Bento Munhoz Hydroelectric Plant

Source đź“ť

360:. It has an 11,000 cubic metres per second (390,000 cu ft/s) capacity and is 400 metres (1,300 ft) long and 70.6 metres (232 ft) wide. Water is brought towards the power station intake through a channel which is 450 metres (1,480 ft) long and 90 metres (300 ft) wide. The actual power intake structure is 70 metres (230 ft) high, 108 metres (354 ft) wide and allows for a maximum reservoir level depletion of 47 metres (154 ft). Six wheel-type gates facilitate bring water into the power station. An additional gate exists for maintenance purposes. 33: 429: 401: 415: 387: 40: 342:
At the time of completion, the dam was the tallest and largest concrete face rock-fill dam in the world. It was also the first of its type to have a reservoir of its size. The techniques to construction the dam were instrumental and an advancement as 50,000 cubic metres (1,800,000 cu ft) of
351:
The Bento Munhoz da Rocha Netto Dam is an 828-metre (2,717 ft) long and 160-metre (520 ft) high concrete face rock-fill type. The dam contains a total 14,138,000 cubic metres (499,300,000 cu ft) of material which includes 14,000,000 cubic metres (490,000,000 cu ft) of
338:
were constructed, one upstream and one downstream of the site. The upstream cofferdam was 45 metres (148 ft) high and allowed the diversion of up to 7,700 cubic metres per second (270,000 cu ft/s) of water. The dam began to impound the reservoir in 1980 and by October it was filled
372:
deliver water to the generators as their diameter reduces from 7.4 to 7 metres (24 to 23 ft). The power station contains four 419 megawatts (562,000 hp) generators for a total installed capacity of 1,476 megawatts (1,979,000 hp). Space for an additional two generators exist and if
334:. By August of that year, a design was chosen and in October 1976 after contracts were awarded, construction began. The river was diverted with two 12 metres (39 ft) diameter and 600-metre (2,000 ft) long diversion tunnels. To facilitate the river's diversion, two 672: 330:
In May 1973, Copel was awarded the concession contract to construct the dam and by May 1974, various studies had recommended a site near the confluence of the Inguazu and
517: 343:
fill was placed each month for two years in a row. The stability and integrity of such a large dam with a large reservoir helped bring confidence to its specific design.
311:
and was constructed between 1976 and 1980. The power station has a 1,676 megawatts (2,248,000 hp) capacity and is supplied with water by a concrete face rock-fill
698: 81: 693: 623: 464: 32: 662: 657: 547: 713: 583: 703: 491: 708: 667: 444: 718: 616: 652: 331: 609: 373:
installed would bring the plant's total installed capacity to 2,511 megawatts (3,367,000 hp).
434: 322:
who renamed it after Bento Munhoz da Rocha Netto, governor of Paraná between 1951 and 1955.
468: 8: 601: 632: 259: 558: 352:
rock-fill and 138,000 cubic metres (4,900,000 cu ft) of concrete. The dam's
356:
is controlled by four 14.5-metre (48 ft) wide and 19.5-metre (64 ft) high
304: 68: 252: 312: 269: 687: 406: 392: 293: 246: 96: 83: 636: 495: 420: 357: 308: 300: 157: 296: 335: 428: 369: 353: 414: 400: 144: 47:
Location of Governor Bento Munhoz da Rocha Netto Dam in Brazil
554: 521: 319: 132: 631: 467:. The Scientific Electronic Library Online. Archived from 289: 282:
Governor Bento Munhoz da Rocha Netto Hydroelectric Plant
59:
Governor Bento Munhoz da Rocha Netto Hydroelectric Plant
39: 318:
As their main power plant, it is owned and operated by
382: 368:From the intake, six 220-metre (720 ft) long 307:, Brazil. It is the furthest dam upstream of the 685: 183:14,138,000 m (499,300,000 cu ft) 699:Hydroelectric power stations in Paraná (state) 212:Governor Bento Munhoz da Rocha Netto Reservoir 617: 492:"Planned Dam Above Famous Falls Draws Fire" 220:6,066,000 dam (4,918,000 acreâ‹…ft) 199:11,000 m/s (390,000 cu ft/s) 624: 610: 586:. Chinese National Committee on Large Dams 465:"Paraná River Basin Study Area - Figure 1" 22:Governor Bento Munhoz da Rocha Netto Dam 694:Energy infrastructure completed in 1980 653:Governador Ney Aminthas de Barros Braga 489: 686: 542: 540: 538: 605: 510: 149:Embankment; concrete face, rock-fill 535: 490:Valente, Marcela (March 30, 2009). 13: 251:4 x 310 MW (420,000 hp) 14: 730: 264:1,676 MW (2,248,000 hp) 445:List of power stations in Brazil 427: 413: 399: 385: 363: 228:167 km (64 sq mi) 38: 31: 274:4,002 GWh (14,410 TJ) 576: 483: 457: 1: 450: 714:Concrete-face rock-fill dams 584:"Foz do Areia Dam in Brazil" 7: 376: 10: 735: 325: 175:828 m (2,717 ft) 643: 268: 258: 245: 237: 232: 224: 216: 208: 203: 195: 191:Service, controlled chute 187: 179: 171: 163: 153: 143: 138: 128: 120: 112: 75: 63: 55: 26: 21: 709:Dams on the Iguazu River 167:160 m (520 ft) 435:Renewable energy portal 260:Installed capacity 113:Construction began 719:Dams completed in 1980 704:Dams in Paraná (state) 346: 270:Annual generation 196:Spillway capacity 494:. IPS. Archived from 303:near Foz do Areia in 145:Type of dam 97:26.00944°S 51.66667°W 16:Dam in Paraná, Brazil 518:"History in details" 284:, formerly known as 238:Commission date 102:-26.00944; -51.66667 217:Total capacity 93: /  633:Hydroelectric dams 548:"FOZ DO AREIA DAM" 471:on 11 October 2012 188:Spillway type 681: 680: 278: 277: 225:Surface area 139:Dam and spillways 121:Opening date 726: 626: 619: 612: 603: 602: 596: 595: 593: 591: 580: 574: 573: 571: 569: 563: 557:. Archived from 552: 544: 533: 532: 530: 528: 514: 508: 507: 505: 503: 487: 481: 480: 478: 476: 461: 437: 432: 431: 423: 418: 417: 409: 404: 403: 395: 390: 389: 388: 253:Francis turbines 108: 107: 105: 104: 103: 98: 94: 91: 90: 89: 86: 42: 41: 35: 19: 18: 734: 733: 729: 728: 727: 725: 724: 723: 684: 683: 682: 677: 639: 630: 600: 599: 589: 587: 582: 581: 577: 567: 565: 561: 550: 546: 545: 536: 526: 524: 516: 515: 511: 501: 499: 498:on 10 June 2011 488: 484: 474: 472: 463: 462: 458: 453: 441: 440: 433: 426: 419: 412: 405: 398: 391: 386: 384: 379: 366: 349: 332:Da Areia Rivers 328: 180:Dam volume 101: 99: 95: 92: 87: 84: 82: 80: 79: 51: 50: 49: 48: 45: 44: 43: 17: 12: 11: 5: 732: 722: 721: 716: 711: 706: 701: 696: 679: 678: 676: 675: 670: 665: 660: 658:Salto Santiago 655: 650: 644: 641: 640: 629: 628: 621: 614: 606: 598: 597: 575: 564:on 7 July 2011 534: 509: 482: 455: 454: 452: 449: 448: 447: 439: 438: 424: 410: 396: 381: 380: 378: 375: 365: 362: 348: 345: 339:and complete. 327: 324: 313:embankment dam 276: 275: 272: 266: 265: 262: 256: 255: 249: 243: 242: 239: 235: 234: 230: 229: 226: 222: 221: 218: 214: 213: 210: 206: 205: 201: 200: 197: 193: 192: 189: 185: 184: 181: 177: 176: 173: 169: 168: 165: 161: 160: 155: 151: 150: 147: 141: 140: 136: 135: 130: 126: 125: 122: 118: 117: 114: 110: 109: 77: 73: 72: 67:Foz do Areia, 65: 61: 60: 57: 53: 52: 46: 37: 36: 30: 29: 28: 27: 24: 23: 15: 9: 6: 4: 3: 2: 731: 720: 717: 715: 712: 710: 707: 705: 702: 700: 697: 695: 692: 691: 689: 674: 671: 669: 666: 664: 661: 659: 656: 654: 651: 649: 646: 645: 642: 638: 634: 627: 622: 620: 615: 613: 608: 607: 604: 585: 579: 560: 556: 549: 543: 541: 539: 523: 519: 513: 497: 493: 486: 470: 466: 460: 456: 446: 443: 442: 436: 430: 425: 422: 416: 411: 408: 407:Energy portal 402: 397: 394: 393:Brazil portal 383: 374: 371: 364:Power station 361: 359: 358:tainter gates 355: 344: 340: 337: 333: 323: 321: 316: 314: 310: 306: 302: 298: 295: 294:hydroelectric 291: 287: 283: 273: 271: 267: 263: 261: 257: 254: 250: 248: 244: 240: 236: 233:Power Station 231: 227: 223: 219: 215: 211: 207: 202: 198: 194: 190: 186: 182: 178: 174: 170: 166: 162: 159: 156: 152: 148: 146: 142: 137: 134: 131: 127: 123: 119: 115: 111: 106: 78: 74: 70: 66: 62: 58: 56:Official name 54: 34: 25: 20: 673:Baixo Iguaçu 668:Salto Caxias 663:Salto OsĂłrio 648:Foz do Areia 647: 637:Iguazu River 590:20 September 588:. Retrieved 578: 568:11 September 566:. Retrieved 559:the original 527:11 September 525:. Retrieved 512: 502:11 September 500:. Retrieved 496:the original 485: 475:11 September 473:. Retrieved 469:the original 459: 421:Water portal 367: 350: 341: 329: 317: 309:Iguazu Falls 301:Iguazu River 286:Foz do Areia 285: 281: 279: 158:Iguazu River 297:power plant 100: / 76:Coordinates 688:Categories 451:References 336:cofferdams 88:51°40′00″W 85:26°00′34″S 370:penstocks 204:Reservoir 377:See also 354:spillway 247:Turbines 154:Impounds 129:Owner(s) 71:, Brazil 64:Location 635:on the 326:History 299:on the 209:Creates 305:Paraná 172:Length 164:Height 69:Paraná 562:(PDF) 555:Copel 551:(PDF) 522:Copel 320:Copel 288:, is 133:Copel 592:2010 570:2010 529:2010 504:2010 477:2010 292:and 280:The 241:1980 124:1980 116:1976 347:Dam 290:dam 690:: 553:. 537:^ 520:. 315:. 625:e 618:t 611:v 594:. 572:. 531:. 506:. 479:.

Index

Bento Munhoz Hydroelectric Plant is located in Brazil
Paraná
26°00′34″S 51°40′00″W / 26.00944°S 51.66667°W / -26.00944; -51.66667
Copel
Type of dam
Iguazu River
Turbines
Francis turbines
Installed capacity
Annual generation
dam
hydroelectric
power plant
Iguazu River
Paraná
Iguazu Falls
embankment dam
Copel
Da Areia Rivers
cofferdams
spillway
tainter gates
penstocks