Knowledge

Pre-engineered building

Source 📝

169: 188:) is designed by a PEB supplier or PEB manufacturer with a single design to be fabricated using various materials and methods to satisfy a wide range of structural and aesthetic design requirements. This is contrasted with a building built to a design that was created specifically for that building. Within some geographic industry sectors pre-engineered buildings are also called pre-engineered metal buildings (PEMB) or, as is becoming increasingly common due to the reduced amount of pre-engineering involved in custom computer-aided designs, simply engineered metal buildings (EMB). 25: 235:
offerings for aspects such as materials, colours, structural form, dimensional modularity, etc. Despite the existence of the manufacturer's standard assembly details, the architect remains responsible to ensure that the manufacturer's product and assembly is consistent with the building code requirements (e.g. continuity of air/vapour retarders, insulation, rain screen; size and location of exits; fire rated assemblies) and occupant/owner expectations.
72: 196:. In pre-engineered buildings, the I beams used are usually formed by welding together steel plates to form the I section. The I beams are then field-assembled (e.g. bolted connections) to form the entire frame of the pre-engineered building. Some manufacturers taper the framing members (varying in web depth) according to the local loading effects. Larger plate dimensions are used in areas of higher load effects. 221:
between bearing points, bay spacing, roof slope, live loads, dead loads, collateral loads, wind uplift, deflection criteria, internal crane system and maximum practical size and weight of fabricated members. Historically, pre-engineered building manufacturers have developed pre-calculated tables for
246:
The specialty engineer is responsible to design only those elements which the manufacturer is commercially obligated to supply (e.g. by contract) and to communicate the assembly procedures, design assumptions and responses, to the extent that the design relies on or affects work by others, to the
234:
The project architect, sometimes called the Architect of Record, is typically responsible for aspects such as aesthetic, dimensional, occupant comfort and fire safety. When a pre-engineered building is selected for a project, the architect accepts conditions inherent in the manufacturer's product
225:
While pre-engineered buildings can be adapted to suit a wide variety of structural applications, the greatest economy will be realized when utilising standard details. An efficiently designed pre-engineered building can be lighter than the conventional steel buildings by up to 30%. Lighter weight
238:
Many jurisdictions recognize the distinction between the project engineer, sometimes called the Engineer of Record, and the manufacturer's employee or subcontract engineer, sometimes called a specialty engineer. The principal differences between these two entities on a project are the limits of
199:
Other forms of primary framing can include trusses, mill sections rather than three-plate welded, castellated beams, etc. The choice of economic form can vary depending on factors such as local capabilities (e.g. manufacturing, transportation, construction) and variations in material vs. labour
242:
The structural Engineer of Record is responsible to specify the design parameters for the project (e.g. materials, loads, design standards, service limits) and to ensure that the element and assembly designs by others are consistent in the global context of the finished building.
250:
In the context described, the Architect and Engineer of Record are the designers of the building and bear ultimate responsibility for the performance of the completed work. A buyer should be aware of the project professional distinctions when developing the project plan.
203:
Typically, primary frames are 2D type frames (i.e. may be analyzed using two-dimensional techniques). Advances in computer-aided design technology, materials and manufacturing capabilities have assisted a growth in alternate forms of pre-engineered building such as the
168: 222:
different structural elements in order to allow designers to select the most efficient I beams size for their projects. However, the table selection procedures are becoming rare with the evolution in computer-aided custom designs.
191:
During the 1960s, standardized engineering designs for buildings were first marketed as PEBs. Historically, the primary framing structure of a pre-engineered building is an assembly of Ɪ-shaped members, often referred to as
247:
Engineer of Record – usually described in the manufacturer's erection drawings and assembly manuals. The manufacturer produces an engineered product but does not typically provide engineering services to the project.
214:
Roll-formed profiled steel sheet, wood, tensioned fabric, precast concrete, masonry block, glass curtainwall or other materials may be used for the external cladding of the building.
136: 108: 254:
These prefabricated structures are widely used in the residential as well as industrial sector for its unmatched characteristics.
89: 115: 211:
Cold formed Z- and C-shaped members may be used as secondary structural elements to fasten and support the external cladding.
122: 280: 155: 104: 325: 305: 93: 46: 330: 129: 37: 205: 82: 42: 208:
and more sophisticated analysis (e.g. three-dimensional) as is required by some building codes.
177: 8: 276: 217:
In order to accurately design a pre-engineered building, engineers consider the
319: 226:
equates to less steel and a potential price savings in structural framework.
229: 24: 218: 71: 239:
commercial obligation, professional responsibility and liability.
193: 275:(2nd ed.). New York: McGraw-Hill Education. p. 3. 230:
Project professionals and manufacturer-designed buildings
96:. Unsourced material may be challenged and removed. 306:"Why PEB is Preferred Choice For Industrial Sheds" 172:A pre-engineered metal building under construction 317: 156:Learn how and when to remove this message 167: 318: 270: 295:National Building Code of Canada 2005 94:adding citations to reliable sources 65: 18: 13: 14: 342: 70: 23: 81:needs additional citations for 298: 289: 264: 1: 257: 7: 36:to comply with Knowledge's 10: 347: 271:Newman, Alexander (2004). 105:"Pre-engineered building" 49:may contain suggestions. 34:may need to be rewritten 206:tension fabric building 182:pre-engineered building 326:Structural engineering 273:Metal Building Systems 178:structural engineering 173: 16:Construction technique 171: 90:improve this article 174: 331:Structural system 166: 165: 158: 140: 64: 63: 38:quality standards 338: 310: 309: 302: 296: 293: 287: 286: 268: 161: 154: 150: 147: 141: 139: 98: 74: 66: 59: 56: 50: 27: 19: 346: 345: 341: 340: 339: 337: 336: 335: 316: 315: 314: 313: 304: 303: 299: 294: 290: 283: 269: 265: 260: 232: 162: 151: 145: 142: 99: 97: 87: 75: 60: 54: 51: 41: 28: 17: 12: 11: 5: 344: 334: 333: 328: 312: 311: 297: 288: 281: 262: 261: 259: 256: 231: 228: 164: 163: 78: 76: 69: 62: 61: 31: 29: 22: 15: 9: 6: 4: 3: 2: 343: 332: 329: 327: 324: 323: 321: 308:. 2022-09-12. 307: 301: 292: 284: 282:9780070463790 278: 274: 267: 263: 255: 252: 248: 244: 240: 236: 227: 223: 220: 215: 212: 209: 207: 201: 197: 195: 189: 187: 183: 179: 170: 160: 157: 149: 138: 135: 131: 128: 124: 121: 117: 114: 110: 107: –  106: 102: 101:Find sources: 95: 91: 85: 84: 79:This article 77: 73: 68: 67: 58: 48: 44: 39: 35: 32:This article 30: 26: 21: 20: 300: 291: 272: 266: 253: 249: 245: 241: 237: 233: 224: 216: 213: 210: 202: 198: 190: 185: 181: 175: 152: 143: 133: 126: 119: 112: 100: 88:Please help 83:verification 80: 55:January 2020 52: 43:You can help 33: 320:Categories 258:References 219:clear span 116:newspapers 146:June 2011 47:talk page 200:costs. 194:I-beams 130:scholar 279:  132:  125:  118:  111:  103:  45:. The 137:JSTOR 123:books 277:ISBN 180:, a 109:news 186:PEB 176:In 92:by 322:: 285:. 184:( 159:) 153:( 148:) 144:( 134:· 127:· 120:· 113:· 86:. 57:) 53:( 40:.

Index


quality standards
You can help
talk page

verification
improve this article
adding citations to reliable sources
"Pre-engineered building"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message

structural engineering
I-beams
tension fabric building
clear span
ISBN
9780070463790
"Why PEB is Preferred Choice For Industrial Sheds"
Categories
Structural engineering
Structural system

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.