As of November 2019, a total Rs 37 billion ($ 300 million) had been raised for the project, mostly via an infrastructure tax on petroleum products imports. This tax allows to collect an estimated Rs 1 billion per month. The government targets to achieve the compensation process by mid-July 2020.
369:
snowmelt during the dry season. Conversely, Budhi Gandaki HPP, which used to be considered "top priority", was compromised by its massive cost and uncertainty related to population relocation. As a result, financing and construction of the latter might not occur during the next few years.
344:
The site has been identified as early as in the late 1970s. A pre-feasibility study was carried out in 1984, and a first feasibility study in 1998. Additional studies conducted by the NEA in 2010–2011 in order to optimize hydropower potential use on the site led to the current proposal.
348:
As of May 2019, the resettlement process was ongoing, with Rs 20 billion already spent in land acquisition in both concerned districts, and another Rs 18 billion set aside to complete compensation by the next fiscal year. In the meanwhile,
395:
Another impact is the heightened water levels will erode the already unstable hills of Dadhing and Gorkha. People who are living above the flooded area were not relocated will be exposed to potential landslides.
364:
to Budi Gandaki HPP, due to its lower social impact ("only" 162 households severely impacted), lower cost ($ 1.5 billion), slightly higher and substantially more steady power output, thanks to its feeding by
357: 685: 459: 695: 700: 142: 680: 675: 73: 392:
There is also large impact on fishing industry as the dam will block the migration of many fish species which impacts fisherman.
386:
generated by the dam is expected to displace 45,000 people. Those residents are to be relocated to a dedicated 785 hectares area.
559: 537: 334:
projects), being sometimes considered a national pride. The 225 meters high dam will also be one of the highest in the country.
656: 515: 389:
There are other concerns from India. In case of dam failure the millions of people will be affected in Bihar and Bengal.
130: 118: 690: 432: 327: 326:
With its planned installed capacity of 1,200 MW, it is the largest hydropower project in Nepal (before 900 MW
630: 361: 32: 705: 285: 649: 710: 488: 642: 8: 206: 43: 460:"Budhi Gandaki project plans to complete compensation distribution by next fiscal year" 350: 305: 585: 337:
Aside from the dam, a 225 km long ring road will be built all around the future
126: 24: 560:"Energy officials lean towards Dudh Koshi Hydroelectric Project | Energy Central" 114: 626: 315: 295: 246: 47: 669: 586:"Rs 37 billion collected so far to build Budhi Gandaki Hydroelectric Project" 366: 157: 144: 122: 491:. Government of Nepal, Ministry of Energy, Water resources and Irrigation 39: 614: 383: 338: 110: 51: 331: 214: 538:"Energy officials lean towards Dudh Koshi Hydroelectric Project" 622: 353:
started to raise concerns over the total cost of the project.
100: 28: 80: 46:, approximately 2 km upstream of its confluence with 625:, its collection, its distribution, or its uses is a 88:
Location of Budhi Gandaki Hydropower project in Nepal
377: 57:
Dam in Dhading district, Central Development Region
686:Proposed renewable energy power stations in Nepal 667: 516:"Land required for Budhi Gandaki project marked" 341:, which may also serve as a tourist attraction. 650: 696:Buildings and structures in Dhading District 701:Buildings and structures in Gorkha District 16:Proposed hydroelectric power plant in Nepal 657: 643: 382:The 49.8 km large, 45 km long 668: 510: 508: 506: 681:Hydroelectric power stations in Nepal 676:Proposed hydroelectric power stations 583: 483: 481: 479: 477: 454: 452: 450: 609: 427: 425: 423: 421: 419: 417: 415: 413: 411: 409: 503: 21:Budhi Gandaki Hydroelectric Project 13: 474: 447: 433:"Budhi Gandaki Hydropower project" 14: 722: 530: 406: 378:Social and environmental concerns 613: 358:Dudh Koshi Hydroelectric Project 79: 72: 63:Budhi Gandaki Hydropower project 577: 552: 42:plant is to be located on the 1: 540:. EnregyCentral. 27 June 2019 399: 629:. You can help Knowledge by 7: 50:, about 55 km west of 33:Nepal Electricity Authority 10: 727: 608: 131:Central Development Region 119:Western Development Region 356:In June 2019, the 635 MW 314: 304: 294: 284: 279: 271: 263: 255: 245: 237: 232: 224: 212: 202: 197: 189: 181: 173: 136: 106: 96: 67: 62: 691:National Pride Projects 306:Installed capacity 435:. Engineering Helpline 316:Annual generation 225:Spillway capacity 190:Construction cost 54:(80 km by road). 272:Normal elevation 158:27.82556°N 84.77361°E 31:, to be developed by 518:. The Kathmandu Post 462:. The Kathmandu Post 621:This article about 489:"About the Project" 264:Maximum length 247:Catchment area 238:Total capacity 207:Budhi Gandaki River 154: /  44:Budhi Gandaki River 163:27.82556; 84.77361 706:Dam controversies 638: 637: 564:energycentral.com 324: 323: 256:Surface area 198:Dam and spillways 718: 659: 652: 645: 617: 610: 600: 599: 597: 596: 581: 575: 574: 572: 571: 556: 550: 549: 547: 545: 534: 528: 527: 525: 523: 512: 501: 500: 498: 496: 485: 472: 471: 469: 467: 456: 445: 444: 442: 440: 429: 360:was favoured by 351:Finance Misistry 169: 168: 166: 165: 164: 159: 155: 152: 151: 150: 147: 127:Dhading district 83: 82: 76: 60: 59: 726: 725: 721: 720: 719: 717: 716: 715: 666: 665: 664: 663: 606: 604: 603: 594: 592: 582: 578: 569: 567: 558: 557: 553: 543: 541: 536: 535: 531: 521: 519: 514: 513: 504: 494: 492: 487: 486: 475: 465: 463: 458: 457: 448: 438: 436: 431: 430: 407: 402: 380: 162: 160: 156: 153: 148: 145: 143: 141: 140: 115:Gorkha district 92: 91: 90: 89: 86: 85: 84: 58: 27:power plant in 17: 12: 11: 5: 724: 714: 713: 708: 703: 698: 693: 688: 683: 678: 662: 661: 654: 647: 639: 636: 635: 618: 602: 601: 576: 566:. 27 June 2019 551: 529: 502: 473: 446: 404: 403: 401: 398: 379: 376: 322: 321: 318: 312: 311: 308: 302: 301: 298: 296:Hydraulic head 292: 291: 288: 282: 281: 277: 276: 273: 269: 268: 265: 261: 260: 257: 253: 252: 249: 243: 242: 239: 235: 234: 230: 229: 226: 222: 221: 218: 210: 209: 204: 200: 199: 195: 194: 193:$ 2.5 billion 191: 187: 186: 183: 179: 178: 175: 171: 170: 138: 134: 133: 108: 104: 103: 98: 94: 93: 87: 78: 77: 71: 70: 69: 68: 65: 64: 56: 48:Trishuli River 23:is a proposed 15: 9: 6: 4: 3: 2: 723: 712: 709: 707: 704: 702: 699: 697: 694: 692: 689: 687: 684: 682: 679: 677: 674: 673: 671: 660: 655: 653: 648: 646: 641: 640: 634: 632: 628: 624: 619: 616: 612: 611: 607: 591: 587: 580: 565: 561: 555: 539: 533: 517: 511: 509: 507: 490: 484: 482: 480: 478: 461: 455: 453: 451: 434: 428: 426: 424: 422: 420: 418: 416: 414: 412: 410: 405: 397: 393: 390: 387: 385: 375: 371: 368: 367:Mount Everest 363: 359: 354: 352: 346: 342: 340: 335: 333: 329: 328:Upper Karnali 319: 317: 313: 309: 307: 303: 299: 297: 293: 289: 287: 283: 280:Power Station 278: 274: 270: 266: 262: 258: 254: 250: 248: 244: 240: 236: 231: 227: 223: 219: 216: 213:Height ( 211: 208: 205: 201: 196: 192: 188: 184: 180: 176: 172: 167: 139: 135: 132: 128: 124: 120: 116: 112: 109: 105: 102: 99: 95: 75: 66: 61: 55: 53: 49: 45: 41: 38:This storage 36: 34: 30: 26: 25:hydroelectric 22: 711:Energy stubs 631:expanding it 620: 605: 593:. Retrieved 590:My Republica 589: 579: 568:. Retrieved 563: 554: 542:. Retrieved 532: 520:. Retrieved 493:. Retrieved 464:. Retrieved 437:. Retrieved 394: 391: 388: 381: 372: 355: 347: 343: 336: 325: 37: 20: 18: 584:Republica. 228:12,827 m/s 161: / 137:Coordinates 670:Categories 595:2020-04-23 570:2020-04-22 400:References 320:3,383 GWh 251:5.000 km² 149:84°46′25″E 146:27°49′32″N 40:hydropower 384:reservoir 339:reservoir 310:1,200 MW 259:49.8 km² 233:Reservoir 111:Ghyalchok 52:Kathmandu 544:23 April 522:23 April 495:23 April 466:23 April 439:23 April 332:Arun III 290:Storage 203:Impounds 185:Proposed 107:Location 241:3,3 km 215:thalweg 174:Purpose 97:Country 35:(NEA). 623:energy 300:185 m 275:540 m 267:45 km 220:263 m 182:Status 123:Salang 177:Power 101:Nepal 29:Nepal 627:stub 546:2020 524:2020 497:2020 468:2020 441:2020 330:and 286:Type 19:The 362:NEA 672:: 588:. 562:. 505:^ 476:^ 449:^ 408:^ 129:, 125:, 121:/ 117:, 113:, 658:e 651:t 644:v 633:. 598:. 573:. 548:. 526:. 499:. 470:. 443:. 217:)

Index

hydroelectric
Nepal
Nepal Electricity Authority
hydropower
Budhi Gandaki River
Trishuli River
Kathmandu
Budhigandaki Hydroelectric Project is located in Nepal
Nepal
Ghyalchok
Gorkha district
Western Development Region
Salang
Dhading district
Central Development Region
27°49′32″N 84°46′25″E / 27.82556°N 84.77361°E / 27.82556; 84.77361
Budhi Gandaki River
thalweg
Catchment area
Type
Hydraulic head
Installed capacity
Annual generation
Upper Karnali
Arun III
reservoir
Finance Misistry
Dudh Koshi Hydroelectric Project
NEA
Mount Everest

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.