Pavagada Solar Park

Source 📝

320:(SECI) established a joint venture company, the Karnataka Solar Power Development Corporation Ltd (KSPDCL), in March 2015 to implement solar power projects in Karnataka. The Chairman of the State High Level Clearance Committee (SLHCC) approved the KSPDCL's proposal to construct a solar power park in Pavagada taluk on 29 October 2015. The project is spread over a total area of 13,000 acres (53 km) which includes the 5 villages of Balasamudra, Tirumani, Kyataganacharlu, Vallur and Rayacharlu. 31: 1682: 505: 491: 1694: 1536: 427:
The most recent letter of award (LoA) was given to Amar Raja Power Systems Limited, to construct 50 MW of capacity at a levelized tariff of ₹1.24 (~$ 1.7¢)/kWh for 24 years. The reason for the extremely low cost was quoted as 'land being available to KREDL at no cost and the availability of the power
419:
Work on the solar park began in October 2016. In March 2017, the NTPC invited bids for a further 750 MW, split into six blocks of 125 MW each. Due to infrastructure issues, this invitation was scrapped and the capacity was retendered in early 2017, with an additional 250 MW (total 1000 MW) which was
335:
G.V. Balram, the managing director of KREDL, was born and raised in a village in Pavaguda taluk. He understood that farmers in the region were reluctant to sell their land due to emotional reasons. In order to aid in the development of the region and reduce economic migration, Balram offered farmers
323:
Pavagada was chosen as the site for the project for several reasons. Apart from high solar radiation and availability of land, the region receives very little rainfall. Pavagada taluk is located in a semi-arid tract, atop an elevated plateau surrounded by rocky hills. The region has been declared
445:
Pavagada Solar Park had a total commissioned capacity of 1,400 MW by 9 April 2019 out of total 2,050 MW planned by December 2019. Another 450 MW was commissioned by November 2019 taking the total project capacity to 1850 MW, making it the largest solar power plant in the world at the time.
441:
announced that it had connected a 100MW solar plant at Pavagada to the grid. Tata Power Renewable Energy Ltd commissioned 100 MW at the park by 19 December, and an additional 50 MW by 2 January 2018. 600 MW of power was commissioned by 31 January 2018. and a further 1,400 MW are planned.
355:
The KSPDCL utilized the "plug and play" model to implement the project. Under this model, the company acquires blocks of land, obtains all required government approvals for solar power generation, and then awards contracts to solar power developers (SPDs) through auctions.
676: 1201: 1306: 554: 717: 665: 744: 479:
that the government was looking to generate wind energy by setting up windmills in Pavagada. Preliminary estimates from the KREDL indicate a potential wind power generation of 250-300 MW.
974: 343:(US$ 250) per acre under the terms of the lease which is valid for 25–35 years. For the entire land required for the park, the total compensation for the entire project amounts to 787: 855: 666:"GoK order dated 13-06-2016 allocating 200MW solar generation plant with 15 minutes battery storage by Solar Energy Corporation Of India Limited in Pavagada Solar park" 1191: 933: 328:
54 times in the past 6 decades. The region is also sparsely populated and most of its residents are poor farmers. Many of the region's residents have migrated to
1576: 1296: 1249: 1725: 707: 577: 544: 1166: 1137: 878: 754: 1227: 1735: 604: 1346: 363:, on behalf of KSPDCL, awarded contracts to 6 firms for the commissioning of a total of 500 MW of power at the Pavaguda Solar Park as follows: 1059: 1720: 81: 966: 777: 1115: 1740: 845: 420:
reserved for "domestic content requirement" scheme, meaning that the components needed to be manufactured in India and not imported.
1089: 1029: 810:"Allocation of 500MW NTPC JNNSM Scheme (Open Category) power to ESCOMs of Karnataka proposed in 2000MW Pavagada Solar Park Area" 336:
the option to lease the land required for the project rather than purchase it outright. Landowners receive an annual payment of
1698: 1438: 1591: 1730: 1581: 1571: 1407: 608: 245: 523: 450: 288: 925: 1586: 1339: 449:
Upon completion, Pavagada Solar Park was the world’s largest solar power plant. However, as of April 2021, it was the
1652: 954: 605:"India Solar Resource - Global Horizontal Irradiance - Annual Average, by NREL, National Renewable Energy Laboratory" 317: 1388: 518: 1428: 820: 1686: 1423: 1332: 1555: 1413: 424:
In May 2018, SB Energy has secured 200 megawatts of capacity at Rs 2.82/kWh, or 4.16¢/kWh offered by SECI.
1521: 1496: 1418: 1223: 612: 1511: 1501: 272: 1516: 1491: 1371: 1486: 1470: 1051: 1506: 635: 510: 325: 303:. It is the second largest in India.The total project cost was ₹14,800 crore (US$ 2.1 billion). 1550: 749: 911: 1444: 129: 1657: 1460: 1355: 1111: 996: 8: 1081: 1021: 997:"50 MW of Solar Projects to be Developed in Pavagada Solar Park at a Tariff of ₹1.24/kWh" 1607: 1401: 207: 287:. Completed in 2019, the park has a capacity of 2,050 MW. As of April 2021, it is the 16:
Solar park in Karnataka, India. Largest solar park in the world by nameplate capacity.
1465: 1396: 1196: 1147: 899: 454: 292: 280: 65: 1662: 1301: 712: 549: 475: 347:
23-25 crore per year. The annual payment amount will increase by 5% every 2 years.
1022:"Fortum Commissions 100 MW of Solar Project in Pavagada Solar Park - Mercom India" 1632: 1622: 1082:"TPREL Commissions 50 MW DCR Solar Project in Pavagada Solar Park - Mercom India" 545:"World's largest solar park Shakti Sthala designed by Ravindra bhan in Karnataka" 1250:"Karnataka's Pavagada Reaches 1850 MW Milestone with 100MW Avaada Commissioning" 1112:"600 MW of Solar Projects Synchronized to the Grid at Karnataka's Pavagada Park" 1271: 1052:"TPREL Commissions 100 MW Solar Project at Pavagada Solar Park - Mercom India" 1714: 1647: 1151: 883: 636:"World's Largest Solar Park at Karnataka's Pavagada is Now Fully Operational" 163: 96: 83: 1297:"For clean energy, Karnataka, AP are in their elements - Bangalore Mirror -" 1667: 496: 360: 30: 1224:"Karnataka's Pavagada Solar Park to be Fully Operational by December 2019" 254: 1642: 1637: 1617: 1366: 850: 405: 1612: 1324: 782: 1627: 1142: 582: 458: 329: 296: 284: 69: 809: 778:"Solar energy to bring jobs and prosperity back to parched villages" 504: 276: 61: 473:
In March 2017, Karnataka Energy Minister DK Shivakumar told the
967:"SB Energy Scores 200 Megawatts Of Solar In India At 4.16¢/kWh" 708:"How the world's largest solar park is shaping up in Karnataka" 438: 879:"Solar power producers bid below ₹5 a unit for Karnataka park" 462: 300: 1535: 926:"India's NTPC invites bids for 750MW of solar in Karnataka" 316:
Karnataka Renewable Energy Development Ltd (KREDL) and the
275:
covering an area of 53 square kilometres (13,000 acres) in
150:
Karnataka Solar Power Development Corporation Ltd. (KSPDCL)
1192:"ReNew Power Commissions 300 MW Solar Plant in Pavagada" 1167:"State to get 500 MW from Pavagada solar park next year" 332:, located about 180 km away, for economic reasons. 1577:
Agency for Non-conventional Energy and Rural Technology
1138:"1st phase of Pavagada solar park to be ready by Dec" 578:"1st phase of Pavagada solar park to be ready by Dec" 299:
and 2,200 MW Huanghe Hydropower Hainan Solar Park in
486: 232: 846:"Fortum wins 100 MW project in Pavagada solar park" 1272:"Reviewing The World's Largest Solar Power Plants" 428:evacuation infrastructure up to the sub-station.' 1712: 1340: 374:Fortum Finnsurya Energy Pvt Ltd. = 100 MW at 367:Parampujya Solar Energy Pvt Ltd. = 100 MW at 289:world's third largest photovoltaic solar park 461:and Huanghe Hydropower Hainan Solar Park in 388:Tata Power Renewable Energy Ltd = 100 MW at 1726:Buildings and structures in Tumkur district 1347: 1333: 660: 658: 656: 381:ACME Solar Holdings Pvt Ltd. = 100 MW at 1354: 745:"Solar power dawns on Pavagada villages" 705: 542: 1736:Energy infrastructure completed in 2018 701: 699: 697: 246:Related media on Commons 1713: 876: 739: 737: 735: 653: 633: 575: 1328: 1269: 1216: 1092:from the original on 19 February 2018 1062:from the original on 22 December 2017 1032:from the original on 22 December 2017 451:third largest photovoltaic solar park 1721:Photovoltaic power stations in India 1693: 1582:Tamil Nadu Energy Development Agency 1572:Ministry of New and Renewable Energy 1146:. Nagesh Prabhu. 30 September 2017. 775: 694: 609:National Renewable Energy Laboratory 576:Prabhu, Nagesh (30 September 2017). 955:Pavagada 750 MW capacity retendered 732: 634:Ranjan, Rakesh (27 December 2019). 557:from the original on 28 August 2018 524:List of photovoltaic power stations 13: 1587:Appellate Tribunal for Electricity 1309:from the original on 20 March 2017 1230:from the original on 12 April 2019 1204:from the original on 10 April 2019 936:from the original on 20 March 2017 769: 627: 14: 1752: 1653:Solar Energy Corporation of India 1164: 858:from the original on 8 March 2017 826:from the original on 8 March 2017 790:from the original on 8 March 2017 720:from the original on 7 March 2017 706:Poovanna, Sharan (6 March 2017). 682:from the original on 8 March 2017 543:Poovanna, Sharan (1 March 2018). 415:(5.8¢ US) per unit (highest) 395:Yarrow Infrastructure = 50 MW at 318:Solar Energy Corporation of India 1741:2018 establishments in Karnataka 1692: 1681: 1680: 1534: 1118:from the original on 27 May 2018 977:from the original on 25 May 2018 503: 489: 432: 402:(5.7¢ US) per unit (lowest) 29: 1289: 1270:Duval, George (13 April 2021). 1263: 1242: 1184: 1158: 1130: 1104: 1074: 1044: 1014: 989: 959: 948: 918: 870: 838: 776:Jain, Amit (22 December 2015). 519:Ultra Mega Solar Power Projects 802: 597: 569: 536: 468: 1: 1154:– via www.thehindu.com. 877:Bureau, Our (13 April 2016). 529: 311: 1556:International Solar Alliance 181:13,000 acres (5,300 ha) 7: 1731:Power stations in Karnataka 482: 350: 10: 1757: 306: 1676: 1600: 1564: 1543: 1532: 1479: 1453: 1387: 1380: 1372:Renewable energy in India 1362: 251: 241: 227: 222: 206: 194: 190: 185: 177: 169: 159: 154: 146: 138: 128: 120: 112: 75: 57: 49: 41: 37: 28: 23: 1389:Ultra Mega (>500 MW) 511:Renewable energy portal 208:Nameplate capacity 121:Construction began 1551:National Solar Mission 750:The New Indian Express 199:Units operational 139:Construction cost 437:On 14 December 2017, 186:Power generation 173:5.5-6.0 kWh/m per day 1658:Su-Kam Power Systems 1410:(under construction) 1356:Solar power in India 1165:Kumar, B.S. Satish. 1058:. 19 December 2017. 1028:. 14 December 2017. 326:Karnataka Government 130:Commission date 1544:Policies/programmes 324:drought hit by the 291:after the 2,245 MW 269:Pavagada Solar Park 223:External links 93: /  24:Pavagada Solar Park 1608:Adani Green Energy 1088:. 2 January 2018. 910:has generic name ( 453:after the 2245 MW 170:Site resource 1708: 1707: 1530: 1529: 1197:Business Standard 971:cleantechnica.com 455:Bhadla Solar Park 293:Bhadla Solar Park 262: 261: 1748: 1696: 1695: 1684: 1683: 1663:Tata Power Solar 1538: 1497:Dhirubhai Ambani 1385: 1384: 1349: 1342: 1335: 1326: 1325: 1319: 1318: 1316: 1314: 1302:Bangalore Mirror 1293: 1287: 1286: 1284: 1282: 1267: 1261: 1260: 1258: 1256: 1246: 1240: 1239: 1237: 1235: 1220: 1214: 1213: 1211: 1209: 1188: 1182: 1181: 1179: 1177: 1162: 1156: 1155: 1134: 1128: 1127: 1125: 1123: 1108: 1102: 1101: 1099: 1097: 1078: 1072: 1071: 1069: 1067: 1048: 1042: 1041: 1039: 1037: 1018: 1012: 1011: 1009: 1007: 993: 987: 986: 984: 982: 963: 957: 952: 946: 945: 943: 941: 922: 916: 915: 909: 905: 903: 895: 893: 891: 874: 868: 867: 865: 863: 842: 836: 835: 833: 831: 825: 814: 806: 800: 799: 797: 795: 773: 767: 766: 764: 762: 753:. Archived from 741: 730: 729: 727: 725: 703: 692: 691: 689: 687: 681: 670: 662: 651: 650: 648: 646: 631: 625: 624: 622: 620: 615:on 29 March 2017 611:. Archived from 601: 595: 594: 592: 590: 573: 567: 566: 564: 562: 540: 513: 508: 507: 499: 494: 493: 492: 476:Bangalore Mirror 414: 412: 401: 399: 391: 384: 377: 370: 346: 342: 340: 255:edit on Wikidata 237: 234: 155:Solar farm 108: 107: 105: 104: 103: 98: 94: 91: 90: 89: 86: 33: 21: 20: 1756: 1755: 1751: 1750: 1749: 1747: 1746: 1745: 1711: 1710: 1709: 1704: 1672: 1633:Mahindra Susten 1623:Hindustan Power 1596: 1560: 1539: 1526: 1475: 1449: 1376: 1358: 1353: 1323: 1322: 1312: 1310: 1295: 1294: 1290: 1280: 1278: 1268: 1264: 1254: 1252: 1248: 1247: 1243: 1233: 1231: 1222: 1221: 1217: 1207: 1205: 1190: 1189: 1185: 1175: 1173: 1163: 1159: 1136: 1135: 1131: 1121: 1119: 1110: 1109: 1105: 1095: 1093: 1080: 1079: 1075: 1065: 1063: 1050: 1049: 1045: 1035: 1033: 1020: 1019: 1015: 1005: 1003: 995: 994: 990: 980: 978: 965: 964: 960: 953: 949: 939: 937: 924: 923: 919: 907: 906: 897: 896: 889: 887: 875: 871: 861: 859: 844: 843: 839: 829: 827: 823: 812: 808: 807: 803: 793: 791: 774: 770: 760: 758: 757:on 8 March 2017 743: 742: 733: 723: 721: 704: 695: 685: 683: 679: 668: 664: 663: 654: 644: 642: 640:mercomindia.com 632: 628: 618: 616: 603: 602: 598: 588: 586: 574: 570: 560: 558: 541: 537: 532: 509: 502: 495: 490: 488: 485: 471: 435: 410: 409: 397: 396: 389: 382: 375: 368: 359:In April 2016, 353: 344: 338: 337: 314: 309: 281:Tumkur district 258: 231: 218: 101: 99: 97:14.25°N 77.45°E 95: 92: 87: 84: 82: 80: 79: 66:Tumkur district 17: 12: 11: 5: 1754: 1744: 1743: 1738: 1733: 1728: 1723: 1706: 1705: 1703: 1702: 1690: 1677: 1674: 1673: 1671: 1670: 1665: 1660: 1655: 1650: 1645: 1640: 1635: 1630: 1625: 1620: 1615: 1610: 1604: 1602: 1598: 1597: 1595: 1594: 1592:Power stations 1589: 1584: 1579: 1574: 1568: 1566: 1562: 1561: 1559: 1558: 1553: 1547: 1545: 1541: 1540: 1533: 1531: 1528: 1527: 1525: 1524: 1519: 1514: 1509: 1504: 1499: 1494: 1489: 1483: 1481: 1477: 1476: 1474: 1473: 1468: 1463: 1457: 1455: 1451: 1450: 1448: 1447: 1442: 1436: 1431: 1426: 1421: 1416: 1411: 1405: 1399: 1393: 1391: 1382: 1378: 1377: 1375: 1374: 1369: 1363: 1360: 1359: 1352: 1351: 1344: 1337: 1329: 1321: 1320: 1288: 1262: 1241: 1215: 1183: 1157: 1129: 1103: 1073: 1043: 1013: 988: 958: 947: 917: 869: 837: 801: 768: 731: 693: 652: 626: 596: 568: 534: 533: 531: 528: 527: 526: 521: 515: 514: 500: 484: 481: 470: 467: 434: 431: 430: 429: 425: 417: 416: 403: 393: 386: 379: 372: 352: 349: 313: 310: 308: 305: 277:Pavagada taluk 267:, also called 260: 259: 252: 249: 248: 243: 239: 238: 229: 225: 224: 220: 219: 217: 216: 212: 210: 204: 203: 200: 196: 195: 192: 191: 188: 187: 183: 182: 179: 178:Site area 175: 174: 171: 167: 166: 161: 157: 156: 152: 151: 148: 144: 143: 140: 136: 135: 132: 126: 125: 122: 118: 117: 114: 110: 109: 77: 73: 72: 62:Pavagada taluk 59: 55: 54: 51: 47: 46: 43: 39: 38: 35: 34: 26: 25: 15: 9: 6: 4: 3: 2: 1753: 1742: 1739: 1737: 1734: 1732: 1729: 1727: 1724: 1722: 1719: 1718: 1716: 1701: 1700: 1691: 1689: 1688: 1679: 1678: 1675: 1669: 1666: 1664: 1661: 1659: 1656: 1654: 1651: 1649: 1648:Solairedirect 1646: 1644: 1641: 1639: 1636: 1634: 1631: 1629: 1626: 1624: 1621: 1619: 1616: 1614: 1611: 1609: 1606: 1605: 1603: 1599: 1593: 1590: 1588: 1585: 1583: 1580: 1578: 1575: 1573: 1570: 1569: 1567: 1563: 1557: 1554: 1552: 1549: 1548: 1546: 1542: 1537: 1523: 1520: 1518: 1515: 1513: 1510: 1508: 1505: 1503: 1500: 1498: 1495: 1493: 1490: 1488: 1485: 1484: 1482: 1478: 1472: 1469: 1467: 1464: 1462: 1459: 1458: 1456: 1452: 1446: 1443: 1440: 1437: 1435: 1432: 1430: 1427: 1425: 1422: 1420: 1417: 1415: 1412: 1409: 1408:Gujarat Kutch 1406: 1403: 1400: 1398: 1395: 1394: 1392: 1390: 1386: 1383: 1379: 1373: 1370: 1368: 1365: 1364: 1361: 1357: 1350: 1345: 1343: 1338: 1336: 1331: 1330: 1327: 1308: 1304: 1303: 1298: 1292: 1277: 1273: 1266: 1251: 1245: 1229: 1225: 1219: 1203: 1199: 1198: 1193: 1187: 1172: 1168: 1161: 1153: 1149: 1145: 1144: 1139: 1133: 1117: 1113: 1107: 1091: 1087: 1083: 1077: 1061: 1057: 1053: 1047: 1031: 1027: 1023: 1017: 1002: 998: 992: 976: 972: 968: 962: 956: 951: 935: 931: 927: 921: 913: 901: 886: 885: 884:Business Line 880: 873: 857: 853: 852: 847: 841: 822: 818: 811: 805: 789: 785: 784: 779: 772: 756: 752: 751: 746: 740: 738: 736: 719: 715: 714: 709: 702: 700: 698: 678: 674: 667: 661: 659: 657: 641: 637: 630: 614: 610: 606: 600: 585: 584: 579: 572: 556: 552: 551: 546: 539: 535: 525: 522: 520: 517: 516: 512: 506: 501: 498: 487: 480: 478: 477: 466: 464: 460: 456: 452: 447: 443: 440: 433:Commissioning 426: 423: 422: 421: 407: 404: 394: 392:4.79 per unit 387: 385:4.79 per unit 380: 378:4.79 per unit 373: 371:4.79 per unit 366: 365: 364: 362: 357: 348: 333: 331: 327: 321: 319: 304: 302: 298: 294: 290: 286: 282: 278: 274: 270: 266: 265:Shakti Sthala 256: 250: 247: 244: 240: 236: 230: 226: 221: 215:2,050 MW 214: 213: 211: 209: 205: 201: 198: 197: 193: 189: 184: 180: 176: 172: 168: 165: 164:Flat-panel PV 162: 158: 153: 149: 145: 142:₹14,425 crore 141: 137: 133: 131: 127: 123: 119: 115: 111: 106: 78: 74: 71: 67: 63: 60: 56: 52: 48: 45:Shakti Sthala 44: 42:Official name 40: 36: 32: 27: 22: 19: 1697: 1685: 1668:Vikram Solar 1480:Below 100 MW 1454:Above 100 MW 1433: 1381:Power plants 1311:. Retrieved 1300: 1291: 1279:. Retrieved 1275: 1265: 1253:. Retrieved 1244: 1232:. Retrieved 1218: 1206:. Retrieved 1195: 1186: 1174:. Retrieved 1170: 1160: 1141: 1132: 1120:. Retrieved 1106: 1094:. Retrieved 1086:Mercom India 1085: 1076: 1064:. Retrieved 1056:Mercom India 1055: 1046: 1034:. Retrieved 1026:Mercom India 1025: 1016: 1004:. Retrieved 1001:MERCOM India 1000: 991: 979:. Retrieved 970: 961: 950: 938:. Retrieved 929: 920: 908:|last1= 888:. Retrieved 882: 872: 860:. Retrieved 849: 840: 828:. Retrieved 816: 804: 792:. Retrieved 781: 771: 759:. Retrieved 755:the original 748: 722:. Retrieved 711: 684:. Retrieved 672: 643:. Retrieved 639: 629: 617:. Retrieved 613:the original 599: 587:. Retrieved 581: 571: 559:. Retrieved 548: 538: 497:India portal 474: 472: 448: 444: 436: 418: 361:NTPC Limited 358: 354: 334: 322: 315: 268: 264: 263: 124:October 2016 102:14.25; 77.45 18: 1643:SELCO India 1638:ReNew Power 1618:Azure Power 1367:Solar power 1255:10 December 1122:18 February 1096:19 February 1066:19 February 1036:19 February 851:India Today 469:Wind energy 408:= 50 MW at 406:Renew Power 116:Operational 100: / 76:Coordinates 1715:Categories 1613:Astonfield 1441:(proposed) 783:World Bank 530:References 312:Background 273:solar park 134:March 2018 1628:Indosolar 1601:Companies 1522:Prayagraj 1461:Gujarat 1 1404:(planned) 1171:The Hindu 1152:0971-751X 1143:The Hindu 583:The Hindu 465:2200 MW. 459:Rajasthan 330:Bangalore 297:Rajasthan 285:Karnataka 70:Karnataka 1687:Category 1565:Agencies 1512:Mithapur 1434:Pavagada 1429:NP Kunta 1313:20 March 1307:Archived 1276:Semprius 1234:12 April 1228:Archived 1208:10 April 1202:Archived 1116:Archived 1090:Archived 1060:Archived 1030:Archived 975:Archived 940:20 March 934:Archived 900:cite web 856:Archived 821:Archived 788:Archived 718:Archived 677:Archived 619:20 March 555:Archived 483:See also 351:Auctions 202:2,050 MW 147:Owner(s) 58:Location 1699:Commons 1517:Phalodi 1471:Welspun 1439:Sambhar 1424:Kurnool 1419:Kamuthi 1402:Dholera 1176:7 March 930:PV-Tech 890:7 March 862:7 March 830:7 March 794:7 March 761:7 March 724:7 March 686:7 March 307:History 242:Commons 228:Website 88:77°27′E 85:14°15′N 50:Country 1502:Jalaun 1414:Kadapa 1397:Bhadla 1150:  1006:20 May 981:25 May 817:KSPDCL 673:KSPDCL 439:Fortum 341:21,000 233:kspdcl 113:Status 1507:Mansa 1492:Canal 1466:Sakri 1281:4 May 824:(PDF) 813:(PDF) 680:(PDF) 669:(PDF) 645:4 May 589:4 May 561:4 May 463:China 301:China 271:is a 253:[ 53:India 1487:CIAL 1445:Rewa 1315:2017 1283:2021 1257:2019 1236:2019 1210:2019 1178:2017 1148:ISSN 1124:2018 1098:2018 1068:2018 1038:2018 1008:2019 983:2018 942:2017 912:help 892:2017 864:2017 832:2017 796:2017 763:2017 726:2017 713:Mint 688:2017 647:2021 621:2017 591:2021 563:2021 550:Mint 413:4.80 400:4.78 160:Type 457:in 295:in 235:.in 1717:: 1305:. 1299:. 1274:. 1226:. 1200:. 1194:. 1169:. 1140:. 1114:. 1084:. 1054:. 1024:. 999:. 973:. 969:. 932:. 928:. 904:: 902:}} 898:{{ 881:. 854:. 848:. 819:. 815:. 786:. 780:. 747:. 734:^ 716:. 710:. 696:^ 675:. 671:. 655:^ 638:. 607:. 580:. 553:. 547:. 283:, 279:, 68:, 64:, 1348:e 1341:t 1334:v 1317:. 1285:. 1259:. 1238:. 1212:. 1180:. 1126:. 1100:. 1070:. 1040:. 1010:. 985:. 944:. 914:) 894:. 866:. 834:. 798:. 765:. 728:. 690:. 649:. 623:. 593:. 565:. 411:₹ 398:₹ 390:₹ 383:₹ 376:₹ 369:₹ 345:₹ 339:₹ 257:]

Index


Pavagada taluk
Tumkur district
Karnataka
14°15′N 77°27′E / 14.25°N 77.45°E / 14.25; 77.45
Commission date
Flat-panel PV
Nameplate capacity
kspdcl.in
Related media on Commons
edit on Wikidata
solar park
Pavagada taluk
Tumkur district
Karnataka
world's third largest photovoltaic solar park
Bhadla Solar Park
Rajasthan
China
Solar Energy Corporation of India
Karnataka Government
Bangalore
NTPC Limited
Renew Power
Fortum
third largest photovoltaic solar park
Bhadla Solar Park
Rajasthan
China
Bangalore Mirror