:
9395:
9388:
9381:
9374:
9367:
9360:
9353:
9346:
9339:
9230:
9140:
8859:
3562:
3483:
3391:
2777:
2686:
2669:
2506:
1623:
1334:
1326:
1319:
1312:
1305:
7361:"Teams Shortlisted for Scarborough Subway and Eglinton Crosstown West Tunnelling Projects"
5179:
4144:
3839:
Emergency exit buildings, traction power substations, and modifications at Kennedy station
2708:
8:
9279:
9054:
8804:
8736:
8647:
8632:
8510:
8418:
8224:
8219:
4263:
4181:
Dewees, D.N. (2004). "The effect of a subway on residential property values in Toronto".
3689:
3314:
3223:
3003:
2902:, add new bus and streetcar platforms, and improve the connections to regional buses and
2827:
in the east opened simultaneously on May 11, 1968. These were completed at a cost of $ 77
2639:
2618:
2558:
2313:
1710:
932:
5352:"Real Estate Acquisitions – TTC Woodbine Station –Easier Access and Second Exit Program"
3699:, which will be decommissioned. The new station facilities will be on the north side of
9579:
9575:
9450:
9147:
9009:
8854:
8839:
8774:
8721:
8662:
8637:
8592:
8582:
8567:
8247:
8237:
8230:
8162:
7899:
7190:
6896:
6793:
6727:
6676:
4727:
4478:
3815:
3652:
3593:
3384:
3363:
3352:
3289:
2932:
and Dundas Street West. After going east for 12 kilometres (7.5 mi), it meets the
2891:
as a subsidized public service, instead of a utility that needed to balance its books.
2760:, had a large U-shaped diversion in the centre. From Christie station, it ran south to
2753:
2593:
2534:
2522:
2518:
2510:
2494:
2482:
2470:
2459:
2455:
2434:
2207:
1748:
1685:
1600:
1577:
1457:
647:
303:
7646:"Dev Co Selected for Scarborough Subway Extension Stations, Rail and Systems Contract"
7331:"Scarborough Subway Extension - Scarborough Subway Extension - Lawrence & McCowan"
3921:
report by the City of Toronto in 2013, as an "unfunded future rapid transit project".
9597:
9322:
9317:
9154:
9049:
8976:
8966:
8864:
8819:
8794:
8789:
8691:
8607:
8587:
8408:
8403:
8347:
8157:
8015:
8008:
7806:
4812:
4731:
4620:
4351:
4314:
4194:
3914:
3898:
3052:
are scheduled to receive second exits for egress only. Due to the potential for land
3036:
2983:
2967:
2530:
2526:
1771:
1185:
759:
737:
9501:
7924:
6991:"Mayor John Tory's transit priorities face financial, political challenge: analysis"
3296:
was only equipped for vehicle storage and to perform basic maintenance of vehicles.
9286:
9265:
9203:
9161:
9091:
9039:
8894:
8879:
8824:
8814:
8779:
8701:
8577:
8372:
8104:
6060:"R76sg20844 - Request For Information (rfi) - New Subway Train - R76SG20844 | MERX"
5109:(Map). 1:62,500. North York : Metro Corporate and Human Resources. April 1996.
4719:
4470:
4190:
3906:
3847:
3375:
In 1983, there was discussion of a rapid transit extension from Kennedy station to
3096:
3045:
3031:
2895:
2879:
2869:
2864:
2792:
2741:
2225:
1977:
1869:
1207:
1163:
1037:
669:
62:
5898:"Feeling the heat, passengers? TTC working to fix its 'hot car' problem on Line 2"
4745:
9612:
9587:
9490:
9306:
9293:
9216:
9190:
9081:
9076:
9014:
8948:
8944:
8914:
8889:
8834:
8764:
8667:
8642:
8332:
8094:
8074:
8000:
7993:
7987:
7980:
7841:
7534:"First look at mighty tunnel boring machine used on Scarborough Subway Extension"
7474:"Clearing the way for the Scarborough Subway Extension launch shaft construction"
6709:
6254:
6192:
5837:
5807:
5777:
5688:
5233:
5146:
4929:
4832:
4665:
4431:
4401:
4371:
4270:
3947:
3882:
3843:
3772:
Construction site at Sheppard Avenue and McCowan Road, the launch site of the TBM
3700:
3681:
3573:
3542:
3487:
3446:
3321:
3181:
3169:
3014:
2937:
2840:
2836:
2713:
2652:
2647:
2565:
2490:
2478:
2451:
2442:
2215:
2203:
2136:
1955:
1344:
416:
107:
102:
9573:
6606:"New plan for Scarborough subway will allow city to 'get on' with project: Tory"
5722:
4895:
3631:
on the extension as it would have been too expensive to convert T1 cars to ATC.
2928:
Kipling station, the western terminus of Line 2 Bloor–Danforth, is located near
9258:
9197:
9029:
8971:
8909:
8672:
8519:
8342:
8209:
8099:
7945:
7772:
3902:
3823:
3268:
3261:
3177:
2929:
2824:
2702:
2672:
operated along the route between Jane Street and Luttrell Avenue (located near
2554:
2430:
2411:
2094:
1910:
1055:
174:
153:
7836:
7250:
6150:"Alarms raised as TTC's Bloor-Danforth subway trains near the end of the line"
6090:"Ttc Information Session For The New Subway Train Rfp - TTC-NST-040521 | MERX"
5084:
128:
9641:
9495:
9272:
9223:
8799:
8622:
8552:
8398:
8119:
7852:
7786:
5107:
Transit stations, Metropolitan Toronto / Metro Corporate and Human Resources
4776:"The Bloor–Danforth Subway 40 Years After Opening. Why Was It So Successful?"
4082:
3227:
3053:
2952:
2899:
2872:
2796:
2788:
2757:
2749:
2538:
2498:
2419:
792:
143:
6756:"Mayor Tory defends Scarborough subway extension despite new ridership data"
3866:
3596:
operating until the SSE's opening resulting in a total project cost of $ 3.2
3429:
billion plus an unknown cost to redesign the connection at Kennedy station.
2787:
The University line opened in 1963, and the Bloor–Danforth line opened from
9531:
9466:
9461:
9300:
9251:
8999:
8874:
8784:
8362:
8357:
8242:
8172:
8114:
8023:
7157:
7028:
7024:"Scarborough subway moves forward as Tory rejects value-for-money analysis"
6995:
6962:
6929:
6863:
6826:
6760:
6643:
6574:
6570:"Deputy Mayor Glenn De Baeremaeker wants to change Scarborough subway plan"
6373:
6174:
6170:"Five key take-aways about the 'new deal' between Toronto and the province"
6154:
6001:
5658:
3782:
3567:
3408:
3293:
3027:
3018:
2987:
2800:
2769:
2745:
2725:
2721:
2643:
2569:
2426:
1847:
1242:
715:
605:
6892:"Scarborough subway will cost more but attract fewer people, reports find"
5498:"Donlands Station – second exit/entrance and Easier Access project update"
4615:
52:
9044:
9034:
8844:
8382:
8109:
8089:
7909:
7055:
6672:"Scarborough subway would shrink under plan to extend Eglinton Crosstown"
6033:
5966:
5867:
5019:
4771:
4508:
4062:
3819:
3794:
3620:
3579:
In June 2016, the estimated cost of the one-stop SSE was revised from $ 2
3395:
like the rest of the Toronto subway in Scarborough was not yet examined.
3072:
3071:
All types of TTC fares are accepted at staffed subway station entrances.
2012:
1499:
1357:
1117:
433:
252:
6703:
http://www.toronto.ca/legdocs/mmis/2016/ex/bgrd/backgroundfile-87737.pdf
3941:
http://www.toronto.ca/legdocs/mmis/2013/pg/bgrd/backgroundfile-64550.pdf
9024:
8352:
8214:
8177:
8084:
7392:"Metrolinx hopes to start tunnelling Scarborough subway by spring 2021"
4343:
3830:
a 7.8-kilometre (4.8 mi) extension of Line 2 Bloor–Danforth subway
3526:
3502:
3310:
3303:
3284:
2903:
2220:
1798:
1050:
959:
877:
428:
290:
179:
4482:
4287:
8449:
8069:
7679:
7567:
7537:
7477:
7455:
7334:
7304:
7254:
7224:
6925:"Priority should be alternative transit routes into downtown: Keenan"
6723:"Toronto City Council approves planning for raft of transit projects"
5929:"Mayor John Tory accepts Twitter challenge to ride in hot subway car"
4028:
3807:
3806:
Infrastructure Ontario released an RFP to three shortlisted bidders:
3736:
3714:
A third new, future Lawrence East station will be located beside the
3648:
3558:
3479:
Kennedy station as its eastern terminus and renamed Line 5 Eglinton.
3442:
3189:
3185:
2682:
2550:
2514:
2502:
4619:(December 6, 2016). Afterwards, Canadian inflation numbers based on
3917:
extensions, the Waterfront LRTs, and others – by the
3909:
transit plan. This plan was revived – along with the
3132:
2963:
2697:
1429:
1421:
1414:
1407:
8413:
8079:
5581:"TTC set to spend $ 570K to put debit machines in collector booths"
4474:
3910:
3437:
3276:
3173:
earlier T1 series trains) were shifted to the Bloor–Danforth line.
3149:
2581:
1784:
1397:
1389:
1382:
945:
5997:"Relief is a long way off for riders on the Bloor-Danforth subway"
5745:
3711:
corridor. The station will also have a pick-up and drop-off area.
3196:
to ride an overheated T1 train on Line 2 during a hot summer day.
2458:. The subway line is closed nightly for maintenance, during which
7930:
7122:"Doug Ford wants to return to 'original' Scarborough subway plan"
4234:
3822:), and Scarborough Transit Connect (Aecon, FCC Construcción, and
3748:
3744:
3732:
3267:
Most trains that serve the Bloor–Danforth line are stored at the
3193:
2894:
On October 15, 1976, an arsonist lit a fire on a subway train at
2701:
Greenwood Avenue Fill, the area that would eventually become the
2466:
88:
7842:
Transit Toronto: A history of subways on Bloor and Queen Streets
5963:"TTC Board "Discovers" Cost of Bloor–Danforth Subway Renovation"
4962:. Toronto Transit Commission. September 19, 2007. Archived from
4723:
3257:
2940:
and St. George stations. It also meets the Yonge Street line at
7825:
5746:"Electromagnetic Fields Associated With Transportation Systems"
4626:"Consumer Price Index, annual average, not seasonally adjusted"
3366:(grey) and the under-construction Line 2 extension (dark green)
3272:
3219:
3140:, one of the first trains to operate on the Bloor–Danforth line
2441:
east of Castle Frank Road, after which the street continues as
7452:"Part of Eglinton to be realigned for Scarborough Subway work"
7153:"Design changes to Scarborough subway come with unknown costs"
3152:, the increased speed provided by the M-series trains and the
2970:
in 2014, depicting the standard design of most Line 2 stations
6958:"Subway, LRT, SRT? What we know about transit in Scarborough"
6333:"Three 'model schools' reimagine their role with York's help"
6223:"Chief Executive Officer's Report (April 1 – April 28, 2012)"
4695:
Sagi, Douglas (May 11, 1968). "Subway rolls to the suburbs".
3894:
3811:
3740:
3642:
3080:
and no change will be given to customers who pay cash fares.
2979:
423:
7676:"Partner selected for Scarborough Subway Extension stations"
4833:"Toronto's Lost Subway Stations – Transit Toronto – Content"
3347:
Line 3 Scarborough § Replacement with alternate transit
2634:. In their final report, the consultants suggested that the
2501:
neighbourhood. It then runs through a very short stretch of
6610:
4930:"At Christie, It's Two-Parts Escalator and One-Part Stairs"
4311:
Unbuilt Toronto: a history of the city that might have been
3842:
Transit connections to existing TTC Line 2 Bloor–Danforth,
3245:
In November 2023, the province promised to contribute $ 758
2978:
on the stations' walls. The tiling theme was influenced by
2621:
in 1916, whose lower deck now carries Line 2 Bloor–Danforth
7780:
7422:"Ontario Moving Forward with Scarborough Subway Extension"
7703:. Toronto Transit Commission. August 2001. pp. 8–9.
5808:"The Camshaft Control Hawkers (Series H1, H2, H3 and H4)"
3199:
3095:
during regular operating hours. Some connections require
2175:
2167:
2160:
5956:
5954:
5778:"Montreal Series Retirement Charter – February 28, 1999"
5606:"TTC to end in-station sales of tickets, tokens, passes"
7504:"Scarborough Subway Extension – Advance Tunnel Project"
7383:
7221:"Scarborough Subway Extension - Sheppard & McCowan"
6639:"New Scarborough transit plan 'buys peace in the land'"
4463:
The Canadian Journal of Economics and Political Science
3964:"Ontario breaks ground on Scarborough subway extension"
3026:
the installation of elevators for accessibility needs.
7048:
6423:"Ontario And Toronto Moving Forward On Public Transit"
5437:"Residents protest demolishing homes for subway exits"
3292:
during the line's operation from 1985 to 2023, as the
7668:
7556:
7526:
7466:
7444:
7243:
6855:"Cost of Scarborough subway extension rises to $ 3.35
6449:"Toronto's OneCity transit plan rejected by province"
6362:
6360:
6358:
6021:
5990:
5988:
5951:
5647:
5645:
5326:"Service Advisories – Dufferin Station Modernization"
5300:"Kipling – Transit Toronto – Subway Station Database"
4666:"The Abandoned Streetcar Shuttle Connection Passages"
7762:
6853:
Spurr, Ben; Pagliaro, Jennifer (February 28, 2017).
6539:"City Council votes in favour of Scarborough subway"
6120:"P76ph22075 - New Subway Trains - P76PH22075 | MERX"
3351:
The Scarborough Subway Extension (SSE) will replace
2768:
subway proposal of the 2010s and its successor, the
2489:. Towards the east, where the line runs parallel to
7564:"Tunnelling begins on Scarborough Subway Extension"
7301:"Scarborough Subway Extension - Scarborough Centre"
7177:
7144:
7015:
6982:
6949:
6916:
6883:
6846:
6813:
5051:"Kipling Subway Station's East Entrance On Its Way"
3936:
3934:
2736:million. The line was approved, but was not built.
1295:
1287:
1280:
6780:
6747:
6714:
6663:
6630:
6599:
6597:
6561:
6355:
6339:. York University. August 29, 2006. Archived from
6162:
6142:
6030:"TTC 2019 Fleet and Capacity Plans Part I: Subway"
5985:
5642:
5468:"TTC slams door on second exit at Donlands subway"
5412:. Toronto Transit Commission. 2010. Archived from
3456:
3398:
2465:The most travelled part of the line is located in
1008:
1000:
993:
986:
4809:Transport For Suburbia: Beyond The Automobile Age
4746:"A History Of Subways on Bloor and Queen Streets"
4712:Environment and Planning C: Government and Policy
4402:"A History of Subways on Bloor and Queen Streets"
3040:the surrounding community, and fully accessible.
9639:
7215:
7213:
6989:Spurr, Ben; Pagliaro, Jennifer (June 26, 2016).
6789:"Scarborough subway cost rises by $ 900-million"
5652:Pagliaro, Jennifer; Spurr, Ben (June 16, 2016).
4623:tables 18-10-0005-01 (formerly CANSIM 326-0021)
3957:
3955:
3931:
3519:
2748:. This plan was championed by the TTC chairman,
1447:
1439:
336:
7414:
7265:
6822:"Scarborough subway might already be off track"
6754:Spurr, Ben; Pagliaro, Jennifer (June 1, 2016).
6670:Moore, Oliver; Gee, Marcus (January 20, 2016).
6594:
6479:"Province To Extend Bloor–Danforth Subway Line"
5654:"Putting Scarborough subway claims to the test"
4606:
4604:
4602:
4273:, Board Period Commencing Sunday, July 21, 1991
3833:Tunnelling work for the length of the alignment
3340:
3144:The first trains to operate on Line 2 were the
7882:
6277:
5721:. Halton County Radial Railway. Archived from
4960:"Station Modernization Program Funding Status"
4864:"Toronto at A Crossroads, and How It Got Here"
4110:"Bloor–Danforth Subway Official Opening, 1966"
3800:
2425:The line runs primarily a few metres north of
2193:
2185:
2117:
2109:
1529:
1521:
8496:
7868:
7323:
7251:"Scarborough Subway Extension - LIVE Meeting"
7210:
6988:
6852:
6753:
6228:. Toronto Transit Commission. June 29, 2012.
5651:
4511:. Ministry of Municipal Affairs and Housing.
4509:"Land Use Planning – Ontario Municipal Board"
4075:
3952:
3383:, known as the Scarborough RT (later renamed
2716:commemorating the extension of Line 2 in 1980
2375:
2309:
7849:about three-stop SSE, published by Metrolinx
6187:
6185:
5689:"The Montreal Series (M-1) Cars (1963–1999)"
5626:. Toronto Transit Commission. Archived from
5530:. Toronto Transit Commission. Archived from
5386:. Toronto Transit Commission. Archived from
5328:. Toronto Transit Commission. Archived from
5234:"An Essay on Original Subway Station Design"
5178:. Toronto Transit Commission. Archived from
5083:. Toronto Transit Commission. Archived from
5014:
5012:
5010:
4991:. Toronto Transit Commission. Archived from
4599:
4286:. Toronto Transit Commission. Archived from
4002:. Toronto Transit Commission. Archived from
3627:(ATC). This would preclude the operation of
3623:, the SSE would have been built to use only
2462:bus routes provide service along the route.
244:7.8 km (4.8 mi) under construction
7816:Template:Attached KML/Line 2 Bloor–Danforth
7293:
5926:
4923:
4921:
4338:
4336:
4334:
4332:
4330:
4308:
4021:
328:Line 2 Bloor–Danforth highlighted in green
8503:
8489:
7875:
7861:
7086:"EX4.1 Attachment 2 LINE 2 EAST EXTENSION"
6509:"Scarborough subway route still in debate"
5751:. Radiation Health and Safety Consulting.
5203:"'Subway Chic' Inspires Graphic Designers"
5123:. Balance for Blind Adults. Archived from
4176:
4174:
4172:
3643:Revised three-stop proposal (2019–present)
3180:subway trains on the Yonge–University and
2382:
2368:
1270:
1262:
915:
907:
900:
7819:
6182:
5598:
5263:
5261:
5259:
5007:
4800:
3991:
3989:
1489:
1481:
7150:
7021:
6955:
6669:
6636:
6366:
5838:"The T-1 (Toronto) Series Cars (1997–?)"
5800:
5410:"Dufferin Station Modernization Project"
5270:"Ride the Rainbow of the Bloor–Danforth"
5267:
4918:
4825:
4432:"A History of the Original Yonge Subway"
4364:
4327:
4209:"TTC tests new numerical signage system"
3865:
3767:
3357:
3298:
3256:
3131:
3013:
3009:
2962:
2919:
2707:
2696:
2650:. The estimated cost of the project was
2608:
1080:
1072:
782:
774:
9630:indicate a future line, station or stop
7735:. City of Mississauga. March 14, 2012.
7289:from the original on February 25, 2023.
7261:from the original on December 21, 2021.
6637:Pagliaro, Jennifer (January 20, 2016).
6519:from the original on September 25, 2013
5578:
5465:
5213:from the original on September 26, 2011
5200:
5170:
5168:
4983:
4981:
4940:from the original on September 24, 2014
4348:TTC Story: The First Seventy-Five Years
4302:
4169:
4139:
4137:
4122:from the original on September 28, 2020
4104:
4102:
4100:
2497:(also known as "the Danforth") and the
2473:. In this area, the subway connects to
2454:, which has a direct connection to the
1899:
1891:
14:
9640:
7686:from the original on December 5, 2022.
7574:from the original on January 18, 2023.
7544:from the original on September 4, 2021
7066:from the original on November 24, 2016
6922:
6582:from the original on November 21, 2015
6489:from the original on September 9, 2013
6381:from the original on December 21, 2019
5994:
5973:from the original on November 17, 2017
5848:from the original on December 14, 2011
5788:from the original on September 7, 2012
5719:"Toronto Transit Commission 5300–5301"
5699:from the original on December 24, 2011
5612:from the original on October 29, 2019.
5508:from the original on September 6, 2020
5434:
5306:from the original on February 28, 2019
5256:
5231:
4952:
4616:A Price Index for Canada, 1688 to 1850
4527:
4460:
4180:
4076:Kuitenbrouwer, Peter (July 19, 2013).
3986:
3861:
3541:billion saved would be used to extend
3498:million to the cost of the extension.
3355:with an eastward extension of Line 2.
3200:Replacing or refurbishing the T1 fleet
2924:Route diagram of Line 2 Bloor–Danforth
2843:in the east at a further cost of $ 110
2692:
2125:
1537:
1512:
29:Rapid transit line in Toronto, Ontario
8484:
8473:indicate a project under construction
8253:Toronto–York Spadina Subway Extension
8125:King Street Transit Priority Corridor
7856:
7742:from the original on October 29, 2013
7690:
7656:from the original on December 2, 2022
7626:from the original on December 3, 2022
7596:from the original on December 3, 2022
7514:from the original on December 3, 2022
7389:
7183:
7054:
7022:Pagliaro, Jennifer (March 28, 2017).
6956:Pagliaro, Jennifer (March 15, 2017).
6889:
6859:billion as number of new riders fall"
6819:
6786:
6720:
6684:from the original on January 21, 2016
6651:from the original on January 20, 2016
6618:from the original on January 22, 2016
6549:from the original on October 10, 2013
6367:Pagliaro, Jennifer (April 10, 2019).
6319:
6301:from the original on November 7, 2017
6235:from the original on October 22, 2013
6130:from the original on October 19, 2022
6100:from the original on October 19, 2022
6070:from the original on October 19, 2022
6027:
5960:
5927:McGillivray, Kate (August 29, 2016).
5866:
5683:
5681:
5478:from the original on October 23, 2012
5447:from the original on October 21, 2012
5048:
5024:"Broadview Station: The End Is Nigh?"
5018:
4927:
4843:from the original on November 3, 2012
4770:
4709:
4593:
4495:
4394:
4342:
4235:"New TTC Signage at Eglinton Station"
4215:from the original on October 10, 2014
4157:from the original on October 19, 2012
4049:Line 2 Bloor–Danforth has 31 stations
2804:
1098:
1090:
1026:
1018:
465:
457:
406:
398:
7462:from the original on August 4, 2022.
6834:from the original on October 5, 2016
6567:
6425:. Ontario Newsroom. March 31, 2011.
5384:"Pape Station Modernization Project"
5268:Blackett, Matthew (March 25, 2008).
5244:from the original on January 2, 2012
5165:
4978:
4869:. The World Bank Group. p. 11.
4806:
4694:
4469:(2). Blackwell Publishing: 171–189.
4134:
4097:
4039:from the original on August 27, 2016
3709:Durham–Scarborough bus rapid transit
2854:
2062:
2054:
528:
520:
7184:Moore, Oliver (February 28, 2020).
7151:Pagliaro, Jennifer (July 6, 2018).
7036:from the original on March 28, 2017
6970:from the original on March 29, 2017
6890:Moore, Oliver (February 28, 2017).
6603:
6040:from the original on March 24, 2019
6009:from the original on March 24, 2019
5560:from the original on August 7, 2012
5528:"Buying Tickets, Tokens and Passes"
5153:from the original on August 1, 2012
4989:"Service Advisories – Pape Station"
4928:Erret, Joshua (November 16, 2005).
4861:
4752:from the original on March 26, 2019
4575:from the original on April 30, 2023
4545:from the original on March 24, 2019
4501:
4442:from the original on March 28, 2013
4382:from the original on April 26, 2012
3961:
3870:Proposed western extension towards
3857:Operating systems for the extension
3814:), KSX Integrated Design-Builders (
2509:, where it connected to the former
2291:
866:
858:
822:
814:
575:
567:
24:
7847:Scarborough Subway Extension (SSE)
7710:from the original on June 12, 2012
7341:from the original on March 7, 2022
7311:from the original on March 7, 2022
7273:"Transit Network Expansion Update"
7231:from the original on March 7, 2022
7198:from the original on March 2, 2020
7102:from the original on April 7, 2019
7003:from the original on June 28, 2016
6904:from the original on March 2, 2017
6871:from the original on March 1, 2017
6801:from the original on June 17, 2016
6735:from the original on April 4, 2017
6568:Dale, Daniel (December 13, 2014).
6459:from the original on July 11, 2012
6429:from the original on April 4, 2011
6407:. December 1, 2010. Archived from
6401:"Rob Ford: 'Transit City is over'"
6203:from the original on July 17, 2012
5939:from the original on June 12, 2019
5908:from the original on June 12, 2019
5878:from the original on March 4, 2015
5758:from the original on March 4, 2016
5678:
5666:from the original on June 17, 2016
5364:from the original on June 11, 2014
5357:. City of Toronto. July 28, 2010.
5061:from the original on April 2, 2015
5030:from the original on March 4, 2015
4906:from the original on June 14, 2012
4876:from the original on March 3, 2016
4565:"Bloor-University-Danforth Subway"
4535:"Historicist: Opposing the Subway"
4515:from the original on April 7, 2012
3974:from the original on June 23, 2021
3335:
3279:. Due to its location next to the
3176:Following the introduction of the
3060:
388:
380:
25:
9684:
8310:Toronto Transportation Commission
8195:1995 Russell Hill subway accident
7758:
7428:. August 18, 2020. Archived from
7282:. February 28, 2023. p. 16.
7257:. May 31, 2021. p. 1:28:47.
7165:from the original on July 7, 2018
7132:from the original on July 7, 2018
6937:from the original on June 4, 2016
6768:from the original on June 1, 2016
6285:"Keele Yard reopens to operation"
6265:from the original on July 5, 2012
5995:Keenan, Edward (March 24, 2019).
5818:from the original on May 15, 2011
5232:Brader, Mark (January 10, 2008).
4811:. New York, New York: Earthscan.
4676:from the original on June 2, 2008
4424:
4412:from the original on May 27, 2013
4241:from the original on May 14, 2014
4060:New subway line opens in Toronto
3725:
3592:million maintenance cost to keep
3547:University of Toronto Scarborough
2668:Before the subway was built, the
2604:
2327:
1882:
1762:
1731:
706:
595:
492:
9673:600 V DC railway electrification
9574:
9460:
9316:
9075:
8986:
8943:
8751:
8539:
8229:
8007:
7992:
7979:
7966:
7953:
7935:
7929:
7923:
7824:
7779:
7765:
7722:
7638:
7608:
7578:
7496:
7390:Kurek, Dominik (March 6, 2020).
7371:from the original on May 6, 2023
7353:
7114:
7078:
5435:Vyhnak, Carola (June 29, 2010).
5201:LeBlanc, Dave (March 25, 2005).
3651:– during his campaign to become
3647:In May 2018, Rob Ford's brother
3370:
3127:
3067:Toronto Transit Commission fares
2564:Construction of an extension to
2433:with a direct connection to the
2326:
2308:
2297:
2290:
2283:
2261:
2239:
2224:
2219:
2214:
2192:
2184:
2174:
2166:
2159:
2150:
2124:
2116:
2108:
2084:
2061:
2053:
2029:
2005:
1990:
1989:
1967:
1945:
1923:
1898:
1890:
1881:
1859:
1837:
1815:
1791:
1777:
1761:
1737:
1730:
1723:
1699:
1673:
1666:
1659:
1635:
1613:
1590:
1589:
1567:
1552:
1536:
1528:
1520:
1511:
1488:
1480:
1463:
1446:
1438:
1428:
1420:
1413:
1406:
1396:
1388:
1381:
1364:
1350:
1333:
1325:
1318:
1311:
1304:
1294:
1286:
1279:
1269:
1261:
1235:
1219:
1197:
1175:
1153:
1131:
1105:
1097:
1089:
1079:
1071:
1054:
1049:
1044:
1025:
1017:
1007:
999:
992:
985:
976:
952:
938:
922:
914:
906:
899:
890:
865:
857:
848:
842:
841:
821:
813:
804:
781:
773:
749:
727:
705:
681:
659:
637:
618:
594:
574:
566:
557:
535:
527:
519:
498:
491:
484:
464:
456:
447:
432:
427:
422:
405:
397:
387:
379:
358:
51:
42:
8298:Toronto and York Radial Railway
7698:"Rapid Transit Expansion Study"
6923:Keenan, Edward (June 2, 2016).
6787:Moore, Oliver (June 17, 2016).
6721:Moore, Oliver (July 13, 2016).
6696:
6604:Fox, Chris (January 21, 2016).
6531:
6501:
6471:
6441:
6415:
6393:
6325:
6313:
6247:
6215:
6112:
6082:
6052:
6028:Munro, Steve (March 18, 2019).
5920:
5890:
5860:
5830:
5770:
5743:
5737:
5711:
5616:
5579:Kretzel, Lasia (July 5, 2012).
5572:
5546:
5520:
5490:
5466:Goddard, John (March 2, 2011).
5459:
5428:
5402:
5376:
5344:
5318:
5292:
5225:
5194:
5139:
5113:
5099:
5073:
5049:White, Craig (August 5, 2010).
5042:
4896:"A history of fares on the TTC"
4888:
4855:
4764:
4738:
4703:
4688:
4658:
4587:
4557:
4489:
4454:
4276:
4253:
4227:
4201:
3705:Scarborough Centre Bus Terminal
3674:
3457:Three-stop proposal (2013–2016)
3399:Light rail proposal (2007–2013)
3192:accepted a challenge posted on
3188:. This was after Toronto Mayor
2916:List of Toronto subway stations
2547:Islington–Etobicoke City Centre
2410:is a rapid transit line in the
2262:
2240:
2030:
1700:
1660:
1636:
891:
750:
682:
660:
9668:1966 establishments in Ontario
6820:Spurr, Ben (October 5, 2016).
5961:Munro, Steve (July 13, 2017).
5556:. Toronto Transit Commission.
4350:. Dundurn Press. p. 111.
4150:. Toronto Transit Commission.
4069:
4054:
4035:. Toronto Transit Commission.
3897:going from Kipling station to
3619:According to transit advocate
2151:
1674:
1667:
1106:
849:
805:
619:
558:
202:404,397 (2022 weekday average)
13:
1:
9663:Rapid transit lines in Canada
7730:"Hurontario-Main LRT Project"
7480:. May 4, 2021. Archived from
3924:
3879:Rapid Transit Expansion Study
3639:implemented at a later date.
3520:One-stop proposal (2016–2019)
3482:In December 2014, Councillor
3425:to 5 years and cost about $ 2
2429:from its western terminus at
1968:
1946:
1924:
1860:
1838:
1816:
1614:
1568:
1220:
1198:
1176:
1154:
1132:
977:
728:
638:
536:
499:
485:
359:
9653:Railway lines opened in 1966
7650:www.infrastructureontario.ca
7620:www.infrastructureontario.ca
7590:www.infrastructureontario.ca
7508:www.infrastructureontario.ca
7060:"TTC Capital Program Review"
6193:"The Greenwood Subway Yards"
5121:"Bloor–Danforth Subway Line"
4195:10.1016/0094-1190(76)90035-8
3962:Fox, Chris (June 23, 2021).
3716:Scarborough General Hospital
3472:Scarborough General Hospital
3341:Scarborough Subway Extension
3150:camshaft propulsion controls
3107:
2934:University segment of Line 1
2886:were geographically part of
2298:
2284:
2085:
1738:
1724:
923:
448:
7:
8286:Metropolitan Street Railway
3801:Stations, rails and systems
3561:and Scarborough Councillor
3549:. (However, most of the $ 1
3381:medium-capacity rail system
3119:
3083:All Line 2 stations except
2909:
2505:to its eastern terminus in
241:26.2 km (16.3 mi)
10:
9689:
9245:Aga Khan Park & Museum
7884:Toronto Transit Commission
7280:Toronto Transit Commission
6292:Toronto Transit Commission
6255:"The Vincent Subway Yards"
5872:"Goodbye to the H4 Trains"
4309:Osbaldeston, Mark (2008).
4260:Toronto Transit Commission
4183:Journal of Urban Economics
4066:February 28, 1966, page 12
3891:Square One Shopping Centre
3697:Scarborough Centre station
3468:Scarborough Centre station
3344:
3328:million, of which only $ 7
3186:hotter than average summer
3102:
3064:
2958:
2913:
2851:million in 2023 dollars).
2816:billion in 2023 dollars).
2599:
2537:, a very short stretch in
2493:, it serves areas such as
2416:Toronto Transit Commission
163:Toronto Transit Commission
79:Toronto Transit Commission
9625:
9566:
9459:
9315:
9074:
9067:
8985:
8942:
8750:
8538:
8531:
8468:
8427:
8391:
8325:
8274:Williams Omnibus Bus Line
8266:
8143:
8060:
7944:
7921:
7890:
6708:January 28, 2016, at the
5608:. TTC. October 23, 2019.
4264:Scheduled Service Summary
3281:Canadian National Railway
2553:, where it terminates at
2469:'s midtown area known as
2335:
2320:
2306:
2277:
2270:
2255:
2248:
2233:
2144:
2133:
2100:
2093:
2078:
2071:
2045:
2038:
2023:
1983:
1976:
1961:
1954:
1939:
1932:
1917:
1908:
1875:
1868:
1853:
1846:
1831:
1824:
1809:
1755:
1746:
1717:
1708:
1693:
1682:
1653:
1644:
1629:
1622:
1607:
1598:
1583:
1576:
1561:
1505:
1498:
1472:
1373:
1253:
1213:
1206:
1191:
1184:
1169:
1162:
1147:
1140:
1125:
1114:
1063:
970:
884:
875:
835:
831:
798:
791:
765:
758:
743:
736:
721:
714:
699:
690:
675:
668:
653:
646:
631:
627:
612:
603:
588:
584:
551:
544:
511:
507:
478:
474:
441:
371:
367:
352:
314:
309:Automatic block signaling
302:
284:
251:
234:
229:
211:
206:
198:
188:
167:
159:
149:
139:
134:
124:
120:31 (3 under construction)
116:
95:
84:
74:
69:
50:
41:
36:
8460:Transit Enforcement Unit
8378:William McBrien Building
7820:KML is not from Wikidata
5554:"TTC PRESTO Fare System"
4638:and table 18-10-0004-13
4372:"Early Subway Proposals"
4269:October 1, 2012, at the
4145:"Blue Night Network Map"
3997:"Subway ridership, 2033"
3545:east- and northwards to
3252:
3021:in 2014 after renovation
2720:During the period after
2414:system, operated by the
2073:Warden maintenance track
8316:Hydro-Electric Railways
8292:Toronto Railway Company
5149:. Bloor-Yorkville BIA.
4284:"Subway/RT Information"
3887:Mississauga City Centre
3872:Mississauga City Centre
3735:, East End Connectors (
3625:automatic train control
3476:Scarborough Town Centre
3464:Scarborough City Centre
3434:2010 mayoralty campaign
3413:Scarborough Town Centre
3377:Scarborough City Centre
3240:Line 1 Yonge–University
3220:Alstom Transport Canada
3163:T1-series subway trains
3146:M1-series subway trains
2976:Toronto Subway typeface
2782:Supreme Court of Canada
2674:Shoppers World Danforth
2628:Horatio Clarence Hocken
2575:
2475:Line 1 Yonge–University
9658:Toronto-gauge railways
8934:Sheppard & McCowan
8921:Lawrence & McCowan
8304:Toronto Civic Railways
8280:Toronto Street Railway
8258:Toronto-gauge railways
8188:Sunnyside Bus Terminal
8183:Toronto Coach Terminal
7915:York University Busway
7365:Infrastructure Ontario
6515:. September 23, 2013.
3946:April 4, 2016, at the
3874:
3773:
3537:billion, where the $ 1
3367:
3306:
3264:
3209:million, versus $ 1.86
3158:G-series subway trains
3141:
3138:M1-series subway train
3022:
2971:
2925:
2801:Milan tunneling method
2717:
2705:
2622:
217:; 58 years ago
215:February 26, 1966
9648:Toronto rapid transit
9522:Riverside–Leslieville
8368:Roncesvalles Carhouse
7831:Line 2 Bloor–Danforth
7540:. September 2, 2021.
7426:Government of Ontario
6485:. September 4, 2013.
6261:. November 10, 2006.
5784:. February 16, 2011.
5725:on September 10, 2009
5695:. February 16, 2011.
5022:(December 18, 2007).
4672:. November 10, 2006.
4408:. November 29, 2009.
4378:. November 10, 2006.
4118:. February 25, 2016.
3869:
3852:Durham Region Transit
3779:tunnel boring machine
3771:
3720:Lawrence East station
3686:Durham Region Transit
3451:provincial government
3361:
3302:
3260:
3135:
3017:
3010:Modernization program
3000:Victoria Park station
2966:
2946:Prince Edward Viaduct
2923:
2914:Further information:
2711:
2703:Greenwood subway yard
2700:
2636:Prince Edward Viaduct
2630:and Mayor of Toronto
2615:Prince Edward Viaduct
2612:
2439:Prince Edward Viaduct
2408:Line 2 Bloor–Danforth
1647:Prince Edward Viaduct
37:Line 2 Bloor–Danforth
7833:at Wikimedia Commons
7682:. November 5, 2022.
7570:. January 18, 2023.
6411:on December 5, 2010.
6178:. November 27, 2023.
5870:(January 26, 2012).
5630:on December 26, 2019
5280:on November 30, 2011
4718:(2). Pion: 163–189.
4033:Schedules & Maps
4009:on November 28, 2022
3846:, GO train service (
3563:Glenn De Baeremaeker
3484:Glenn De Baeremaeker
3453:and Mayor Rob Ford.
3392:Toronto City Council
3362:Superimposed former
3004:Union subway station
2670:Bloor streetcar line
2613:Construction of the
2487:Bloor–Yonge stations
331:Show interactive map
57:Trains crossing the
9055:Queens Quay station
8419:Waterfront West LRT
8225:522 Exhibition West
8220:521 Exhibition East
7837:Official route page
7058:(October 4, 2016).
6545:. October 8, 2013.
4807:Mees, Paul (2010).
4788:on October 19, 2007
4628:. Statistics Canada
4613:: Geloso, Vincent,
3862:West to Mississauga
3781:(TBM) was built by
3690:York Region Transit
3315:Dundas West station
3224:CRRC Qingdao Sifang
3087:connect to surface
2984:Broad Street Subway
2693:Subway construction
129:Official route page
9608:Scarborough Centre
9010:Dufferin Gate Loop
8928:Scarborough Centre
8248:St. Clair Carhouse
8163:Eglinton West line
7900:Blue Night Network
7458:. August 4, 2022.
7432:on August 19, 2020
7191:The Globe and Mail
6897:The Globe and Mail
6794:The Globe and Mail
6728:The Globe and Mail
6677:The Globe and Mail
6343:on January 7, 2016
6158:. October 5, 2023.
5207:The Globe and Mail
5127:on October 9, 2011
4902:. April 21, 2012.
4862:Frisken, Frances.
4774:(March 14, 2006).
4697:The Globe and Mail
4498:, pp. 110–111
4438:. April 21, 2012.
3919:Feeling Congested?
3875:
3774:
3653:premier of Ontario
3594:Line 3 Scarborough
3385:Line 3 Scarborough
3368:
3364:Line 3 Scarborough
3353:Line 3 Scarborough
3307:
3290:Line 3 Scarborough
3265:
3142:
3023:
2972:
2926:
2754:St. George station
2718:
2706:
2638:, which spans the
2623:
2582:renaming the first
2535:Bloor West Village
2523:Bloorcourt Village
2511:Line 3 Scarborough
2460:Blue Night Network
2456:Kennedy GO Station
2435:Kipling GO Station
2394:Show route diagram
2272:Scarborough Centre
1749:Don Valley Parkway
1686:Richmond Hill line
296:600 V DC
9635:
9634:
9621:
9620:
9562:
9561:
9063:
9062:
9050:Neville Park Loop
8558:North York Centre
8478:
8477:
8409:Eglinton East LRT
8404:East Bayfront LRT
8348:Hillcrest Complex
8158:Queen subway line
7829:Media related to
6455:. June 29, 2012.
5844:. March 4, 2012.
5814:. June 16, 2012.
5585:The National Post
5534:on April 25, 2019
5176:"Paying the Fare"
5147:"Finding Us Line"
5087:on August 5, 2012
4818:978-1-84407-740-3
4645:Statistics Canada
4621:Statistics Canada
4320:978-1-55002-835-5
4313:. Dundurn Press.
4290:on March 23, 2016
4211:. March 2, 2014.
3901:, linking to the
3899:Hurontario Street
3787:Schwanau, Germany
3607:million to $ 3.35
3512:billion and $ 6.9
3232:Kawasaki Rail Car
3037:Broadview station
2968:High Park station
2870:Lower Bay station
2855:Subway operations
2821:Islington station
2762:Queen Street West
2584:subway line "the
2531:Junction Triangle
2527:Bloordale Village
2418:(TTC). It has 31
2405:
2404:
2401:
2400:
2392:
2391:
2356:
2355:
2336:McCowan/Sheppard
16:(Redirected from
9680:
9578:
9571:
9570:
9542:Thorncliffe Park
9464:
9417:Norfinch Oakdale
9320:
9079:
9072:
9071:
9040:Long Branch Loop
8992:Streetcar system
8990:
8947:
8755:
8545:Yonge–University
8543:
8536:
8535:
8505:
8498:
8491:
8482:
8481:
8373:Russell Carhouse
8236:
8233:
8105:509 Harbourfront
8014:
8011:
7999:
7996:
7986:
7983:
7973:
7970:
7962:Yonge–University
7960:
7957:
7939:
7933:
7927:
7877:
7870:
7863:
7854:
7853:
7828:
7810:
7789:
7784:
7783:
7775:
7770:
7769:
7768:
7752:
7751:
7749:
7747:
7741:
7734:
7726:
7720:
7719:
7717:
7715:
7709:
7702:
7694:
7688:
7687:
7672:
7666:
7665:
7663:
7661:
7642:
7636:
7635:
7633:
7631:
7612:
7606:
7605:
7603:
7601:
7582:
7576:
7575:
7560:
7554:
7553:
7551:
7549:
7530:
7524:
7523:
7521:
7519:
7500:
7494:
7493:
7491:
7489:
7470:
7464:
7463:
7448:
7442:
7441:
7439:
7437:
7418:
7412:
7411:
7409:
7407:
7402:on March 8, 2020
7398:. Archived from
7387:
7381:
7380:
7378:
7376:
7357:
7351:
7350:
7348:
7346:
7327:
7321:
7320:
7318:
7316:
7297:
7291:
7290:
7288:
7277:
7269:
7263:
7262:
7247:
7241:
7240:
7238:
7236:
7217:
7208:
7207:
7205:
7203:
7181:
7175:
7174:
7172:
7170:
7148:
7142:
7141:
7139:
7137:
7118:
7112:
7111:
7109:
7107:
7101:
7090:
7082:
7076:
7075:
7073:
7071:
7052:
7046:
7045:
7043:
7041:
7019:
7013:
7012:
7010:
7008:
6986:
6980:
6979:
6977:
6975:
6953:
6947:
6946:
6944:
6942:
6920:
6914:
6913:
6911:
6909:
6887:
6881:
6880:
6878:
6876:
6858:
6850:
6844:
6843:
6841:
6839:
6817:
6811:
6810:
6808:
6806:
6784:
6778:
6777:
6775:
6773:
6751:
6745:
6744:
6742:
6740:
6718:
6712:
6700:
6694:
6693:
6691:
6689:
6667:
6661:
6660:
6658:
6656:
6634:
6628:
6627:
6625:
6623:
6601:
6592:
6591:
6589:
6587:
6565:
6559:
6558:
6556:
6554:
6543:CityNews Toronto
6535:
6529:
6528:
6526:
6524:
6513:CityNews Toronto
6505:
6499:
6498:
6496:
6494:
6475:
6469:
6468:
6466:
6464:
6445:
6439:
6438:
6436:
6434:
6419:
6413:
6412:
6397:
6391:
6390:
6388:
6386:
6364:
6353:
6352:
6350:
6348:
6329:
6323:
6317:
6311:
6310:
6308:
6306:
6300:
6294:. May 24, 2017.
6289:
6281:
6275:
6274:
6272:
6270:
6251:
6245:
6244:
6242:
6240:
6234:
6227:
6219:
6213:
6212:
6210:
6208:
6199:. June 7, 2011.
6189:
6180:
6179:
6166:
6160:
6159:
6146:
6140:
6139:
6137:
6135:
6116:
6110:
6109:
6107:
6105:
6086:
6080:
6079:
6077:
6075:
6056:
6050:
6049:
6047:
6045:
6025:
6019:
6018:
6016:
6014:
5992:
5983:
5982:
5980:
5978:
5958:
5949:
5948:
5946:
5944:
5924:
5918:
5917:
5915:
5913:
5894:
5888:
5887:
5885:
5883:
5864:
5858:
5857:
5855:
5853:
5834:
5828:
5827:
5825:
5823:
5804:
5798:
5797:
5795:
5793:
5774:
5768:
5767:
5765:
5763:
5757:
5750:
5741:
5735:
5734:
5732:
5730:
5715:
5709:
5708:
5706:
5704:
5685:
5676:
5675:
5673:
5671:
5649:
5640:
5639:
5637:
5635:
5620:
5614:
5613:
5602:
5596:
5595:
5593:
5591:
5576:
5570:
5569:
5567:
5565:
5550:
5544:
5543:
5541:
5539:
5524:
5518:
5517:
5515:
5513:
5494:
5488:
5487:
5485:
5483:
5463:
5457:
5456:
5454:
5452:
5432:
5426:
5425:
5423:
5421:
5406:
5400:
5399:
5397:
5395:
5390:on July 11, 2012
5380:
5374:
5373:
5371:
5369:
5363:
5356:
5348:
5342:
5341:
5339:
5337:
5332:on April 4, 2012
5322:
5316:
5315:
5313:
5311:
5296:
5290:
5289:
5287:
5285:
5276:. Archived from
5265:
5254:
5253:
5251:
5249:
5229:
5223:
5222:
5220:
5218:
5198:
5192:
5191:
5189:
5187:
5182:on July 16, 2012
5172:
5163:
5162:
5160:
5158:
5143:
5137:
5136:
5134:
5132:
5117:
5111:
5110:
5103:
5097:
5096:
5094:
5092:
5077:
5071:
5070:
5068:
5066:
5046:
5040:
5039:
5037:
5035:
5016:
5005:
5004:
5002:
5000:
4995:on April 4, 2012
4985:
4976:
4975:
4973:
4971:
4966:on July 26, 2020
4956:
4950:
4949:
4947:
4945:
4925:
4916:
4915:
4913:
4911:
4892:
4886:
4885:
4883:
4881:
4875:
4868:
4859:
4853:
4852:
4850:
4848:
4829:
4823:
4822:
4804:
4798:
4797:
4795:
4793:
4787:
4781:. Archived from
4780:
4768:
4762:
4761:
4759:
4757:
4742:
4736:
4735:
4707:
4701:
4700:
4692:
4686:
4685:
4683:
4681:
4662:
4656:
4655:
4653:
4651:
4637:
4635:
4633:
4608:
4597:
4591:
4585:
4584:
4582:
4580:
4561:
4555:
4554:
4552:
4550:
4541:. May 11, 2013.
4531:
4525:
4524:
4522:
4520:
4505:
4499:
4493:
4487:
4486:
4458:
4452:
4451:
4449:
4447:
4428:
4422:
4421:
4419:
4417:
4398:
4392:
4391:
4389:
4387:
4368:
4362:
4361:
4340:
4325:
4324:
4306:
4300:
4299:
4297:
4295:
4280:
4274:
4257:
4251:
4250:
4248:
4246:
4231:
4225:
4224:
4222:
4220:
4205:
4199:
4198:
4178:
4167:
4166:
4164:
4162:
4156:
4149:
4141:
4132:
4131:
4129:
4127:
4106:
4095:
4094:
4092:
4090:
4073:
4067:
4058:
4052:
4051:
4046:
4044:
4025:
4019:
4018:
4016:
4014:
4008:
4001:
3993:
3984:
3983:
3981:
3979:
3968:CTV News Toronto
3959:
3950:
3938:
3907:MoveOntario 2020
3848:Stouffville line
3743:and Ghella) and
3669:
3661:
3637:
3610:
3606:
3599:
3591:
3586:
3583:billion to $ 2.9
3582:
3552:
3540:
3536:
3533:billion to $ 2.5
3532:
3515:
3511:
3497:
3494:million to $ 150
3493:
3428:
3424:
3423:
3419:
3331:
3327:
3248:
3212:
3208:
3097:proof-of-payment
3093:streetcar routes
2896:Christie station
2865:Eglinton station
2850:
2846:
2839:in the west and
2834:
2830:
2823:in the west and
2815:
2812:million ($ 2.054
2811:
2806:
2793:Woodbine station
2742:Christie station
2735:
2660:
2658:
2640:Don River Valley
2395:
2384:
2377:
2370:
2364:
2330:
2329:
2312:
2311:
2301:
2300:
2294:
2293:
2287:
2286:
2265:
2264:
2243:
2242:
2228:
2223:
2218:
2196:
2195:
2188:
2187:
2178:
2177:
2170:
2169:
2163:
2162:
2154:
2153:
2128:
2127:
2120:
2119:
2112:
2111:
2088:
2087:
2065:
2064:
2057:
2056:
2033:
2032:
2018:
2015:
2009:
1993:
1992:
1971:
1970:
1949:
1948:
1927:
1926:
1902:
1901:
1894:
1893:
1885:
1884:
1863:
1862:
1841:
1840:
1819:
1818:
1804:
1801:
1795:
1790:
1787:
1781:
1765:
1764:
1741:
1740:
1734:
1733:
1727:
1726:
1703:
1702:
1677:
1676:
1670:
1669:
1663:
1662:
1639:
1638:
1617:
1616:
1593:
1592:
1571:
1570:
1556:
1540:
1539:
1532:
1531:
1524:
1523:
1515:
1514:
1492:
1491:
1484:
1483:
1467:
1450:
1449:
1442:
1441:
1432:
1431:
1424:
1423:
1417:
1416:
1410:
1409:
1400:
1399:
1392:
1391:
1385:
1384:
1368:
1363:
1360:
1354:
1337:
1336:
1329:
1328:
1322:
1321:
1315:
1314:
1308:
1307:
1298:
1297:
1290:
1289:
1283:
1282:
1273:
1272:
1265:
1264:
1248:
1245:
1239:
1223:
1222:
1201:
1200:
1179:
1178:
1157:
1156:
1135:
1134:
1109:
1108:
1101:
1100:
1093:
1092:
1083:
1082:
1075:
1074:
1058:
1053:
1048:
1029:
1028:
1021:
1020:
1011:
1010:
1003:
1002:
996:
995:
989:
988:
980:
979:
965:
962:
956:
951:
948:
942:
926:
925:
918:
917:
910:
909:
903:
902:
894:
893:
869:
868:
861:
860:
852:
851:
845:
844:
825:
824:
817:
816:
808:
807:
785:
784:
777:
776:
753:
752:
731:
730:
709:
708:
685:
684:
663:
662:
641:
640:
622:
621:
598:
597:
578:
577:
570:
569:
561:
560:
539:
538:
531:
530:
523:
522:
502:
501:
495:
494:
488:
487:
468:
467:
460:
459:
451:
450:
436:
431:
426:
409:
408:
401:
400:
391:
390:
383:
382:
362:
361:
350:
349:
337:
332:
316:
315:
297:
279:
274:
272:
271:
267:
264:
225:
223:
218:
63:Old Mill station
55:
46:
34:
33:
21:
9688:
9687:
9683:
9682:
9681:
9679:
9678:
9677:
9638:
9637:
9636:
9631:
9617:
9558:
9547:Flemingdon Park
9455:
9311:
9231:Sunnybrook Park
9178:(Eglinton West)
9059:
9015:Exhibition Loop
9005:Distillery Loop
8981:
8938:
8746:
8732:Pioneer Village
8727:York University
8683:Eglinton West (
8527:
8512:Stations, stops
8509:
8479:
8474:
8464:
8423:
8387:
8333:Davisville Yard
8321:
8262:
8234:
8139:
8095:507 Long Branch
8075:503 Kingston Rd
8056:
8012:
7997:
7984:
7971:
7958:
7940:
7934:
7928:
7919:
7886:
7881:
7821:
7818:
7813:
7812:
7811:
7795:
7785:
7778:
7771:
7766:
7764:
7761:
7756:
7755:
7745:
7743:
7739:
7732:
7728:
7727:
7723:
7713:
7711:
7707:
7700:
7696:
7695:
7691:
7674:
7673:
7669:
7659:
7657:
7644:
7643:
7639:
7629:
7627:
7614:
7613:
7609:
7599:
7597:
7584:
7583:
7579:
7562:
7561:
7557:
7547:
7545:
7532:
7531:
7527:
7517:
7515:
7502:
7501:
7497:
7487:
7485:
7472:
7471:
7467:
7450:
7449:
7445:
7435:
7433:
7420:
7419:
7415:
7405:
7403:
7388:
7384:
7374:
7372:
7359:
7358:
7354:
7344:
7342:
7329:
7328:
7324:
7314:
7312:
7299:
7298:
7294:
7286:
7275:
7271:
7270:
7266:
7249:
7248:
7244:
7234:
7232:
7219:
7218:
7211:
7201:
7199:
7182:
7178:
7168:
7166:
7149:
7145:
7135:
7133:
7128:. May 9, 2018.
7120:
7119:
7115:
7105:
7103:
7099:
7093:City of Toronto
7088:
7084:
7083:
7079:
7069:
7067:
7053:
7049:
7039:
7037:
7020:
7016:
7006:
7004:
6987:
6983:
6973:
6971:
6954:
6950:
6940:
6938:
6921:
6917:
6907:
6905:
6888:
6884:
6874:
6872:
6856:
6851:
6847:
6837:
6835:
6818:
6814:
6804:
6802:
6785:
6781:
6771:
6769:
6752:
6748:
6738:
6736:
6719:
6715:
6710:Wayback Machine
6701:
6697:
6687:
6685:
6668:
6664:
6654:
6652:
6635:
6631:
6621:
6619:
6602:
6595:
6585:
6583:
6566:
6562:
6552:
6550:
6537:
6536:
6532:
6522:
6520:
6507:
6506:
6502:
6492:
6490:
6477:
6476:
6472:
6462:
6460:
6447:
6446:
6442:
6432:
6430:
6421:
6420:
6416:
6399:
6398:
6394:
6384:
6382:
6365:
6356:
6346:
6344:
6331:
6330:
6326:
6318:
6314:
6304:
6302:
6298:
6287:
6283:
6282:
6278:
6268:
6266:
6259:Transit Toronto
6253:
6252:
6248:
6238:
6236:
6232:
6225:
6221:
6220:
6216:
6206:
6204:
6197:Transit Toronto
6191:
6190:
6183:
6168:
6167:
6163:
6148:
6147:
6143:
6133:
6131:
6118:
6117:
6113:
6103:
6101:
6088:
6087:
6083:
6073:
6071:
6058:
6057:
6053:
6043:
6041:
6026:
6022:
6012:
6010:
5993:
5986:
5976:
5974:
5959:
5952:
5942:
5940:
5925:
5921:
5911:
5909:
5896:
5895:
5891:
5881:
5879:
5865:
5861:
5851:
5849:
5842:Transit Toronto
5836:
5835:
5831:
5821:
5819:
5812:Transit Toronto
5806:
5805:
5801:
5791:
5789:
5782:Transit Toronto
5776:
5775:
5771:
5761:
5759:
5755:
5748:
5742:
5738:
5728:
5726:
5717:
5716:
5712:
5702:
5700:
5693:Transit Toronto
5687:
5686:
5679:
5669:
5667:
5650:
5643:
5633:
5631:
5622:
5621:
5617:
5604:
5603:
5599:
5589:
5587:
5577:
5573:
5563:
5561:
5552:
5551:
5547:
5537:
5535:
5526:
5525:
5521:
5511:
5509:
5496:
5495:
5491:
5481:
5479:
5464:
5460:
5450:
5448:
5433:
5429:
5419:
5417:
5408:
5407:
5403:
5393:
5391:
5382:
5381:
5377:
5367:
5365:
5361:
5354:
5350:
5349:
5345:
5335:
5333:
5324:
5323:
5319:
5309:
5307:
5298:
5297:
5293:
5283:
5281:
5274:Spacing Toronto
5266:
5257:
5247:
5245:
5238:Transit Toronto
5230:
5226:
5216:
5214:
5199:
5195:
5185:
5183:
5174:
5173:
5166:
5156:
5154:
5145:
5144:
5140:
5130:
5128:
5119:
5118:
5114:
5105:
5104:
5100:
5090:
5088:
5081:"Subway/RT Map"
5079:
5078:
5074:
5064:
5062:
5055:urbantoronto.ca
5047:
5043:
5033:
5031:
5017:
5008:
4998:
4996:
4987:
4986:
4979:
4969:
4967:
4958:
4957:
4953:
4943:
4941:
4926:
4919:
4909:
4907:
4900:Transit Toronto
4894:
4893:
4889:
4879:
4877:
4873:
4866:
4860:
4856:
4846:
4844:
4837:Transit Toronto
4831:
4830:
4826:
4819:
4805:
4801:
4791:
4789:
4785:
4778:
4769:
4765:
4755:
4753:
4744:
4743:
4739:
4708:
4704:
4693:
4689:
4679:
4677:
4670:Transit Toronto
4664:
4663:
4659:
4649:
4647:
4639:
4631:
4629:
4624:
4609:
4600:
4592:
4588:
4578:
4576:
4563:
4562:
4558:
4548:
4546:
4533:
4532:
4528:
4518:
4516:
4507:
4506:
4502:
4494:
4490:
4459:
4455:
4445:
4443:
4436:Transit Toronto
4430:
4429:
4425:
4415:
4413:
4406:Transit Toronto
4400:
4399:
4395:
4385:
4383:
4376:Transit Toronto
4370:
4369:
4365:
4358:
4341:
4328:
4321:
4307:
4303:
4293:
4291:
4282:
4281:
4277:
4271:Wayback Machine
4258:
4254:
4244:
4242:
4233:
4232:
4228:
4218:
4216:
4207:
4206:
4202:
4179:
4170:
4160:
4158:
4154:
4147:
4143:
4142:
4135:
4125:
4123:
4108:
4107:
4098:
4088:
4086:
4074:
4070:
4059:
4055:
4042:
4040:
4027:
4026:
4022:
4012:
4010:
4006:
3999:
3995:
3994:
3987:
3977:
3975:
3960:
3953:
3948:Wayback Machine
3939:
3932:
3927:
3905:as part of the
3883:Sherway Gardens
3864:
3844:Line 5 Eglinton
3803:
3728:
3701:McCowan station
3682:Line 4 Sheppard
3677:
3667:
3659:
3645:
3635:
3608:
3604:
3597:
3589:
3584:
3580:
3550:
3543:Line 5 Eglinton
3538:
3534:
3530:
3522:
3513:
3509:
3495:
3491:
3488:Eglinton Avenue
3459:
3447:Line 5 Eglinton
3426:
3421:
3417:
3416:
3403:In 2007, mayor
3401:
3373:
3349:
3343:
3338:
3336:Expansion plans
3329:
3325:
3322:Kipling station
3255:
3246:
3210:
3206:
3202:
3170:Hawker Siddeley
3154:H-series trains
3130:
3122:
3110:
3105:
3069:
3063:
3061:Fare collection
3012:
2961:
2918:
2912:
2857:
2848:
2844:
2841:Kennedy station
2837:Kipling station
2832:
2828:
2813:
2809:
2791:in the west to
2733:
2714:Kennedy station
2695:
2656:
2651:
2648:Danforth Avenue
2607:
2602:
2578:
2566:Sheppard Avenue
2491:Danforth Avenue
2452:Eglinton Avenue
2443:Danforth Avenue
2397:
2396:
2393:
2388:
2362:
2331:
2316:
2302:
2295:
2288:
2266:
2244:
2229:
2198:
2197:
2190:
2189:
2180:
2179:
2172:
2171:
2164:
2155:
2140:
2137:Line 5 Eglinton
2129:
2122:
2121:
2114:
2113:
2089:
2074:
2067:
2066:
2059:
2058:
2034:
2019:
2013:
2010:
1994:
1972:
1950:
1928:
1913:
1904:
1903:
1896:
1895:
1886:
1864:
1842:
1820:
1805:
1799:
1796:
1785:
1782:
1766:
1751:
1742:
1735:
1728:
1713:
1704:
1689:
1678:
1671:
1664:
1649:
1640:
1618:
1603:
1601:Rosedale Ravine
1594:
1572:
1557:
1541:
1534:
1533:
1526:
1525:
1516:
1494:
1493:
1486:
1485:
1468:
1452:
1451:
1444:
1443:
1434:
1433:
1426:
1425:
1418:
1411:
1402:
1401:
1394:
1393:
1386:
1369:
1358:
1355:
1339:
1338:
1331:
1330:
1323:
1316:
1309:
1300:
1299:
1292:
1291:
1284:
1275:
1274:
1267:
1266:
1249:
1243:
1240:
1224:
1202:
1180:
1158:
1136:
1121:
1110:
1103:
1102:
1095:
1094:
1085:
1084:
1077:
1076:
1059:
1040:
1031:
1030:
1023:
1022:
1013:
1012:
1005:
1004:
997:
990:
981:
966:
960:
957:
946:
943:
927:
920:
919:
912:
911:
904:
895:
880:
871:
870:
863:
862:
853:
846:
827:
826:
819:
818:
809:
787:
786:
779:
778:
754:
732:
710:
695:
686:
664:
642:
623:
608:
599:
580:
579:
572:
571:
562:
540:
533:
532:
525:
524:
503:
496:
489:
470:
469:
462:
461:
452:
437:
411:
410:
403:
402:
393:
392:
385:
384:
363:
344:
333:
330:
329:
321:
295:
286:Electrification
277:
269:
265:
262:
260:
259:4 ft
258:
247:
221:
219:
216:
199:Daily ridership
184:
112:
65:
30:
23:
22:
15:
12:
11:
5:
9686:
9676:
9675:
9670:
9665:
9660:
9655:
9650:
9633:
9632:
9626:
9623:
9622:
9619:
9618:
9616:
9615:
9610:
9605:
9600:
9595:
9590:
9584:
9582:
9568:
9564:
9563:
9560:
9559:
9557:
9556:
9553:Science Centre
9549:
9544:
9539:
9534:
9529:
9524:
9519:
9512:
9505:
9498:
9493:
9488:
9483:
9478:
9472:
9470:
9457:
9456:
9454:
9453:
9448:
9441:
9434:
9427:
9424:Jane and Finch
9420:
9413:
9406:
9399:
9392:
9385:
9378:
9375:Rowntree Mills
9371:
9364:
9357:
9350:
9343:
9336:
9333:Humber College
9328:
9326:
9313:
9312:
9310:
9309:
9304:
9297:
9290:
9283:
9280:Hakimi Lebovic
9276:
9269:
9262:
9255:
9248:
9241:
9238:Science Centre
9234:
9227:
9220:
9213:
9210:Mount Pleasant
9206:
9201:
9194:
9187:
9180:
9172:
9165:
9158:
9151:
9144:
9137:
9130:
9123:
9116:
9109:
9102:
9095:
9087:
9085:
9069:
9065:
9064:
9061:
9060:
9058:
9057:
9052:
9047:
9042:
9037:
9032:
9030:High Park Loop
9027:
9022:
9017:
9012:
9007:
9002:
8996:
8994:
8983:
8982:
8980:
8979:
8974:
8969:
8964:
8959:
8957:Sheppard–Yonge
8953:
8951:
8940:
8939:
8937:
8936:
8931:
8924:
8917:
8912:
8907:
8902:
8897:
8892:
8887:
8882:
8877:
8872:
8867:
8862:
8857:
8852:
8847:
8842:
8837:
8832:
8827:
8822:
8817:
8812:
8807:
8802:
8797:
8792:
8787:
8782:
8777:
8772:
8767:
8761:
8759:
8757:Bloor–Danforth
8748:
8747:
8745:
8744:
8739:
8734:
8729:
8724:
8719:
8717:Downsview Park
8714:
8709:
8704:
8699:
8694:
8689:
8680:
8678:St. Clair West
8675:
8670:
8665:
8660:
8655:
8650:
8645:
8640:
8635:
8630:
8625:
8620:
8615:
8610:
8605:
8600:
8595:
8590:
8585:
8580:
8575:
8570:
8565:
8563:Sheppard–Yonge
8560:
8555:
8549:
8547:
8533:
8529:
8528:
8520:Toronto subway
8508:
8507:
8500:
8493:
8485:
8476:
8475:
8469:
8466:
8465:
8463:
8462:
8457:
8452:
8447:
8442:
8437:
8431:
8429:
8425:
8424:
8422:
8421:
8416:
8411:
8406:
8401:
8395:
8393:
8389:
8388:
8386:
8385:
8380:
8375:
8370:
8365:
8360:
8355:
8350:
8345:
8343:Greenwood Yard
8340:
8335:
8329:
8327:
8323:
8322:
8320:
8319:
8313:
8307:
8301:
8295:
8289:
8283:
8277:
8270:
8268:
8264:
8263:
8261:
8260:
8255:
8250:
8245:
8240:
8227:
8222:
8217:
8212:
8210:502 Downtowner
8207:
8202:
8197:
8192:
8191:
8190:
8185:
8175:
8170:
8165:
8160:
8155:
8149:
8147:
8141:
8140:
8138:
8137:
8132:
8127:
8122:
8117:
8112:
8107:
8102:
8100:508 Lake Shore
8097:
8092:
8087:
8082:
8077:
8072:
8066:
8064:
8058:
8057:
8055:
8054:
8049:
8044:
8039:
8034:
8028:
8027:
8020:
8005:
7990:
7977:
7975:Bloor–Danforth
7964:
7950:
7948:
7942:
7941:
7922:
7920:
7918:
7917:
7912:
7907:
7902:
7896:
7894:
7888:
7887:
7880:
7879:
7872:
7865:
7857:
7851:
7850:
7844:
7839:
7834:
7794:
7793:
7792:
7791:
7790:
7776:
7773:Ontario portal
7760:
7759:External links
7757:
7754:
7753:
7721:
7689:
7667:
7637:
7607:
7577:
7555:
7525:
7495:
7484:on May 4, 2021
7465:
7443:
7413:
7382:
7352:
7322:
7292:
7264:
7242:
7209:
7176:
7143:
7113:
7077:
7047:
7014:
6981:
6948:
6915:
6882:
6845:
6812:
6779:
6746:
6713:
6695:
6662:
6629:
6593:
6560:
6530:
6500:
6470:
6440:
6414:
6392:
6354:
6324:
6312:
6276:
6246:
6214:
6181:
6161:
6141:
6111:
6081:
6051:
6020:
5984:
5950:
5919:
5889:
5859:
5829:
5799:
5769:
5736:
5710:
5677:
5641:
5615:
5597:
5571:
5545:
5519:
5489:
5458:
5427:
5416:on May 9, 2012
5401:
5375:
5343:
5317:
5291:
5255:
5224:
5193:
5164:
5138:
5112:
5098:
5072:
5041:
5006:
4977:
4951:
4917:
4887:
4854:
4824:
4817:
4799:
4763:
4737:
4702:
4687:
4657:
4598:
4586:
4556:
4539:The Torontoist
4526:
4500:
4488:
4475:10.2307/139770
4453:
4423:
4393:
4363:
4356:
4326:
4319:
4301:
4275:
4252:
4226:
4200:
4189:(4): 357–369.
4168:
4133:
4096:
4068:
4053:
4020:
3985:
3951:
3929:
3928:
3926:
3923:
3915:Finch West LRT
3903:Hurontario LRT
3863:
3860:
3859:
3858:
3855:
3840:
3837:
3834:
3831:
3824:Mott MacDonald
3802:
3799:
3791:Ziggy Stardust
3766:
3765:
3762:
3759:
3756:
3727:
3726:Advance tunnel
3724:
3676:
3673:
3644:
3641:
3629:T1 subway cars
3521:
3518:
3458:
3455:
3400:
3397:
3387:), was built.
3372:
3369:
3342:
3339:
3337:
3334:
3269:Greenwood Yard
3262:Greenwood Yard
3254:
3251:
3201:
3198:
3182:Sheppard lines
3178:Toronto Rocket
3129:
3126:
3121:
3118:
3109:
3106:
3104:
3101:
3065:Main article:
3062:
3059:
3011:
3008:
2960:
2957:
2930:Kipling Avenue
2911:
2908:
2856:
2853:
2847:million ($ 393
2831:million ($ 643
2825:Warden station
2694:
2691:
2678:PCC streetcars
2606:
2605:Pre-subway era
2603:
2601:
2598:
2577:
2574:
2555:Kipling Avenue
2431:Kipling Avenue
2412:Toronto subway
2403:
2402:
2399:
2398:
2390:
2389:
2387:
2386:
2379:
2372:
2363:This diagram:
2361:
2358:
2357:
2354:
2353:
2351:
2349:
2347:
2345:
2343:
2341:
2338:
2337:
2334:
2332:
2325:
2323:
2321:
2318:
2317:
2307:
2305:
2303:
2296:
2289:
2282:
2280:
2278:
2275:
2274:
2269:
2267:
2260:
2258:
2256:
2253:
2252:
2247:
2245:
2238:
2236:
2234:
2231:
2230:
2213:
2211:
2201:
2199:
2191:
2183:
2182:
2181:
2173:
2165:
2158:
2157:
2156:
2149:
2147:
2145:
2142:
2141:
2134:
2132:
2130:
2123:
2115:
2107:
2106:
2105:
2103:
2101:
2098:
2097:
2092:
2090:
2083:
2081:
2079:
2076:
2075:
2072:
2070:
2068:
2060:
2052:
2051:
2050:
2048:
2046:
2043:
2042:
2037:
2035:
2028:
2026:
2024:
2021:
2020:
2004:
2002:
1997:
1995:
1988:
1986:
1984:
1981:
1980:
1975:
1973:
1966:
1964:
1962:
1959:
1958:
1953:
1951:
1944:
1942:
1940:
1937:
1936:
1931:
1929:
1922:
1920:
1918:
1915:
1914:
1911:Greenwood Yard
1909:
1907:
1905:
1897:
1889:
1888:
1887:
1880:
1878:
1876:
1873:
1872:
1867:
1865:
1858:
1856:
1854:
1851:
1850:
1845:
1843:
1836:
1834:
1832:
1829:
1828:
1823:
1821:
1814:
1812:
1810:
1807:
1806:
1776:
1774:
1769:
1767:
1760:
1758:
1756:
1753:
1752:
1747:
1745:
1743:
1736:
1729:
1722:
1720:
1718:
1715:
1714:
1709:
1707:
1705:
1698:
1696:
1694:
1691:
1690:
1683:
1681:
1679:
1672:
1665:
1658:
1656:
1654:
1651:
1650:
1645:
1643:
1641:
1634:
1632:
1630:
1627:
1626:
1621:
1619:
1612:
1610:
1608:
1605:
1604:
1599:
1597:
1595:
1588:
1586:
1584:
1581:
1580:
1575:
1573:
1566:
1564:
1562:
1559:
1558:
1551:
1549:
1544:
1542:
1535:
1527:
1519:
1518:
1517:
1510:
1508:
1506:
1503:
1502:
1497:
1495:
1487:
1479:
1478:
1477:
1475:
1473:
1470:
1469:
1462:
1460:
1455:
1453:
1445:
1437:
1436:
1435:
1427:
1419:
1412:
1405:
1404:
1403:
1395:
1387:
1380:
1379:
1378:
1376:
1374:
1371:
1370:
1349:
1347:
1342:
1340:
1332:
1324:
1317:
1310:
1303:
1302:
1301:
1293:
1285:
1278:
1277:
1276:
1268:
1260:
1259:
1258:
1256:
1254:
1251:
1250:
1234:
1232:
1227:
1225:
1218:
1216:
1214:
1211:
1210:
1205:
1203:
1196:
1194:
1192:
1189:
1188:
1183:
1181:
1174:
1172:
1170:
1167:
1166:
1161:
1159:
1152:
1150:
1148:
1145:
1144:
1139:
1137:
1130:
1128:
1126:
1123:
1122:
1115:
1113:
1111:
1104:
1096:
1088:
1087:
1086:
1078:
1070:
1069:
1068:
1066:
1064:
1061:
1060:
1043:
1041:
1036:
1034:
1032:
1024:
1016:
1015:
1014:
1006:
998:
991:
984:
983:
982:
975:
973:
971:
968:
967:
937:
935:
930:
928:
921:
913:
905:
898:
897:
896:
889:
887:
885:
882:
881:
876:
874:
872:
864:
856:
855:
854:
847:
840:
838:
836:
833:
832:
830:
828:
820:
812:
811:
810:
803:
801:
799:
796:
795:
790:
788:
780:
772:
771:
770:
768:
766:
763:
762:
757:
755:
748:
746:
744:
741:
740:
735:
733:
726:
724:
722:
719:
718:
713:
711:
704:
702:
700:
697:
696:
691:
689:
687:
680:
678:
676:
673:
672:
667:
665:
658:
656:
654:
651:
650:
645:
643:
636:
634:
632:
629:
628:
626:
624:
617:
615:
613:
610:
609:
604:
602:
600:
593:
591:
589:
586:
585:
583:
581:
573:
565:
564:
563:
556:
554:
552:
549:
548:
543:
541:
534:
526:
518:
517:
516:
514:
512:
509:
508:
506:
504:
497:
490:
483:
481:
479:
476:
475:
473:
471:
463:
455:
454:
453:
446:
444:
442:
439:
438:
421:
419:
414:
412:
404:
396:
395:
394:
386:
378:
377:
376:
374:
372:
369:
368:
366:
364:
357:
355:
353:
346:
345:
340:
334:
327:
326:
323:
322:
319:
312:
311:
306:
300:
299:
288:
282:
281:
255:
249:
248:
246:
245:
242:
238:
236:
232:
231:
227:
226:
213:
209:
208:
204:
203:
200:
196:
195:
190:
186:
185:
183:
182:
177:
175:Greenwood Yard
171:
169:
165:
164:
161:
157:
156:
154:Toronto subway
151:
147:
146:
141:
137:
136:
132:
131:
126:
122:
121:
118:
114:
113:
111:
110:
105:
99:
97:
93:
92:
86:
82:
81:
76:
72:
71:
67:
66:
56:
48:
47:
39:
38:
28:
18:Bloor–Danforth
9:
6:
4:
3:
2:
9685:
9674:
9671:
9669:
9666:
9664:
9661:
9659:
9656:
9654:
9651:
9649:
9646:
9645:
9643:
9629:
9624:
9614:
9611:
9609:
9606:
9604:
9601:
9599:
9596:
9594:
9593:Lawrence East
9591:
9589:
9586:
9585:
9583:
9581:
9577:
9572:
9569:
9565:
9555:
9554:
9550:
9548:
9545:
9543:
9540:
9538:
9535:
9533:
9530:
9528:
9525:
9523:
9520:
9518:
9517:
9513:
9511:
9510:
9506:
9504:
9503:
9499:
9497:
9494:
9492:
9489:
9487:
9486:Queen–Spadina
9484:
9482:
9481:King–Bathurst
9479:
9477:
9474:
9473:
9471:
9469:
9468:
9463:
9458:
9452:
9449:
9447:
9446:
9442:
9440:
9439:
9435:
9433:
9432:
9428:
9426:
9425:
9421:
9419:
9418:
9414:
9412:
9411:
9407:
9405:
9404:
9400:
9398:
9397:
9396:Milvan Rumike
9393:
9391:
9390:
9386:
9384:
9383:
9379:
9377:
9376:
9372:
9370:
9369:
9365:
9363:
9362:
9358:
9356:
9355:
9351:
9349:
9348:
9344:
9342:
9341:
9337:
9335:
9334:
9330:
9329:
9327:
9325:
9324:
9319:
9314:
9308:
9305:
9303:
9302:
9298:
9296:
9295:
9291:
9289:
9288:
9284:
9282:
9281:
9277:
9275:
9274:
9270:
9268:
9267:
9263:
9261:
9260:
9256:
9254:
9253:
9249:
9247:
9246:
9242:
9240:
9239:
9235:
9233:
9232:
9228:
9226:
9225:
9221:
9219:
9218:
9214:
9212:
9211:
9207:
9205:
9202:
9200:
9199:
9195:
9193:
9192:
9188:
9186:
9185:
9181:
9179:
9177:
9173:
9171:
9170:
9166:
9164:
9163:
9159:
9157:
9156:
9152:
9150:
9149:
9145:
9143:
9142:
9138:
9136:
9135:
9131:
9129:
9128:
9124:
9122:
9121:
9117:
9115:
9114:
9110:
9108:
9107:
9103:
9101:
9100:
9096:
9094:
9093:
9089:
9088:
9086:
9084:
9083:
9078:
9073:
9070:
9066:
9056:
9053:
9051:
9048:
9046:
9043:
9041:
9038:
9036:
9033:
9031:
9028:
9026:
9023:
9021:
9018:
9016:
9013:
9011:
9008:
9006:
9003:
9001:
8998:
8997:
8995:
8993:
8989:
8984:
8978:
8975:
8973:
8970:
8968:
8965:
8963:
8960:
8958:
8955:
8954:
8952:
8950:
8946:
8941:
8935:
8932:
8930:
8929:
8925:
8923:
8922:
8918:
8916:
8913:
8911:
8908:
8906:
8905:Victoria Park
8903:
8901:
8898:
8896:
8893:
8891:
8888:
8886:
8883:
8881:
8878:
8876:
8873:
8871:
8868:
8866:
8863:
8861:
8858:
8856:
8853:
8851:
8848:
8846:
8843:
8841:
8838:
8836:
8833:
8831:
8828:
8826:
8823:
8821:
8818:
8816:
8813:
8811:
8808:
8806:
8803:
8801:
8798:
8796:
8793:
8791:
8788:
8786:
8783:
8781:
8778:
8776:
8773:
8771:
8768:
8766:
8763:
8762:
8760:
8758:
8754:
8749:
8743:
8740:
8738:
8735:
8733:
8730:
8728:
8725:
8723:
8720:
8718:
8715:
8713:
8712:Sheppard West
8710:
8708:
8705:
8703:
8700:
8698:
8697:Lawrence West
8695:
8693:
8690:
8688:
8686:
8681:
8679:
8676:
8674:
8671:
8669:
8666:
8664:
8661:
8659:
8656:
8654:
8651:
8649:
8646:
8644:
8641:
8639:
8636:
8634:
8631:
8629:
8626:
8624:
8621:
8619:
8616:
8614:
8611:
8609:
8606:
8604:
8601:
8599:
8596:
8594:
8591:
8589:
8586:
8584:
8581:
8579:
8576:
8574:
8571:
8569:
8566:
8564:
8561:
8559:
8556:
8554:
8551:
8550:
8548:
8546:
8542:
8537:
8534:
8530:
8525:
8521:
8517:
8513:
8506:
8501:
8499:
8494:
8492:
8487:
8486:
8483:
8472:
8467:
8461:
8458:
8456:
8453:
8451:
8448:
8446:
8443:
8441:
8438:
8436:
8435:Accessibility
8433:
8432:
8430:
8428:Miscellaneous
8426:
8420:
8417:
8415:
8412:
8410:
8407:
8405:
8402:
8400:
8399:Don Mills LRT
8397:
8396:
8394:
8390:
8384:
8381:
8379:
8376:
8374:
8371:
8369:
8366:
8364:
8361:
8359:
8356:
8354:
8351:
8349:
8346:
8344:
8341:
8339:
8336:
8334:
8331:
8330:
8328:
8324:
8317:
8314:
8311:
8308:
8305:
8302:
8299:
8296:
8293:
8290:
8287:
8284:
8281:
8278:
8275:
8272:
8271:
8269:
8265:
8259:
8256:
8254:
8251:
8249:
8246:
8244:
8241:
8239:
8232:
8228:
8226:
8223:
8221:
8218:
8216:
8213:
8211:
8208:
8206:
8203:
8201:
8198:
8196:
8193:
8189:
8186:
8184:
8181:
8180:
8179:
8176:
8174:
8171:
8169:
8166:
8164:
8161:
8159:
8156:
8154:
8151:
8150:
8148:
8146:
8142:
8136:
8135:Rolling stock
8133:
8131:
8128:
8126:
8123:
8121:
8120:512 St. Clair
8118:
8116:
8113:
8111:
8108:
8106:
8103:
8101:
8098:
8096:
8093:
8091:
8088:
8086:
8083:
8081:
8078:
8076:
8073:
8071:
8068:
8067:
8065:
8063:
8059:
8053:
8050:
8048:
8045:
8043:
8040:
8038:
8037:Rolling stock
8035:
8033:
8030:
8029:
8026:
8025:
8021:
8019:
8018:
8010:
8006:
8004:
8003:
7995:
7991:
7989:
7982:
7978:
7976:
7969:
7965:
7963:
7956:
7952:
7951:
7949:
7947:
7943:
7938:
7932:
7926:
7916:
7913:
7911:
7908:
7906:
7903:
7901:
7898:
7897:
7895:
7893:
7889:
7885:
7878:
7873:
7871:
7866:
7864:
7859:
7858:
7855:
7848:
7845:
7843:
7840:
7838:
7835:
7832:
7827:
7823:
7822:
7817:
7808:
7804:
7800:
7799:
7788:
7787:Trains portal
7782:
7777:
7774:
7763:
7738:
7731:
7725:
7706:
7699:
7693:
7685:
7681:
7677:
7671:
7655:
7651:
7647:
7641:
7625:
7621:
7617:
7611:
7595:
7591:
7587:
7581:
7573:
7569:
7565:
7559:
7543:
7539:
7535:
7529:
7513:
7509:
7505:
7499:
7483:
7479:
7475:
7469:
7461:
7457:
7453:
7447:
7431:
7427:
7423:
7417:
7401:
7397:
7393:
7386:
7370:
7366:
7362:
7356:
7340:
7336:
7332:
7326:
7310:
7306:
7302:
7296:
7285:
7281:
7274:
7268:
7260:
7256:
7252:
7246:
7230:
7226:
7222:
7216:
7214:
7197:
7193:
7192:
7187:
7180:
7164:
7160:
7159:
7154:
7147:
7131:
7127:
7123:
7117:
7098:
7094:
7087:
7081:
7065:
7061:
7057:
7051:
7035:
7031:
7030:
7025:
7018:
7002:
6998:
6997:
6992:
6985:
6969:
6965:
6964:
6959:
6952:
6936:
6932:
6931:
6926:
6919:
6903:
6899:
6898:
6893:
6886:
6870:
6866:
6865:
6860:
6849:
6833:
6829:
6828:
6823:
6816:
6800:
6796:
6795:
6790:
6783:
6767:
6763:
6762:
6757:
6750:
6734:
6730:
6729:
6724:
6717:
6711:
6707:
6704:
6699:
6683:
6679:
6678:
6673:
6666:
6650:
6646:
6645:
6640:
6633:
6617:
6613:
6612:
6611:CablePulse 24
6607:
6600:
6598:
6581:
6577:
6576:
6571:
6564:
6548:
6544:
6540:
6534:
6523:September 23,
6518:
6514:
6510:
6504:
6488:
6484:
6480:
6474:
6458:
6454:
6450:
6444:
6428:
6424:
6418:
6410:
6406:
6402:
6396:
6380:
6376:
6375:
6370:
6363:
6361:
6359:
6342:
6338:
6334:
6328:
6322:, p. 137
6321:
6316:
6297:
6293:
6286:
6280:
6264:
6260:
6256:
6250:
6231:
6224:
6218:
6202:
6198:
6194:
6188:
6186:
6177:
6176:
6171:
6165:
6157:
6156:
6151:
6145:
6129:
6125:
6121:
6115:
6099:
6095:
6091:
6085:
6069:
6065:
6061:
6055:
6039:
6035:
6031:
6024:
6008:
6004:
6003:
5998:
5991:
5989:
5972:
5968:
5964:
5957:
5955:
5938:
5934:
5930:
5923:
5907:
5903:
5899:
5893:
5877:
5873:
5869:
5863:
5847:
5843:
5839:
5833:
5817:
5813:
5809:
5803:
5787:
5783:
5779:
5773:
5754:
5747:
5740:
5724:
5720:
5714:
5698:
5694:
5690:
5684:
5682:
5665:
5661:
5660:
5655:
5648:
5646:
5629:
5625:
5619:
5611:
5607:
5601:
5586:
5582:
5575:
5559:
5555:
5549:
5533:
5529:
5523:
5507:
5503:
5499:
5493:
5477:
5473:
5469:
5462:
5446:
5442:
5438:
5431:
5415:
5411:
5405:
5389:
5385:
5379:
5360:
5353:
5347:
5331:
5327:
5321:
5305:
5301:
5295:
5279:
5275:
5271:
5264:
5262:
5260:
5243:
5239:
5235:
5228:
5212:
5208:
5204:
5197:
5181:
5177:
5171:
5169:
5152:
5148:
5142:
5126:
5122:
5116:
5108:
5102:
5086:
5082:
5076:
5060:
5056:
5052:
5045:
5029:
5025:
5021:
5015:
5013:
5011:
4994:
4990:
4984:
4982:
4965:
4961:
4955:
4939:
4935:
4931:
4924:
4922:
4905:
4901:
4897:
4891:
4872:
4865:
4858:
4842:
4838:
4834:
4828:
4820:
4814:
4810:
4803:
4784:
4777:
4773:
4767:
4751:
4747:
4741:
4733:
4729:
4725:
4721:
4717:
4713:
4706:
4698:
4691:
4675:
4671:
4667:
4661:
4646:
4642:
4627:
4622:
4618:
4617:
4612:
4607:
4605:
4603:
4596:, p. 110
4595:
4590:
4574:
4570:
4566:
4560:
4544:
4540:
4536:
4530:
4514:
4510:
4504:
4497:
4492:
4484:
4480:
4476:
4472:
4468:
4464:
4457:
4441:
4437:
4433:
4427:
4411:
4407:
4403:
4397:
4381:
4377:
4373:
4367:
4359:
4357:1-55002-244-X
4353:
4349:
4345:
4339:
4337:
4335:
4333:
4331:
4322:
4316:
4312:
4305:
4289:
4285:
4279:
4272:
4268:
4265:
4261:
4256:
4240:
4236:
4230:
4214:
4210:
4204:
4196:
4192:
4188:
4184:
4177:
4175:
4173:
4153:
4146:
4140:
4138:
4121:
4117:
4116:
4111:
4105:
4103:
4101:
4085:
4084:
4083:National Post
4079:
4072:
4065:
4064:
4057:
4050:
4038:
4034:
4030:
4024:
4005:
3998:
3992:
3990:
3973:
3969:
3965:
3958:
3956:
3949:
3945:
3942:
3937:
3935:
3930:
3922:
3920:
3916:
3912:
3908:
3904:
3900:
3896:
3892:
3888:
3884:
3880:
3873:
3868:
3856:
3853:
3849:
3845:
3841:
3838:
3835:
3832:
3829:
3828:
3827:
3825:
3821:
3817:
3813:
3809:
3798:
3796:
3792:
3788:
3784:
3780:
3770:
3763:
3760:
3757:
3754:
3753:
3752:
3750:
3746:
3742:
3738:
3734:
3723:
3721:
3717:
3712:
3710:
3706:
3702:
3698:
3693:
3691:
3687:
3683:
3672:
3664:
3656:
3654:
3650:
3640:
3632:
3630:
3626:
3622:
3617:
3613:
3601:
3595:
3577:
3575:
3570:
3569:
3564:
3560:
3554:
3548:
3544:
3528:
3517:
3506:
3504:
3499:
3489:
3485:
3480:
3477:
3473:
3469:
3465:
3454:
3452:
3448:
3444:
3439:
3435:
3430:
3414:
3410:
3406:
3396:
3393:
3388:
3386:
3382:
3378:
3371:Early history
3365:
3360:
3356:
3354:
3348:
3333:
3323:
3318:
3316:
3312:
3305:
3301:
3297:
3295:
3291:
3286:
3282:
3278:
3274:
3270:
3263:
3259:
3250:
3243:
3241:
3235:
3233:
3229:
3228:Hyundai Rotem
3225:
3221:
3215:
3197:
3195:
3191:
3187:
3183:
3179:
3174:
3171:
3166:
3164:
3159:
3155:
3151:
3147:
3139:
3134:
3128:Rolling stock
3125:
3117:
3113:
3100:
3098:
3094:
3090:
3086:
3081:
3077:
3074:
3068:
3058:
3055:
3054:expropriation
3051:
3047:
3041:
3038:
3033:
3029:
3020:
3016:
3007:
3005:
3001:
2996:
2992:
2989:
2985:
2981:
2977:
2969:
2965:
2956:
2954:
2953:shopping area
2949:
2947:
2943:
2942:Yonge station
2939:
2935:
2931:
2922:
2917:
2907:
2905:
2901:
2897:
2892:
2889:
2885:
2884:Victoria Park
2881:
2876:
2874:
2871:
2866:
2861:
2852:
2842:
2838:
2826:
2822:
2817:
2802:
2798:
2797:cut-and-cover
2794:
2790:
2789:Keele station
2785:
2783:
2779:
2773:
2771:
2767:
2763:
2759:
2758:Fred Gardiner
2755:
2751:
2750:Allan Lamport
2747:
2743:
2737:
2731:
2727:
2723:
2715:
2710:
2704:
2699:
2690:
2688:
2684:
2679:
2675:
2671:
2666:
2664:
2654:
2649:
2645:
2641:
2637:
2633:
2632:Joseph Oliver
2629:
2620:
2616:
2611:
2597:
2595:
2591:
2587:
2583:
2573:
2571:
2567:
2562:
2560:
2556:
2552:
2548:
2544:
2540:
2536:
2532:
2528:
2524:
2520:
2516:
2512:
2508:
2504:
2500:
2499:East Danforth
2496:
2492:
2488:
2484:
2480:
2476:
2472:
2468:
2463:
2461:
2457:
2453:
2449:
2444:
2440:
2436:
2432:
2428:
2423:
2421:
2417:
2413:
2409:
2385:
2380:
2378:
2373:
2371:
2366:
2365:
2360:
2359:
2352:
2350:
2348:
2346:
2344:
2342:
2340:
2339:
2333:
2324:
2322:
2319:
2315:
2304:
2281:
2279:
2276:
2273:
2268:
2259:
2257:
2254:
2251:
2250:Lawrence East
2246:
2237:
2235:
2232:
2227:
2222:
2217:
2212:
2209:
2205:
2202:
2200:
2148:
2146:
2143:
2139:
2138:
2131:
2104:
2102:
2099:
2096:
2091:
2082:
2080:
2077:
2069:
2049:
2047:
2044:
2041:
2040:Victoria Park
2036:
2027:
2025:
2022:
2016:
2008:
2003:
2001:
1998:
1996:
1987:
1985:
1982:
1979:
1974:
1965:
1963:
1960:
1957:
1952:
1943:
1941:
1938:
1935:
1930:
1921:
1919:
1916:
1912:
1906:
1879:
1877:
1874:
1871:
1866:
1857:
1855:
1852:
1849:
1844:
1835:
1833:
1830:
1827:
1822:
1813:
1811:
1808:
1802:
1794:
1788:
1780:
1775:
1773:
1770:
1768:
1759:
1757:
1754:
1750:
1744:
1721:
1719:
1716:
1712:
1706:
1697:
1695:
1692:
1688:
1687:
1680:
1657:
1655:
1652:
1648:
1642:
1633:
1631:
1628:
1625:
1620:
1611:
1609:
1606:
1602:
1596:
1587:
1585:
1582:
1579:
1574:
1565:
1563:
1560:
1555:
1550:
1548:
1545:
1543:
1509:
1507:
1504:
1501:
1496:
1476:
1474:
1471:
1466:
1461:
1459:
1456:
1454:
1377:
1375:
1372:
1367:
1361:
1353:
1348:
1346:
1343:
1341:
1257:
1255:
1252:
1246:
1238:
1233:
1231:
1228:
1226:
1217:
1215:
1212:
1209:
1204:
1195:
1193:
1190:
1187:
1182:
1173:
1171:
1168:
1165:
1160:
1151:
1149:
1146:
1143:
1138:
1129:
1127:
1124:
1120:
1119:
1112:
1067:
1065:
1062:
1057:
1052:
1047:
1042:
1039:
1035:
1033:
974:
972:
969:
963:
955:
949:
941:
936:
934:
931:
929:
888:
886:
883:
879:
873:
839:
837:
834:
829:
802:
800:
797:
794:
789:
769:
767:
764:
761:
756:
747:
745:
742:
739:
734:
725:
723:
720:
717:
712:
703:
701:
698:
694:
688:
679:
677:
674:
671:
666:
657:
655:
652:
649:
644:
635:
633:
630:
625:
616:
614:
611:
607:
601:
592:
590:
587:
582:
555:
553:
550:
547:
542:
515:
513:
510:
505:
482:
480:
477:
472:
445:
443:
440:
435:
430:
425:
420:
418:
415:
413:
375:
373:
370:
365:
356:
354:
351:
348:
347:
343:
339:
338:
325:
324:
318:
317:
313:
310:
307:
305:
301:
298:
292:
289:
287:
283:
278:1,495 mm
275:
256:
254:
250:
243:
240:
239:
237:
233:
228:
214:
210:
205:
201:
197:
194:
191:
189:Rolling stock
187:
181:
178:
176:
173:
172:
170:
166:
162:
158:
155:
152:
148:
145:
144:Rapid transit
142:
138:
133:
130:
127:
123:
119:
115:
109:
106:
104:
101:
100:
98:
94:
90:
87:
83:
80:
77:
73:
68:
64:
60:
54:
49:
45:
40:
35:
32:
27:
19:
9627:
9551:
9546:
9541:
9536:
9526:
9521:
9516:East Harbour
9514:
9507:
9500:
9485:
9480:
9467:Ontario Line
9465:
9443:
9436:
9429:
9422:
9415:
9410:Signet Arrow
9408:
9401:
9394:
9387:
9380:
9373:
9366:
9359:
9352:
9347:Martin Grove
9345:
9338:
9331:
9321:
9299:
9292:
9285:
9278:
9271:
9264:
9257:
9250:
9243:
9236:
9229:
9222:
9215:
9208:
9196:
9189:
9182:
9175:
9167:
9160:
9153:
9146:
9141:Mount Dennis
9139:
9132:
9125:
9118:
9111:
9104:
9099:Martin Grove
9097:
9090:
9080:
9000:Bingham Loop
8933:
8926:
8919:
8860:Castle Frank
8756:
8684:
8653:Queen's Park
8470:
8363:McCowan Yard
8358:Leslie Barns
8338:Eglinton MSF
8267:Predecessors
8243:Transit City
8173:Network 2011
8115:511 Bathurst
8024:Ontario Line
8022:
8016:
8001:
7974:
7796:
7744:. Retrieved
7724:
7712:. Retrieved
7692:
7670:
7658:. Retrieved
7649:
7640:
7628:. Retrieved
7619:
7610:
7598:. Retrieved
7589:
7580:
7558:
7548:September 4,
7546:. Retrieved
7528:
7516:. Retrieved
7507:
7498:
7486:. Retrieved
7482:the original
7468:
7446:
7434:. Retrieved
7430:the original
7416:
7404:. Retrieved
7400:the original
7395:
7385:
7373:. Retrieved
7364:
7355:
7343:. Retrieved
7325:
7313:. Retrieved
7295:
7267:
7245:
7233:. Retrieved
7200:. Retrieved
7189:
7179:
7167:. Retrieved
7158:Toronto Star
7156:
7146:
7134:. Retrieved
7125:
7116:
7104:. Retrieved
7092:
7080:
7068:. Retrieved
7056:Munro, Steve
7050:
7038:. Retrieved
7029:Toronto Star
7027:
7017:
7005:. Retrieved
6996:Toronto Star
6994:
6984:
6972:. Retrieved
6963:Toronto Star
6961:
6951:
6939:. Retrieved
6930:Toronto Star
6928:
6918:
6906:. Retrieved
6895:
6885:
6873:. Retrieved
6864:Toronto Star
6862:
6848:
6836:. Retrieved
6827:Toronto Star
6825:
6815:
6803:. Retrieved
6792:
6782:
6770:. Retrieved
6761:Toronto Star
6759:
6749:
6737:. Retrieved
6726:
6716:
6698:
6686:. Retrieved
6675:
6665:
6653:. Retrieved
6644:Toronto Star
6642:
6632:
6620:. Retrieved
6609:
6586:November 20,
6584:. Retrieved
6575:Toronto Star
6573:
6563:
6551:. Retrieved
6542:
6533:
6521:. Retrieved
6512:
6503:
6493:September 4,
6491:. Retrieved
6482:
6473:
6461:. Retrieved
6452:
6443:
6431:. Retrieved
6417:
6409:the original
6404:
6395:
6383:. Retrieved
6374:Toronto Star
6372:
6345:. Retrieved
6341:the original
6336:
6327:
6315:
6303:. Retrieved
6279:
6267:. Retrieved
6258:
6249:
6237:. Retrieved
6217:
6205:. Retrieved
6196:
6175:Toronto Star
6173:
6164:
6155:Toronto Star
6153:
6144:
6132:. Retrieved
6124:www.merx.com
6123:
6114:
6102:. Retrieved
6094:www.merx.com
6093:
6084:
6072:. Retrieved
6064:www.merx.com
6063:
6054:
6042:. Retrieved
6023:
6011:. Retrieved
6002:Toronto Star
6000:
5975:. Retrieved
5943:December 18,
5941:. Retrieved
5932:
5922:
5910:. Retrieved
5901:
5892:
5880:. Retrieved
5868:Munro, Steve
5862:
5850:. Retrieved
5841:
5832:
5820:. Retrieved
5811:
5802:
5790:. Retrieved
5781:
5772:
5760:. Retrieved
5739:
5727:. Retrieved
5723:the original
5713:
5701:. Retrieved
5692:
5668:. Retrieved
5659:Toronto Star
5657:
5632:. Retrieved
5628:the original
5618:
5600:
5588:. Retrieved
5584:
5574:
5562:. Retrieved
5548:
5536:. Retrieved
5532:the original
5522:
5510:. Retrieved
5501:
5492:
5480:. Retrieved
5472:Toronto Star
5471:
5461:
5451:September 3,
5449:. Retrieved
5440:
5430:
5418:. Retrieved
5414:the original
5404:
5392:. Retrieved
5388:the original
5378:
5366:. Retrieved
5346:
5336:February 19,
5334:. Retrieved
5330:the original
5320:
5308:. Retrieved
5294:
5282:. Retrieved
5278:the original
5273:
5246:. Retrieved
5237:
5227:
5215:. Retrieved
5206:
5196:
5184:. Retrieved
5180:the original
5155:. Retrieved
5141:
5129:. Retrieved
5125:the original
5115:
5106:
5101:
5089:. Retrieved
5085:the original
5075:
5063:. Retrieved
5054:
5044:
5032:. Retrieved
5020:Munro, Steve
4999:February 19,
4997:. Retrieved
4993:the original
4968:. Retrieved
4964:the original
4954:
4942:. Retrieved
4933:
4908:. Retrieved
4899:
4890:
4878:. Retrieved
4857:
4845:. Retrieved
4836:
4827:
4808:
4802:
4790:. Retrieved
4783:the original
4772:Munro, Steve
4766:
4754:. Retrieved
4740:
4715:
4711:
4705:
4699:. p. 1.
4696:
4690:
4678:. Retrieved
4669:
4660:
4648:. Retrieved
4644:
4630:. Retrieved
4614:
4611:1688 to 1923
4610:
4589:
4577:. Retrieved
4568:
4559:
4547:. Retrieved
4538:
4529:
4517:. Retrieved
4503:
4491:
4466:
4462:
4456:
4444:. Retrieved
4435:
4426:
4414:. Retrieved
4405:
4396:
4384:. Retrieved
4375:
4366:
4347:
4310:
4304:
4294:February 19,
4292:. Retrieved
4288:the original
4278:
4255:
4243:. Retrieved
4229:
4217:. Retrieved
4203:
4186:
4182:
4159:. Retrieved
4126:February 26,
4124:. Retrieved
4113:
4089:February 26,
4087:. Retrieved
4081:
4071:
4061:
4056:
4048:
4041:. Retrieved
4032:
4023:
4011:. Retrieved
4004:the original
3976:. Retrieved
3967:
3918:
3878:
3876:
3804:
3783:Herrenknecht
3775:
3729:
3713:
3694:
3678:
3675:New stations
3665:
3657:
3646:
3633:
3618:
3614:
3602:
3578:
3568:Toronto Star
3566:
3555:
3523:
3507:
3500:
3481:
3460:
3431:
3409:Transit City
3405:David Miller
3402:
3389:
3374:
3350:
3319:
3308:
3294:McCowan Yard
3277:garbage dump
3266:
3244:
3236:
3216:
3203:
3175:
3167:
3143:
3123:
3114:
3111:
3082:
3078:
3073:Presto cards
3070:
3042:
3024:
3019:Pape station
2997:
2993:
2988:Philadelphia
2973:
2950:
2927:
2893:
2882:and east of
2877:
2862:
2858:
2818:
2786:
2774:
2770:Ontario Line
2746:Pape station
2738:
2730:Yonge subway
2726:Yonge Street
2722:World War II
2719:
2667:
2663:Humber River
2644:Bloor Street
2624:
2579:
2570:McCowan Road
2563:
2543:the Kingsway
2464:
2448:Kennedy Road
2427:Bloor Street
2424:
2407:
2406:
2135:
1684:
1624:Castle Frank
1116:
693:Humber River
606:Mimico Creek
59:Humber River
31:
26:
9580:Scarborough
9389:Duncanwoods
9368:Mount Olive
9287:Golden Mile
9184:Forest Hill
9045:McCaul Loop
9035:Humber Loop
8900:Main Street
8850:Bloor–Yonge
8805:Dundas West
8737:Highway 407
8648:St. Patrick
8603:Bloor–Yonge
8383:Wilson Yard
8318:(1922–1927)
8312:(1921–1953)
8306:(1912–1921)
8300:(1904–1922)
8294:(1891–1921)
8288:(1885–1904)
8282:(1861–1891)
8276:(1849–1862)
8238:Scarborough
8205:2008 strike
8200:2006 strike
8168:Relief Line
8110:510 Spadina
8090:506 Carlton
7910:Wheel-Trans
7660:December 3,
7630:December 3,
7600:December 3,
7518:December 3,
7396:Toronto.com
6688:January 20,
6655:January 20,
6622:January 21,
6134:October 19,
6104:October 19,
6074:October 19,
6034:Steve Munro
5967:Steve Munro
5624:"Transfers"
5474:. Toronto.
5443:. Toronto.
5310:January 27,
4847:November 9,
4724:10.1068/c2m
4344:Filey, Mike
4063:Railway Age
4043:February 3,
3854:bus service
3820:SNC-Lavalin
3810:(including
3795:David Bowie
3621:Steve Munro
3432:During his
2778:Long Branch
2766:Relief Line
2687:Scarborough
2590:Bloor–Yonge
2507:Scarborough
2314:Highway 401
2000:Main Street
1547:Bloor–Yonge
1118:Barrie line
1038:Bloor GO/UP
933:Dundas West
253:Track gauge
235:Line length
160:Operator(s)
9642:Categories
9476:Exhibition
9451:Finch West
9323:Finch West
9294:Birchmount
9148:Keelesdale
9120:Royal York
9025:Gunns Loop
9020:Fleet Loop
8855:Sherbourne
8840:St. George
8775:Royal York
8722:Finch West
8663:St. George
8638:St. Andrew
8593:Summerhill
8583:Davisville
8568:York Mills
8353:Keele Yard
8326:Facilities
8215:514 Cherry
8178:Gray Coach
8085:505 Dundas
8062:Streetcars
8032:Public art
8017:Finch West
7436:August 20,
7070:October 5,
6838:October 5,
6553:October 8,
6320:Filey 1996
5744:Muc, A.M.
4934:Torontoist
4594:Filey 1996
4496:Filey 1996
3925:References
3877:The TTC's
3527:SmartTrack
3505:stations.
3503:SmartTrack
3345:See also:
3311:Keele Yard
3304:Keele Yard
3285:GO Transit
2900:accessible
2712:Plaque at
2676:). Paired
2594:St. George
2586:Yonge line
2559:Six Points
2483:St. George
1578:Sherbourne
1458:St. George
878:Keele Yard
648:Royal York
304:Signalling
291:Third rail
222:1966-02-26
180:Keele Yard
9598:Ellesmere
9502:Moss Park
9438:Tobermory
9431:Driftwood
9382:Pearldale
9361:Stevenson
9176:Cedarvale
9155:Caledonia
9113:Islington
8977:Don Mills
8967:Bessarion
8885:Greenwood
8865:Broadview
8820:Ossington
8810:Lansdowne
8795:High Park
8790:Runnymede
8770:Islington
8692:Glencairn
8685:Cedarvale
8608:Wellesley
8588:St. Clair
8524:streetcar
8455:Personnel
8450:Metrolinx
8153:Incidents
8070:501 Queen
7680:Metrolinx
7568:Metrolinx
7538:Metrolinx
7478:Metrolinx
7456:Metrolinx
7406:March 18,
7335:Metrolinx
7305:Metrolinx
7255:Metrolinx
7225:Metrolinx
7202:March 17,
7040:March 29,
6974:March 29,
6385:March 15,
6044:March 26,
6013:March 26,
5186:August 1,
5157:August 3,
5131:August 3,
5065:August 1,
4970:August 1,
4792:August 1,
4756:March 26,
4732:153670088
4632:April 17,
4579:April 30,
4549:March 24,
4416:August 1,
3649:Doug Ford
3600:billion.
3559:John Tory
3516:billion.
3443:Metrolinx
3390:In 2005,
3190:John Tory
3108:Frequency
3050:Greenwood
2904:GO trains
2873:abandoned
2683:East York
2619:Don River
2617:over the
2551:Etobicoke
2549:areas in
2519:Koreatown
2515:the Annex
2503:East York
2495:Greektown
2471:Yorkville
1934:Greenwood
1772:Broadview
1711:Don River
1186:Ossington
1142:Lansdowne
760:High Park
738:Runnymede
546:Islington
320:Route map
230:Technical
91:, Ontario
9509:Corktown
9445:Sentinel
9340:Westmore
9273:Pharmacy
9266:O'Connor
9204:Eglinton
9162:Fairbank
9127:Scarlett
9092:Renforth
9082:Eglinton
8949:Sheppard
8895:Woodbine
8880:Donlands
8830:Bathurst
8825:Christie
8815:Dufferin
8780:Old Mill
8702:Yorkdale
8598:Rosedale
8578:Eglinton
8573:Lawrence
8414:Jane LRT
8392:Proposed
8080:504 King
8052:Trackage
8047:Stations
8002:Eglinton
7988:Sheppard
7798:KML file
7746:July 31,
7737:Archived
7714:June 19,
7705:Archived
7684:Archived
7654:Archived
7624:Archived
7594:Archived
7572:Archived
7542:Archived
7512:Archived
7460:Archived
7369:Archived
7345:March 7,
7339:Archived
7315:March 7,
7309:Archived
7284:Archived
7259:Archived
7235:March 7,
7229:Archived
7196:Archived
7163:Archived
7130:Archived
7126:CityNews
7106:April 7,
7097:Archived
7064:Archived
7034:Archived
7007:July 20,
7001:Archived
6968:Archived
6935:Archived
6908:March 2,
6902:Archived
6875:March 2,
6869:Archived
6832:Archived
6805:June 17,
6799:Archived
6766:Archived
6739:July 14,
6733:Archived
6706:Archived
6682:Archived
6649:Archived
6616:Archived
6580:Archived
6547:Archived
6517:Archived
6487:Archived
6457:Archived
6453:CBC News
6433:April 2,
6427:Archived
6405:CBC News
6379:Archived
6347:June 19,
6296:Archived
6269:July 24,
6263:Archived
6239:July 24,
6230:Archived
6207:July 24,
6201:Archived
6128:Archived
6098:Archived
6068:Archived
6038:Archived
6007:Archived
5977:July 15,
5971:Archived
5937:Archived
5933:CBC News
5906:Archived
5902:CBC News
5882:June 28,
5876:Archived
5852:June 28,
5846:Archived
5822:June 27,
5816:Archived
5792:June 27,
5786:Archived
5762:June 27,
5753:Archived
5729:June 27,
5703:June 27,
5697:Archived
5670:June 16,
5664:Archived
5634:June 25,
5610:Archived
5558:Archived
5512:July 18,
5506:Archived
5482:June 19,
5476:Archived
5445:Archived
5441:The Star
5420:June 25,
5394:June 25,
5368:June 21,
5359:Archived
5304:Archived
5284:April 5,
5248:July 28,
5242:Archived
5217:April 5,
5211:Archived
5151:Archived
5091:July 31,
5059:Archived
5034:June 19,
5028:Archived
4944:April 5,
4938:Archived
4910:June 24,
4904:Archived
4880:April 6,
4871:Archived
4841:Archived
4750:Archived
4674:Archived
4573:Archived
4543:Archived
4519:July 31,
4513:Archived
4446:July 31,
4440:Archived
4410:Archived
4386:July 31,
4380:Archived
4346:(1996).
4267:Archived
4245:July 19,
4239:Archived
4219:July 19,
4213:Archived
4161:July 31,
4152:Archived
4120:Archived
4037:Archived
4029:"Subway"
4013:July 21,
3978:June 23,
3972:Archived
3944:Archived
3911:Jane LRT
3808:Dragados
3737:Dragados
3574:Sheppard
3438:Rob Ford
3120:Capacity
3046:Donlands
3032:Dufferin
2936:at both
2910:Stations
2880:Old Mill
2420:stations
1978:Woodbine
1870:Donlands
1230:Bathurst
1208:Christie
1164:Dufferin
670:Old Mill
273: in
168:Depot(s)
117:Stations
70:Overview
9628:Italics
9613:McCowan
9603:Midland
9588:Kennedy
9537:Cosburn
9527:Gerrard
9491:Osgoode
9307:Kennedy
9301:Ionview
9252:Wynford
9217:Leaside
9191:Chaplin
9169:Oakwood
9106:Kipling
8962:Bayview
8915:Kennedy
8890:Coxwell
8870:Chester
8835:Spadina
8765:Kipling
8742:Vaughan
8668:Spadina
8643:Osgoode
8613:College
8532:Present
8526:systems
8518:of the
8471:Italics
8145:History
8042:Signals
7169:July 6,
7136:July 6,
6941:June 5,
6772:June 1,
6463:July 7,
6305:June 4,
5912:May 29,
5590:July 6,
5564:July 6,
5538:July 6,
4680:May 10,
4569:Toronto
3850:), and
3749:Strabag
3745:Strabag
3733:Acciona
3420:⁄
3194:Twitter
3103:Service
3089:TTC bus
3085:Chester
2959:Designs
2938:Spadina
2659:million
2600:History
2479:Spadina
2467:Toronto
2437:to the
2204:Kennedy
1956:Coxwell
1826:Chester
1345:Spadina
417:Kipling
293:,
268:⁄
220: (
207:History
135:Service
125:Website
108:Kennedy
103:Kipling
96:Termini
89:Toronto
9567:Former
9354:Albion
9259:Sloane
9198:Avenue
9068:Future
8972:Leslie
8910:Warden
8707:Wilson
8673:Dupont
8658:Museum
8618:Dundas
8235:
8013:
7998:
7985:
7972:
7959:
7946:Subway
7905:Routes
7488:May 4,
7375:May 6,
6857:
5502:ttc.ca
4815:
4730:
4650:May 8,
4483:139770
4481:
4354:
4317:
3913:, the
3816:Kiewit
3668:
3660:
3636:
3609:
3605:
3598:
3590:
3585:
3581:
3576:line.
3551:
3539:
3535:
3531:
3514:
3510:
3496:
3492:
3427:
3330:
3326:
3275:and a
3273:quarry
3247:
3230:, and
3211:
3207:
2888:Zone 2
2849:
2845:
2833:
2829:
2814:
2810:
2805:a.k.a.
2734:
2657:
2541:, and
2095:Warden
2017:
2011:
1803:
1797:
1789:
1783:
1362:
1356:
1247:
1241:
964:
958:
950:
944:
342:Legend
335:
212:Opened
150:System
85:Locale
9496:Queen
9403:Emery
9224:Laird
8800:Keele
8633:Union
8623:Queen
8553:Finch
8516:loops
8440:Fares
8130:Loops
7740:(PDF)
7733:(PDF)
7708:(PDF)
7701:(PDF)
7287:(PDF)
7276:(PDF)
7100:(PDF)
7089:(PDF)
6337:YFile
6299:(PDF)
6288:(PDF)
6233:(PDF)
6226:(PDF)
5756:(PDF)
5749:(PDF)
5362:(PDF)
5355:(PDF)
4874:(PDF)
4867:(PDF)
4786:(PDF)
4779:(PDF)
4728:S2CID
4479:JSTOR
4155:(PDF)
4148:(PDF)
4007:(PDF)
4000:(PDF)
3895:MiWay
3812:AECOM
3741:Aecon
3283:(and
3253:Depot
2980:SEPTA
793:Keele
75:Owner
61:near
9532:Pape
9134:Jane
8875:Pape
8785:Jane
8628:King
8522:and
8514:and
8445:Font
7807:help
7803:edit
7748:2012
7716:2012
7662:2022
7632:2022
7602:2022
7550:2021
7520:2022
7490:2021
7438:2020
7408:2020
7377:2023
7347:2022
7317:2022
7237:2022
7204:2020
7171:2018
7138:2018
7108:2019
7072:2016
7042:2017
7009:2016
6976:2017
6943:2016
6910:2017
6877:2017
6840:2016
6807:2016
6774:2016
6741:2016
6690:2016
6657:2016
6624:2016
6588:2015
6555:2013
6525:2013
6495:2013
6465:2012
6435:2011
6387:2020
6349:2012
6307:2017
6271:2012
6241:2012
6209:2012
6136:2022
6106:2022
6076:2022
6046:2019
6015:2019
5979:2017
5945:2019
5914:2019
5884:2012
5854:2012
5824:2012
5794:2012
5764:2012
5731:2012
5705:2012
5672:2016
5636:2012
5592:2012
5566:2012
5540:2012
5514:2020
5484:2012
5453:2017
5422:2012
5396:2012
5370:2012
5338:2012
5312:2018
5286:2012
5250:2012
5219:2012
5188:2012
5159:2012
5133:2012
5093:2012
5067:2012
5036:2012
5001:2012
4972:2012
4946:2012
4912:2012
4882:2012
4849:2014
4813:ISBN
4794:2012
4758:2019
4682:2008
4652:2024
4634:2021
4581:2023
4551:2019
4521:2012
4448:2012
4418:2012
4388:2012
4352:ISBN
4315:ISBN
4296:2012
4247:2014
4221:2014
4163:2012
4128:2018
4091:2018
4045:2017
4015:2023
3980:2021
3889:and
3818:and
3688:and
3309:The
3048:and
3030:and
3028:Pape
2685:and
2653:CA$
2646:and
2592:and
2576:Name
2568:and
2545:and
2539:York
2485:and
2383:edit
2376:talk
2369:view
1848:Pape
716:Jane
140:Type
8845:Bay
7892:Bus
6483:MTO
4720:doi
4471:doi
4191:doi
4115:TTC
3785:in
3588:300
3474:),
3466:at
3136:An
3091:or
2986:in
2982:'s
2808:200
2744:to
2655:120
2557:in
2477:at
2450:on
2014:506
1800:505
1786:504
1500:Bay
1359:510
1244:511
961:505
947:504
9644::
7805:•
7678:.
7652:.
7648:.
7622:.
7618:.
7592:.
7588:.
7566:.
7536:.
7510:.
7506:.
7476:.
7454:.
7424:.
7394:.
7367:.
7363:.
7337:.
7333:.
7307:.
7303:.
7278:.
7253:.
7227:.
7223:.
7212:^
7194:.
7188:.
7161:.
7155:.
7124:.
7095:.
7091:.
7062:.
7032:.
7026:.
6999:.
6993:.
6966:.
6960:.
6933:.
6927:.
6900:.
6894:.
6867:.
6861:.
6830:.
6824:.
6797:.
6791:.
6764:.
6758:.
6731:.
6725:.
6680:.
6674:.
6647:.
6641:.
6614:.
6608:.
6596:^
6578:.
6572:.
6541:.
6511:.
6481:.
6451:.
6403:.
6377:.
6371:.
6357:^
6335:.
6290:.
6257:.
6195:.
6184:^
6172:.
6152:.
6126:.
6122:.
6096:.
6092:.
6066:.
6062:.
6036:.
6032:.
6005:.
5999:.
5987:^
5969:.
5965:.
5953:^
5935:.
5931:.
5904:.
5900:.
5874:.
5840:.
5810:.
5780:.
5691:.
5680:^
5662:.
5656:.
5644:^
5583:.
5504:.
5500:.
5470:.
5439:.
5302:.
5272:.
5258:^
5240:.
5236:.
5209:.
5205:.
5167:^
5057:.
5053:.
5026:.
5009:^
4980:^
4936:.
4932:.
4920:^
4898:.
4839:.
4835:.
4748:.
4726:.
4716:18
4714:.
4668:.
4643:.
4601:^
4571:.
4567:.
4537:.
4477:.
4467:33
4465:.
4434:.
4404:.
4374:.
4329:^
4262:,
4237:.
4185:.
4171:^
4136:^
4112:.
4099:^
4080:.
4047:.
4031:.
3988:^
3970:.
3966:.
3954:^
3933:^
3793:,
3739:,
3692:.
3436:,
3234:.
3226:,
3222:,
2906:.
2875:.
2784:.
2772:.
2561:.
2533:,
2529:,
2525:,
2521:,
2517:,
2481:,
2210:)
2208:GO
261:10
193:T1
8687:)
8504:e
8497:t
8490:v
7876:e
7869:t
7862:v
7809:)
7801:(
7750:.
7718:.
7664:.
7634:.
7604:.
7552:.
7522:.
7492:.
7440:.
7410:.
7379:.
7349:.
7319:.
7239:.
7206:.
7173:.
7140:.
7110:.
7074:.
7044:.
7011:.
6978:.
6945:.
6912:.
6879:.
6842:.
6809:.
6776:.
6743:.
6692:.
6659:.
6626:.
6590:.
6557:.
6527:.
6497:.
6467:.
6437:.
6389:.
6351:.
6309:.
6273:.
6243:.
6211:.
6138:.
6108:.
6078:.
6048:.
6017:.
5981:.
5947:.
5916:.
5886:.
5856:.
5826:.
5796:.
5766:.
5733:.
5707:.
5674:.
5638:.
5594:.
5568:.
5542:.
5516:.
5486:.
5455:.
5424:.
5398:.
5372:.
5340:.
5314:.
5288:.
5252:.
5221:.
5190:.
5161:.
5135:.
5095:.
5069:.
5038:.
5003:.
4974:.
4948:.
4914:.
4884:.
4851:.
4821:.
4796:.
4760:.
4734:.
4722::
4684:.
4654:.
4636:.
4583:.
4553:.
4523:.
4485:.
4473::
4450:.
4420:.
4390:.
4360:.
4323:.
4298:.
4249:.
4223:.
4197:.
4193::
4187:3
4165:.
4130:.
4093:.
4017:.
3982:.
3422:2
3418:1
2803:(
2206:(
280:)
276:(
270:8
266:7
263:+
224:)
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.