940:
underground tanks of different capacities will be built in the Agra Metro Depot complex. For zero discharge facility, a joint water treatment plant of 1 lakh litre capacity will be set up at Agra Metro Depot. In this water treatment plant, the grey water coming out from the kitchen, washroom, floor cleaning, will be recycled. For this, a plant with a capacity of 70,000 litres will be installed. Similarly, a 30,000 litres capacity plant will be set up to treat such black water by washing the coach and whatever other chemical-rich water will come out. Both the plants will be built in the same building so that they can be used in a better way.
322:
501:
67:
833:
25:
2529:
379:
848:. However the contract was cancelled and Alstom was chosen to supply the rolling stock for the Yellow line. The rolling stock resembles those that run on the Kanpur Metro. On 6 March 2023, the first set of coaches arrived at the Taj Station of the Yellow line from Alstom's manufacturing facility at Savli in Gujarat.
943:
June 2021: Construction of depot line for Agra Metro has begun with the commencement of piling work on the depot line with 13 piles already constructed so far.} The depot line will connect the mainline with the Metro Depot which is under construction at PAC Ground where metro trains will be stabled
951:
June 2021: Along with the construction of the Agra Metro
Project Priority Section (Taj East Gate to Jama Masjid), UP Metro has also started the construction of the Depot Line. For this, along with starting the piling, the construction of 13 piles has also been completed. The covered train stabling
947:
June 2021: The casting of the concourse beam of Taj East Gate, the first metro station of Agra Metro, has also started. The piling work has already been completed with the construction of 69 piles of Taj East Gate Metro
Station. Currently, the pillars are being constructed in the side grid of Taj
939:
May 2021: UP Metro has built 400 piles out of a total of 686 in the priority section of the Agra Metro project. With this, 45 pile-caps and 16 pillars are also ready. The work of a zero discharge facility at Agra Metro depot is also at a rapid pace. For the zero discharge facility, several
935:
April 2021: In Agra metro priority section, a total of 688 piles are to be constructed in the 3 km long portion on
Fatehabad Road, in which 344 piles are ready, 10 pillars are built, and digging is continued for 3 metro
359:(UPMRC). It is set to consist of two metro lines, with a total length of 29.65 kilometres (18.42 mi) and 27 stations. The Agra Metro is one of four rapid transit system in Uttar Pradesh, the others being the
1685:
1339:
1839:
1736:
1369:
1248:
1276:
926:
rolling stock and signalling contract. Agra Metro project gets conditional clearance from the
Supreme Court. The project which was stuck due to the court stay will now progress fast.
1196:
717:
508:
In Phase 1, 14 metro stations will be built on the Yellow Line (Line 1) from
Sikandra to Taj East Gate and 15 metro stations will be built on the Blue Line (Line 2) from
461:
About 20 lakh population of the city is expected to be benefited by Agra Metro Rail
Project directly and indirectly at the time of commencement of commercial operations.
2664:
447:
The length of
Sikandra to Taj East Gate corridor 14.00 km, which is partly elevated and partly underground and comprises 13 stations (6-Elevated and 7-Underground).
1503:
2517:
1529:
1331:
1405:
1145:
1361:
1115:
1762:
1582:
860:
September 2017: The central government rejected the DPR of Agra Metro as it didn't conform with the new Metro Rail Policy 2017 introduced that month.
3243:
1171:
1448:
952:
yard, integrated workshop, and pit wheel length are being constructed in Agra Metro Depot with the new PEB (Pre
Engineering Building) technique.
2622:
1909:
1026:
424:
Agra Metro Rail
Project will have 2 corridors that will pass through the heart of the city and will connect prominent tourist places including
2495:
1788:
1659:
1420:
2659:
1865:
1475:
1711:
1607:
976:
Aug 2021: Taj East Gate Metro
Station takes shape, and it will be the first metro station of Agra Metro to be completed, as of 24 August.
1555:
1633:
3253:
2510:
1813:
3204:
973:
August 2021: European Investment Bank (EIB) approves and is ready to fund 480 mn euros for Agra Metro Rail Project, as of 10 August.
321:
2363:
2312:
932:
December 2020: Prime Minister Narendra Modi inaugurated the construction work at the Agra Metro Project Site on 7 December 2020.
844:
won the contract to supply the rolling stock and the signalling system, and the project received conditional clearance from the
2581:
2568:
985:
December 2021: Work on Agra Metro's third metro station, Fatehabad Metro Station, is expected to be completed by December-end.
472:(IPT), and non-motorized transport (NMT). The project will have non-fare box revenue from rental and advertisement as well as
2368:
2503:
2110:
1686:"Agra Metro Rail Project: आगरा मेट्रो के सभी स्टेशनों के यूनिक कोड को मिली मंजूरी, अब इन नामों से भी जाने जाएंगे ये स्टेशन"
1391:
1006:
929:
October 2020: Contract awarded for construction for three metro stations. Civil engineering work to start in December 2020.
356:
85:
2586:
2479:
2429:
2474:
2469:
2439:
2434:
2358:
2307:
1902:
2715:
2484:
2464:
2419:
2414:
2409:
2322:
2128:
1996:
1763:"आगरा मेट्रो के काम ने पकड़ी रफ्तार: ताज पूर्वी के साथ अब बसई स्टेशन पर कार्य शुरू, दस महीने में 102 पिलर का निर्माण"
912:
and others other departments are pending. Once permissions are in place, land acquisition will take another 3 months.
2454:
2404:
2317:
1814:"आगरा में मेट्रो: तीसरे स्टेशन का काम दिसंबर अंत में होगा पूरा, निर्माण के दौरान ताजमहल की खूबसूरत तस्वीर आई सामने"
1089:
3258:
2459:
2449:
2444:
991:
March 2024: Prime Minister Narendra Modi inaugurated the priority corridor section of Agra Metro on 6 March 2024.
676:
509:
437:
2050:
3080:
2525:
2424:
2378:
909:
898:
481:
2383:
2302:
1895:
469:
433:
2388:
2133:
1123:
477:
944:
and maintained. For the depot line, a total of 500 piles, 39 pile capes, and 34 piers will be constructed.
2533:
2343:
2286:
2281:
1300:
1298:
1001:
66:
450:
The length of Agra Cantt to Kalindi Vihar corridor is 15.40 km comprising 14 stations all elevated.
3248:
3070:
2638:
2348:
2276:
2271:
1295:
2373:
2353:
1453:
919:
841:
3016:
2643:
2573:
2558:
1737:"Agra Metro Rail Project: जल्द आकार लेने लगेगा आगरा का ये मेट्रो स्टेशन, रखा गया पहला डबल टी गर्डर"
956:
761:
623:
533:
1222:
1064:
1050:
874:
September 2018: Detailed Project Report (DPR) sent by the UP Government to the Central Government.
2617:
2593:
2045:
1306:
473:
275:
2818:
2563:
2541:
2338:
2148:
1991:
905:
668:
556:
979:
September 2021: Construction begins of Agra Metro's second metro station, Basai Metro Station.
3075:
2598:
2138:
2060:
1634:"Narendra Modi: PM Narendra Modi inaugurates construction work | Agra News - Times of India"
3065:
2986:
966:
August 2021: Unique codes of all metro stations in Agra Metro Rail Project get approved by
8:
3101:
2780:
2230:
2143:
2080:
1973:
648:
38:
Please help update this article to reflect recent events or newly available information.
2981:
2173:
1608:"दिसंबर से शुरू होगा आगरा मेट्रो का काम, 273 करोड़ की लागत से बनेंगे तीन प्रमुख स्टेशन"
1583:"Agra Metro Line-1's Construction Works Worth Rs 272 Crores Set for award to Sam India"
464:
The proposed corridors will be having multimodal integration with railway stations and
948:
East Gate Metro Station. Soon the construction of the concourse level will also start.
421:
350 crore per km. The cost will be evaluated based on the June 2015 price index.
3106:
3050:
3021:
2765:
2178:
2075:
2070:
1504:"तेजी सेे बढ़ रही आगरा की मेट्रो, स्टेशनों के लिए जमीन हस्तांतरण की तैयारी Agra News"
1476:"कानपुर से पीएम मोदी ने किया आगरा मेट्रो का शिलान्यास, ताजनगरी में हुआ सीधा प्रसारण"
3001:
2960:
2839:
2834:
2261:
2183:
1968:
1277:"Agra Metro Project: अब आएगी रफ्तार, अगले सप्ताह से शुरू होगा मेट्रो के लिए ये काम"
789:
440:, Collectorate, Sanjay Place, and surrounding densely populated residential areas.
1866:"PM Modi inaugurates priority section of Agra Metro; here's a look at the project"
3096:
3060:
3055:
2996:
2991:
2976:
2944:
2844:
2725:
2700:
1943:
1530:"Work on Agra Metro yet to start; may miss deadline | Agra News - Times of India"
967:
1421:"कानपुर-आगरा को जल्द मिलेगी मेट्रो की सौगात, 350 करोड़ रुपयों से पकड़ेगी रफ्तार"
3151:
3120:
3006:
2900:
2885:
2869:
2859:
2854:
2849:
2235:
2090:
2055:
2040:
2035:
1425:
1197:"PM Modi to flag off Agra Metro priority corridor: Route, price, other details"
888:
284:
267:
500:
3237:
3219:
3206:
3011:
2910:
2750:
2745:
2710:
2678:
2168:
1918:
1011:
891:
845:
406:
360:
348:
340:
119:
109:
1249:"Now, reach Taj Mahal by Metro. PM to launch Agra 'priority corridor' today"
398:
On 28 February 2019, Union Cabinet approved the metro project in Agra worth
3156:
3135:
2915:
2895:
2864:
2803:
2760:
2755:
2735:
2730:
2204:
2199:
2105:
2100:
1021:
1016:
923:
901:
has requested relevant authorities to transfer land for Metro construction.
368:
364:
982:
October 2021: Tenders invited for electrification contract for Agra Metro.
3181:
3176:
3166:
2905:
2890:
2813:
2808:
2770:
2740:
2720:
2705:
2095:
2085:
2065:
1789:"Tender invited for electrification contract for Agra Metro Rail Project"
904:
January 2020: Construction work yet to start as few permissions from the
372:
239:
884:
28 February 2019: Central Government approved the metro project in Agra.
3186:
3171:
3161:
2798:
2775:
2225:
2209:
1887:
1480:
819:
287:
1556:"TYPSA-Italferr JV Wins Kanpur & Agra Metro's General Consultancy"
832:
3035:
2030:
2025:
857:
July 2016: Detailed Project Report submitted to the State Government.
429:
425:
1223:"Agra Metro – Information, Route Maps, Fares, Tenders & Updates"
2929:
1065:"Agra Metro - Information, Route Map, Fares, Tenders & Updates"
1051:"Agra Metro - Information, Route Map, Fares, Tenders & Updates"
863:
January 2018: The UP Government Cabinet decides to build metros in
1712:"EIB agrees to fund 480 million euros for Agra Metro Rail Project"
915:
15 June 2020: TYPSA - Italferr JV wins General Consultant contract
2120:
1960:
1449:"Adityanath thanks Modi for clearing Agra, Kanpur Metro projects"
868:
864:
786:
457:
8,379.62 crore and the project will be completed in five years.
2528:
2245:
960:
392:
378:
352:
2240:
2017:
1983:
1938:
1933:
1362:"Centre rejects metro rail project report - Times of India"
1090:"Agra Metro: Information, Route Maps & Project Updates"
465:
344:
281:
105:
95:
908:, Taj Trapezium Zone Authority (TTZ), Forest department,
173:
1392:"UP to Start Metro Services in Agra, Kanpur and Meerut"
1307:"Decks cleared for Agra Metro project, with conditions"
1271:
1269:
409:
inaugurated the first stretch of Agra Metro Project.
16:
Mass rapid transit system in the city of Agra, India
2665:
Delhi–Sonipat–Panipat Regional Rapid Transit System
487:The Agra Metro became operational on 6 March 2024.
1266:
1172:"Centre approves Agra, Kanpur metro rail projects"
1146:"Kanpur & Agra metro projects get cabinet nod"
1118:[Metro project remains pending in Agra].
877:7 February 2019: The UP Government has allocated
3235:
468:stations and will have a feeder network of bus,
1332:"Uttar Pradesh govt gets DPRs for Meerut, Agra"
391:As of July 2016, DPR has been prepared by
881:175 crore to start preliminary work in budget.
2511:
1903:
1840:"Agra witnesses first Metro train trial run"
1660:"EIB to fund Agra metro rail project: UPMRC"
1418:
1189:
887:8 March 2019: Foundation stone laid down by
2623:Delhi–Meerut Regional Rapid Transit System
2518:
2504:
1910:
1896:
1441:
1247:Rao, Lingamgunta Nirmitha (6 March 2024).
2660:Delhi–Alwar Regional Rapid Transit System
417:The cost of construction is estimated at
355:. The metro is owned and operated by the
1917:
1152:. Press Trust of India. 28 February 2019
831:
499:
377:
3244:Proposed rapid transit in Uttar Pradesh
443:Highlights of these corridors include:
395:and submitted to the state government.
3236:
2569:Hyderabad Multi-Modal Transport System
2344:Cities and towns in Firozabad district
1116:"मेट्रो का सपना कहीं सपना ही न रह जाए"
2499:
2349:Cities and towns in Mainpuri district
1891:
453:The estimated cost of the project is
412:
2354:Cities and towns in Mathura district
1342:from the original on 6 February 2017
1304:
1007:Uttar Pradesh Metro Rail Corporation
357:Uttar Pradesh Metro Rail Corporation
86:Uttar Pradesh Metro Rail Corporation
18:
1580:
1372:from the original on 9 October 2017
1246:
13:
2582:Barabanki–Lucknow Suburban Railway
1122:. 16 February 2016. Archived from
988:July 2023 : Trial run begins.
711:
14:
3270:
2129:Krishna Janmasthan Temple Complex
1997:United Provinces of Agra and Oudh
851:
592:
504:Mankameshwar Temple Metro Station
3254:Standard gauge railways in India
2527:
1419:Anurag Gupta (8 February 2019).
1406:"UP govt sent DPR to Union govt"
827:
490:
432:, and Sikandra as well as ISBT,
320:
234:7.0 km (priority corridor)
65:
23:
2587:Lucknow–Kanpur Suburban Railway
1858:
1832:
1806:
1781:
1755:
1729:
1704:
1678:
1652:
1626:
1600:
1574:
1548:
1522:
1496:
1468:
1412:
1398:
1384:
1354:
1324:
476:(VCF) through the mechanism of
438:Agra Cantonment railway station
3081:Thiruvananthapuram Light Metro
2364:Villages in Firozabad district
1581:Rai, M. K. (23 October 2020).
1240:
1215:
1164:
1138:
1108:
1082:
1057:
1043:
910:Archaeological Survey of India
482:transfer of development rights
297:34.0 km/h (21.1 mph)
1:
1036:
470:intermediate public transport
434:Raja Ki Mandi railway station
405:6 March 2024: Prime Minister
2369:Villages in Mathura district
2134:Vrindavan Chandrodaya Mandir
963:for Agra Metro Rail Project.
770:
478:transit-oriented development
7:
3220:27.18000000°N 78.02000000°E
2534:Urban rail transit in India
2193:Rivers, dams, lakes, canals
2111:Tourist attractions in Agra
1614:(in Hindi). 21 October 2020
1002:Urban rail transit in India
995:
718:List of Agra Metro stations
10:
3275:
3071:Kolkata Light Rail Transit
2639:Ahmedabad Suburban Railway
2618:Bengaluru Suburban Railway
2010:Places of tourist interest
1510:(in Hindi). 22 August 2019
724:
715:
495:
386:
382:Agra Metro & Taj Mahal
305:90 km/h (56 mph)
211:Elevated & Underground
3144:
3128:
3119:
3089:
3043:
3034:
2969:
2953:
2937:
2928:
2878:
2827:
2789:
2688:
2677:
2652:
2631:
2607:
2551:
2540:
2397:
2359:Villages in Agra district
2331:
2295:
2254:
2218:
2192:
2161:
2119:
2051:Tomb of I'timād-ud-Daulah
2016:
2009:
1982:
1959:
1952:
1926:
920:Bombardier Transportation
842:Bombardier Transportation
746:
705:
694:
621:
607:
599:
577:
520:
309:
301:
293:
274:
238:
228:
223:
215:
207:
189:
184:
168:
158:
133:
125:
115:
101:
91:
81:
76:
64:
59:
32:This article needs to be
3225:27.18000000; 78.02000000
3017:Tiruchirappalli Monorail
2644:Nagpur broad-gauge Metro
2574:Kolkata Suburban Railway
2559:Chennai Suburban Railway
2296:Lok Sabha constituencies
1484:(in Hindi). 8 March 2019
1283:(in Hindi). 24 July 2020
957:European Investment Bank
71:Agra metro rolling stock
2594:Mumbai Suburban Railway
2046:Tomb of Akbar the Great
1150:Business Standard India
922:won the Agra Metro and
474:value capture financing
232:29.65 km (Phase-1)
3259:2024 in rail transport
2564:Delhi Suburban Railway
2149:Krishna Balaram Mandir
906:Supreme Court of India
837:
505:
383:
195:; 6 months ago
3076:Kozhikode Light Metro
2599:Pune Suburban Railway
2379:People from Firozabad
2121:In and around Mathura
2061:Tomb of Mariam Zamani
1368:. 16 September 2017.
1305:IANS (24 July 2020).
959:(EIB) to fund 480 mn
835:
503:
381:
164:6 (priority corridor)
3066:Greater Nashik Metro
2987:Bhubaneswar Monorail
2384:People from Mainpuri
2339:Agra district topics
1793:Urban Transport News
1716:Urban Transport News
780:Mankameshwar Mandir
634:Mankameshwar Mandir
3216: /
3102:Visakhapatnam Metro
2799:Bhoj Metro (Bhopal)
2781:Rapid Metro Gurgaon
2389:People from Mathura
2287:National Highway 93
2282:National Highway 11
2144:Banke Bihari Temple
2081:Mankameshwar Temple
1974:Krishna Janmashtami
1408:. 5 September 2018.
643:Under construction
436:, Medical College,
2982:Bengaluru Monorail
2277:National Highway 3
2272:National Highway 2
2018:In and around Agra
1953:Mythology, history
1870:The Indian Express
1638:The Times of India
1560:The Metro Rail Guy
1534:The Times of India
1394:. 18 January 2018.
1366:The Times of India
1336:The Indian Express
1311:www.daijiworld.com
1227:The Metro Rail Guy
1069:The Metro Rail Guy
838:
735:First Operational
512:to Kalindi Vihar.
506:
413:Project highlights
384:
193:March 6, 2024
159:Number of stations
3249:Transport in Agra
3199:
3198:
3195:
3194:
3115:
3114:
3107:Uttarakhand Metro
3051:Chennai Metrolite
3030:
3029:
3022:Warangal Monorail
2924:
2923:
2819:Bhubaneswar Metro
2766:Navi Mumbai Metro
2673:
2672:
2493:
2492:
2219:Languages, people
2157:
2156:
2005:
2004:
1640:. 7 December 2020
1536:. 21 January 2020
1027:Delhi Meerut RRTS
970:, as of 7 August.
836:Agra Metro Inside
825:
824:
709:
708:
590:
589:
333:
332:
329:
328:
53:
52:
3266:
3231:
3230:
3228:
3227:
3226:
3221:
3217:
3214:
3213:
3212:
3209:
3126:
3125:
3041:
3040:
3002:Kolkata Monorail
2961:Chennai Monorail
2935:
2934:
2840:Coimbatore Metro
2835:Chandigarh Metro
2686:
2685:
2549:
2548:
2532:
2531:
2520:
2513:
2506:
2497:
2496:
2374:People from Agra
2262:Grand Trunk Road
2014:
2013:
1957:
1956:
1912:
1905:
1898:
1889:
1888:
1882:
1881:
1879:
1877:
1862:
1856:
1855:
1853:
1851:
1836:
1830:
1829:
1827:
1825:
1810:
1804:
1803:
1801:
1799:
1785:
1779:
1778:
1776:
1774:
1759:
1753:
1752:
1750:
1748:
1733:
1727:
1726:
1724:
1722:
1708:
1702:
1701:
1699:
1697:
1682:
1676:
1675:
1673:
1671:
1656:
1650:
1649:
1647:
1645:
1630:
1624:
1623:
1621:
1619:
1604:
1598:
1597:
1595:
1593:
1578:
1572:
1571:
1569:
1567:
1552:
1546:
1545:
1543:
1541:
1526:
1520:
1519:
1517:
1515:
1500:
1494:
1493:
1491:
1489:
1472:
1466:
1465:
1463:
1461:
1445:
1439:
1438:
1436:
1434:
1416:
1410:
1409:
1402:
1396:
1395:
1388:
1382:
1381:
1379:
1377:
1358:
1352:
1351:
1349:
1347:
1328:
1322:
1321:
1319:
1317:
1302:
1293:
1292:
1290:
1288:
1273:
1264:
1263:
1261:
1259:
1244:
1238:
1237:
1235:
1233:
1219:
1213:
1212:
1210:
1208:
1193:
1187:
1186:
1184:
1182:
1168:
1162:
1161:
1159:
1157:
1142:
1136:
1135:
1133:
1131:
1112:
1106:
1105:
1103:
1101:
1086:
1080:
1079:
1077:
1075:
1061:
1055:
1054:
1047:
880:
814:
812:
811:
807:
804:
796:
764:
756:Electrification
722:
721:
671:
626:
597:
596:
559:
536:
515:
514:
456:
420:
401:
324:
311:
310:
270:
264:
262:
261:
257:
254:
246:
203:
201:
196:
180:
177:
175:
152:
151:
143:
69:
57:
56:
48:
45:
39:
27:
26:
19:
3274:
3273:
3269:
3268:
3267:
3265:
3264:
3263:
3234:
3233:
3224:
3222:
3218:
3215:
3210:
3207:
3205:
3203:
3202:
3200:
3191:
3140:
3111:
3097:Prayagraj Metro
3085:
3061:Gorakhpur Metro
3056:Delhi Metrolite
3026:
2997:Kanpur Monorail
2992:Indore Monorail
2977:Aizawl Monorail
2965:
2949:
2945:Mumbai Monorail
2920:
2874:
2845:Gorakhpur Metro
2823:
2791:
2785:
2726:Hyderabad Metro
2706:Bengaluru Metro
2701:Ahmedabad Metro
2680:
2669:
2648:
2627:
2611:
2609:
2603:
2543:
2536:
2526:
2524:
2494:
2489:
2398:Other divisions
2393:
2327:
2291:
2250:
2214:
2188:
2153:
2115:
2001:
1978:
1961:Mathura related
1948:
1944:Saman Sanctuary
1922:
1916:
1886:
1885:
1875:
1873:
1864:
1863:
1859:
1849:
1847:
1844:Hindustan Times
1838:
1837:
1833:
1823:
1821:
1812:
1811:
1807:
1797:
1795:
1787:
1786:
1782:
1772:
1770:
1761:
1760:
1756:
1746:
1744:
1735:
1734:
1730:
1720:
1718:
1710:
1709:
1705:
1695:
1693:
1684:
1683:
1679:
1669:
1667:
1664:Hindustan Times
1658:
1657:
1653:
1643:
1641:
1632:
1631:
1627:
1617:
1615:
1606:
1605:
1601:
1591:
1589:
1587:Metro Rail News
1579:
1575:
1565:
1563:
1554:
1553:
1549:
1539:
1537:
1528:
1527:
1523:
1513:
1511:
1502:
1501:
1497:
1487:
1485:
1474:
1473:
1469:
1459:
1457:
1447:
1446:
1442:
1432:
1430:
1417:
1413:
1404:
1403:
1399:
1390:
1389:
1385:
1375:
1373:
1360:
1359:
1355:
1345:
1343:
1338:. 1 July 2016.
1330:
1329:
1325:
1315:
1313:
1303:
1296:
1286:
1284:
1275:
1274:
1267:
1257:
1255:
1253:Hindustan Times
1245:
1241:
1231:
1229:
1221:
1220:
1216:
1206:
1204:
1195:
1194:
1190:
1180:
1178:
1170:
1169:
1165:
1155:
1153:
1144:
1143:
1139:
1129:
1127:
1114:
1113:
1109:
1099:
1097:
1096:. 8 August 2023
1094:Metro Rail News
1088:
1087:
1083:
1073:
1071:
1063:
1062:
1058:
1049:
1048:
1044:
1039:
998:
968:Indian Railways
878:
854:
830:
809:
805:
802:
800:
799:4 ft
798:
794:
762:
738:Last Extension
727:
720:
714:
712:Current network
669:
624:
595:
557:
534:
498:
493:
454:
418:
415:
402:8379.62 crore.
399:
389:
276:Electrification
266:
259:
255:
252:
250:
249:4 ft
248:
244:
233:
199:
197:
194:
190:Began operation
172:
163:
147:
146:
139:
126:Number of lines
72:
49:
43:
40:
37:
28:
24:
17:
12:
11:
5:
3272:
3262:
3261:
3256:
3251:
3246:
3208:27°10′48.000″N
3197:
3196:
3193:
3192:
3190:
3189:
3184:
3179:
3174:
3169:
3164:
3159:
3154:
3152:Bhavnagar Tram
3148:
3146:
3142:
3141:
3139:
3138:
3132:
3130:
3123:
3117:
3116:
3113:
3112:
3110:
3109:
3104:
3099:
3093:
3091:
3087:
3086:
3084:
3083:
3078:
3073:
3068:
3063:
3058:
3053:
3047:
3045:
3038:
3032:
3031:
3028:
3027:
3025:
3024:
3019:
3014:
3009:
3007:Patna Monorail
3004:
2999:
2994:
2989:
2984:
2979:
2973:
2971:
2967:
2966:
2964:
2963:
2957:
2955:
2951:
2950:
2948:
2947:
2941:
2939:
2932:
2926:
2925:
2922:
2921:
2919:
2918:
2913:
2908:
2903:
2901:Srinagar Metro
2898:
2893:
2888:
2886:Bareilly Metro
2882:
2880:
2876:
2875:
2873:
2872:
2870:Varanasi Metro
2867:
2862:
2860:Ludhiana Metro
2857:
2855:Jabalpur Metro
2852:
2850:Guwahati Metro
2847:
2842:
2837:
2831:
2829:
2825:
2824:
2822:
2821:
2816:
2811:
2806:
2801:
2795:
2793:
2787:
2786:
2784:
2783:
2778:
2773:
2768:
2763:
2758:
2753:
2748:
2743:
2738:
2733:
2728:
2723:
2718:
2713:
2708:
2703:
2698:
2692:
2690:
2683:
2675:
2674:
2671:
2670:
2668:
2667:
2662:
2656:
2654:
2650:
2649:
2647:
2646:
2641:
2635:
2633:
2629:
2628:
2626:
2625:
2620:
2614:
2612:
2605:
2604:
2602:
2601:
2596:
2591:
2590:
2589:
2584:
2576:
2571:
2566:
2561:
2555:
2553:
2546:
2538:
2537:
2523:
2522:
2515:
2508:
2500:
2491:
2490:
2488:
2487:
2482:
2477:
2472:
2467:
2462:
2457:
2452:
2447:
2442:
2437:
2432:
2427:
2422:
2417:
2412:
2407:
2401:
2399:
2395:
2394:
2392:
2391:
2386:
2381:
2376:
2371:
2366:
2361:
2356:
2351:
2346:
2341:
2335:
2333:
2329:
2328:
2326:
2325:
2320:
2315:
2313:Fatehpur Sikri
2310:
2305:
2299:
2297:
2293:
2292:
2290:
2289:
2284:
2279:
2274:
2269:
2264:
2258:
2256:
2252:
2251:
2249:
2248:
2243:
2238:
2236:Standard Hindi
2233:
2228:
2222:
2220:
2216:
2215:
2213:
2212:
2207:
2202:
2196:
2194:
2190:
2189:
2187:
2186:
2181:
2176:
2171:
2165:
2163:
2159:
2158:
2155:
2154:
2152:
2151:
2146:
2141:
2136:
2131:
2125:
2123:
2117:
2116:
2114:
2113:
2108:
2103:
2098:
2093:
2088:
2083:
2078:
2073:
2068:
2063:
2058:
2056:Chini Ka Rauza
2053:
2048:
2043:
2041:Buland Darwaza
2038:
2036:Fatehpur Sikri
2033:
2028:
2022:
2020:
2011:
2007:
2006:
2003:
2002:
2000:
1999:
1994:
1988:
1986:
1980:
1979:
1977:
1976:
1971:
1965:
1963:
1954:
1950:
1949:
1947:
1946:
1941:
1936:
1930:
1928:
1924:
1923:
1915:
1914:
1907:
1900:
1892:
1884:
1883:
1872:. 6 March 2024
1857:
1846:. 11 July 2023
1831:
1805:
1780:
1754:
1728:
1703:
1677:
1666:. 29 July 2021
1651:
1625:
1599:
1573:
1562:. 15 June 2020
1547:
1521:
1495:
1467:
1440:
1426:Dainik Jagaran
1411:
1397:
1383:
1353:
1323:
1294:
1265:
1239:
1214:
1203:. 5 March 2024
1188:
1163:
1137:
1126:on 3 July 2017
1120:Agra City News
1107:
1081:
1056:
1041:
1040:
1038:
1035:
1034:
1033:
1032:
1031:
1030:
1029:
1024:
1019:
1014:
997:
994:
993:
992:
989:
986:
983:
980:
977:
974:
971:
964:
953:
949:
945:
941:
937:
933:
930:
927:
916:
913:
902:
895:
889:Prime Minister
885:
882:
875:
872:
861:
858:
853:
852:Status updates
850:
829:
826:
823:
822:
816:
792:
784:
783:Taj East Gate
781:
778:
775:
772:
769:
766:
758:
757:
754:
751:
750:Rolling Stock
748:
745:
742:
739:
736:
733:
729:
728:
725:
716:Main article:
713:
710:
707:
706:
704:
701:
700:29.67 km
698:
692:
691:
688:
685:
684:15.40 km
682:
681:Kalindi Vihar
679:
674:
664:
663:
660:
657:
654:
653:Taj East Gate
651:
645:
644:
641:
638:
635:
632:
629:
619:
618:
615:
612:
609:
606:
602:
601:
594:
593:Current phases
591:
588:
587:
584:
583:29.67 km
581:
575:
574:
571:
570:15.40 km
568:
567:Kalindi Vihar
565:
562:
552:
551:
548:
547:14.27 km
545:
544:Taj East Gate
542:
539:
529:
528:
525:
522:
519:
497:
494:
492:
489:
459:
458:
451:
448:
414:
411:
388:
385:
331:
330:
327:
326:
316:
315:
307:
306:
303:
299:
298:
295:
291:
290:
278:
272:
271:
268:standard gauge
242:
236:
235:
230:
226:
225:
221:
220:
217:
213:
212:
209:
205:
204:
191:
187:
186:
182:
181:
170:
166:
165:
160:
156:
155:
154:
153:
144:
135:
131:
130:
127:
123:
122:
117:
113:
112:
103:
99:
98:
93:
89:
88:
83:
79:
78:
74:
73:
70:
62:
61:
51:
50:
31:
29:
22:
15:
9:
6:
4:
3:
2:
3271:
3260:
3257:
3255:
3252:
3250:
3247:
3245:
3242:
3241:
3239:
3232:
3229:
3211:78°1′12.000″E
3188:
3185:
3183:
3180:
3178:
3175:
3173:
3170:
3168:
3165:
3163:
3160:
3158:
3155:
3153:
3150:
3149:
3147:
3143:
3137:
3134:
3133:
3131:
3127:
3124:
3122:
3118:
3108:
3105:
3103:
3100:
3098:
3095:
3094:
3092:
3088:
3082:
3079:
3077:
3074:
3072:
3069:
3067:
3064:
3062:
3059:
3057:
3054:
3052:
3049:
3048:
3046:
3042:
3039:
3037:
3033:
3023:
3020:
3018:
3015:
3013:
3012:Pune Monorail
3010:
3008:
3005:
3003:
3000:
2998:
2995:
2993:
2990:
2988:
2985:
2983:
2980:
2978:
2975:
2974:
2972:
2968:
2962:
2959:
2958:
2956:
2952:
2946:
2943:
2942:
2940:
2936:
2933:
2931:
2927:
2917:
2914:
2912:
2911:Madurai Metro
2909:
2907:
2904:
2902:
2899:
2897:
2894:
2892:
2889:
2887:
2884:
2883:
2881:
2877:
2871:
2868:
2866:
2863:
2861:
2858:
2856:
2853:
2851:
2848:
2846:
2843:
2841:
2838:
2836:
2833:
2832:
2830:
2826:
2820:
2817:
2815:
2812:
2810:
2807:
2805:
2802:
2800:
2797:
2796:
2794:
2788:
2782:
2779:
2777:
2774:
2772:
2769:
2767:
2764:
2762:
2759:
2757:
2754:
2752:
2751:Lucknow Metro
2749:
2747:
2746:Kolkata Metro
2744:
2742:
2739:
2737:
2734:
2732:
2729:
2727:
2724:
2722:
2719:
2717:
2714:
2712:
2711:Chennai Metro
2709:
2707:
2704:
2702:
2699:
2697:
2694:
2693:
2691:
2687:
2684:
2682:
2676:
2666:
2663:
2661:
2658:
2657:
2655:
2651:
2645:
2642:
2640:
2637:
2636:
2634:
2630:
2624:
2621:
2619:
2616:
2615:
2613:
2606:
2600:
2597:
2595:
2592:
2588:
2585:
2583:
2580:
2579:
2577:
2575:
2572:
2570:
2567:
2565:
2562:
2560:
2557:
2556:
2554:
2550:
2547:
2545:
2539:
2535:
2530:
2521:
2516:
2514:
2509:
2507:
2502:
2501:
2498:
2486:
2483:
2481:
2478:
2476:
2473:
2471:
2468:
2466:
2463:
2461:
2458:
2456:
2453:
2451:
2448:
2446:
2443:
2441:
2438:
2436:
2433:
2431:
2428:
2426:
2423:
2421:
2418:
2416:
2413:
2411:
2408:
2406:
2403:
2402:
2400:
2396:
2390:
2387:
2385:
2382:
2380:
2377:
2375:
2372:
2370:
2367:
2365:
2362:
2360:
2357:
2355:
2352:
2350:
2347:
2345:
2342:
2340:
2337:
2336:
2334:
2330:
2324:
2321:
2319:
2316:
2314:
2311:
2309:
2306:
2304:
2301:
2300:
2298:
2294:
2288:
2285:
2283:
2280:
2278:
2275:
2273:
2270:
2268:
2265:
2263:
2260:
2259:
2257:
2253:
2247:
2244:
2242:
2239:
2237:
2234:
2232:
2229:
2227:
2224:
2223:
2221:
2217:
2211:
2208:
2206:
2203:
2201:
2198:
2197:
2195:
2191:
2185:
2182:
2180:
2177:
2175:
2172:
2170:
2167:
2166:
2164:
2160:
2150:
2147:
2145:
2142:
2140:
2137:
2135:
2132:
2130:
2127:
2126:
2124:
2122:
2118:
2112:
2109:
2107:
2104:
2102:
2099:
2097:
2094:
2092:
2089:
2087:
2084:
2082:
2079:
2077:
2074:
2072:
2069:
2067:
2064:
2062:
2059:
2057:
2054:
2052:
2049:
2047:
2044:
2042:
2039:
2037:
2034:
2032:
2029:
2027:
2024:
2023:
2021:
2019:
2015:
2012:
2008:
1998:
1995:
1993:
1992:Mughal Empire
1990:
1989:
1987:
1985:
1981:
1975:
1972:
1970:
1967:
1966:
1964:
1962:
1958:
1955:
1951:
1945:
1942:
1940:
1937:
1935:
1932:
1931:
1929:
1925:
1920:
1919:Agra division
1913:
1908:
1906:
1901:
1899:
1894:
1893:
1890:
1871:
1867:
1861:
1845:
1841:
1835:
1819:
1815:
1809:
1794:
1790:
1784:
1768:
1764:
1758:
1742:
1741:Dainik Jagran
1738:
1732:
1717:
1713:
1707:
1691:
1690:Dainik Jagran
1687:
1681:
1665:
1661:
1655:
1639:
1635:
1629:
1613:
1609:
1603:
1588:
1584:
1577:
1561:
1557:
1551:
1535:
1531:
1525:
1509:
1508:Dainik Jagran
1505:
1499:
1483:
1482:
1477:
1471:
1456:
1455:
1450:
1444:
1428:
1427:
1422:
1415:
1407:
1401:
1393:
1387:
1371:
1367:
1363:
1357:
1341:
1337:
1333:
1327:
1312:
1308:
1301:
1299:
1282:
1281:Dainik Jagran
1278:
1272:
1270:
1254:
1250:
1243:
1228:
1224:
1218:
1202:
1198:
1192:
1177:
1173:
1167:
1151:
1147:
1141:
1125:
1121:
1117:
1111:
1095:
1091:
1085:
1070:
1066:
1060:
1052:
1046:
1042:
1028:
1025:
1023:
1020:
1018:
1015:
1013:
1012:Lucknow Metro
1010:
1009:
1008:
1005:
1004:
1003:
1000:
999:
990:
987:
984:
981:
978:
975:
972:
969:
965:
962:
958:
954:
950:
946:
942:
938:
934:
931:
928:
925:
921:
917:
914:
911:
907:
903:
900:
897:August 2019:
896:
893:
892:Narendra Modi
890:
886:
883:
876:
873:
870:
866:
862:
859:
856:
855:
849:
847:
846:Supreme Court
843:
834:
828:Rolling stock
821:
817:
795:1,435 mm
793:
791:
788:
785:
782:
779:
776:
773:
768:6 March 2024
767:
765:
760:
759:
755:
752:
749:
743:
740:
737:
734:
731:
730:
723:
719:
702:
699:
697:
693:
689:
686:
683:
680:
678:
675:
673:
672:
666:
665:
662:6 March 2024
661:
658:
655:
652:
650:
647:
646:
642:
639:
637:9.07 km
636:
633:
630:
628:
627:
620:
617:Opening Date
616:
613:
610:
604:
603:
598:
585:
582:
580:
576:
572:
569:
566:
563:
561:
560:
554:
553:
549:
546:
543:
540:
538:
537:
531:
530:
526:
523:
517:
516:
513:
511:
502:
491:Route network
488:
485:
483:
479:
475:
471:
467:
462:
452:
449:
446:
445:
444:
441:
439:
435:
431:
427:
422:
410:
408:
407:Narendra Modi
403:
396:
394:
380:
376:
374:
370:
366:
362:
361:Lucknow Metro
358:
354:
350:
349:Uttar Pradesh
346:
342:
341:rapid transit
338:
325:
323:
318:
317:
313:
312:
308:
304:
300:
296:
294:Average speed
292:
289:
286:
283:
279:
277:
273:
269:
245:1,435 mm
243:
241:
237:
231:
229:System length
227:
222:
218:
214:
210:
206:
192:
188:
183:
179:
171:
167:
161:
157:
150:
145:
142:
138:
137:
136:
132:
128:
124:
121:
120:Rapid transit
118:
114:
111:
110:Uttar Pradesh
107:
104:
100:
97:
94:
90:
87:
84:
80:
75:
68:
63:
58:
55:
47:
35:
30:
21:
20:
3201:
3157:Chennai Tram
3136:Kolkata Tram
2916:Trichy Metro
2896:Ranchi Metro
2865:Meerut Metro
2804:Indore Metro
2792:construction
2761:Nagpur Metro
2756:Mumbai Metro
2736:Kanpur Metro
2731:Jaipur Metro
2716:Chennai MRTS
2695:
2610:construction
2266:
2205:Keetham Lake
2106:Taj Mahotsav
2101:Paliwal Park
1984:Agra related
1874:. Retrieved
1869:
1860:
1848:. Retrieved
1843:
1834:
1822:. Retrieved
1817:
1808:
1796:. Retrieved
1792:
1783:
1773:28 September
1771:. Retrieved
1766:
1757:
1747:28 September
1745:. Retrieved
1740:
1731:
1721:28 September
1719:. Retrieved
1715:
1706:
1696:28 September
1694:. Retrieved
1689:
1680:
1670:28 September
1668:. Retrieved
1663:
1654:
1642:. Retrieved
1637:
1628:
1616:. Retrieved
1611:
1602:
1590:. Retrieved
1586:
1576:
1564:. Retrieved
1559:
1550:
1538:. Retrieved
1533:
1524:
1512:. Retrieved
1507:
1498:
1486:. Retrieved
1479:
1470:
1458:. Retrieved
1452:
1443:
1431:. Retrieved
1424:
1414:
1400:
1386:
1374:. Retrieved
1365:
1356:
1344:. Retrieved
1335:
1326:
1314:. Retrieved
1310:
1285:. Retrieved
1280:
1256:. Retrieved
1252:
1242:
1230:. Retrieved
1226:
1217:
1205:. Retrieved
1200:
1191:
1179:. Retrieved
1175:
1166:
1154:. Retrieved
1149:
1140:
1128:. Retrieved
1124:the original
1119:
1110:
1098:. Retrieved
1093:
1084:
1072:. Retrieved
1068:
1059:
1045:
1022:Meerut Metro
1017:Kanpur Metro
924:Kanpur Metro
839:
777:5.2 km
753:Track Gauge
695:
667:
649:Mankameshwar
622:
578:
555:
532:
507:
486:
463:
460:
442:
423:
416:
404:
397:
390:
369:Kanpur Metro
365:Meerut Metro
336:
334:
319:
216:Train length
162:27 (Phase 1)
148:
140:
116:Transit type
54:
41:
33:
3223: /
3182:Nashik Tram
3177:Mumbai Tram
3167:Kanpur Tram
3129:Operational
2938:Operational
2906:Thane Metro
2891:Jammu Metro
2814:Surat Metro
2809:Patna Metro
2771:Noida Metro
2741:Kochi Metro
2721:Delhi Metro
2689:Operational
2552:Operational
2139:Prem Mandir
2096:Mehtab Bagh
2086:Guru ka Tal
2076:Moti Masjid
2071:Jama Masjid
2066:Gyarah Sidi
1232:19 December
1181:28 February
1156:28 February
955:July 2021:
918:July 2020:
871:, and Agra.
763:Yellow Line
625:Yellow Line
564:Agra Cantt
535:Yellow Line
373:Noida Metro
240:Track gauge
141:Yellow Line
134:Line number
92:Area served
3238:Categories
3187:Patna Tram
3172:Kochi Tram
3162:Delhi Tram
2776:Pune Metro
2696:Agra Metro
2480:Saharanpur
2430:Chitrakoot
2267:Agra Metro
2231:Hindustani
2226:Braj Bhasa
2210:Agra Canal
1824:6 December
1820:(in Hindi)
1818:Amar Ujala
1798:23 October
1769:(in Hindi)
1767:Amar Ujala
1743:(in Hindi)
1692:(in Hindi)
1644:7 December
1618:30 October
1612:Amar Ujala
1592:30 October
1540:29 January
1481:Amar Ujala
1429:(in Hindi)
1176:aninews.in
1037:References
820:third rail
732:Line Name
726:Agra Metro
677:Agra Cantt
656:6 km
608:Terminals
605:Line Name
541:Sikandara
521:Terminals
518:Line Name
510:Agra Cantt
480:(TOD) and
343:system in
337:Agra Metro
314:System map
288:third rail
200:2024-03-06
60:Agra Metro
44:March 2024
3036:Metrolite
2475:Prayagraj
2470:Moradabad
2440:Gorakhpur
2435:Devipatan
2308:Firozabad
2255:Transport
2174:Firozabad
2162:Districts
2031:Agra Fort
2026:Taj Mahal
1514:29 August
1376:9 October
1346:9 October
1316:16 August
1287:16 August
1130:9 October
936:stations.
840:In 2020,
818:750 V DC
747:Terminal
670:Blue Line
631:Sikandra
614:Stations
558:Blue Line
527:Stations
430:Agra Fort
426:Taj Mahal
302:Top speed
224:Technical
219:3 Coaches
208:Character
185:Operation
149:Blue Line
3090:Proposed
2970:Proposed
2930:Monorail
2879:Proposed
2653:Proposed
2578:Lucknow
2542:Suburban
2485:Varanasi
2465:Mirzapur
2420:Bareilly
2415:Azamgarh
2332:See also
2323:Mainpuri
2179:Mainpuri
2091:Ram Bagh
1488:20 March
1460:20 March
1433:20 March
1370:Archived
1340:Archived
996:See also
813: in
741:Station
690:Planned
600:Phase 1
263: in
77:Overview
3145:Defunct
3044:Planned
2954:Planned
2828:Planned
2681:transit
2632:Planned
2455:Lucknow
2410:Ayodhya
2405:Aligarh
2318:Mathura
2184:Mathura
1969:Krishna
1927:General
1876:6 March
1850:12 July
1566:15 June
1454:Outlook
1258:6 March
1207:5 March
1100:6 March
1074:6 March
808:⁄
744:Length
611:Length
524:Length
496:Phase 1
484:(TDR).
387:History
258:⁄
198: (
169:Website
34:updated
2460:Meerut
2450:Kanpur
2445:Jhansi
2200:Yamuna
1921:topics
869:Kanpur
865:Meerut
787:Alstom
371:, and
176:.lmrcl
102:Locale
2790:Under
2679:Rapid
2608:Under
2425:Basti
2246:Jatav
961:euros
790:MOVIA
696:Total
579:Total
393:RITES
353:India
339:is a
82:Owner
3121:Tram
2544:rail
2303:Agra
2241:Urdu
2169:Agra
1939:Braj
1934:Doab
1878:2024
1852:2023
1826:2021
1800:2021
1775:2021
1749:2021
1723:2021
1698:2021
1672:2021
1646:2020
1620:2020
1594:2020
1568:2020
1542:2020
1516:2019
1490:2019
1462:2019
1435:2019
1378:2017
1348:2017
1318:2020
1289:2020
1260:2024
1234:2020
1209:2024
1201:Mint
1183:2019
1158:2019
1132:2017
1102:2024
1076:2024
899:LMRC
771:N/A
466:BRTS
345:Agra
335:The
280:750
178:.com
106:Agra
96:Agra
703:28
687:15
586:28
573:15
550:13
174:www
3240::
1868:.
1842:.
1816:.
1791:.
1765:.
1739:.
1714:.
1688:.
1662:.
1636:.
1610:.
1585:.
1558:.
1532:.
1506:.
1478:.
1451:.
1423:.
1364:.
1334:.
1309:.
1297:^
1279:.
1268:^
1251:.
1225:.
1199:.
1174:.
1148:.
1092:.
1067:.
867:,
815:)
774:6
659:6
640:7
428:,
375:.
367:,
363:,
351:,
347:,
285:DC
265:)
108:,
2519:e
2512:t
2505:v
1911:e
1904:t
1897:v
1880:.
1854:.
1828:.
1802:.
1777:.
1751:.
1725:.
1700:.
1674:.
1648:.
1622:.
1596:.
1570:.
1544:.
1518:.
1492:.
1464:.
1437:.
1380:.
1350:.
1320:.
1291:.
1262:.
1236:.
1211:.
1185:.
1160:.
1134:.
1104:.
1078:.
1053:.
894:.
879:₹
810:2
806:1
803:+
801:8
797:(
455:₹
419:₹
400:₹
282:V
260:2
256:1
253:+
251:8
247:(
202:)
129:2
46:)
42:(
36:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.