Knowledge

Pioneer MRT station

Source 📝

76: 390: 832: 1135: 397: 1121: 474: 482: 528:
that prevent commuters from falling onto the train tracks. Installation of the half-height screen doors eventually started on 21 June 2011. By 24 August that year, all of the screen doors were installed and began operations.
508:
carried out amendments and additions (A&A) works on Pioneer Road North, such as expanding the road and constructing an overhead pedestrian ramp bridge, as complements to the station to serve the residents of
441:
planning area. Rather, its name was derived from Pioneer Road North, a major road to the west of the station that travels in the north–south direction. Pioneer station is currently the nearest MRT station to the
461:
It is one of two above-ground stations on the MRT network with a privacy screen built along the track of the eastbound platform to ensure the privacy of nearby residents; the other station is
434:
and serves the residential estate of Pioneer. The station is located along Jurong West Street 63 and provides a convenient mode of transportation for residents and visitors to the area.
736: 798: 110: 1164: 760: 1174: 820: 828: 719: 701: 747: 624: 813: 443: 806: 764: 836: 427: 314: 66: 451: 1082: 447: 1047: 1016: 981: 1011: 931: 926: 583: 533: 389: 612: 1105: 956: 620: 505: 494: 504:
introduced a new feeder bus service 241 to provide bridging services for the N9 residents and the
1037: 976: 961: 941: 936: 876: 1069: 1006: 951: 896: 853: 455: 337: 165: 1021: 921: 886: 861: 748:
Award of Contract for the Widening of Pioneer Road North between Jurong West Avenue 4 and AYE
525: 462: 349: 329: 1169: 1001: 991: 986: 971: 911: 901: 866: 672: 537: 490: 344: 324: 723: 705: 8: 946: 906: 791: 521: 514: 510: 438: 431: 966: 916: 891: 881: 871: 497:
in December 2004 to help people working in the Jurong Industrial Area travel faster.
177: 75: 1139: 1042: 646: 557: 149: 81: 536:, which commenced operations on 10 June 2012. It was the second station, after 1158: 1125: 125: 112: 1076: 1110: 501: 145: 1088: 493:, it was part of the Boon Lay Extension (BLE) project announced by the 437:
Despite its name, Pioneer station is not physically located within the
831: 737:
Widening of Pioneer Road North between PIE and Jurong West Avenue 4
500:
The station opened on 28 February 2009 and following the opening,
761:"Above-ground MRT stations to have platform screen doors by 2012" 702:"Expanding The Rail Network: LTA To Build Boon Lay MRT Extension" 520:
As with most above-ground stations built in the past along the
704:. Land Transport Authority. 29 December 2004. Archived from 1120: 473: 481: 720:"New and Amended Bus Routes for Jurong West Residents" 846:
Italicised locations are currently not in operation
1030: 1156: 758: 647:"SMRT > Trains > NetworkMap > Pioneer" 558:"SMRT > Trains > NetworkMap > Pioneer" 837:Mass Rapid Transit (MRT) stations in Singapore 814: 43: 1165:Railway stations in Singapore opened in 2009 51: 821: 807: 74: 480: 472: 430:station in Singapore. It is part of the 1175:Mass Rapid Transit (Singapore) stations 16:Mass Rapid Transit station in Singapore 1157: 802: 313: 759:Wong, Siew Ying (January 26, 2008). 627:from the original on 14 August 2024 13: 763:. Channel NewsAsia. Archived from 14: 1186: 783: 524:, it was initially built without 485:A C651 train entering the station 1133: 1119: 830: 444:Nanyang Technological University 395: 388: 752: 532:The station was installed with 396: 741: 730: 712: 694: 665: 639: 605: 576: 550: 44: 1: 722:. SBS Transit. Archived from 543: 477:Pioneer MRT station at night. 409:Pioneer station in Singapore 7: 10: 1191: 534:high-volume low-speed fans 468: 1097: 1060: 852: 843: 613:"Land Transport DataMall" 383: 376: 372: 368: 364: 360: 318: 310: 306: 301: 297: 293: 285: 281: 276: 268: 250: 245: 237: 229: 221: 213: 205: 200: 192: 184: 172: 156: 141: 126:1.3375778°N 103.6972167°E 104: 94: 89: 73: 65: 52: 21: 1106:Land Transport Authority 621:Land Transport Authority 540:to have them installed. 506:Land Transport Authority 495:Land Transport Authority 98:31 Jurong West Street 63 679:. SMRT Corporation Ltd 653:. SMRT Corporation Ltd 590:. SMRT Corporation Ltd 564:. SMRT Corporation Ltd 486: 478: 456:Jurong Region MRT line 256:; 15 years ago 131:1.3375778; 103.6972167 526:platform screen doors 484: 476: 463:Marsiling MRT station 254:28 February 2009 1140:Singapore portal 1031:Changi Airport Line 677:journey.smrt.com.sg 588:journey.smrt.com.sg 454:stations along the 424:Pioneer MRT station 122: /  90:General information 487: 479: 432:MRT East West Line 428:Mass Rapid Transit 319:Following station 315:Mass Rapid Transit 311:Preceding station 230:Bicycle facilities 84:of Pioneer station 67:Mass Rapid Transit 1152: 1151: 1126:Trains portal 1056: 1055: 726:on 16 March 2009. 489:Built along with 421: 420: 417: 416: 356: 355: 178:1 island platform 1182: 1138: 1137: 1136: 1124: 1123: 1075: 1072: 1028: 1027: 835: 834: 823: 816: 809: 800: 799: 795: 794: 792:Official website 777: 776: 774: 772: 767:on July 30, 2012 756: 750: 745: 739: 734: 728: 727: 716: 710: 709: 698: 692: 691: 686: 684: 669: 663: 662: 660: 658: 643: 637: 636: 634: 632: 609: 603: 602: 597: 595: 580: 574: 573: 571: 569: 554: 452:Nanyang Crescent 446:until 2029 when 399: 398: 392: 374: 373: 308: 307: 264: 262: 257: 163: 150:SMRT Corporation 137: 136: 134: 133: 132: 127: 123: 120: 119: 118: 115: 100:Singapore 648310 78: 56: 55: 54: 48: 47: 46: 38: 37: 36: 30: 19: 18: 1190: 1189: 1185: 1184: 1183: 1181: 1180: 1179: 1155: 1154: 1153: 1148: 1147: 1134: 1132: 1118: 1093: 1070: 1067: 1052: 1026: 848: 839: 829: 827: 790: 789: 786: 781: 780: 770: 768: 757: 753: 746: 742: 735: 731: 718: 717: 713: 708:on 13 May 2011. 700: 699: 695: 682: 680: 673:"SMRT Journeys" 671: 670: 666: 656: 654: 651:www.smrt.com.sg 645: 644: 640: 630: 628: 611: 610: 606: 593: 591: 584:"SMRT Journeys" 582: 581: 577: 567: 565: 562:www.smrt.com.sg 556: 555: 551: 546: 471: 448:Nanyang Gateway 413: 412: 411: 410: 407: 406: 405: 404: 400: 379: 352: 332: 260: 258: 255: 214:Platform levels 168: 161: 146:SMRT Trains Ltd 130: 128: 124: 121: 116: 113: 111: 109: 108: 99: 85: 82:island platform 61: 60: 59: 58: 57: 50: 49: 42: 41: 39: 34: 28: 27: 26: 17: 12: 11: 5: 1188: 1178: 1177: 1172: 1167: 1150: 1149: 1146: 1145: 1144: 1143: 1129: 1113: 1108: 1099: 1098: 1095: 1094: 1092: 1091: 1086: 1079: 1064: 1062: 1058: 1057: 1054: 1053: 1051: 1050: 1048:Changi Airport 1045: 1040: 1034: 1032: 1025: 1024: 1019: 1017:Tuas West Road 1014: 1009: 1004: 999: 994: 989: 984: 982:Chinese Garden 979: 974: 969: 964: 959: 954: 949: 944: 939: 934: 929: 924: 919: 914: 909: 904: 899: 894: 889: 884: 879: 874: 869: 864: 858: 856: 854:East–West Line 850: 849: 844: 841: 840: 826: 825: 818: 811: 803: 797: 796: 785: 784:External links 782: 779: 778: 751: 740: 729: 711: 693: 664: 638: 617:mytransport.sg 604: 575: 548: 547: 545: 542: 522:East West line 470: 467: 419: 418: 415: 414: 408: 402: 401: 394: 393: 387: 386: 385: 384: 381: 380: 377: 370: 369: 366: 365: 362: 361: 358: 357: 354: 353: 347: 342: 340: 338:East–West Line 335: 333: 327: 321: 320: 317: 312: 304: 303: 299: 298: 295: 294: 291: 290: 289:27,013 per day 287: 283: 282: 279: 278: 274: 273: 270: 266: 265: 252: 248: 247: 243: 242: 239: 235: 234: 231: 227: 226: 223: 219: 218: 215: 211: 210: 207: 206:Structure type 203: 202: 198: 197: 194: 190: 189: 186: 182: 181: 174: 170: 169: 166:East–West Line 160: 158: 154: 153: 143: 139: 138: 117:103°41′49.98″E 106: 102: 101: 96: 92: 91: 87: 86: 79: 71: 70: 63: 62: 25: 24: 23: 22: 15: 9: 6: 4: 3: 2: 1187: 1176: 1173: 1171: 1168: 1166: 1163: 1162: 1160: 1142: 1141: 1130: 1128: 1127: 1122: 1116: 1115: 1114: 1112: 1109: 1107: 1104: 1101: 1100: 1096: 1090: 1087: 1085: 1084: 1080: 1078: 1073: 1066: 1065: 1063: 1059: 1049: 1046: 1044: 1041: 1039: 1036: 1035: 1033: 1029: 1023: 1020: 1018: 1015: 1013: 1012:Tuas Crescent 1010: 1008: 1005: 1003: 1000: 998: 995: 993: 990: 988: 985: 983: 980: 978: 975: 973: 970: 968: 965: 963: 960: 958: 955: 953: 950: 948: 945: 943: 940: 938: 935: 933: 932:Tanjong Pagar 930: 928: 927:Raffles Place 925: 923: 920: 918: 915: 913: 910: 908: 905: 903: 900: 898: 895: 893: 890: 888: 885: 883: 880: 878: 875: 873: 870: 868: 865: 863: 860: 859: 857: 855: 851: 847: 842: 838: 833: 824: 819: 817: 812: 810: 805: 804: 801: 793: 788: 787: 766: 762: 755: 749: 744: 738: 733: 725: 721: 715: 707: 703: 697: 690: 678: 674: 668: 652: 648: 642: 626: 622: 618: 614: 608: 601: 589: 585: 579: 563: 559: 553: 549: 541: 539: 535: 530: 527: 523: 518: 516: 512: 507: 503: 498: 496: 492: 483: 475: 466: 464: 459: 457: 453: 449: 445: 440: 435: 433: 429: 425: 391: 382: 375: 371: 367: 363: 359: 351: 346: 343: 341: 339: 336: 334: 331: 326: 323: 322: 316: 309: 305: 300: 296: 292: 288: 284: 280: 275: 271: 267: 253: 249: 244: 240: 236: 232: 228: 224: 220: 216: 212: 208: 204: 199: 195: 191: 187: 183: 179: 175: 171: 167: 159: 155: 151: 147: 144: 140: 135: 107: 103: 97: 93: 88: 83: 77: 72: 69:(MRT) station 68: 64: 33: 20: 1131: 1117: 1102: 1081: 996: 957:Commonwealth 845: 769:. Retrieved 765:the original 754: 743: 732: 724:the original 714: 706:the original 696: 688: 683:10 September 681:. Retrieved 676: 667: 657:10 September 655:. Retrieved 650: 641: 629:. Retrieved 616: 607: 599: 594:10 September 592:. Retrieved 587: 578: 568:10 September 566:. Retrieved 561: 552: 531: 519: 499: 488: 460: 436: 423: 422: 201:Construction 114:1°20′15.28″N 31: 1170:Jurong West 1111:SMRT Trains 1038:Tanah Merah 977:Jurong East 962:Buona Vista 942:Tiong Bahru 937:Outram Park 877:Tanah Merah 771:February 1, 502:SBS Transit 269:Electrified 193:Connections 142:Operated by 129: / 105:Coordinates 1159:Categories 1083:East Coast 1007:Gul Circle 952:Queenstown 897:Paya Lebar 544:References 277:Passengers 261:2009-02-28 238:Accessible 1103:See also: 1022:Tuas Link 922:City Hall 887:Kembangan 862:Pasir Ris 631:14 August 600:Amenities 350:Tuas Link 330:Pasir Ris 286:June 2024 196:Bus, Taxi 173:Platforms 1061:Depot(s) 1002:Joo Koon 992:Boon Lay 987:Lakeside 972:Clementi 912:Lavender 902:Aljunied 867:Tampines 625:Archived 538:Tampines 491:Joo Koon 378:Location 348:towards 345:Joo Koon 328:towards 325:Boon Lay 302:Services 209:Elevated 95:Location 997:Pioneer 947:Redhill 907:Kallang 689:Pioneer 515:Pioneer 511:Nanyang 469:History 458:opens. 439:Pioneer 403:Pioneer 259: ( 246:History 222:Parking 157:Line(s) 53:பயனியர் 40:Pioneer 1077:Changi 1074:  1068:  251:Opened 185:Tracks 164:  162:  35:  29:  967:Dover 917:Bugis 892:Eunos 882:Bedok 872:Simei 426:is a 1089:Tuas 1043:Expo 773:2012 685:2017 659:2017 633:2024 596:2017 570:2017 513:and 450:and 80:The 32:EW28 1071:EWL 272:Yes 241:Yes 233:Yes 176:2 ( 1161:: 687:. 675:. 649:. 623:. 619:. 615:. 598:. 586:. 560:. 517:. 465:. 225:No 45:先驱 822:e 815:t 808:v 775:. 661:. 635:. 572:. 263:) 217:1 188:2 180:) 152:) 148:(

Index

Mass Rapid Transit

island platform
1°20′15.28″N 103°41′49.98″E / 1.3375778°N 103.6972167°E / 1.3375778; 103.6972167
SMRT Trains Ltd
SMRT Corporation
East–West Line
1 island platform
Mass Rapid Transit
Boon Lay
Pasir Ris
East–West Line
Joo Koon
Tuas Link
Singapore MRT/LRT system map
Mass Rapid Transit
MRT East West Line
Pioneer
Nanyang Technological University
Nanyang Gateway
Nanyang Crescent
Jurong Region MRT line
Marsiling MRT station


Joo Koon
Land Transport Authority
SBS Transit
Land Transport Authority
Nanyang

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.