371:
with no impact on the power supply. The system was isolated, and energisation testing was not permitted to resume until 29 September 2021. The cause of the fire was determined to have been a leak of cooling fluid that short-circuited cells to thermal runaway. Subsequent configuration changes mean that the monitoring remains active on offline battery packs.
370:
modules and destroyed two battery units while the fire was left to burn itself out, as recommended. No injuries were reported. The battery pack had been placed into offline mode before the fire, and this had also isolated the monitoring and management systems. The site was disconnected from the grid,
283:
during periods of network instability by providing grid support services, capturing and storing excess energy from sources such as wind farms, and feeding it into the grid during peak periods or outages to support
Victoria's electricity supply. The battery will store enough energy to power more than
296:
Construction began in
January 2021. The battery was scheduled to be commissioned in the Australian summer period 2021-2022 and has been in operation since December 8, 2021. For Neoen's battery, the EPC (Engineering, Procurement and Construction) contractor is
334:
to reserve approximately 80% of its capacity during the summer months to provide 250 MW of System
Integrity Protection Scheme (SIPS) services. This will increase the transfer capacity on the Victorian/New South Wales
950:
945:
342:
The remaining 50 MW of the battery can be commercially deployed in the market by the operator. Outside the summer period, the battery, with a total capacity of 300 MW, will be operated commercially.
601:
319:
The battery is being built within AusNet's
Moorabool Power Terminal in close proximity to the 500 KV high voltage line so that power can be sent quickly to where it is needed.
1286:
871:
316:
The storage unit uses 212 Tesla
Megapacks, each with a capacity of 3 MWh. This will be the first time Megapacks have been used in a facility of this scale in Australia.
1356:
462:
886:
1291:
921:
866:
322:
Construction of the battery was supported by a $ 160 million loan from the Clean Energy
Finance Corporation, an agency owned by the Australian federal government.
388:
1270:
896:
825:
810:
861:
567:
593:
1361:
346:
With the services provided by the battery, average industrial electricity consumers could save as much as $ 280,000 per year on their bills. The
548:
1327:
489:
1351:
633:
1366:
1296:
1250:
940:
748:
723:
1301:
519:
1260:
68:
738:
1255:
413:
331:
1346:
1043:
626:
262:
254:, United States. As of December 2021, the project is the largest lithium-ion battery in the Southern Hemisphere.
1038:
781:
768:
707:
355:
758:
743:
687:
1265:
728:
619:
490:"Neoen starts operating 300 MW Victorian Big Battery in Australia, one of the world's largest batteries"
366:
During the initial testing of the energy storage system on 30 July 2021, a fire broke out in one of the
753:
347:
820:
805:
440:
1306:
677:
330:
Following a tender issued by the
Victorian Government in 2020, Neoen was awarded a contract by the
272:
Construction started at the beginning of 2021. It commenced operations on 8 December 2021. It uses
1234:
851:
800:
682:
246:. The battery provides 450 MWh of storage and can discharge at 300 MW. It surpasses the 250 MWh
177:
876:
697:
692:
661:
656:
247:
971:
881:
702:
520:"Victoria's new Tesla battery in Moorabool to drive down power prices, State Government says"
467:
235:
108:
966:
835:
830:
815:
795:
524:
8:
986:
911:
856:
243:
53:
1085:
976:
891:
763:
642:
284:
half a million
Victorian homes for an hour, or the homes of a population equivalent of
276:
storage units, an electric accumulator designed specifically for large-scale projects.
161:
981:
845:
389:"LS Power Energizes World's Biggest Battery, Just in Time for California's Heat Wave"
594:"Investigation confirms cause of fire at Tesla's Victorian Big Battery in Australia"
568:"Tesla 450MWh Victorian Big Battery in Australia resumes testing after fire setback"
257:
The
Victorian Big Battery is owned and operated by French renewable energy producer
991:
916:
906:
790:
1179:
1101:
901:
840:
306:
339:
during peak consumption periods and reduce the risk of unplanned power outages.
1171:
549:"Grid inertia measurement trial at Australia's biggest battery storage project"
367:
336:
1340:
1229:
1213:
1195:
1158:
1133:
733:
302:
83:
70:
216:
1166:
310:
298:
280:
273:
1184:
463:"Federal green bank powers up Victoria's 'Big Battery' with $ 160m boost"
230:
is a grid-connected battery electricity storage facility adjacent to the
1208:
1153:
266:
251:
202:
1203:
611:
305:
as the prime contractor. The connection assets are being provided by
231:
1316:
285:
239:
1311:
1117:
496:
258:
146:
130:
350:
could see its bills drop by as much as $ 1 million per year.
441:"$ 160 million for Victorian Big Battery – Energy Spurt"
1357:Electric power infrastructure in Victoria (state)
1338:
414:"Neoen switches on Australia's biggest battery"
288:(the city where it is situated) for two hours.
261:. Funding of $ 160 million was provided by the
1095:Eastern/northeastern suburbs, eastern Victoria
627:
1127:Southeastern suburbs, Mornington Peninsula
634:
620:
591:
565:
546:
517:
1362:Energy infrastructure completed in 2021
460:
1339:
641:
1010:Victoria Harbour Cogeneration Project
615:
566:Colthorpe, Andy (28 September 2021).
518:Rollason, Bridget (5 November 2020).
438:
16:Power station in Victoria, Australia
1352:Buildings and structures in Geelong
1261:Australian Energy Market Commission
13:
1328:List of power stations in Victoria
511:
461:Toscano, Nick (25 February 2021).
406:
14:
1378:
1256:Australian Energy Market Operator
1079:Western suburbs, western Victoria
604:from the original on 11 May 2022.
547:Colthorpe, Andy (25 April 2023).
332:Australian Energy Market Operator
1367:2021 establishments in Australia
1044:Gannawarra Energy Storage System
263:Clean Energy Finance Corporation
592:Colthorpe, Andy (11 May 2022).
358:with 'grid forming' abilities.
291:
1039:Ballarat Energy Storage System
585:
559:
540:
482:
454:
432:
381:
265:, the Australian government's
1:
1287:Decommissioned power stations
1251:Essential Services Commission
374:
1297:State Electricity Commission
1024:Portland Geothermal Facility
279:The battery aims to prevent
7:
1266:Australian Energy Regulator
325:
10:
1383:
1007:Symex Cogeneration Project
354:The battery is tested for
348:Portland aluminium smelter
1325:
1292:Defunct utility companies
1279:
1243:
1222:
1146:
1126:
1110:
1094:
1078:
1064:
1057:
1031:
1017:
1000:
959:
930:
777:
716:
670:
650:Coal-fired power stations
649:
420:. Yahoo!. 8 December 2021
313:as the prime contractor.
213:
197:
192:
176:
160:
155:
139:
123:
107:
99:
62:
46:
32:
28:
23:
1307:Victorian Power Exchange
1302:Gas and Fuel Corporation
1163:Australian Power and Gas
671:Gas-fired power stations
1347:Energy storage projects
361:
162:Nameplate capacity
393:www.greentechmedia.com
248:Gateway Energy Storage
1049:Victorian Big Battery
468:Sydney Morning Herald
228:Victorian Big Battery
178:Storage capacity
156:Power generation
24:Victorian Big Battery
1271:Energy Safe Victoria
1192:Neighbourhood Energy
1176:Dodo Power & Gas
1111:Northwestern suburbs
109:Commission date
598:Energy Storage News
572:Energy Storage News
553:Energy Storage News
244:Victoria, Australia
203:victorianbigbattery
193:External links
80: /
1086:Powercor Australia
960:Solar photovoltaic
931:Solar concentrator
643:Energy in Victoria
439:Hartmann, Imogen.
234:Terminal Station (
1334:
1333:
1142:
1141:
499:. 8 December 2021
495:(Press release).
224:
223:
1374:
1062:
1061:
872:Mount Gellibrand
636:
629:
622:
613:
612:
606:
605:
589:
583:
582:
580:
578:
563:
557:
556:
544:
538:
537:
535:
533:
515:
509:
508:
506:
504:
494:
486:
480:
479:
477:
475:
458:
452:
451:
449:
447:
436:
430:
429:
427:
425:
410:
404:
403:
401:
399:
385:
351:
217:edit on Wikidata
209:
206:
204:
95:
94:
92:
91:
90:
85:
84:38.04°S 144.29°E
81:
78:
77:
76:
73:
21:
20:
1382:
1381:
1377:
1376:
1375:
1373:
1372:
1371:
1337:
1336:
1335:
1330:
1321:
1275:
1239:
1218:
1189:Momentum Energy
1180:EnergyAustralia
1138:
1122:
1106:
1102:Ausnet Services
1090:
1074:
1065:Inner Melbourne
1053:
1027:
1013:
996:
955:
926:
821:Coonooer Bridge
806:Challicum Hills
779:
773:
769:Yarrawonga Weir
712:
666:
645:
640:
610:
609:
590:
586:
576:
574:
564:
560:
545:
541:
531:
529:
516:
512:
502:
500:
492:
488:
487:
483:
473:
471:
459:
455:
445:
443:
437:
433:
423:
421:
412:
411:
407:
397:
395:
387:
386:
382:
377:
364:
345:
328:
307:AusNet Services
294:
220:
201:
188:
172:
151:
135:
119:
116:8 December 2021
88:
86:
82:
79:
74:
71:
69:
67:
66:
58:
42:
17:
12:
11:
5:
1380:
1370:
1369:
1364:
1359:
1354:
1349:
1332:
1331:
1326:
1323:
1322:
1320:
1319:
1314:
1309:
1304:
1299:
1294:
1289:
1283:
1281:
1277:
1276:
1274:
1273:
1268:
1263:
1258:
1253:
1247:
1245:
1241:
1240:
1238:
1237:
1232:
1226:
1224:
1220:
1219:
1217:
1216:
1211:
1206:
1201:
1198:
1193:
1190:
1187:
1182:
1177:
1174:
1172:Country Energy
1169:
1164:
1161:
1156:
1150:
1148:
1144:
1143:
1140:
1139:
1137:
1136:
1130:
1128:
1124:
1123:
1121:
1120:
1114:
1112:
1108:
1107:
1105:
1104:
1098:
1096:
1092:
1091:
1089:
1088:
1082:
1080:
1076:
1075:
1073:
1072:
1068:
1066:
1059:
1055:
1054:
1052:
1051:
1046:
1041:
1035:
1033:
1029:
1028:
1026:
1025:
1021:
1019:
1015:
1014:
1012:
1011:
1008:
1004:
1002:
998:
997:
995:
994:
989:
984:
979:
974:
969:
963:
961:
957:
956:
954:
953:
948:
943:
934:
932:
928:
927:
925:
924:
919:
914:
909:
904:
899:
894:
889:
884:
879:
874:
869:
864:
859:
854:
849:
843:
838:
833:
828:
823:
818:
813:
808:
803:
798:
793:
787:
785:
775:
774:
772:
771:
766:
764:William Hovell
761:
759:Rubicon Scheme
756:
751:
746:
744:Eildon Pondage
741:
736:
731:
726:
720:
718:
714:
713:
711:
710:
705:
700:
695:
690:
688:Laverton North
685:
680:
674:
672:
668:
667:
665:
664:
659:
653:
651:
647:
646:
639:
638:
631:
624:
616:
608:
607:
584:
558:
539:
510:
481:
453:
431:
405:
379:
378:
376:
373:
368:Tesla Megapack
363:
360:
337:interconnector
327:
324:
293:
290:
274:Tesla Megapack
222:
221:
214:
211:
210:
199:
195:
194:
190:
189:
187:
186:
182:
180:
174:
173:
171:
170:
166:
164:
158:
157:
153:
152:
150:
149:
143:
141:
137:
136:
134:
133:
127:
125:
121:
120:
118:
117:
113:
111:
105:
104:
101:
97:
96:
89:-38.04; 144.29
64:
60:
59:
57:
56:
50:
48:
44:
43:
41:
40:
36:
34:
30:
29:
26:
25:
15:
9:
6:
4:
3:
2:
1379:
1368:
1365:
1363:
1360:
1358:
1355:
1353:
1350:
1348:
1345:
1344:
1342:
1329:
1324:
1318:
1315:
1313:
1310:
1308:
1305:
1303:
1300:
1298:
1295:
1293:
1290:
1288:
1285:
1284:
1282:
1278:
1272:
1269:
1267:
1264:
1262:
1259:
1257:
1254:
1252:
1249:
1248:
1246:
1242:
1236:
1235:Solar Systems
1233:
1231:
1230:Pacific Hydro
1228:
1227:
1225:
1221:
1215:
1214:Simply Energy
1212:
1210:
1207:
1205:
1202:
1199:
1197:
1196:Origin Energy
1194:
1191:
1188:
1186:
1183:
1181:
1178:
1175:
1173:
1170:
1168:
1165:
1162:
1160:
1159:Alinta Energy
1157:
1155:
1152:
1151:
1149:
1145:
1135:
1134:United Energy
1132:
1131:
1129:
1125:
1119:
1116:
1115:
1113:
1109:
1103:
1100:
1099:
1097:
1093:
1087:
1084:
1083:
1081:
1077:
1070:
1069:
1067:
1063:
1060:
1056:
1050:
1047:
1045:
1042:
1040:
1037:
1036:
1034:
1030:
1023:
1022:
1020:
1016:
1009:
1006:
1005:
1003:
999:
993:
990:
988:
985:
983:
980:
978:
975:
973:
970:
968:
965:
964:
962:
958:
952:
949:
947:
944:
942:
939:
936:
935:
933:
929:
923:
920:
918:
915:
913:
910:
908:
905:
903:
900:
898:
895:
893:
890:
888:
887:Oaklands Hill
885:
883:
880:
878:
875:
873:
870:
868:
865:
863:
860:
858:
855:
853:
852:Leonards Hill
850:
847:
844:
842:
839:
837:
834:
832:
829:
827:
824:
822:
819:
817:
814:
812:
809:
807:
804:
802:
799:
797:
794:
792:
789:
788:
786:
783:
776:
770:
767:
765:
762:
760:
757:
755:
752:
750:
747:
745:
742:
740:
737:
735:
732:
730:
727:
725:
722:
721:
719:
717:Hydroelectric
715:
709:
706:
704:
701:
699:
696:
694:
691:
689:
686:
684:
681:
679:
676:
675:
673:
669:
663:
660:
658:
655:
654:
652:
648:
644:
637:
632:
630:
625:
623:
618:
617:
614:
603:
599:
595:
588:
573:
569:
562:
554:
550:
543:
527:
526:
521:
514:
498:
491:
485:
470:
469:
464:
457:
442:
435:
419:
415:
409:
394:
390:
384:
380:
372:
369:
359:
357:
352:
349:
343:
340:
338:
333:
323:
320:
317:
314:
312:
308:
304:
300:
289:
287:
282:
277:
275:
270:
268:
264:
260:
255:
253:
249:
245:
241:
237:
233:
229:
218:
212:
208:
200:
196:
191:
185:450 MW h
184:
183:
181:
179:
175:
168:
167:
165:
163:
159:
154:
148:
145:
144:
142:
138:
132:
129:
128:
126:
122:
115:
114:
112:
110:
106:
102:
98:
93:
65:
61:
55:
52:
51:
49:
45:
38:
37:
35:
31:
27:
22:
19:
1167:Click Energy
1058:Distributors
1048:
1001:Cogeneration
937:
922:Yaloak South
877:Mount Mercer
867:Mortons Lane
754:Kiewa Scheme
708:Valley Power
597:
587:
575:. Retrieved
571:
561:
552:
542:
530:. Retrieved
523:
513:
501:. Retrieved
484:
472:. Retrieved
466:
456:
444:. Retrieved
434:
422:. Retrieved
417:
408:
396:. Retrieved
392:
383:
365:
356:grid inertia
353:
344:
341:
329:
321:
318:
315:
295:
292:Construction
278:
271:
256:
227:
225:
18:
1200:Powerdirect
1185:Lumo Energy
882:Murra Warra
749:McKay Creek
577:13 December
532:13 December
528:. Australia
503:13 December
474:29 December
446:29 December
424:14 December
398:30 December
169:300 MW
140:Operator(s)
103:Operational
87: /
63:Coordinates
1341:Categories
1280:Historical
1244:Regulators
1223:Generators
1209:Red Energy
1154:AGL Energy
1018:Geothermal
972:Gannawarra
951:Shepparton
897:Salt Creek
831:Dundonnell
816:Codrington
796:Bald Hills
778:Wind farms
724:Banimboola
678:Bairnsdale
375:References
267:green bank
252:California
236:substation
1204:Powershop
1147:Retailers
1071:Citipower
967:Bannerton
938:Proposed:
912:Wonthaggi
857:Macarthur
826:Crowlands
811:Chepstowe
734:Dartmouth
729:Blue Rock
683:Jeeralang
418:yahoonews
281:blackouts
232:Moorabool
54:Moorabool
39:Australia
987:Numurkah
892:Portland
848:(Yendon)
698:Somerton
693:Mortlake
662:Yallourn
657:Loy Yang
602:Archived
525:ABC News
326:Services
301:, using
124:Owner(s)
75:144°17′E
47:Location
1317:VENCorp
1032:Storage
977:Karadoc
946:Bendigo
941:Mildura
862:Maroona
846:Lal Lal
836:Hepburn
801:Bulgana
703:Newport
309:, with
286:Geelong
240:Geelong
238:) near
198:Website
72:38°02′S
33:Country
1312:NEMMCO
1118:Jemena
982:Kiamal
917:Yambuk
907:Waubra
791:Ararat
739:Eildon
311:Downer
100:Status
992:Wemen
902:Toora
841:Kiata
497:Neoen
493:(PDF)
299:Tesla
259:Neoen
215:[
147:Neoen
131:Neoen
782:List
579:2021
534:2021
505:2021
476:2021
448:2021
426:2021
400:2021
362:Fire
226:The
205:.com
303:UGL
250:in
242:in
207:.au
1343::
600:.
596:.
570:.
551:.
522:.
465:.
416:.
391:.
269:.
784:)
780:(
635:e
628:t
621:v
581:.
555:.
536:.
507:.
478:.
450:.
428:.
402:.
219:]
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.