Alberta Carbon Trunk Line System

Source đź“ť

152:, said at that time it had no further plans to "fund future efforts using the technology." A previous public and private partnership project in 2012 had been forced to cancel "similar plans to retrofit a coal-fired power plant in Alberta, citing the absence of carbon pricing policies". Shell hired the environmental group, the 193:
By January 2021, Enhance Energy (Enhance) was reporting that it was producing an estimated 200 barrels a day (BOE/D). The company anticipated that carbon capture technology would result in an expanding production of about 4,000 or 5,000 BOE/D. Kevin Jabusch, president and CEO of Enhanced Energy says
147:
The $ 1.3-billion SCQEP at the Scotford complex, located northeast of Edmonton—which became operational in 2015—was almost completely paid for with funding from the Alberta government of $ 745 million and $ 120 million from the federal government. At the 2015 SCQEP launch, the provincial government
131:
EOR operation—which will recover oil from fields at a depth of 6,000 feet (1,800 m) below ground—will be the first in Alberta. The cost of water management at the Clive legacy oil field—which still held "vast oil reserves"—had closed "oil revenue profit margins". Enhance Energy expects to
41:(EOR) projects. The pipeline, upstream carbon capture infrastructure and downstream EOR project, which is owned and operated by Enhance Energy, came online on June 2, 2020 and are part of the ACTL System, which is the largest 194:
that since his company is "carbon mitigation company" not an oil company, and would therefore would benefit as the carbon tax increases. Eventually, Enhance would no longer "need to produce oil anymore to be profitable".
176:
are transported to an oilfield in region south of Regina, in neighbouring Saskatchewan—the Weyburn oilfields. Whitecap has operations in Alberta, Saskatchewan, and British Columbia. According to a 2008 article in
72:(CPPIB) was constructed and is owned and operated Wolf Midstream. CPPIB is Wolf Midstream's principal investor. Funding included up to $ CDN305 million from CPPIB, as well as $ CDN63 million from the 535: 85: 267: 401: 77: 156:, to advise them on the SCQEP project. A Pembina Institute director, Duncan Kenyon, said the "government should strengthen existing carbon pricing to encourage carbon capture." 144:(SCQEP). Both SCQEP and Carbon Trunk Line's Enhance Energy received hundreds of millions in government financial support for Alberta's two largest carbon capture projects. 599: 81: 29:
pipeline owned and operated Wolf Midstream, which is 240 kilometres (150 mi) in length and part of a $ CDN1.2 billion system that captures
107: 103: 319: 235: 62: 172:, a Calgary, Alberta-based public Canadian oil company founded in 2009. Emissions from a North Dakota coal power plant and the 165: 69: 132:
recover 47 million barrels of oil at the Clive field, which represents "between 40 and 50% of the total oil in place."
347: 141: 34: 562: 434: 140:
Public subsidies enabled the launch of the first "oil sands project to capture and bury carbon emissions" in 2015—
495: 594: 469: 98:
and Nutrien's Redwater Fertilizer facility in the Heartland—provide "4,400 tonnes per day of high purity CO
236:"1.2 billion CO2 pipeline from Industrial Heartland to depleted oilfields in central Alberta comes online" 536:"Enhance Energy and Wolf Midstream Sign Agreement to Finance and Construct the Alberta Carbon Trunk Line" 268:"Enhance Energy and Wolf Midstream Sign Agreement to Finance and Construct the Alberta Carbon Trunk Line" 173: 182: 42: 84:. Alberta approved "$ CDN223 million in "construction funding" for the ACTL System through Alberta's 563:"You've heard of net zero? These oil companies say they've reached 'net-negative' carbon emissions" 435:"You've heard of net zero? These oil companies say they've reached 'net-negative' carbon emissions" 403:
Final preparations for Alberta's biggest CO2 Enhanced Oil Recovery in the Leduc Formation at Clive
37:
and transports it to "central and southern Alberta for secure storage" in "aging reservoirs", and
94:
In the first phase, the ACTL System project partners—North West Redwater Partnership's (NWRP)
124: 73: 38: 8: 181:, at that time the Weyburn carbon monitoring and storage project was the world's largest 164:
A similar but much larger project located near Weyburn, Saskatchewan, Canada, called the
496:"Alberta carbon capture project hits another milestone ahead of schedule and below cost" 169: 153: 95: 68:
The ACTL, which was partially financed through federal government programs and the
289: 30: 588: 149: 91:
Construction began at the end of 2018, and ACTL went online on June 2, 2020.
113:
ACTL has the capacity to transport a maximum of 14.6 million tonnes of CO
372: 210: 102:" to be transported through the pipeline to Enhance Energy's aging 470:"Shell Canada carbon capture likely last to get Alberta subsidies" 313: 311: 229: 227: 46: 50: 308: 224: 395: 393: 391: 389: 463: 461: 459: 457: 455: 320:"New Alberta carbon capture project now fully operational" 386: 282: 452: 270:. Calgary, Alberta: Wolf Midstream, Inc. August 2, 2018 127:(EOR) operation. Clive legacy oil field's full scale CO 120:
The third facet of the project is Enhance Energy's CO
428: 426: 424: 342: 340: 262: 260: 258: 256: 487: 586: 520:Casey, Allan (January 2008). "Carbon Cemetery". 421: 337: 253: 600:Transport buildings and structures in Alberta 317: 513: 294:Alberta’s Industrial Heartland Association 542:(Press release). Calgary. August 2, 2018 63:Canadian Environmental Assessment Agency 135: 587: 233: 86:Carbon Capture and Storage Funding Act 16:CO2 pipeline system in Alberta, Canada 519: 467: 399: 166:Weyburn-Midale Carbon Dioxide Project 159: 560: 493: 432: 348:"Alberta Carbon Trunk Line, Alberta" 70:Canada Pension Plan Investment Board 468:Souza, Mike De (November 5, 2015). 13: 318:Heidenreich, Phil (June 2, 2020). 14: 611: 409:. Geoconvention. Calgary, Alberta 188: 142:Shell Canada Quest Energy project 78:Eco Energy Innovation Initiative 33:from industrial emitters in the 23:Alberta Carbon Trunk Line (ACTL) 561:Bakx, Kyle (January 25, 2021). 554: 528: 433:Bakx, Kyle (January 25, 2021). 365: 211:"Wolf Carbon – Wolf Midstream" 203: 35:Alberta's Industrial Heartland 1: 373:"About Wolf – Wolf Midstream" 234:Labine, Jeff (June 2, 2020). 197: 65:(CEAA) approved the project. 56: 522:Canadian Geographic Magazine 494:Bakx, Kyle (July 10, 2020). 179:Canadian Geographic Magazine 174:Dakota Gasification facility 7: 168:, is owned and operated by 10: 616: 183:carbon capture and storage 43:carbon capture and storage 400:Hills, David (May 2019). 352:Hydrocarbons Technology 61:In September 2010, the 125:Enhanced Oil Recovery 74:Harper administration 39:enhanced oil recovery 595:Pipelines in Alberta 136:Government subsidies 170:Whitecap Resources 160:Whitecap Resources 148:under the Premier 290:"The Opportunity" 154:Pembina Institute 96:Sturgeon Refinery 82:Clean Energy Fund 45:(CCS) system" in 607: 578: 577: 575: 573: 558: 552: 551: 549: 547: 540:Business Insider 532: 526: 525: 517: 511: 510: 508: 506: 491: 485: 484: 482: 480: 465: 450: 449: 447: 445: 430: 419: 418: 416: 414: 408: 397: 384: 383: 381: 379: 369: 363: 362: 360: 358: 344: 335: 334: 332: 330: 315: 306: 305: 303: 301: 286: 280: 279: 277: 275: 264: 251: 250: 248: 246: 240:Edmonton Journal 231: 222: 221: 219: 217: 207: 615: 614: 610: 609: 608: 606: 605: 604: 585: 584: 581: 571: 569: 559: 555: 545: 543: 534: 533: 529: 518: 514: 504: 502: 492: 488: 478: 476: 466: 453: 443: 441: 431: 422: 412: 410: 406: 398: 387: 377: 375: 371: 370: 366: 356: 354: 346: 345: 338: 328: 326: 316: 309: 299: 297: 288: 287: 283: 273: 271: 266: 265: 254: 244: 242: 232: 225: 215: 213: 209: 208: 204: 200: 191: 162: 138: 130: 123: 116: 101: 59: 28: 17: 12: 11: 5: 613: 603: 602: 597: 580: 579: 553: 527: 512: 486: 451: 420: 385: 364: 336: 307: 281: 252: 223: 201: 199: 196: 190: 189:Enhance Energy 187: 161: 158: 137: 134: 128: 121: 114: 99: 58: 55: 31:carbon dioxide 26: 15: 9: 6: 4: 3: 2: 612: 601: 598: 596: 593: 592: 590: 583: 568: 564: 557: 541: 537: 531: 523: 516: 501: 497: 490: 475: 471: 464: 462: 460: 458: 456: 440: 436: 429: 427: 425: 413:September 15, 405: 404: 396: 394: 392: 390: 378:September 26, 374: 368: 357:September 15, 353: 349: 343: 341: 329:September 15, 325: 321: 314: 312: 300:September 15, 295: 291: 285: 274:September 15, 269: 263: 261: 259: 257: 245:September 15, 241: 237: 230: 228: 216:September 26, 212: 206: 202: 195: 186: 184: 180: 175: 171: 167: 157: 155: 151: 150:Rachel Notley 145: 143: 133: 126: 118: 111: 109: 105: 97: 92: 89: 87: 83: 79: 75: 71: 66: 64: 54: 52: 48: 44: 40: 36: 32: 24: 19: 582: 570:. Retrieved 566: 556: 544:. Retrieved 539: 530: 521: 515: 503:. Retrieved 499: 489: 477:. Retrieved 473: 442:. Retrieved 438: 411:. Retrieved 402: 376:. Retrieved 367: 355:. Retrieved 351: 327:. Retrieved 323: 298:. Retrieved 293: 284: 272:. Retrieved 243:. Retrieved 239: 214:. Retrieved 205: 192: 178: 163: 146: 139: 119: 112: 110:reservoirs. 93: 90: 67: 60: 22: 20: 18: 572:October 18, 546:October 18, 505:January 25, 479:January 25, 444:January 25, 324:Global News 108:Leduc field 104:Clive Nisku 589:Categories 198:References 117:annually. 57:Background 185:project. 567:CBC News 439:CBC News 88:(2009). 474:Reuters 47:Alberta 25:is a CO 296:. 2017 51:Canada 407:(PDF) 574:2021 548:2021 507:2021 481:2021 446:2021 415:2020 380:2023 359:2020 331:2020 302:2020 276:2020 247:2020 218:2023 106:and 80:and 21:The 500:CBC 76:'s 591:: 565:. 538:. 498:. 472:. 454:^ 437:. 423:^ 388:^ 350:. 339:^ 322:. 310:^ 292:. 255:^ 238:. 226:^ 53:. 49:, 576:. 550:. 524:. 509:. 483:. 448:. 417:. 382:. 361:. 333:. 304:. 278:. 249:. 220:. 129:2 122:2 115:2 100:2 27:2

Index

carbon dioxide
Alberta's Industrial Heartland
enhanced oil recovery
carbon capture and storage
Alberta
Canada
Canadian Environmental Assessment Agency
Canada Pension Plan Investment Board
Harper administration
Eco Energy Innovation Initiative
Clean Energy Fund
Carbon Capture and Storage Funding Act
Sturgeon Refinery
Clive Nisku
Leduc field
Enhanced Oil Recovery
Shell Canada Quest Energy project
Rachel Notley
Pembina Institute
Weyburn-Midale Carbon Dioxide Project
Whitecap Resources
Dakota Gasification facility
carbon capture and storage
"Wolf Carbon – Wolf Midstream"


"1.2 billion CO2 pipeline from Industrial Heartland to depleted oilfields in central Alberta comes online"