New England Wind

Source 📝

188:
Avangrid has divided the project into two sections for bidding in the joint Connecticut–Rhode Island–Massachusetts offshore wind procurement, one with 791 MW (formerly Park City Wind) and one with 1,080 MW (formerly Commonwealth Wind). The project was awarded a contract with Massachsetts for 791 MW
412: 492: 53: 510: 248: 395: 182:
In October 2023, Avangrid canceled its contract with Connecticut due to higher development costs. It intends to rebid the project for a higher price.
582: 577: 358: 319: 425: 525: 444: 468: 377: 339: 572: 493:"Avangrid Submits Multiple Proposals for Transformative New England Wind Projects to Regional Offshore Wind Solicitation" 567: 293: 199: 551: 138: 172: 189:
in September 2024. This section is expected to begin construction in 2025 with commercial operation by 2030.
161: 314: 340:"Park City Wind Offshore Wind Farm - Consent Application Submitted - United States | 4C Offshore" 309: 165: 149: 130: 36: 511:"Massachusetts and Rhode Island Announce Largest Offshore Wind Selection in New England History" 240: 126: 8: 208: 153: 134: 122: 160:. Electric transmission cables from the project would make an underground landfall at 185:
BOEM issued approval of the project's construction and operations plan in July 2024.
157: 469:"BOEM issues key approvals for New Jersey, Massachusetts offshore wind projects" 359:"Bridgeport Property To Serve As Staging Ground For Wind Turbine Construction" 561: 263: 250: 68: 55: 41: 100: 175:(DEIS) and a construction and operations plan (COP) had been submitted to 16:
Proposed offshore wind farm off the coast of Massachusetts, United States
426:"Avangrid delays commissioning of Park City, Commonwealth wind projects" 445:"Avangrid Cancels Park City Wind Contract, Pays State $ 16m Penalty" 289: 213: 142: 396:"Park City Wind Will Transform Bridgeport into Offshore Wind Hub" 546: 526:"New England Wind Offshore Wind Project Reaches New Milestone" 378:"Millions in federal aid to boost offshore wind in Bridgeport" 176: 125:
to be located about 23 miles (37 km) off the coast of
148:
The project takes its original name from the nickname of
559: 320:List of offshore wind farms in the United States 179:. It was projected to be commissioned in 2027. 156:is being developed to support the project at 583:Offshore wind farms in the United States 578:Proposed wind farms in the United States 375: 442: 423: 356: 560: 523: 424:Petrova, Veselina (October 28, 2022). 376:Lockhart, Brian (November 6, 2022). 524:Memija, Adnan (December 20, 2022). 13: 503: 294:Copenhagen Infrastructure Partners 236:Offshore Massachusetts OCS-A 0501 14: 594: 540: 517: 443:Crowley, Brendan (2023-10-03). 357:Dunavin, Davis (May 19, 2021). 139:East Coast of the United States 485: 461: 436: 417: 406: 388: 369: 350: 332: 173:environmental impact statement 1: 325: 90:Distance from shore 7: 573:Wind power in Massachusetts 315:Wind power in Massachusetts 303: 10: 599: 239:23 miles off the coast of 568:Wind power in Connecticut 310:Wind power in Connecticut 197: 166:Barnstable, Massachusetts 97: 89: 84: 47: 30: 26: 21: 552:New England Wind 1 and 2 202:wind energy lease area 150:Bridgeport, Connecticut 131:Outer Continental Shelf 37:Outer Continental Shelf 264:40.86111°N 70.71111°W 219:Projected completion 93:23 miles (37 km) 69:40.86111°N 70.71111°W 34:OCS-A 0501 Lease Area 513:. September 6, 2024. 269:40.86111; -70.71111 260: /  171:As of 2022 a draft 74:40.86111; -70.71111 65: /  344:www.4coffshore.com 228:Regulatory agency 225:Developer/Utility 154:offshore wind port 145:is the developer. 135:territorial waters 123:offshore wind farm 113:, formerly called 499:. March 27, 2024. 301: 300: 241:Martha's Vineyard 233:New England Wind 158:Bridgeport Harbor 127:Martha's Vineyard 119:Commonwealth Wind 108: 107: 590: 534: 533: 530:OffshoreWIND.biz 521: 515: 514: 507: 501: 500: 489: 483: 482: 480: 479: 465: 459: 458: 456: 455: 440: 434: 433: 421: 415: 413:Federal Register 410: 404: 403: 392: 386: 385: 382:Connecticut Post 373: 367: 366: 354: 348: 347: 336: 275: 274: 272: 271: 270: 265: 261: 258: 257: 256: 253: 205:Receiving state 192: 191: 162:Craigville Beach 121:, is a proposed 111:New England Wind 101:edit on Wikidata 80: 79: 77: 76: 75: 70: 66: 63: 62: 61: 58: 22:New England Wind 19: 18: 598: 597: 593: 592: 591: 589: 588: 587: 558: 557: 543: 538: 537: 522: 518: 509: 508: 504: 491: 490: 486: 477: 475: 467: 466: 462: 453: 451: 441: 437: 422: 418: 411: 407: 394: 393: 389: 374: 370: 355: 351: 338: 337: 333: 328: 306: 292: 268: 266: 262: 259: 254: 251: 249: 247: 246: 211: 104: 85:Wind farm 73: 71: 67: 64: 59: 56: 54: 52: 51: 39: 35: 17: 12: 11: 5: 596: 586: 585: 580: 575: 570: 556: 555: 549: 547:Park City Wind 542: 541:External links 539: 536: 535: 516: 502: 484: 460: 435: 430:Renewables Now 416: 405: 387: 368: 349: 330: 329: 327: 324: 323: 322: 317: 312: 305: 302: 299: 298: 296: 287: 284: 281: 278: 276: 244: 237: 234: 230: 229: 226: 223: 220: 217: 206: 203: 196: 115:Park City Wind 106: 105: 98: 95: 94: 91: 87: 86: 82: 81: 49: 45: 44: 32: 28: 27: 24: 23: 15: 9: 6: 4: 3: 2: 595: 584: 581: 579: 576: 574: 571: 569: 566: 565: 563: 553: 550: 548: 545: 544: 531: 527: 520: 512: 506: 498: 494: 488: 474: 470: 464: 450: 446: 439: 431: 427: 420: 414: 409: 401: 400:Vineyard Wind 397: 391: 383: 379: 372: 364: 360: 353: 345: 341: 335: 331: 321: 318: 316: 313: 311: 308: 307: 297: 295: 291: 288: 285: 282: 279: 277: 273: 245: 242: 238: 235: 232: 231: 227: 224: 221: 218: 215: 210: 207: 204: 201: 194: 193: 190: 186: 183: 180: 178: 174: 169: 167: 163: 159: 155: 151: 146: 144: 140: 136: 132: 128: 124: 120: 116: 112: 102: 96: 92: 88: 83: 78: 50: 46: 43: 42:Massachusetts 38: 33: 29: 25: 20: 529: 519: 505: 496: 487: 476:. Retrieved 473:Utility Dive 472: 463: 452:. Retrieved 448: 438: 429: 419: 408: 399: 390: 381: 371: 362: 352: 343: 334: 187: 184: 181: 170: 147: 118: 114: 110: 109: 449:CT Examiner 267: / 72: / 48:Coordinates 562:Categories 478:2024-07-03 454:2024-01-23 326:References 286:Up to 129 255:70°42′40″W 252:40°51′40″N 195:Wind farm 152:, where a 60:70°42′40″W 57:40°51′40″N 222:Turbines 198:Offshore 40:Offshore 497:Avangrid 304:See also 290:Avangrid 209:Capacity 143:Avangrid 133:in U.S. 129:(MA) on 31:Location 137:of the 554:– BOEM 280:1,871 283:2030 243:(MA) 99:[ 363:WSHU 200:BOEM 177:BOEM 117:and 168:. 164:in 564:: 528:. 495:. 471:. 447:. 428:. 398:. 380:. 361:. 342:. 216:) 214:MW 141:. 532:. 481:. 457:. 432:. 402:. 384:. 365:. 346:. 212:( 103:]

Index

Outer Continental Shelf
Massachusetts
40°51′40″N 70°42′40″W / 40.86111°N 70.71111°W / 40.86111; -70.71111
edit on Wikidata
offshore wind farm
Martha's Vineyard
Outer Continental Shelf
territorial waters
East Coast of the United States
Avangrid
Bridgeport, Connecticut
offshore wind port
Bridgeport Harbor
Craigville Beach
Barnstable, Massachusetts
environmental impact statement
BOEM
BOEM
Capacity
MW
Martha's Vineyard
40°51′40″N 70°42′40″W / 40.86111°N 70.71111°W / 40.86111; -70.71111
Avangrid
Copenhagen Infrastructure Partners
Wind power in Connecticut
Wind power in Massachusetts
List of offshore wind farms in the United States
"Park City Wind Offshore Wind Farm - Consent Application Submitted - United States | 4C Offshore"
"Bridgeport Property To Serve As Staging Ground For Wind Turbine Construction"
"Millions in federal aid to boost offshore wind in Bridgeport"