Knowledge

Atucha Nuclear Power Plant

Source 📝

285: 700: 605:, but was halted in 1994. It was planned to have a much higher power (thermal power approx. 2,000 MW, electrical 750 MW) than Atucha I. At the time when it was started, it had the largest reactor pressure vessel of any nuclear power plant worldwide. The total cost as of 2006 was estimated at US$ 3.8 billion, or about $ 5500/kWe. Atucha II like Atucha I before it is one of only a handful of heavy water reactors of a type other than the 714: 728: 636:
On 23 August 2006 the government announced the re-activation of the national nuclear programme, and updated its promise to finish Atucha II by 2010, devoting a total of 1,850 million pesos ($ 596/€466 million). The plant was slated to come online with an installed capacity of about 750 MW (3% of
632:
signed a decree to reactivate the construction and pledged to finish it by 2009. New technicians were hired and a budget of about $ 120 million was requested for 2006. Eduardo Messi, president of Nucleoeléctrica Argentina S.A. (the firm in charge of the plant), told reporters that 93% of the
1194: 1045: 984: 358: 146: 77: 799: 824: 1265: 1042: 670:
nuclear power plant with a gross generation capacity of 1200 MWe, at a cost of about US$ 8 billion. Unlike the other two blocks the Hualong One is a
1166: 17: 674:- which would make it the first such reactor in the country - and thus needs a higher enriched fuel, requiring Argentina either to build up 1399: 1394: 847: 780: 650:
On 19 February 2015, the plant reached 100% power production for the first time, increasing the percentage of nuclear power in Argentina's
1077: 932: 465: 256: 560: 1013: 1250: 1027: 992: 1061: 958: 1100: 796: 567:
and three .45 caliber handguns. When they retired they had a confrontation with the police, injuring two police officers.
1270: 663: 1275: 1159: 748: 641: 1333: 1255: 583: 1260: 816: 517: 373: 161: 621: 1404: 1369: 1364: 1224: 1359: 1245: 1152: 753: 743: 540: 1280: 733: 886: 758: 1328: 555:
Atucha I was started in 1968 and began operation in 1974; it was the first nuclear power plant in
682:
but it is a much more powerful design than the other two blocks at Atucha and will have a higher
625: 854: 777: 936: 903: 873: 614: 505: 345: 125: 1136: 853:. Instituto de Investigación en Ciencias Sociales, Universidad del Salvador. Archived from 647:
On 3 June 2014 reached its first criticality, and on 27 June 2014 began to produce energy.
564: 1209: 1128: 8: 1175: 671: 493: 455: 246: 683: 675: 497: 424: 320: 284: 212: 65: 678:
facilities or to import fuel for this reactor. The Hualong One is also not capable of
629: 1318: 559:. On 25 March 1973, before its completion, the plant was temporarily captured by the 533: 1024: 501: 1338: 1323: 705: 679: 525: 1313: 1214: 1049: 1031: 803: 784: 598: 521: 1343: 513: 437: 225: 1308: 601:
fueled reactor, which construction started in July 1981 under a contract with
1388: 719: 556: 92: 79: 509: 1285: 1189: 667: 529: 1195:
Compañía Administradora del Mercado Mayorista Eléctrico Sociedad Anónima
1043:
La Central Nuclear Néstor Kirchner -Atucha II- comenzó a generar energía
474: 265: 666:
agreed on an engineering, procurement, and construction contract for a
651: 1144: 1219: 310: 55: 917: 586:, supplying about 2.5% of the total electricity production (2005). 430: 218: 905:
El Gobierno dice que terminará la central Atucha II en cuatro años
959:"CFK praises Argentina's 'leadership in peaceful nuclear energy'" 820: 713: 602: 544: 539:
The other currently operating nuclear power plant in the country
417: 383: 205: 171: 231: 1204: 1199: 930:
By April 2014, it was, however, not yet connected to the grid.
644:
and it was scheduled to start commercial service by mid-2013.
640:
Atucha II was "pre-started" on 28 September 2011 by President
1014:
Pusieron en marcha el reactor de la Central Nuclear Atucha II
610: 606: 579: 547:
type rather than the Siemens provided type used at Atucha.
1078:"China inks $ 8 bln nuclear power plant deal in Argentina" 543:
is also a natural uranium fueled PHWR but of the Canadian
1229: 919:
Lanzó el Gobierno un plan de impulso a la energía nuclear
1062:"Atucha 2 reaches 100% rated power - World Nuclear News" 633:
components were either in storage or already installed.
935:. World Nuclear News. 29 September 2011. Archived from 620:
Partly as a response to the energy shortage caused by
617:
it was the last nuclear power plant built by Siemens.
695: 1076: 985:"Argentina's Atucha Unit 2 to be on line mid-2013" 1075:Singh, Shivani; Jourdan, Adam (2 February 2022). 1386: 1068: 637:Argentina's total electric installed capacity). 1101:"China and Argentina sign nuclear project deal" 845: 578:of electricity, which is delivered at 220  1160: 624:, the issue of Atucha II was taken up by the 1093: 1074: 1167: 1153: 817:"FACTBOX-Argentina's nuclear power plants" 289:The plant still under construction (2012). 933:"President helps with Atucha 2 pre-start" 508:, about 100 kilometres (60 mi) from 924: 1174: 570:It has a thermal power of 1,179 MW 466:Related media on Commons 257:Related media on Commons 27:Nuclear generating complex in Argentina 14: 1387: 686:than the other two reactors combined. 1148: 1103:. World Nuclear News. 2 February 2022 951: 848:"Análisis del plan nuclear argentino" 662:In February 2022, Argentina and the 1400:Science and technology in Argentina 1395:Nuclear power stations in Argentina 492:, is the location for two adjacent 24: 977: 846:Facundo Deluchi (1 October 2006). 827:from the original on 14 April 2022 664:China National Nuclear Corporation 47:Central Nuclear Juan Domingo Perón 25: 1416: 1276:National Atomic Energy Commission 1119: 991:. 3 December 2012. Archived from 749:National Atomic Energy Commission 512:, on the right-hand shore of the 1256:Argentine Interconnection System 726: 712: 698: 584:Argentine Interconnection System 518:pressurized heavy-water reactors 365:Nuclear power station 283: 153:Nuclear power station 1054: 1036: 1018: 1007: 613:-type ever built. Prior to the 302:Central Nuclear Néstor Kirchner 1251:2006 nuclear reactivation plan 910: 893: 839: 809: 790: 771: 642:Cristina Fernández de Kirchner 520:(PHWR) employing a mixture of 13: 1: 1225:Transportadora de Gas del Sur 764: 657: 278:Atucha II Nuclear Power Plant 18:Atucha II Nuclear Power Plant 589: 35:Atucha I nuclear power plant 7: 916:La Nación. 24 August 2006. 754:Embalse nuclear power plant 744:Nuclear energy in Argentina 689: 574:, and generates 357 MW 561:People's Revolutionary Army 550: 541:Embalse Nuclear Power Plant 438:Annual net output 340:2007 (resumed construction) 226:Annual net output 10: 1421: 622:natural gas crisis of 2004 514:Paraná de las Palmas River 490:Atucha Nuclear Power Plant 1352: 1301: 1294: 1238: 1182: 734:Nuclear technology portal 471: 461: 456:central nuclear atucha II 451: 446: 436: 423: 409: 405: 400: 389: 379: 369: 364: 359:Nucleoelectrica Argentina 354: 344: 334: 326: 316: 306: 298: 294: 282: 277: 262: 252: 242: 237: 224: 211: 197: 193: 188: 177: 167: 157: 152: 147:Nucleoelectrica Argentina 142: 134: 124: 116: 108: 71: 61: 51: 43: 39: 34: 783:19 November 2011 at the 759:List of nuclear reactors 414:Make and model 247:central nuclear atucha I 202:Make and model 425:Nameplate capacity 335:Construction began 213:Nameplate capacity 117:Construction began 1271:List of power stations 881:Cite journal requires 528:(0.85% of U), and use 486:Atucha Nuclear Complex 135:Construction cost 609:-type or the related 506:Buenos Aires Province 401:Power generation 390:Thermal capacity 380:Reactor supplier 189:Power generation 178:Thermal capacity 168:Reactor supplier 93:33.96722°S 59.20750°W 1405:Heavy water reactors 1266:Hydroelectric plants 1048:15 July 2014 at the 1030:14 July 2014 at the 902:. 4 September 2005. 823:. 9 September 2010. 802:2 April 2016 at the 628:. In 2005 President 626:Argentine government 565:FMK-3 submachine gun 494:nuclear power plants 346:Commission date 126:Commission date 98:-33.96722; -59.20750 1176:Energy in Argentina 989:Atomic Power Review 965:. 28 September 2011 963:Buenos Aires Herald 672:light water reactor 447:External links 238:External links 89: /  1246:2004 energy crisis 778:Estrella Roja Nº19 684:nameplate capacity 676:uranium enrichment 534:neutron moderation 321:Lima, Buenos Aires 66:Lima, Buenos Aires 1382: 1381: 1378: 1377: 1329:Piedra del Águila 1210:Energía Argentina 1137:RinconDelVago.com 482: 481: 442:5,201 GW·h (2016) 370:Reactor type 273: 272: 158:Reactor type 16:(Redirected from 1412: 1299: 1298: 1169: 1162: 1155: 1146: 1145: 1135: 1127: 1113: 1112: 1110: 1108: 1097: 1091: 1090: 1088: 1086: 1080: 1072: 1066: 1065: 1058: 1052: 1040: 1034: 1022: 1016: 1011: 1005: 1004: 1002: 1000: 995:on 11 April 2015 981: 975: 974: 972: 970: 955: 949: 948: 946: 944: 928: 922: 914: 908: 897: 891: 890: 884: 879: 877: 869: 867: 865: 860:on 13 April 2008 859: 852: 843: 837: 836: 834: 832: 813: 807: 794: 788: 775: 736: 731: 730: 729: 722: 717: 716: 708: 706:Argentina portal 703: 702: 701: 680:online refueling 654:from 7% to 10%. 532:for cooling and 526:enriched uranium 475:edit on Wikidata 287: 275: 274: 266:edit on Wikidata 104: 103: 101: 100: 99: 94: 90: 87: 86: 85: 82: 32: 31: 21: 1420: 1419: 1415: 1414: 1413: 1411: 1410: 1409: 1385: 1384: 1383: 1374: 1348: 1324:Néstor Kirchner 1290: 1234: 1178: 1173: 1142: 1133: 1129:Monografias.com 1125: 1122: 1117: 1116: 1106: 1104: 1099: 1098: 1094: 1084: 1082: 1073: 1069: 1060: 1059: 1055: 1050:Wayback Machine 1041: 1037: 1032:Wayback Machine 1023: 1019: 1012: 1008: 998: 996: 983: 982: 978: 968: 966: 957: 956: 952: 942: 940: 939:on 3 March 2016 931: 929: 925: 915: 911: 898: 894: 882: 880: 871: 870: 863: 861: 857: 850: 844: 840: 830: 828: 815: 814: 810: 804:Wayback Machine 795: 791: 785:Wayback Machine 776: 772: 767: 740: 739: 732: 727: 725: 718: 711: 704: 699: 697: 692: 660: 630:Néstor Kirchner 599:natural uranium 592: 577: 573: 553: 522:natural uranium 478: 396: 339: 290: 269: 184: 97: 95: 91: 88: 83: 80: 78: 76: 75: 28: 23: 22: 15: 12: 11: 5: 1418: 1408: 1407: 1402: 1397: 1380: 1379: 1376: 1375: 1373: 1372: 1367: 1362: 1356: 1354: 1350: 1349: 1347: 1346: 1341: 1336: 1331: 1326: 1321: 1319:Jorge Cepernic 1316: 1311: 1305: 1303: 1296: 1292: 1291: 1289: 1288: 1283: 1278: 1273: 1268: 1263: 1261:Electric power 1258: 1253: 1248: 1242: 1240: 1236: 1235: 1233: 1232: 1227: 1222: 1217: 1212: 1207: 1202: 1197: 1192: 1186: 1184: 1180: 1179: 1172: 1171: 1164: 1157: 1149: 1140: 1139: 1131: 1121: 1120:External links 1118: 1115: 1114: 1092: 1067: 1053: 1035: 1017: 1006: 976: 950: 923: 909: 892: 883:|journal= 838: 808: 789: 769: 768: 766: 763: 762: 761: 756: 751: 746: 738: 737: 723: 709: 694: 693: 691: 688: 659: 656: 591: 588: 575: 571: 552: 549: 480: 479: 472: 469: 468: 463: 459: 458: 453: 449: 448: 444: 443: 440: 434: 433: 427: 421: 420: 415: 411: 410: 407: 406: 403: 402: 398: 397: 394: 391: 387: 386: 381: 377: 376: 371: 367: 366: 362: 361: 356: 352: 351: 348: 342: 341: 336: 332: 331: 328: 324: 323: 318: 314: 313: 308: 304: 303: 300: 296: 295: 292: 291: 288: 280: 279: 271: 270: 263: 260: 259: 254: 250: 249: 244: 240: 239: 235: 234: 228: 222: 221: 215: 209: 208: 203: 199: 198: 195: 194: 191: 190: 186: 185: 182: 179: 175: 174: 169: 165: 164: 159: 155: 154: 150: 149: 144: 140: 139: 136: 132: 131: 128: 122: 121: 118: 114: 113: 110: 106: 105: 73: 69: 68: 63: 59: 58: 53: 49: 48: 45: 41: 40: 37: 36: 26: 9: 6: 4: 3: 2: 1417: 1406: 1403: 1401: 1398: 1396: 1393: 1392: 1390: 1371: 1368: 1366: 1363: 1361: 1358: 1357: 1355: 1351: 1345: 1342: 1340: 1337: 1335: 1332: 1330: 1327: 1325: 1322: 1320: 1317: 1315: 1312: 1310: 1307: 1306: 1304: 1302:Hydroelectric 1300: 1297: 1293: 1287: 1284: 1282: 1281:Nuclear power 1279: 1277: 1274: 1272: 1269: 1267: 1264: 1262: 1259: 1257: 1254: 1252: 1249: 1247: 1244: 1243: 1241: 1237: 1231: 1228: 1226: 1223: 1221: 1218: 1216: 1215:Pampa Energía 1213: 1211: 1208: 1206: 1203: 1201: 1198: 1196: 1193: 1191: 1188: 1187: 1185: 1181: 1177: 1170: 1165: 1163: 1158: 1156: 1151: 1150: 1147: 1143: 1138: 1132: 1130: 1124: 1123: 1102: 1096: 1079: 1071: 1063: 1057: 1051: 1047: 1044: 1039: 1033: 1029: 1026: 1021: 1015: 1010: 994: 990: 986: 980: 964: 960: 954: 938: 934: 927: 921: 920: 913: 907: 906: 901: 896: 888: 875: 856: 849: 842: 826: 822: 818: 812: 805: 801: 798: 797:Brittle Power 793: 786: 782: 779: 774: 770: 760: 757: 755: 752: 750: 747: 745: 742: 741: 735: 724: 721: 720:Energy portal 715: 710: 707: 696: 687: 685: 681: 677: 673: 669: 665: 655: 653: 648: 645: 643: 638: 634: 631: 627: 623: 618: 616: 612: 608: 604: 600: 596: 587: 585: 581: 568: 566: 562: 558: 557:Latin America 548: 546: 542: 537: 535: 531: 527: 523: 519: 515: 511: 507: 503: 499: 495: 491: 487: 476: 470: 467: 464: 460: 457: 454: 450: 445: 441: 439: 435: 432: 428: 426: 422: 419: 416: 413: 412: 408: 404: 399: 393:2,160 MW 392: 388: 385: 382: 378: 375: 372: 368: 363: 360: 357: 353: 349: 347: 343: 337: 333: 329: 325: 322: 319: 315: 312: 309: 305: 301: 299:Official name 297: 293: 286: 281: 276: 267: 261: 258: 255: 251: 248: 245: 241: 236: 233: 229: 227: 223: 220: 216: 214: 210: 207: 204: 201: 200: 196: 192: 187: 181:1,179 MW 180: 176: 173: 170: 166: 163: 160: 156: 151: 148: 145: 141: 138:$ 1.3 Billion 137: 133: 129: 127: 123: 119: 115: 111: 107: 102: 74: 70: 67: 64: 60: 57: 54: 50: 46: 44:Official name 42: 38: 33: 30: 19: 1339:Salto Grande 1295:Power plants 1141: 1134:(in Spanish) 1126:(in Spanish) 1105:. Retrieved 1095: 1083:. Retrieved 1070: 1056: 1038: 1025:Power Output 1020: 1009: 997:. Retrieved 993:the original 988: 979: 967:. Retrieved 962: 953: 941:. Retrieved 937:the original 926: 918: 912: 904: 899: 895: 874:cite journal 862:. Retrieved 855:the original 841: 829:. Retrieved 811: 792: 773: 661: 649: 646: 639: 635: 619: 594: 593: 569: 563:who stole a 554: 538: 510:Buenos Aires 489: 485: 483: 29: 1286:Vaca Muerta 1190:Camuzzi Gas 864:10 November 668:Hualong One 530:heavy water 516:. Both are 355:Operator(s) 330:Operational 143:Operator(s) 112:Operational 96: / 72:Coordinates 1389:Categories 1334:Rio Grande 1107:2 February 1085:2 February 999:23 January 765:References 658:Atucha III 652:energy mix 84:59°12′27″W 81:33°58′02″S 1365:Atucha II 1314:El Chocón 1220:Transener 1183:Companies 1081:. Reuters 969:1 October 943:1 October 806:, p. 144. 595:Atucha II 590:Atucha II 580:kilovolts 311:Argentina 56:Argentina 1360:Atucha I 1344:Yacyretá 1046:Archived 1028:Archived 831:14 April 825:Archived 800:Archived 787:, p. 10. 781:Archived 690:See also 551:Atucha I 317:Location 62:Location 1370:Embalse 1353:Nuclear 1309:Alicurá 821:Reuters 603:Siemens 582:to the 545:CANDU 6 462:Commons 452:Website 418:Siemens 384:Siemens 307:Country 253:Commons 243:Website 206:Siemens 172:Siemens 52:Country 1239:Topics 1205:Edesur 1200:Edenor 900:Clarín 502:Zárate 327:Status 230:2,397 109:Status 858:(PDF) 851:(PDF) 611:IPHWR 607:CANDU 597:is a 488:, or 473:[ 264:[ 1109:2022 1087:2022 1001:2013 971:2011 945:2011 887:help 866:2006 833:2022 524:and 498:Lima 484:The 429:693 374:PHWR 350:2014 338:1981 232:GW·h 217:340 162:PHWR 130:1974 120:1968 1230:YPF 615:EPR 496:in 1391:: 987:. 961:. 878:: 876:}} 872:{{ 819:. 572:th 536:. 504:, 500:, 431:MW 395:th 219:MW 183:th 1168:e 1161:t 1154:v 1111:. 1089:. 1064:. 1003:. 973:. 947:. 889:) 885:( 868:. 835:. 576:e 477:] 268:] 20:)

Index

Atucha II Nuclear Power Plant
Argentina
Lima, Buenos Aires
33°58′02″S 59°12′27″W / 33.96722°S 59.20750°W / -33.96722; -59.20750
Commission date
Nucleoelectrica Argentina
PHWR
Siemens
Siemens
Nameplate capacity
MW
Annual net output
GW·h
central nuclear atucha I
Related media on Commons
edit on Wikidata

Argentina
Lima, Buenos Aires
Commission date
Nucleoelectrica Argentina
PHWR
Siemens
Siemens
Nameplate capacity
MW
Annual net output
central nuclear atucha II
Related media on Commons
edit on Wikidata

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.