and Nanyang Crescent stations and 1.4 km (0.87 mi) of associated viaducts – Contract J113 – was awarded to Hwa Seng Builder Pte Ltd at S$ 263 million (US$ 192.8 million) on 6 April 2021. Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029.
577: 547: 569: 539: 440:
Starting on 31 July 2022, a section of Nanyang Drive had to be temporarily diverted for the station's construction, with two bus stops along the road shifted accordingly. The overhead bridge connecting the
668: 752: 716: 409:(LTA) announced that Nanyang Crescent station would be part of the proposed JRL. The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to 517: 461:
stations. The official station code will be JW4. The station will be located in the Nanyang Technological University (NTU), along Nanyang Drive near the junction with Nanyang Walk.
478: 804: 610: 660: 99: 1176: 540:"News Room – News Releases – Joint News Release by the Land Transport Authority (LTA) & SLA – Jurong Region Line: Enhancing Connectivity in the West" 760: 1161: 826: 1171: 727: 509: 834: 570:"Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line" 1166: 486: 782: 819: 599: 635: 636:"J113 – Design and Construction of Nanyang Gateway Station, Nanyang Crescent Station and Viaduct for Jurong Region Line" 442: 394: 812: 882: 842: 690: 382: 269: 69: 956: 875: 284: 998: 991: 970: 445:(NTU) North Spine and the National Institute of Education (NIE) was demolished on 11 September that year. 1044: 454: 433: 279: 1058: 917: 458: 418: 302: 344: 1107: 406: 134: 1037: 1030: 984: 963: 910: 903: 410: 390: 425:. It was expected to be completed in 2028. However, the restrictions on construction due to the 1081: 1016: 859: 386: 292: 149: 977: 924: 896: 414: 78: 8: 931: 1023: 889: 938: 426: 422: 1136: 661:"Two Civil Contracts to Construct Four Stations for the Jurong Region Line Awarded" 1155: 1122: 161: 114: 101: 453:
Nanyang Crescent station will serve the JRL and will be located between the
1089: 479:"Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate" 837: 429:
has led to delays, with the completion date pushed to 2029.
1117: 510:"New Jurong Region Line to boost access for NTU students" 628: 683: 432:
The contract for the design and construction of the
393:, Singapore. The station will be located within the 852:
Italicised locations are currently not in operation
775: 1153: 843:Mass Rapid Transit (MRT) stations in Singapore 16:Future Mass Rapid Transit station in Singapore 820: 45: 653: 53: 1177:Railway stations scheduled to open in 2029 827: 813: 77: 351: 1162:Mass Rapid Transit (Singapore) stations 532: 501: 1172:Proposed railway stations in Singapore 1154: 783:"MRT Stations & Work Sites at NTU" 808: 364:Nanyang Crescent station in Singapore 268: 507: 485:. 21 September 2019. Archived from 13: 753:"JW4 Nanyang Crescent MRT station" 14: 1188: 671:from the original on 6 April 2021 616:from the original on 9 April 2021 580:from the original on 9 April 2021 550:from the original on 9 April 2021 520:from the original on 9 April 2021 83:Nanyang Crescent MRT station site 1167:Nanyang Technological University 1130: 1116: 836: 443:Nanyang Technological University 395:Nanyang Technological University 350: 343: 745: 709: 592: 562: 471: 46: 1: 464: 417:and a 3 station extension to 379:Nanyang Crescent MRT station 232:; 5 years' time 7: 10: 1193: 508:Lim, Adrian (9 May 2018). 448: 400: 1099: 1072: 1008: 948: 867: 858: 849: 338: 331: 327: 323: 319: 315: 273: 265: 261: 256: 252: 244: 226: 221: 213: 205: 197: 189: 181: 176: 168: 156: 140: 130: 93: 88: 76: 67: 54: 23: 1108:Land Transport Authority 757:Land Transport Authority 724:Land Transport Authority 665:Land Transport Authority 640:Hwa Seng Builder Pte Ltd 607:Land Transport Authority 544:Land Transport Authority 407:Land Transport Authority 135:Land Transport Authority 391:Western Water Catchment 385:(MRT) station on the 381:is a future elevated 115:1.34836°N 103.68085°E 1137:Singapore portal 489:on 21 September 2019 717:"Future system map" 576:. 1 February 2021. 405:On 9 May 2018, the 111: /  89:General information 883:Choa Chu Kang West 860:Jurong Region Line 387:Jurong Region line 383:Mass Rapid Transit 293:Jurong Region Line 274:Following station 270:Mass Rapid Transit 266:Preceding station 206:Bicycle facilities 150:Jurong Region Line 120:1.34836; 103.68085 70:Mass Rapid Transit 1149: 1148: 1123:Trains portal 1068: 1067: 957:Tengah Plantation 789:. 23 January 2022 697:. 26 January 2022 514:The Straits Times 427:COVID-19 pandemic 376: 375: 372: 371: 311: 310: 55:நன்யாங் க்ரெஸ்ஸன் 1184: 1135: 1134: 1133: 1121: 1120: 1087: 1084: 1052:Nanyang Crescent 999:Pandan Reservoir 992:Jurong Town Hall 971:Bukit Batok West 865: 864: 841: 840: 829: 822: 815: 806: 805: 799: 798: 796: 794: 779: 773: 772: 770: 768: 763:on 20 April 2021 759:. Archived from 749: 743: 742: 740: 738: 732: 726:. Archived from 721: 713: 707: 706: 704: 702: 691:"Latest Updates" 687: 681: 680: 678: 676: 667:. 6 April 2021. 657: 651: 650: 648: 646: 632: 626: 625: 623: 621: 615: 604: 596: 590: 589: 587: 585: 566: 560: 559: 557: 555: 546:. 9 April 2021. 536: 530: 529: 527: 525: 505: 499: 498: 496: 494: 475: 358:Nanyang Crescent 354: 353: 347: 329: 328: 263: 262: 240: 238: 233: 162:2 side platforms 147: 126: 125: 123: 122: 121: 116: 112: 109: 108: 107: 104: 81: 58: 57: 56: 50: 49: 48: 42:Nanyang Crescent 40: 39: 38: 32: 21: 20: 1192: 1191: 1187: 1186: 1185: 1183: 1182: 1181: 1152: 1151: 1150: 1145: 1144: 1131: 1129: 1115: 1095: 1082: 1079: 1064: 1045:Nanyang Gateway 1004: 944: 854: 845: 835: 833: 803: 802: 792: 790: 781: 780: 776: 766: 764: 751: 750: 746: 736: 734: 733:on 5 April 2021 730: 719: 715: 714: 710: 700: 698: 689: 688: 684: 674: 672: 659: 658: 654: 644: 642: 634: 633: 629: 619: 617: 613: 602: 600:"Contract J113" 598: 597: 593: 583: 581: 568: 567: 563: 553: 551: 538: 537: 533: 523: 521: 506: 502: 492: 490: 477: 476: 472: 467: 455:Nanyang Gateway 451: 434:Nanyang Gateway 403: 368: 367: 366: 365: 362: 361: 360: 359: 355: 334: 307: 297: 287: 280:Nanyang Gateway 236: 234: 231: 190:Platform levels 152: 145: 119: 117: 113: 110: 105: 102: 100: 98: 97: 84: 63: 62: 61: 60: 59: 52: 51: 44: 43: 41: 36: 30: 29: 28: 17: 12: 11: 5: 1190: 1180: 1179: 1174: 1169: 1164: 1147: 1146: 1143: 1142: 1141: 1140: 1126: 1110: 1101: 1100: 1097: 1096: 1094: 1093: 1076: 1074: 1070: 1069: 1066: 1065: 1063: 1062: 1059:Peng Kang Hill 1055: 1048: 1041: 1034: 1027: 1020: 1012: 1010: 1009:Stage 3 (2029) 1006: 1005: 1003: 1002: 995: 988: 981: 974: 967: 960: 952: 950: 949:Stage 2 (2028) 946: 945: 943: 942: 935: 928: 921: 918:Bahar Junction 914: 907: 900: 893: 886: 879: 871: 869: 868:Stage 1 (2027) 862: 856: 855: 850: 847: 846: 832: 831: 824: 817: 809: 801: 800: 774: 744: 708: 682: 652: 627: 591: 574:www.mot.gov.sg 561: 531: 500: 469: 468: 466: 463: 459:Peng Kang Hill 450: 447: 419:Peng Kang Hill 402: 399: 374: 373: 370: 369: 363: 357: 356: 349: 348: 342: 341: 340: 339: 336: 335: 332: 325: 324: 321: 320: 317: 316: 313: 312: 309: 308: 305: 303:Peng Kang Hill 300: 298: 296:Future service 295: 290: 288: 282: 276: 275: 272: 267: 259: 258: 254: 253: 250: 249: 246: 242: 241: 228: 224: 223: 219: 218: 215: 211: 210: 207: 203: 202: 199: 195: 194: 191: 187: 186: 183: 182:Structure type 179: 178: 174: 173: 170: 166: 165: 158: 154: 153: 144: 142: 138: 137: 132: 128: 127: 95: 91: 90: 86: 85: 82: 74: 73: 65: 64: 27: 26: 25: 24: 15: 9: 6: 4: 3: 2: 1189: 1178: 1175: 1173: 1170: 1168: 1165: 1163: 1160: 1159: 1157: 1139: 1138: 1127: 1125: 1124: 1119: 1113: 1112: 1111: 1109: 1106: 1103: 1102: 1098: 1092: 1091: 1085: 1078: 1077: 1075: 1071: 1061: 1060: 1056: 1054: 1053: 1049: 1047: 1046: 1042: 1040: 1039: 1035: 1033: 1032: 1028: 1026: 1025: 1021: 1019: 1018: 1014: 1013: 1011: 1007: 1001: 1000: 996: 994: 993: 989: 987: 986: 982: 980: 979: 975: 973: 972: 968: 966: 965: 961: 959: 958: 954: 953: 951: 947: 941: 940: 936: 934: 933: 929: 927: 926: 922: 920: 919: 915: 913: 912: 908: 906: 905: 901: 899: 898: 894: 892: 891: 887: 885: 884: 880: 878: 877: 876:Choa Chu Kang 873: 872: 870: 866: 863: 861: 857: 853: 848: 844: 839: 830: 825: 823: 818: 816: 811: 810: 807: 788: 784: 778: 762: 758: 754: 748: 729: 725: 718: 712: 696: 692: 686: 670: 666: 662: 656: 641: 637: 631: 612: 608: 601: 595: 579: 575: 571: 565: 549: 545: 541: 535: 519: 515: 511: 504: 488: 484: 480: 474: 470: 462: 460: 456: 446: 444: 438: 435: 430: 428: 424: 420: 416: 412: 408: 398: 396: 392: 388: 384: 380: 346: 337: 330: 326: 322: 318: 314: 304: 301: 299: 294: 291: 289: 286: 285:Choa Chu Kang 281: 278: 277: 271: 264: 260: 255: 251: 247: 243: 229: 225: 220: 216: 212: 208: 204: 200: 196: 192: 188: 184: 180: 175: 171: 167: 163: 159: 155: 151: 143: 139: 136: 133: 129: 124: 96: 92: 87: 80: 75: 72:(MRT) station 71: 66: 35: 22: 19: 1128: 1114: 1104: 1088: 1057: 1051: 1050: 1043: 1036: 1029: 1022: 1015: 997: 990: 983: 976: 969: 962: 955: 937: 930: 923: 916: 909: 902: 895: 888: 881: 874: 851: 791:. Retrieved 786: 777: 765:. Retrieved 761:the original 756: 747: 735:. Retrieved 728:the original 723: 711: 699:. Retrieved 694: 685: 673:. Retrieved 664: 655: 643:. Retrieved 639: 630: 618:. Retrieved 606: 594: 582:. Retrieved 573: 564: 552:. Retrieved 543: 534: 522:. Retrieved 513: 503: 493:21 September 491:. Retrieved 487:the original 482: 473: 452: 439: 431: 404: 378: 377: 177:Construction 33: 18: 1038:Jurong Pier 1031:Jurong Hill 985:Jurong East 964:Tengah Park 911:Jurong West 904:Corporation 411:Jurong Pier 245:Electrified 118: / 106:103°40′51″E 94:Coordinates 1156:Categories 1017:Enterprise 465:References 214:Accessible 1105:See also: 793:24 August 701:24 August 645:24 August 157:Platforms 103:1°20′54″N 1073:Depot(s) 978:Toh Guan 925:Boon Lay 897:Hong Kah 767:20 April 669:Archived 611:Archived 584:24 March 578:Archived 548:Archived 518:Archived 415:Boon Lay 333:Location 306:Terminus 283:towards 257:Services 185:Elevated 131:Owned by 932:Gek Poh 737:9 April 675:8 April 620:9 April 554:9 April 524:9 April 449:Details 401:History 397:(NTU). 235: ( 227:Opening 222:History 198:Parking 141:Line(s) 68:Future 1090:Tengah 1086:  1080:  1024:Tukang 890:Tengah 169:Tracks 148:  146:  37:  31:  939:Tawas 731:(PDF) 720:(PDF) 614:(PDF) 603:(PDF) 423:Tawas 421:from 413:from 795:2022 769:2021 739:2021 703:2022 677:2021 647:2022 622:2021 586:2021 556:2021 526:2021 495:2019 457:and 237:2029 230:2029 1083:JRL 787:NTU 695:NTU 483:CNA 389:in 248:Yes 217:Yes 209:Yes 201:Yes 160:2 ( 47:南洋弯 34:JW4 1158:: 785:. 755:. 722:. 693:. 663:. 638:. 609:. 605:. 572:. 542:. 516:. 512:. 481:. 828:e 821:t 814:v 797:. 771:. 741:. 705:. 679:. 649:. 624:. 588:. 558:. 528:. 497:. 239:) 193:1 172:2 164:)

Index

Mass Rapid Transit

1°20′54″N 103°40′51″E / 1.34836°N 103.68085°E / 1.34836; 103.68085
Land Transport Authority
Jurong Region Line
2 side platforms
Mass Rapid Transit
Nanyang Gateway
Choa Chu Kang
Jurong Region Line
Peng Kang Hill
Singapore MRT/LRT system map
Mass Rapid Transit
Jurong Region line
Western Water Catchment
Nanyang Technological University
Land Transport Authority
Jurong Pier
Boon Lay
Peng Kang Hill
Tawas
COVID-19 pandemic
Nanyang Gateway
Nanyang Technological University
Nanyang Gateway
Peng Kang Hill
"Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate"
the original
"New Jurong Region Line to boost access for NTU students"
Archived

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.